Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
ECA A ECA B
Job Title Two units Warehouse Proposed New Open
For Back-of-Port Works Warehouse and Factory
Market conditions
Competitive Competitive
Private Private
12/12/1996 2/6/1999
TOTAL PROJECT
ECA C ECA D
Comprise of 3 Blok Gudang/Pejabat
factory/Office, di atas Lot 41, No.10,
Warehouse, Canteen, Jalan Bersatu 13/4,
Ancillary Buildings and Seksyen 13, Petaling
External Works. Site is Jaya, Selangor.(Block A
generally flat with soft and Basement Works
soil condition. Very to Block B(Fasa2)). The
good access, near to site is generally flat
express way with minor earthworks.
Accessibility to the site
is good.
Competitive Competitive
6 months 8 months
5 6
None None
RM 540,000.00 RM 350.000.00
RM3,534,300,00 RM 6,016,750.00
RM180,500.00 RM 669263.27
RM 750,000.00 RM 250,000.00
RM 11,446,232.57 RM 13,814,000.00
ANALYSIS OF SINGLE BUILDING
ECA A ECA B
Accomodation
and design
features
Areas (m)
Lower ground
- -
floor
Ground floor 6,974 2,119
upper floors 96 837
Internal division 6 37
Floor spaces
- -
NOT enclosed
Roof (structural
8970 2,475
and plant room)
External wall
3,440 1694
area
7,070 2956
= 0.49 = 0.57
Storey Heights (m)
Av. Below Grd.
- -
Floor
At Grd. Floor 8.68 4.26
b) Single storey
97.00 -
Construction
c) 2-storey
3.00 -
Construction
d) 3- storey
- 100.00
Construction
e) 4-storey
- -
construction
Brief Cost Information
Contract Sum RM5,934,028.15 RM2,026,101.13
RM265,985.75 RM64,000.00
Preleminaries
(5%) (3.44%)
RM100,000.00
Contingencies -
(5.37%)
Functional Unit
RM722.39 RM699.69
Cost/m
Contract Sum
less RM5,934,028.15 RM1,926,101.13
Contigencies
LE BUILDING
ECA C ECA D
s (m)
- 3,379
10,058 2,628
712 10,872
10,770 16,879
10,257 13,175
253 2,333
179 1,188
81 183
10,770 16,879
730 372
11,520 2,785
3,366 6,054.01
10,770 16,879.00
= 0.31 = 0.359
eights (m)
- 4.00
3.80 5.50
3.80 20.10
- 20.02
86.78 -
13.22 -
- -
- 79.98
Information
RM9,028,715.35 RM12,362,617.87
RM405,000.00 RM350,000.00
RM3,029,500.00 RM5,345,554.38
RM135,500.00 RM598,859.27
(1.63%) (5.09%)
RM565,000.00 RM225,500.00
(6.78%) (1.86%)
RM646.67 RM888.03
RM8,463,715.35 RM12,137,117.87
Total cost of elements
ELEMENTS
ECA (A) ECA (B)
1 Substructure
1A Piling 8.54
1B Work Below Lowest Floor Finish 4.34
Group Element Total 12.88
Total cost of elements (%) Cost per m GFA (%)
ECA ( C) ECA (D) Average ECA (A) ECA (B) ECA ( C) ECA (D) Average
8.54
4.34
12.88