No. S No. Of cost estimate cost Estimate (Appx.) by AHEC Remark by by PDC (Rs.) Lacs JKPDC (Rs.) Lacs A item Finalised 1 1. Detailed estimate for the protection of 15.54 28.48 Revised water conductor from RD 2430 to 2445 Drawing mts of SHP-III Mashka by way of Enclosed filling cavity beneath the water (RC 1) conductor and construction of toe wall 2 2. Detailed estimate for providing and 7.68 7.68 Revised laying MS pipe 1-1/2, dia (45 cms/ Drawing 450mm) on the downhill side of water Enclosed conductor at cross drainage at RD-2400 (RC 2) of water conductor for proper drainage of catch water in the river Ravi and construction of cement concrete sump in m-20 mix at RD 2400m along the water conductor for catchment of water. 3 4. Detailed estimate for construction of 63.70 0 Not gabion Revetment along Right side of required water conductor between RD 2300 to 2500 Mtrs. 4 5. Detailed estimate for construction of 24.55 19.0 Revised diversion bund at RD 2250 on the right Drawing bank of river Ravi in the sliding zone Enclosed for diverting water flow from right (RC 3) Bank to left bank River to safeguard the sliding zone. 5 6. Detailed estimate for the treatment of 6.71 6.71 Revised 02 no piers of head works (pier no 3&4) Drawing in RCC M-25 mix. Enclosed (RC 4) 6 10. Detailed estimate for restoration of 7.94 7.94 OK Damaged/Cracked RCC lining at places of water conductor from RD 100 to 1250 Mts of SHP-III 7 11 Detailed estimate for removal of silt 16.24 16.24 OK from forebay at intake of Sewa HEP-III, Mashka 8 14. Detailed estimate for removal of silt 7.55 7.55 OK (wet) slips from inside of water conductor and removal of boulders from the right side berm & bed of the water conductor from r.d-2300 to 2750m at Sewa-III, Mashka 9 15. Detailed estimate for clearance of 9.14 9.14 OK slips/mulba from catch water drain/berm on right side of water conductor from rd-2400 to 2900m 10 16. Detailed estimate for jungle 2.7 2.7 OK clearance/weed clearance/ vegetations and thorny bushes and uprooting the small plants from the water conductor from R.D. 2500m to R.D. surroundings the water conductor on both right & left banks. 11 17. Detailed estimate for the removal of silt 7.32 7.32 OK from the desilting tank of Sewa-III in between RD-350 to 444 m. Sub Total 134.3 112.76 B item under review 12 3. Detailed estimate for construction of 20 131.53 Spur is being Mtrs long 05 on spurs with gabions redesigned between RD 2300 to 2500 in River Ravi of 20m length 13 7. Detailed estimate for Restoration of 17.24 Drawing Under damaged RCC floor between piers 2 &3 Preparation and between piers no. 3 & 4 at head work site of SHP-III near head works. 14 8. Detailed estimate for the 1.94 Drawing Under repairs/construction of R/wall on the Preparation downstream side of the weir axis on the head works site at RD-87.75m 15 9. Detailed estimate for treatment of 3.78 Drawing Under expansion/contraction joints of RCC Preparation rectangular section of WC from RD 1860 to 2900 mts of Sewa-III 16 12. Detailed estimate for restoration of 7.85 More data Nalni Nallah at R.D. 1590 to RD 1664 required On the downstream side of cause way/ water conductor by way of laying of creates. 17 13. Detailed Estimate for restoration of 12.86 Drawing Under damaged/washed of creates (River Preparation Protection work) beyond D/S side of weir axis of diversion structure at Rd 8.5 Mts by way of stone filling at SHP- III. Sub Total(B) 175.2 Total (A+B)
Specification Report Construction of Intake Well, WTP & Clear Water Sump For Ramappa-Godavari (Mangapeta Segment) in Mangapeta Mandal in Mulugu Constituency of Warangal District