PRD F 04 Daily Process Check List

Sr. No. Points


1 RT Camera Working in good Condition

2 Darkroom equipment working in good condition

3 Darkroom Loading bench is Clean?

4 Developer Strength is proper?

5 Fixer Strength is proper?

6 Stop Bath Water Changed ?

7 Running Water Changed ?

8 Wetting Agent water is changed ?

9 Darkroom Ambient Temperature proper ?


Measurement :

10 Developer Temperature proper ?


Measurement :

11 Drying area is Clean ?

12 Darkroom Film Cutting / Loading register filled up in previous shifts ?

13 Densitometer Daily Calibration carried out ?

14 Density and Quality Random Check perform on previous date ?


15 Other things to be noticed..

Check performed by :
00 / 01.04.2013

Date : _________
Shift : _________
/X

us shifts ?
Name & Signature