ABSTRACT OF COST CIVIL WORKS SEWA-III

Sl. Name of Work Estimate Recommended


No. S No. Of cost estimate cost
Estimate (Appx.) by AHEC Remark
by by PDC (Rs.) Lacs
JKPDC (Rs.)
Lacs
A item Finalised
1 1. Detailed estimate for the protection of 15.54 28.48 Revised
water conductor from RD 2430 to 2445 Drawing
mts of SHP-III Mashka by way of Enclosed
filling cavity beneath the water (RC 1)
conductor and construction of toe wall
2 2. Detailed estimate for providing and 7.68 7.68 Revised
laying MS pipe 1-1/2, dia (45 cms/ Drawing
450mm) on the downhill side of water Enclosed
conductor at cross drainage at RD-2400 (RC 2)
of water conductor for proper drainage
of catch water in the river Ravi and
construction of cement concrete sump
in m-20 mix at RD 2400m along the
water conductor for catchment of water.
3 4. Detailed estimate for construction of 63.70 0 Not
gabion Revetment along Right side of required
water conductor between RD 2300 to
2500 Mtrs.
4 5. Detailed estimate for construction of 24.55 19.0 Revised
diversion bund at RD 2250 on the right Drawing
bank of river Ravi in the sliding zone Enclosed
for diverting water flow from right (RC 3)
Bank to left bank River to safeguard the
sliding zone.
5 6. Detailed estimate for the treatment of 6.71 6.71 Revised
02 no piers of head works (pier no 3&4) Drawing
in RCC M-25 mix. Enclosed
(RC 4)
6 10. Detailed estimate for restoration of 7.94 7.94 OK
Damaged/Cracked RCC lining at places
of water conductor from RD 100 to
1250 Mts of SHP-III
7 11 Detailed estimate for removal of silt 16.24 16.24 OK
from forebay at intake of Sewa HEP-III,
Mashka
8 14. Detailed estimate for removal of silt 7.55 7.55 OK
(wet) slips from inside of water
conductor and removal of boulders from
the right side berm & bed of the water
conductor from r.d-2300 to 2750m at
Sewa-III, Mashka
9 15. Detailed estimate for clearance of 9.14 9.14 OK
slips/mulba from catch water
drain/berm on right side of water
conductor from rd-2400 to 2900m
10 16. Detailed estimate for jungle 2.7 2.7 OK
clearance/weed clearance/ vegetations
and thorny bushes and uprooting the
small plants from the water conductor
from R.D. 2500m to R.D. surroundings
the water conductor on both right & left
banks.
11 17. Detailed estimate for the removal of silt 7.32 7.32 OK
from the desilting tank of Sewa-III in
between RD-350 to 444 m.
Sub Total 134.3 112.76
B item under review
12 3. Detailed estimate for construction of 20 131.53 Spur is being
Mtrs long 05 on spurs with gabions redesigned
between RD 2300 to 2500 in River Ravi
of 20m length
13 7. Detailed estimate for Restoration of 17.24 Drawing Under
damaged RCC floor between piers 2 &3 Preparation
and between piers no. 3 & 4 at head
work site of SHP-III near head works.
14 8. Detailed estimate for the 1.94 Drawing Under
repairs/construction of R/wall on the Preparation
downstream side of the weir axis on the
head works site at RD-87.75m
15 9. Detailed estimate for treatment of 3.78 Drawing Under
expansion/contraction joints of RCC Preparation
rectangular section of WC from RD
1860 to 2900 mts of Sewa-III
16 12. Detailed estimate for restoration of 7.85 More data
Nalni Nallah at R.D. 1590 to RD 1664 required
On the downstream side of cause way/
water conductor by way of laying of
creates.
17 13. Detailed Estimate for restoration of 12.86 Drawing Under
damaged/washed of creates (River Preparation
Protection work) beyond D/S side of
weir axis of diversion structure at Rd
8.5 Mts by way of stone filling at SHP-
III.
Sub Total(B) 175.2