Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
23.0 21.2
So = 1500
So = 0.0012
Calculation
= 180 + 2
y r
= 180 + 2 sin-1( r )
1.110.65
-1
= 180 + 2 sin ( 0.65 )
Q=
AR 3
So
n
sin
A= d2
8
270.09
4.714 rad sin
A= 1.32
8
A = 1.206 m2
P=r
A
R= P
1.206
R = 3.0641
R = 0.394 m
2
(1.206)(0.393) 3
0.0012
Q=
0.011
v
Fr = gD
9.81 x( 0.938 x 1.3)
Fr = 2.041/1.206
Channel 2: The existing is short grassed earth rectangular open channel of 1.24
m width and 1.10 m high. The channel is 1.5 km long. This channel cannot
convey water and must be replaced by a properly lined best hydraulic section.
The width of the reserved government land for this channel is 3 m.
Given :
B = 1.24 m
y = 1.10 m
L = 1.5 km (1500m)
n = 0.030
So = 0.0012
Manning Equation
2
Q=
AR 3
So
n
Q = 6.123 m3/s
2
Q=
AR 3
So
n
8
y3
2.651 = 2
3
2
4.208 = y3
y = 1.714 m
B = 2y
B = 2(1.714)
B = 3.428 m
y = 1.714 m + 0.3 m (freeboard high)
y = 2.014 m
v
Fr = gD
6.123/7.213
Fr = 9.81 x 2.104
Channel 3: The existing is short grassed earth trapezoidal open channel with a
bottom width of 0.40 m, 0.66 m high and side slope of 750 on both sides. The
channel is 1.63 km long. The flow rate during the monsoon is 6.66 m3/s. This
channel also cannot convey the flow rate and must be replaced by a properly
lined best hydraulic channel. The width of the reserved government land for
this channel is 3 m.
Given :
B = 0.40 m
y = 0.66 m
L = 1.63 km (1630m)
n = 0.011
37.5 21.2
So = 1630 = 0.010
Q = 6.66 m3/s
1
z = tan 75o
1
z= tan 75 = 0.268
A = By + zy2 P = B + 2w A
R= P
w=y 1+ z 2
A = (0.4 0.66 + (0.2679
0.3807
P = 0.40 + 2(0.66) R= = 0.216 m
1.766
2
0.66 ) 1+ 0.26792
A = 0.381 m2 P = 1.767 m
Manning Equation
2
A R 3 So
Q=
n
2
(0.3807) ( 0.2155 ) 3 0.010
Q=
0.011
Q = 1.247 m3/s
The channel cannot covey 6.66 m3/s of existing flow rate
Q = 6.66 m3/s
T = 2w
B + 2zy = 2y 1+ z 2
B + 2(0.268) y = 2y 1+ 0.2682
B = 2.071 y 0.536 y
B = 1.535 y
Manning Equation
2
Q=
AR 3
So
n
2 2 y 2
(1.535 y + 0.268 y )( ) 3 0.010
6.66 m3/s = 2
0.011
y 2
0.733 = (1.803 y 2)( ) 3
2
8
1.1629 = 1.8027 y 3
y = 0.849 m
B = 1.535 (0.849)
B = 1.303 m
y = 0.849 m + 0.3 m (freeboard high)
y = 1.149 m (freeboard high)
v
Fr = gD
6.66/3.986
Fr = 9.81 x 0.849
Channel 4: The existing are two adjacent circular concrete culverts of diameter
0.6 m each under a roadway of 7.6 m wide. These culverts cannot convey water
and must be replaced by several designed circular culverts to cater the
maximum designed flow rate. The available concrete culverts inner diameters
in the local markets are 0.6 m, 0.7 m, 0.8 m, 0.9 m, 1.0 m, 1.2 m and 1.4 m only.
The road thickness above the culverts is 0.5 m. The culverts are 100 mm of
standard thickness.
Given :
Q = 6.66 m3/s (for 3 culverts)
y = 0.938 d
r = 0.5 d
n = 0.017(maximum n for culvert finished)
37.5 21.2
So = 1630 = 0.010
Calculation
0.938 d0.5 d
-1
= sin ( 0.5 d )
= 61.164
= 180 + 2
= 302.327
= 5.277 rad
sin
A= d2
8
302.327
5.277 radsin
A= d2
8
A = 0.765 d2
P=r
A
R = P
0.765 d2
R = 2.639 d
2
6.66 A R 3 So
3 = n
0.765 d 2
2.639 d
0.493 = 2
0.01
3
0.765 d 2
v
Fr = gD
2.22 /1.106
Fr = 9.81 x (1.2 x 0.938)
2 12.782( 0.033)
A R3 = 0.0008
2
A R3 = 14.914
A = By + zy2 P = B + 2w A
R= P
w=y 1+ z 2
A = 2y + 2y2
2 y +2 y 2
P = 2 + 2y 1+ 22 R= 2+2 y 5
P = 2 + 2y 5
2 y+ 2 y 2
2+2 y 5
= 14.914
2
2 y+ 2 y
2 vn
R3 = So
2 1.154 (0.025)
R3 = 0.0008
R = 1.030m
A = Q/v
A = 12.783/1.154
A = 11.077m2
P = A/R
P = 11.077m2/1.030m
P = 10.754m
Find B and y
By + 2y2 = 11.077m2----1
B + 2y 5 = 10.754m-----2
B = 10.754m - 2y 5
Sub 3 to 1
(10.754m - 2y 5 )y + 2y2 = 11.077m2
v
Fr = gD
2.783/16.68
Fr = 9.81 x 1.675
y = 0.484 m
Compare Eo with Emin + h to know whether the pier control the flow or not:
2
Q
E o = yo + 2 g Ao
2
Eo = 1.743 m
Q2
Emin = yc2 + 2 g A c 22
Q2 T c
g Ac23 =1
Ac 23 Q
2
Tc2 = g
(2.463 y c2 +2 y 2c 2)3
2.463+ 2 y c 2 = 16.657
Ac2 = 4.262 m2
2
12.783
E = 0.95502 + 2
min 2 ( 9.81 ) (4.1783)
Emin = 1.414 m
E2 = E0 h
2
Q
y2 + 2 g Ac 2
2 = 1.743
2.463 y 2+2 y 2
2
19.62( 2)
y2 + 12.783
2 = 1.743
CONSTRUCTION COST
1. Excavation cost = RM 4.50/m3.
2. Lining cost = RM 8.00/m2. This includes the cost to build bracings if any.
3. Fencing = RM 4.90 per meter long (of standard height). Including labour
cost. Fencing is required only for channels with supercritical flows.
4. Culvert price = RM 110 per meter long per meter inner diameter (including
transportation).
5. Cost to replace road surfaces = RM 215/m2.
6. Land reclaiming cost = RM 52/m2.
Channel 2 (Rectangular Channel)
L = 1.5 km (1500m)
y = 1.714 m + 0.3 m =2.014m
B = 3.428 m
T = 3.428 m
A = By
A = (3.428) (1.714)
A = 5.876 m2
v = Q/A
= 6.123/5.876
= 1.044 m/s
Volume = A L
Volume = 5.540 m2 1500 m
Volume = 8310 m3
Excavation Cost
= RM 4.50/m3 8310 m3
= RM 37394.95
P = B + 2y
P = 3.428 + 2(1.714)
P = 6.856 m
Area = P L
Area = 7.456 m 1500 m
Area = 11,184.00 m2
v
Fr = gD
1.044
Fr =
9.81 x (
5.876
3.428
)
Lining Cost
= RM 8.00/m2 11,184.00 m2
= RM 89,472.00
Total cost
= RM 37394.95 + RM 89,472.00 + RM 33,383.00
= RM 160,249.95
L = 1.63 km (1630m)
z = 0.268
y = 0.849 m + 0.3 m = 1.149 m
B = 1.303 m
A = By + zy2
A = ((1.303)( 0.849) + (0.268)( 0.849)2 + (0.3)(2.473)) - ((0.4)(0.66) + (0.268)
(0.662 ))
A = 1.661 m2
Volume = A L
Volume = 1.661m2 1630 m
Volume = 3034.726 m3
Excavation Cost
= RM 4.50/m3 2706.747 m3
= RM 12,180.36
P=B+2y 1+ z 2
Lining Cost
= RM 8.00/m2 4989.43 m2
= RM 39,914.41
Total cost
= RM 12,180.36 + RM 39,914.41= RM 52,094.77
A = By + zy2
A = ((3.263)( 1.675) + (2)( 1.675)2 + (0.3)( 4.163 )) (2)(0.82) + (2)(0.822 )
A = 12.510 m2
Volume = A L
Volume = 12.510 m2 3500 m
Volume = 43,784.21 m3
Excavation Cost
= RM 4.50/m3 43,784.21 m3
= RM 197,029.00
P=B+2y 1+ z 2
P = 3.263 + 2(1.675) 1+ 22
P = 10.754 m
Area = P L
Area = 10.7574 m 3500 m
Area = 37,638.4 m2
Lining Cost
= RM 8.00/m2 37,651.02 m2
= RM 301,107.20
T = B + 2zy
T = 3.263 + 2(2)( 1.975)
T = 11.163 m 7 m = 4.163 m
= 4.163 m 3500 m
= 14,570.5 m2
Channel 4
Pricing on culvert. (RM 110 per meter long per meter inner diameter (including
transportation).
= RM 110 7.6 m 1.2 m 3
=RM 3009.6
Excavation cost
= RM 4.50/m3 1.9 m 4.2 m 7.6 m
= RM 272.916
Total cost
= RM 3009.6+ RM272.916+ RM 6862.8
= RM 10,145.32
Channel 6
Wetland width = 100 m
L = 1.38 km (1380m)
1380-11.163 = 1368.837
Perimeter = 1380 + 1368.837 + 100 + 100
= 2948.837
Fencing
= RM 4.90 2948.837 m
= RM 14,449.301
Total RM 1,492,741.33