BOILER - A Revision : A5

Issue date : May -


SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 1 of 13

BP BERAU
TANGGUH LNG

BOILER - A

SYSTEM LINE-UP

Doc Number: 062-CKL-OP-3308

May
A5 SKM / EMA
-2011

Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM
BOILER - A Revision : A5
Issue date : May -
SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 2 of 13

Originator / Checked Checked by Approved Authorised


Rev Date
Reviewer by OPS TL Engineering by OM by DSM

SCOPE: This checklist covers the system line up for the Unit 062 Boiler
Steam generation system includes the Blow down system and the
Boiler sampling system. It covers line up as it is in normal
operation, after maintenance activities, or other routine activities.

It is use as guide to ensure the entire Steam Generation system


unit-062 is lined up properly for the above condition.

ASSUMPTIONS: All commissioning activities have been completed and all systems
are in their normal stand by mode of operation, where the unit is
ready for start up after all documentation signed.

There are no ongoing maintenance activities and the all related


completion document has been closed out

Communications have been established between all personnel


involved in this checklist

The utilities shall be available i.e. electrical power, instrument air


system, utility Air system and the cooling water

Fire and Gas Detection, Fire Protection, and Safety Systems are
operational.

All ESD trips have been cleared and reset

All the area technicians have been fully trained and competent
about basic philosophy and process description of the above
system

Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM
BOILER - A Revision : A5
Issue date : May -
SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 3 of 13

Initia
Ste MCB/ l
Action
p Local Date/
Time
Electrical, Instrument and Utility Air refer to
1. drawing number 062-VDR-MCI-1020 & 062-VDR-
MCI-1022
ENSURE power supply for all controls at main sub-station are
1.1. Local
energized
ENSURE power supply to Forced Draft Fan at main sub-
1.2. Local
station are energized
Ensure all the control system indicated on DCS are well
1.3. MCB
functioned
1.4. Ensure Instrument air isolation valve 062-HV-5428 is Open Local
1.5. Ensure spare valve 062-HV-5429 is Close Local
Ensure the instrument devices are ready then ensure to
open valves
062-HV-5430
062-HV-5431
1.6. Local
062-HV-5432
062-HV-5433
062-HV-5434
062-HV-5435
1.7. Ensure manual valve 062-HV-5436 to 062-PG-3110A is Open Local
1.8. Ensure Utility air isolation valve 062-HV-5437 is Open Local
1.9. Ensure manual valve 062-HV-5438 to 062-PG-3111A is Open Local
ENSURE all PSV are in place
062-PSV-3071 A
1.10. Local
062-PSV-3072 A
062-PSV-3073 A
Ensure all PSV(s) at Sampling system are installed
062-PSV-3075 A
1.11. 062-PSV-3076 A Local
062-PSV-3077 A
062-PSV-3078 A
Ensure all PSV(s) at Blow down system are properly installed
1.12. 062-PSV-8003 A Local
062-PSV-8003 B
Boiler-A valves status refer to drawing number
2.
062-VDR-MCI-1020 / 1021 / 1024 / 1025 / 1026

Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM
BOILER - A Revision : A5
Issue date : May -
SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 4 of 13

Initia
Ste MCB/ l
Action
p Local Date/
Time
Ensure drain valve 062-HV-5374 from water drum to CHS is
2.1. Local
Close
2.2. Ensure valve 062-HV-5373 IBD line is Close Local
2.3. Ensure valve 062-HV-5375 IBD line is Close Local
2.4. Ensure drain valve 062-HV-5342 to CHS is normally Close Local
2.5. Ensure drain valve 062-HV-5343 to CHS is normally Close Local
Ensure drain valves 062-HV-5339 and 062-HV-5340 from
2.6. Local
Front stand pipe to CHS are normally Close
Ensure topping off valves 062-HV-5333 & 062-HV-5334 at
2.7. Local
062-LT-3002AA are Open
Ensure topping off valves 062-HV-5335 & 062-HV-5336 at
2.8. Local
062-LT-3002AB are Open
Ensure vent valves 062-HV-5337 and 062-HV-5338 at stand
2.9. Local
pipe are normally Close
Ensure the isolation valves 062-HV-5353 and 062-HV-5355 for
2.10. Local
062-LG-3101 A are Open
Ensure topping off valves 062-HV-5352 and 062-HV-5354 for
2.11. Local
062-LG-3101 A are Open
Ensure drain valves 062-HV-5356 and 062-HV-5357 at 062-
2.12. Local
LG-3101A to CHS are normally Close
2.13. Ensure valve 062-HV-5364 at 062-PG-3104A is Open Local
2.14. Ensure valve 062-HV-5365 at 062-PT-3001A is Open Local
Ensure steam drum vent valves 062-HV-5366 and 062-HV-
2.15. Local
5367 are normally Close
Ensure the isolation valves 062-HV-5359 and 062-HV-5361 for
2.16. Local
062-LG-3102 A are Open
Ensure topping off valves 062-HV-5358 and 062-HV-5360 for
2.17. Local
062-LG-3102 A are Open
Ensure drain valves 062-HV-5362 and 062-HV-5363 at 062-
2.18. Local
LG-3102A to CHS are normally Close
Ensure vent valves 062-HV-5368 and 062-HV-5369 at Steam
2.19. Local
product line are normally Close
Ensure the Nitrogen injection line valve 062-HV-5370 is Close
2.20. Local
and no hose connected
Ensure vent valves 062-HV-5348 and 062-HV-5349 at stand
2.21. Local
pipe are normally Close
Ensure topping off valves 062-HV-5346 & 062-HV-5347 at
2.22. Local
062-LT-3002AC are Open
Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM
BOILER - A Revision : A5
Issue date : May -
SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 5 of 13

Initia
Ste MCB/ l
Action
p Local Date/
Time
Ensure topping off valves 062-HV-5344 & 062-HV-5345 at
2.23. Local
062-LT-3001A are Open
Ensure drain valves 062-HV-5350 and 062-HV-5351 from
2.24. Local
Front stand pipe to CHS are normally Close
2.25. Ensure sampling line valve 062-HV-5390 is Open Local
Ensure drain valves 062-HV-5379 and 062-HV-5380 from
2.26. Local
primary Superheater to CHS are normally Close
Ensure continues blow down valve 062-HV-5371 is partially
2.27. Local
Open
Ensure drain valves 062-HV-5381 and 062-HV-5382 from
2.28. Local
bottom Final Superheater to CHS are normally Close
2.29. Ensure drain valve 062-HV-5384 at Superheater is Close Local
Ensure by pass steam trap 062-STP-3501A valve 062-HV-5388
2.30. Local
is Close
2.31. Ensure drain valve 062-HV-5387 at 062-STP-3501A is Close Local
2.32. Ensure isolation valves 062-HV-5385 & 062-HV-5386 are Open Local
2.33. Ensure isolation valve 062-HV-5317 at 062-PG-3105A is Open Local
2.34. Ensure isolation valve 062-HV-5318 at 062-PT-3002A is Open Local
Ensure topping off valves 062-HV-5319 & 062-HV-5320 at
2.35. Local
062-FT-3003A are Open
2.36. Ensure manual valve 062-HV-5321 to sampling point is Open Local
Ensure the manual valve to start up vent 062-HV-5327 is
2.37. Local
normally Close
Ensure manual valves 062-HV-5322 & 062-HV-5323 to 062-
2.38. Local
STP-3503A are normally Close
2.39. Ensure by pass steam trap 062-STP-3503A is Close Local
Ensure isolation valves 062-HV-5324 and 062-HV-5325 on
2.40. Local
steam trap 062-STP-3503A are Open
2.41. Ensure drain valve 062-HV-5331 and 062-HV-5332 are Close Local
2.42. Ensure 2 equalizing valve 062-HV-5329 is Close Local
If Boiler under normal operation, Ensure HPS header valves
2.43. Local
062-HV-5328 and 062-HV-5330 are Open
Ensure drain valve 062-HV-5376 CBD line to CHS is normally
2.44. Local
Close
2.45. Ensure utility air to Burner#1 062-HV-5468 is Open Local

Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM
BOILER - A Revision : A5
Issue date : May -
SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 6 of 13

Initia
Ste MCB/ l
Action
p Local Date/
Time
Ensure instrument air valves to Burner#1 062-HV-5464 and
2.46. Local
062-HV-5465 are Open
Ensure fuel gas manual valve to Burner#1 062-HV-5466 is
2.47. Local
Open
2.48. Ensure manual valve 062-HV-5467 to 062-PG-3114A is Open Local
2.49. Ensure utility air to Burner#2 062-HV-5473 is Open Local
Ensure instrument air valves to Burner#2 062-HV-5469 and
2.50. Local
062-HV-5470 are Open
Ensure fuel gas manual valve to Burner#2 062-HV-5471 is
2.51. Local
Open
2.52. Ensure manual valve 062-HV-5472 to 062-PG-3117A is Open Local
2.53. Ensure utility air to Burner#3 062-HV-5478 is Open Local
Ensure instrument air valves to Burner#3 062-HV-5475 and
2.54. Local
062-HV-5475 are Open
Ensure fuel gas manual valve to Burner#3 062-HV-5476 is
2.55. Local
Open
2.56. Ensure manual valve 062-HV-5477 to 062-PG-3120A is Open Local
Ensure Close cooling water valves 062-HV-5401 and 062-HV-
2.57. Local
5402 to FDF-A are Lock Open
Ensure topping off valves 062-HV-5399 & 062-HV-5400 at
2.58. Local
062-FT-3005A are Open
Ensure topping off valves 062-HV-5397 & 062-HV-5398 at
2.59. Local
062-FT-3004AA are Open
Ensure topping off valves 062-HV-5395 & 062-HV-5396 at
2.60. Local
062-FT-3004AB are Open
2.61. Ensure manual valve 062-HV-5391 to 062-PG-3106A is Open Local
2.62. Ensure manual valve 062-HV-5392 to 062-PT-3005AA is Open Local
2.63. Ensure manual valve 062-HV-5393 to 062-PT-3005AB is Open Local
2.64. Ensure manual valve 062-HV-5394 to 062-PT-3005AC is Open Local
Ensure manual sampling valves 062-HV-5404 and 062-HV-
2.65. Local
5405 are close
2.66. Ensure manual sampling valve 062-HV-5403 on stack is Open Local
Boiler Feed Water to Boiler A valves status refer to
3.
drawing 062-VDR-MCI-1020
Ensure topping off valves 062-HV-5301 & 062-HV-5302 at
3.1. Local
062-FT-3001A are Open
Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM
BOILER - A Revision : A5
Issue date : May -
SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 7 of 13

Initia
Ste MCB/ l
Action
p Local Date/
Time
3.2. Ensure drain valve 062-HV-5307 at 062-FV-3001A is Close Local
Ensure isolation valves 062-HV-5305 and 062-HV-5306 of
3.3. Local
062-FV-3001A are Open
3.4. Ensure manual valve 062-HV-5309 to 062-PG-3103A is Open Local
Ensure by pass manual valve 062-HV-5308 of 062-FV-3001A
3.5. Local
is Close
Ensure 1 manual valves 062-HV-5310 & 062-HV-5311 at 062-
3.6. Local
FO-3101A are Open
3.7. Ensure drain valve 062-HV-5312 at 062-MOV-3038A is Close Local
3.8. Ensure drain valve 062-HV-5313 inlet economiser is Close Local
3.9. Ensure drain valve 062-HV-5314 outlet economiser is Close Local
Ensure drain valve 062-HV-5304 BFW to desuperheater is
3.10. Local
Close
3.11. Ensure manual valve 062-HV-5303 BFW to DPH-11 is Open Local
Ensure topping off valves 062-HV-5315 & 062-HV-5316 at
3.12. Local
062-FT-3002A are Open
3.13. Ensure manual valve 062-HV-5389 to 062-PG-3102A is Open Local
Once the Boiler ready, ensure to Open BFW manual valve
3.14. Local
062-HV-5300
Phosphate to Boiler A valves status refer to
4. drawing
062-VDR-MCI-1020
4.1. Ensure manual valve 062-HV-5294 is Open Local
4.2. Ensure manual valve 062-HV-5341 is Open Local
Fuel Gas to Boiler A valves status refer to drawing
5.
062-VDR-MCI-1022 & 60-PID-PS-1203
5.1. Ensure drain manual valve 062-HV-5410 is Close Local
5.2. Ensure manual valve 062-HV-5409 is Open Local
5.3. Ensure manual valve 062-HV-5411 to 062-PG-3107A is Open Local
5.4. Ensure manual valve 062-HV-5412 to 062-PT-3006A is Open Local
Ensure topping off valves 062-HV-5313 & 062-HV-5314 at
5.5. Local
062-FT-3007A are Open
Ensure manual valve 062-HV-5406 for LPG bottle connection
5.6. Local
is Close

Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM
BOILER - A Revision : A5
Issue date : May -
SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 8 of 13

Initia
Ste MCB/ l
Action
p Local Date/
Time
5.7. Ensure manual valve to pilot line 062-HV-5415 is Open Local
5.8. Ensure manual valve 062-HV-5407 to 062-PG-3108A is Open Local
5.9. Ensure manual valve 062-HV-5408 to 062-PT-3009A is Open Local
Ensure isolation valves 062-HV-5416 and 062-HV-5417 for
5.10. Local
USV-3002A are Open
Ensure drain valve 062-HV-5418 at 062-FV-3007A is properly
5.11. Local
Close
Ensure drain valve 062-HV-5420 at 062-PCV-3021A is properly
5.12. Local
Close
Ensure feed back pressure valve 062-HV-5421 for PCV-3021A
5.13. Local
is Open
Ensure isolation valves 062-HV-5419 and 062-HV-5422 for
5.14. Local
062-PCV-3021A are Open
5.15. Ensure manual valve 062-HV-5423 to 062-PT-3007A is Open Local
5.16. Ensure manual valve 062-HV-5424 to 062-PT-3008AA is Open Local
5.17. Ensure manual valve 062-HV-5425 to 062-PT-3008AB is Open Local
5.18. Ensure manual valve 062-HV-5426 to 062-PT-3013AA is Open Local
5.19. Ensure manual valve 062-HV-5427 to 062-PT-3013AB is Open Local
Once Boiler ready, ensure Fuel gas spectacle blind at manual
5.20. Local
valve 062-HV-5005 is Open position
5.21. Ensure LP fuel gas manual valve 062-HV-5005 is Open Local
Sampling system on Boiler A valves status refer to
6.
drawing 062-VDR-MCI-1023
Ensure Close cooling water manual valves 062-HV-5445 and
6.1. Local
062-HV-5446 are Lock Open
Ensure Close cooling water manual valves 062-HV-5444 and
6.2. Local
062-HV-5447 are Lock Open
Ensure Close cooling water manual valves 062-HV-5448 and
6.3. 062-HV-5450 to sampling cooler No.1 (062-E-2001A) are Lock Local
Open
Ensure Close cooling water manual valves 062-HV-5451 and
6.4. 062-HV-5453 to sampling cooler No.2 (062-E-2002A) are Lock Local
Open
Ensure Close cooling water manual valves 062-HV-5454 and
6.5. 062-HV-5456 to sampling cooler No.3 (062-E-2003A) are Lock Local
Open

Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM
BOILER - A Revision : A5
Issue date : May -
SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 9 of 13

Initia
Ste MCB/ l
Action
p Local Date/
Time
6.6. Ensure valve 062-HV-5457 to 062-FG-3051A is Open Local
6.7. Ensure valve 062-HV-5459 to 062-FG-3052A is Open Local
Ensure manual sampling valve 062-HV-5458 is Open as
6.8. Local
requirement
6.9. Ensure bypass valve 062-HV-5463 of cationic column is Close Local
Ensure isolation valves 062-HV-5461 and 062-HV-5462 of
6.10. Local
cationic column are open
Ensure manual sampling valve 062-HV-5460 is Open as
6.11. Local
requirement
Ensure boiler water sampling isolation valve 062-HV-5449 to
6.12. Local
cooler No.1 is Open
6.13. Ensure drain valve 062-HV-5442 for boiler water is Close Local
Ensure boiler water sampling isolation valve 062-HV-5441 is
6.14. Local
Open
Ensure boiler water sampling isolation valve 062-HV-5452 to
6.15. Local
cooler No.2 is Open
Ensure boiler water sampling isolation valve 062-HV-5455 to
6.16. Local
cooler No.3 is Open
6.17. Ensure drain valve 062-HV-5443 for boiler water is Close Local
Ensure saturated and Superheated sampling isolation valves
6.18. Local
062-HV-5439 & 062-HV-5440 are Open
Blow Down system for Boiler A valves status refer
7.
to drawing number 62-PID-PS-1221
7.1. Ensure vent valve 062-HV-5484 is Close Local
Ensure manual valve 062-HV-5479 to 062-PSV-8003A is Car
7.2. Local
Seal Open
Ensure manual valve 062-HV-5480 to 062-PSV-8003B is Car
7.3. Local
Seal Close
Ensure by pass valves 062-HV-5481 and 062-HV-5482 are
7.4. Local
Close
7.5. Ensure LP steam manual valve 062-HV-5483 is Open Local
7.6. Ensure drain valve 062-HV-5489 is Close Local
7.7. Ensure drain valve 062-HV-5491 is Close Local
7.8. Ensure bypass valve 062-HV-5492 of 062-LV-1022 is Close Local
Ensure isolation valves 062-HV-5490 and 062-HV-5495 of
7.9. Local
062-LV-1022 are Open
Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM
BOILER - A Revision : A5
Issue date : May -
SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 10 of 13

Initia
Ste MCB/ l
Action
p Local Date/
Time
Ensure topping off valves 062-HV-5487 & 062-HV-5488 at
7.10. Local
062-LT-1022 are Open
Ensure inlet blow down drum valves 062-HV-5485 and 062-
7.11. Local
HV-5486 are Open
Ensure outlet blow down drum valve 062-HV-5499 is Normally
7.12. Local
Open
7.13. Ensure vent valve 062-HV-5496 is Close Local
7.14. Ensure drain valve 062-HV-5297 is Close Local
7.15. Ensure CCW vent valve 062-HV-5498 is close Local
7.16. Ensure CCW drain valve 062-HV-5493 is close Local
7.17. Ensure CCW Return valve 062-HV-5497 is lock Open Local
7.18. Ensure CCW Supply valve 062-HV-5494 is lock Open Local

Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM
BOILER - A Revision : A5
Issue date : May -
SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 11 of 13

Reference Document:

Doc Number Title


60-PID-PS-1203 LP Fuel gas network Utility area
62-PID-PS-1221 Blow Down system
062-VDR-MCI-1020 Steam & Water Drum vendor drawing
062-VDR-MCI-1021 Air combustion system
062-VDR-MCI-1022 Utility, Instrument & Fuel gas system
062-VDR-MCI-1023 Sampling system
062-VDR-MCI-1024 Burner # 1 vendor drawing
062-VDR-MCI-1025 Burner # 2 vendor drawing
062-VDR-MCI-1026 Burner # 3 vendor drawing

Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM
BOILER - A Revision : A5
Issue date : May -
SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 12 of 13

Revision Log

Section
Description of Change Rev.
Affected

Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM
BOILER - A Revision : A5
Issue date : May -
SYSTEM LINE-UP 2011
Expiry date : May -
2013

BP Berau Doc Number: 062-CKL-OP-3308 Page 13 of 13

Paper copies are uncontrolled. This copy valid only at the time of printing. The controlled
version of this document can be found at DOCUMENTUM

Potrebbero piacerti anche