Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Background
Objective
Landfills mamboing
Drawing strength from more than 90 years of experience in the field of waste and environmental
management, the Trienekens Group, with its reputable engineering companies, coupled with
exchange of technical know-how and project experience gained throughout Europe and Asia;
offers municipal, commercial and industrial customers including hazardous and scheduled
waste generators, high quality waste management solutions.
As the operating company appointed by Sarawak Wastes Management Sdn. Bhd. to implement
the Integrated Waste Management System (IWMS) for the State of Sarawak; the successful
integration of collection, transportation, treatment and disposal of municipal and scheduled waste
by Trienekens (Sarawak) Sdn. Bhd. has made IWMS in Sarawak a reality, while firmly
establishing Trienekens as South East Asias leading company in the business of environmental
and waste management.
background
On 7 November 1998, Trienekens GmbH of Germany and Sarawak Incorporated Sdn. Bhd.
signed a joint venture agreement to implement an Integrated Waste Management System
(IWMS) in Sarawak.
This led to the formation of a joint venture company, Sarawak Wastes Management Sdn. Bhd.
(SWM), the concession holder for the States IWMS.
Trienekens (Sarawak) Sdn. Bhd. was incorporated on the 8th of June 1999 as the operating
company to develop, implement and operate the Integrated Waste Management System (IWMS);
operations commenced in June 2000.
Our Mission
Trienekens is a service company working towards environmental protection.
Conservation of the earths natural resources, protection of the environment and quality services
for our customers are addressed in unison.
The Mission Statement
We carry the responsibility
One common belief is the basis of the goal setting and orientation of the Trienekens Group. The
Mission Statement strengthens the unity within the Group and towards our valued customers and
business partners. It has become the foundation of our Groups effort and is adopted by all team
members.
Quality
(screenshots on phone)
Qualified and performance-oriented employees are the foundations of our success. Every staff is
a specialist in his/her field. Their skills are our competence. We foster inter-disciplinary
cooperation based on partnerships and delegation of tasks, competence and responsibility.
Our Values
While working with our colleagues and business partners, we act honestly and justly.
We consider credibility and respect the most important pre-requisites for success in the market.
Domestic dwellings within the jurisdiction of Kuching North City Hall (DBKU),
Kuching South City Council (MBKS) and Padawan Municipal Council (MPP) are
provided with 120-litre mobile garbage bins which are emptied twice a week.
Additional waste of reasonable volume which are properly packed in closed
garbage bags and placed beside the bin will also be collected. Usage of wheel
bins under these council jurisdictions is compulsory.
Renovation waste
Bulky waste
Trienekens will assist the customer in ascertaining the best service solution to
cater for individual needs with RoRo containers of various sizes and
specifications available.
Scheduled & Hazardous Waste
The management of Scheduled and Hazardous Waste requires experience,
diligence and special resources and equipment due to the nature of these types
of waste, as well as the legal framework regulating the handling of such waste.
Trienekens offers a comprehensive range of services for the handling, collection,
transportation, treatment and final disposal of scheduled waste, including toxic,
hazardous, pathological and clinical waste; thus opening avenues for proper
management of these strictly regulated industrial by-products for all waste
generators, from small industries to multinational organizations.
With a diversified fleet of fully licensed collection vehicles, specialist equipment
of international standards and a team of trained specialists, Trienekens presents
itself as the first One-Stop-Agency for the management of scheduled waste in the
region.
The integration of all components and close proximity to the industries in East
Malaysia results not only in higher service standards, reduction of risks and total
transparency with respect to liabilities, but also in increased cost efficiency for
customers.
By offering individually tailored Total Waste Management Solutions, Trienekens
provides waste generators with the opportunity to outsource all environmental
services from on-site management of scheduled and non-scheduled waste to
final disposal with report to only one partner, thus enabling customers to focus
solely on their core business activities.
DOE Regulations
All Trienekens scheduled waste operations and facilities are licensed by the
Department of Environment, Malaysia (DOE).
Trienekens collection, transportation, treatment and disposal procedures comply
with the Environmental Quality (Scheduled Wastes) Regulations 2005.
Service
Waste Management Centre
The range of waste management services provided by Trienekens extends to consulting,
planning, designing and project management as well as operating waste management facilities
from landfills and incinerators to leachate wastewater treatment plants.
One of the core components of the Integrated Waste Management System in Sarawak is the
Kuching Integrated Waste Management Park.
The first Integrated Waste Management Park in South East Asia, this state-of-the-art facility was
designed to cater for both municipal waste and scheduled waste, including hazardous and
pathological waste.
The careful selection of environmental protection equipment and disposal technologies of highest
efficiency guarantees all of the facility components are in full compliance with both local and
international safety and environmental standards.
Preservation of natural resources and immediate as well as long-term protection of the
environment are the basis of operations at the Kuching Integrated Waste Management Park.
The Sanitary Landfill caters to the disposal of municipal waste from the city of Kuching.
To avoid any leaching of pollutants into groundwater, the landfill is constructed with a multi-layer
base sealing system, comprising of a highly impermeable sealing layer using the latest
environmental protection material, covered by geotextile and a drainage and filtration layer to
ensure undisturbed flow of the leachate wastewater into the embedded leachate collection pipes,
at all times.
Landfill gas consisting mainly of methane is extracted and collected through a web of gas
collection pipes in various levels of the landfill body. In initial stages the gas is pre-treated and
flared off for neutralization; once sufficient amounts of gas is generated, the gas extracted will be
used for power generation which will further contribute to the conservation of natural resources,
further fulfilling the main objectives of the overall facility design and operations.
Waste not suitable for incineration and the ashes from the Scheduled Waste Incineration
Facility are deposited in the Secure Landfill.
Here, a double-liner system has been constructed for maximum safety while the facility itself sits
on solid rock as a geological barrier.
Most stringent operating procedures and covering of the waste with impermeable material
ensures that this landfill does not have any adverse impacts on the environment or on the people
working at the facility.
Leachate from the Secure Landfill is pre-treated in a chemical treatment stage where heavy
metals are removed, before the pre-treated leachate undergoes the same extensive treatment as
the leachate wastewater from the Sanitary Landfill.
Leachate Wastewater Treatment Plant
Leachate from the sanitary and secure landfill is collected through an extensive network of pipes
then pumped to the Leachate Wastewater Treatment Plant. All leachate is treated in a multi-
stage process including biological treatment, clarifiers and activated carbon reactors as a final
polishing stage to ensure the highest treatment results. The plant is fully computerized and all
stages of the treatment process are continuously monitored; the water effectively has close to
drinking water quality when finally discharged.
Trienekens interim storage facilities are constantly upgraded based on the latest tonnage data,
to facilitate better waste reception and to comply with prevailing storage capacity requirements.
Waste stored in this facility prior to disposal is maintained via a waste management database
system called Reception Inventory Management System (RIM).
Safety Features:
The scheduled waste incineration facility for the disposal and treatment of hazardous waste
consists of two fully computerised Incineration Plants. Both plants are equipped with a
continuous emissions monitoring system, and are capable of treating hazardous waste including
toxic, industrial, clinical and pathological waste.
The facilitys incineration treatment not only incinerates hazardous waste but also controls
emissions to a point that the treatment is considered to be environmentally beneficial, as
opposed to alternative methods of hazardous waste disposal. Just like in common incineration,
burning occurs, however the Plants cutting edge technology allows for digital control of the
amount of oxygen allowed in each chamber, hence controlling the combustion rate of waste
resulting in a significant reduction of any harmful bi-products and air pollutants.
Laboratory