Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
The AdMU is located at Katipunan Road, Loyola Heights, Quezon City, Manila.
The university was established by the Spanish Jesuits. The AdMU started when a
public primary school, the Escuela Municipal de Manila, was established in Intramuros,
secondary education. The Escuela was then called Ateneo Municipal de Manila.
business were offered in the Ateneo Municipal. The Ateneo Municipal was acknowledged
as a college in 1908. The Ateneo Municipal offered the bachelors degree and certificates
in several disciplines. In 1909, the Ateneo Municipal de Manilas official name became
Construction Industry
through which a society reaches and accomplishes its goals of urban and rural
development. The complexity in the construction industry is due to the redefinition of the
construction process itself and the large number of parties involved in the process. The
persons involved in the construction process are the users, clients, designers, regulators,
the owner. In line with this factors, uncertainties and complexities in the construction
process arises, which includes the physical, financial, and economic matters. These
factors eventually lead to the delay of the project completion (Divya and Ramya, 2015).
Delay
construction project, delay can be such a problem and a critical subject for the parties
involved such as client, contractors and consultants. Delay could be defined as time over
run beyond completion date specified in a contract or beyond the date that the parties
agree upon for delivery of a project. It is sliding over its intended schedule and is
considered as common problems causing a varied undesirable outcome on the project and
its partaking parties. Delay happens in many construction projects, although the priority
of delay causes is different in various countries due to environmental effects. Delays can
lead to considerable negative effects such as lawsuits between owners and contractors,
loss of productivity and revenue, and contract termination (Hisham and Yahya, n.d.).
The causes of construction delay may be categorized as (1) client related factors,
(2) contractor related factors, (3) consultant related factors, (4) material related factors,
(5) labor an equipment related factors, (6) contract related. (7) contract relationship
Client related factors or the owner related factors includes the delay in progress
payments and in delivering the site to the contractor, poor communication and
coordination, change orders by the owner during construction, and late in revising and
approving design documents. These factors are also comprised by finance and payments
The second category is the contractor related factor. This category is composed of
funding by contractor during construction and mistakes in initial stage or during soil
investigation. Also, one of the causes of delay linked to this category was rework due to
Consultant related factors are somehow related to the unclear and inadequate
details in drawings. The causes of consultant related delay are the management of the
contract, preparation and approval of drawings, and the quality assurance and waiting
The quality and shortage of construction material, delay in material delivery, and
changes in material types during construction are some of the causes of material related
delay factors.
Labor and equipment related factors are those which are associated with the
workers and machines used in the construction process. Labor related factors include
labor supply, skills of labors, and personal conflicts among workers. Under the equipment
related factors are the supply of equipment, equipment breakdown, and the availability of
contract document. Delays may also be caused by the major disputes and negotiations,
communication between the parties. Delay may also be due to the interruption and delay
accidents in the workplace during actual construction, rise in prices and delay in
According to Hisham and Yahya (n.d.), there are numerous consequences that can
occur as the result of the delays. When a project is delayed, both the client and user will
have an impact not only the building cannot be used, but they had to reschedule their
early planning in addition to bear the cost of delay. This issue is one of the major
Construction safety standards is a general term for the safety rules and
regulations starting from the safety of the workers up to the safety in using the
construction site yearly. Some of the common causes of injuries and accidents are: (1)
overworking of muscles; (2) improper and/or reckless use of machineries and tools; (3)
trench and scaffold collapses; (4) electric shock, and lastly; (5) failure to use protective
equipment.
Construction safety standards are rules and guidelines that provide for the
protection of the worker. Some of the regulations are concerned with the use of protective
gears by the workers and the proper use and maintenance of heavy equipment.
identifies deviation from the plan and is a mechanism for making any necessary
corrective actions. Consider the ramifications of deviation and learn about ways to avoid
reporting, progress measurement, forecasting and updating current cost and schedule
approved changes is monitored when and as they occur (Sheryl R., 2011).
compliance with project scope, timelines, deliverables and schedules. Project control is
measuring such progress by comparing and contrasting actual progress with project plans
and schedules and taking corrective action as required. The basis for project monitoring
and control such as the tools and techniques to use incorporates in the planning stage and
the actual monitoring and control mostly takes place during project execution (Nayab N.
2011).
To monitor is to check on how project activities are progressing. It is observation;
about the progress of the project to the donors, implementers and beneficiaries of the
project. Reporting enables the gathered information to be used in making decisions for
and completion; assisting in the entire lifecycle of the project. The use of controls will
vary according to individual project demands, but project controls address, organize, and
of course control the following aspects of your project management system (Aramyan,
2016).
Scheduling
Scheduling is the fitting of the final work plan to a time scale. It shows the
duration and order of various construction activities. It deals with the aspect of when to
do it.
Scheduling is determination of timing of events in the project i.e., When tasks will
what and who whereas, Scheduling is When and Why. Schedule can also be defined as
Scheduling also provides comparison of actual progress against plan and help
identify deviations from plan. Scheduling also enables early corrective actions and
adjustments to plan.
Procurement Strategy
services that are necessary and required in the project or a company for the success of the
operation or work. Procurement is the art of planning and organizing resources for their
factors such as the timeline for procurement, the funding and budget, the projected risks
and opportunities, among others. It is also define as the approach of passing the gap
between executive level plans and policy directives and daily activities
(http://www.procurement-academy.com/procurement-competences/procurement-strategy-
development/ 2017).
Histogram
A histogram is an efficient instrument for presenting an overview data or
numerical data. Histogram is one of the most used tools to analyse the numerical datas
frequency. In constructing a histogram, the first thing to do is to divide the entire range of
values into a series of intervals or bin the range of values. The bins are typically classified
constructing of graphical representation of how much data falls within each interval will
Some of the works where histogram was applied were in rebar, formworks and
concrete works.
According to the data acquired from D. M. Consunji, Inc. (DMCI) in their recent
Concrete histogram. This graph shows the relationship of volume of concrete per
Rebar histogram. This graph shows the relationship of weight of rebars per time
Cash flow refers to the cost that will be incurred and how much they will amount
Cash flow estimates and forecasts are based on settled fee expense schedules for
consultants and a simple partition of the construction cost over the construction period,
up until the main contractor has been appointed. Upon the appointment of the main
contractor, some forms of payment timetables agreed and a master programme prepared
Manpower
Manpower is the total supply of persons available and fitted for service.
Manpower refers to those people who are skilled enough to do a specified work.
Temfacil
Temfacil is a short term for the word temporary facilities. These facilities are
permanent in the project. Temfacil may be used for project office/engineering office,
canteen, barracks, and security office. The existence of the temfacil was just like the time
of finishing the project. Temfacil was cut-off as the project was completed.
It is an area where the project engineers and project manager work together
regarding the planning and scheduling of the project. This area serves as a storage for all
the drawings, plans and other important documents for the project (Motin, M., 2011).
Plans and Specifications
Based on the Building Act 2004, plans and specifications include the
inspection during construction, the definition of the intended building use and
the details of specified systems and procedures for their inspection and
Bidding Documents
as the basis for bids, furnishing all information necessary for a prospective
bidder to prepare a bid for the Goods, Infrastructure Projects and Consulting
Services to be provided.
process and reduce costs, to reduce unresponsive bids and thus increasing
bid document are important since they narrate to the bidders on how to
clarifications during the bidding process; how, when, and where to submit
submitting various information for the bid. The bidder should ensure that
According to Section 23 Article VII of R.A. 9184, the Bids and Awards
Committee (BAC) or under special circumstances specified in the IRR, its duly
for the procurement based on the bidders compliance with the eligibility
requirements within the period set forth in the Invitation to Bid (ITB). The
eligibility requirements shall provide for fair and equal access to all
numerical ratings on the basis of the short listing requirements prescribed for
the competitive Bidding concerned, within the period stated in the Invitation
to Bid to determine the short list of bidders who shall be allowed to submit
Financial Documents
the BAC shall open and evaluate the financial component of the prospective
bidders who completed the necessary bid requirements of the first envelope.
The bids of the short listed bidders shall be evaluated using numerical ratings
which shall include factors such as, but not limited to, experience,
highest in terms of their corresponding calculated prices. The bid with the
and the highest calculated rating shall be the Highest Rated Bid.
Last January 13, 2016, Engr. Sta. Maria, the president and general
for the time extension of the project duration due to the delays encountered.
The causes and number of days covered for such delays were enumerated.
First was due to unfavourable weather conditions with the total delays of 79
days. It was caused by typhoons Kabayan, Lando and Nona which affected
the accessibility of the site, concreting of roof beam and concrete gutter,
plastering works, delivery of cement, and arrival of backhoe for the specific
operation. Second was the lack of water supply due to the major repair of
Accomplishment Report
provides an over view of what was achieved during the given period. Specific