Sei sulla pagina 1di 2

Timescale

27th May 2017


Dot To Dot Festival Bristol 12:00pm 4:00am

PRODUCTION SCHEDUAL

ARRIVE: 10:30pm
Backstage passes
Meet managers/ support team
Set up filming equipment
Run through with the band what and who I will be filming
Make sure camera battery is charged!!!

FILMING BACKSTAGE: 11:00pm


Film band backstage
Support team
Pre show rituals
Equipment set up

FILMING PERFORMANCE: 12:30pm


Film band on stage
Crowd from side of stage (get bands perspective of audience)
Inside the crowd (singing along)
Back of arena
Get as close from side of stage

FILMING BACKSTAGE: 01.30am


Film band relax after performance
Shot clips of them talking about the show
Celebration after show

LEAVE VENUE: 02:00am


Thank manager, support team and band

EMAIL FROM SUPPORT TEAM CONFERMING TIME AND


DATE >>>>

Potrebbero piacerti anche