Sei sulla pagina 1di 562

PERENCO OIL AND GAS COLOMBIA LIMITED

SOLICITUD DE OFERTAS No. C166885BOQ

OBRAS DE CONSTRUCCIN Y DE MANTENIMIENTO DE VIAS, LOCACIONES Y FACILIDADES POR LLAMADO EN CAMPO GUANDO
ANEXO No. 2 CUADROS DE CANTIDADES Y TARIFAS

TEM DESCRIPCIN UNID CANT. VR. UNITARIO VR. TOTAL


(INC AIU) COP$ (INC AIU) COP$
1.00 PRELIMINARES / MOVILIZACION- DESMOVILIZACION
1.10 Movilizacin Inicial Equipos y Facilidades Base a Campo GLB 2.00 $ 27,303,577 $ 54,607,154
1.20 Localizacin y Replanteo M2 25,000.00 $ 6,391 $ 159,775,000
1.30 Desmonte y Limpieza (Incluye acarreo y disposicion final) HA 10.00 $ 4,740,886 $ 47,408,860
1.40 Descapote M3 2,012.00 $ 32,224 $ 64,834,688
2.00 EXCAVACIONES
2.10 Excavacin Mecanica en suelo M3 2,350.00 $ 9,949 $ 23,380,150
2.20 Excavacn Mecanica en roca M3 1,600.00 $ 72,088 $ 115,340,800
2.30 Excavacin Manual en roca M3 103.00 $ 248,644 $ 25,610,332
2.40 Excavacin Manual en suelo compacto M3 1,780.00 $ 102,004 $ 181,567,120
3.00 DEMOLICIONES
3.10 Demolicin Concreto Manual M3 108.00 $ 402,802 $ 43,502,616
3.20 Demolicin Concreto Mecanica M3 20.00 $ 93,754 $ 1,875,080
3.30 Demolicin Muros M3 25.00 $ 217,073 $ 5,426,825
3.40 Demolicin Manual de roca M3 25.00 $ 402,802 $ 10,070,050
3.50 Demolicin Mecanica Roca M3 82.00 $ 93,754 $ 7,687,828
4.00 SUMINISTRO Y COLOCACION ACERO DE REFUERZO Y ESTRUCTURAS
4.10 Acero de refuerzo KG 9,440.00 $ 5,962 $ 56,281,280
4.20 Malla Electrosoldada KG 4,561.00 $ 6,240 $ 28,460,640
4.30 Const. Estructuras Metlicas Soportes, Escalera, Tapas, Rejillas etc. KG 4,000.00 $ 19,261 $ 77,044,000
4.40 Suministro e instalacin de pernos sin camisa para anclaje KG 30.00 $ 293,618 $ 8,808,540
4.50 Suministro e instalacin de pernos con camisa para anclaje KG 30.00 $ 273,674 $ 8,210,220
5.00 RELLENOS COMPACTOS

5.10 Terraplen general con material de excavacion (prestamo lateral acarreo hasta 5 km) M3 1,674.00 $ 11,418 $ 19,113,732
5.20 Terrapln armado con geotextil T 2400 o similar M3 1,000 $ 100,896 $ 100,896,000
5.30 Relleno de zanjas con material excavacion M3 1,662.00 $ 64,073 $ 106,489,326
5.40 Relleno Material Filtrante Piedra o crudo de rio incluido acarreo M3 105.00 $ 184,950 $ 19,419,750
5.50 88.00 $ 45,466 $ 4,001,008
Relleno estructural con material seleccinado incluido acarreo compacto a maquina M3
5.60 Sum. E Inst. Base granular compacto a maquina M3 243.00 $ 90,877 $ 22,083,111
5.70 Sum. E Inst. sub base granular compacto a maquina M3 243.00 $ 94,834 $ 23,044,662
5.80 Colocacin y Compactacin de Afirmado manual. M3 162.00 $ 77,905 $ 12,620,610
6.00 SUMINISTRO Y COLOCACION GEOSINTETICOS
6.10 Geotextiles No Tejido 2400 Instalado M2 619.00 $ 7,793 $ 4,823,867
6.20 Geotextiles No Tejido 1600 Instalado M2 1,200.00 $ 6,345 $ 7,614,000
6.30 Geotextil 2400 tejido Instalado M2 194.00 $ 8,874 $ 1,721,556
6.40 Geomembrana calibre 40 Instalada M2 540.00 $ 28,717 $ 15,507,180
6.50 Suministro e inst de Geodren planar M2 120.00 $ 50,613 $ 6,073,560
7.00 CONCRETO Y PAETES
7.10 Concreto simple 3000 PSI mezcla en sitio M3 251.00 $ 945,983 $ 237,441,733
7.20 Concreto simple 3000 PSI mezcla en planta M3 16.00 $ 989,010 $ 15,824,160
7.30 Concreto simple 3000 PSI mezcla sitio con acelerante 3 dias M3 71.00 $ 1,078,762 $ 76,592,102
7.40 Concreto simple 3000 PSI mezcla planta acelerado 3 das M3 20.00 $ 1,093,844 $ 21,876,880
7.50 Concreto 3.000 psi (tipo tremie) M3 20.00 $ 1,056,657 $ 21,133,140
7.60 Concreto de 4000 PSI mezcla en sitio M3 8.00 $ 983,405 $ 7,867,240
7.70 Concreto de 4000 PSI mezcla en planta M3 8.00 $ 1,022,291 $ 8,178,328
7.80 Concreto de 4000 PSI mezcla en sitio acelerado 3 dias M3 8.00 $ 1,116,184 $ 8,929,472
7.90 Concreto de 4000 PSI con acelerante 3 dias mezcla en planta M3 8.00 $ 1,143,765 $ 9,150,120
7.10 Concreto ciclpeo 2500 PSI M3 116.00 $ 727,092 $ 84,342,672
7.11 Concreto simple 2000 PSI M3 28.00 $ 672,562 $ 18,831,736
7.12 Concreto Simple de 2500 PSI para Sardineles ML 40.00 $ 155,264 $ 6,210,560
7.13 Concreto de 3000 PSI impermeabilizado M3 10.00 $ 1,089,074 $ 10,890,740
7.14 Concreto simple 3000 PSI mezcla sitio para Vigas Areas y Columnas. M3 10.00 $ 1,102,418 $ 11,024,180
7.15 Canal Recolector en Piedra Pegada (concreto de 3000 PSI) M3 10.00 $ 760,878 $ 7,608,780
PERENCO OIL AND GAS COLOMBIA LIMITED

SOLICITUD DE OFERTAS No. C166885BOQ

OBRAS DE CONSTRUCCIN Y DE MANTENIMIENTO DE VIAS, LOCACIONES Y FACILIDADES POR LLAMADO EN CAMPO GUANDO
ANEXO No. 2 CUADROS DE CANTIDADES Y TARIFAS

TEM DESCRIPCIN UNID CANT. VR. UNITARIO VR. TOTAL


(INC AIU) COP$ (INC AIU) COP$
7.16 Disipadores de Energia en Concreto Simple 3000 PSI M3 15.00 $ 1,215,321 $ 18,229,815
7.17 Concreto Carcamo 3000 PSI Con Rejilla y Marco (Prof aprox 40 cm) ML 80.00 $ 411,183 $ 32,894,640
7.18 Bordillos en Concreto Contrapozos Concreto 2500 PSI ML 150.00 $ 58,065 $ 8,709,750
7.19 Grouting Epoxico M3 2.00 $ 69,620,984 $ 139,241,968
7.20 Grouting Cementoso M3 2.00 $ 11,144,984 $ 22,289,968
7.21 Acelerante (x m3 de concreto instalado) M3 91.00 $ 196,429 $ 17,875,039
7.22 Sum. E Inst. SIKA DUR 32 PRIMER M2 120.00 $ 129,033 $ 15,483,960

7.23 200.00 $ 43,646 $ 8,729,200


Paete Impermeabilizado con Sika (Mortero 1:4 Inc. Filos y Dilataciones) M2
7.24 Paete sobre Muro (Incluye Filos y Dilataciones) M2 80.00 $ 41,993 $ 3,359,440
8.00 PROTECCION GEOTECNICA
8.10 Gaviones en piedra de rio M3 150.00 $ 385,897 $ 57,884,550
8.20 Gaviones en piedra rajon M3 100.00 $ 343,261 $ 34,326,100
8.30 Gaviones en sacos de suelo -cemento Proporcin 1:8 M3 40.00 $ 446,920 $ 17,876,800
8.40 Gaviones tipo Colchoneta Tipo reno en Piedra M3 20.00 $ 349,386 $ 6,987,720
8.50 Demolicin de Gaviones M3 90.00 $ 28,871 $ 2,598,390
8.60 Reconstruccin de Gaviones M3 40.00 $ 247,825 $ 9,913,000
8.70 Cerramiento tipo I (alambre de puas 4 hilos y poste plastico) ML 100.00 $ 51,881 $ 5,188,100
8.80 Cerramiento tipo I (alambre de puas 4 hilos y madera rolliza) ML 350.00 $ 30,022 $ 10,507,700
8.90 Suministro e instalacin de postes en plastico reciclado UND 121.00 $ 42,051 $ 5,088,171
8.10 Empradizacion con Cespedon M2 516.00 $ 32,737 $ 16,892,292
8.11 Empradizacin con Estoln M2 505.00 $ 30,361 $ 15,332,305
8.12 Empradizacin con semilla al voleo M2 3,070.00 $ 11,617 $ 35,664,190
8.13 Revegetalizacin con arbustos UND 46.00 $ 41,947 $ 1,929,562
8.14 Revegetalizacion con agrotextil M2 928.00 $ 32,341 $ 30,012,448
8.15 Tiegra Negra (incluye transporte) M3 100.00 $ 309,630 $ 30,963,000
8.16 Barreras Sacos de fique rellenos con suelo cemento 1:8 M3 120.00 $ 363,104 $ 43,572,480
8.17 Barreras Sacos de fique rellenos con suelo M3 100.00 $ 181,274 $ 18,127,400
8.18 Filtro Frances (Incluye Tuberia Flexible Perforada y Geotextil) M3 70 $ 308,209 $ 21,574,630
8.19 Corta corrientes Tipo I en Sacos de Suelo Cemento Proporcin 1-8 ML 102.00 $ 77,026 $ 7,856,652
8.20 Canal en sacos fique suelo cemento. 1:8 M2 150 $ 70,558 $ 10,583,700
8.21 Barreras o trinchos en madera M2 404.00 $ 117,781 $ 47,583,524
8.22 Bolsacreto M3 10.00 $ 718,065 $ 7,180,650
8.23 Fabricacion e instalacion de geoesteras e= 0.20 m M2 500.00 $ 211,508 $ 105,754,000
9.00 OTRAS OBRAS MTO EDIFICIOS Y FACILIDADES
9.1 Impermeabilizacin Placas y Cubiertas con Manto Asfltico M2 81.00 $ 61,882 $ 5,012,442
9.20 Pintura Muros Interiores Viniltex (3 Manos y Resane Estucos)) M2 101.00 $ 43,200 $ 4,363,200
9.30 Pintura Muros Exteriores Koraza (3 Manos y Resane Estucos)) M2 101.00 $ 44,869 $ 4,531,769
9.40 Pintura para Techo, Placas y Cielorraso M2 40.00 $ 47,962 $ 1,918,480
9.50 Pintura en Vinilo Sobre Paete M2 40.00 $ 56,231 $ 2,249,240
9.60 Pintura Esmalte para Carpintera Metlica. M2 116.00 $ 58,810 $ 6,821,960
9.70 Pintura Carpintera Madera M2 20.00 $ 58,810 $ 1,176,200
9.80 Pintura Pisos, Vigas, Columnas, Guarda escoba y Sardineles M2 73.00 $ 88,510 $ 6,461,230
9.90 Piso en Cermica M2 50.00 $ 102,436 $ 5,121,800
9.10 Cermica en Muros M2 47.00 $ 107,056 $ 5,031,632
9.11 Guardaescoba en Ceramica ML 20.00 $ 32,097 $ 641,940
9.12 Desmonte de cieloraso M2 40.00 $ 30,430 $ 1,217,200
9.13 Suministro e instalacin de Cielorraso en Drywall M2 40.00 $ 156,941 $ 6,277,640
9.14 40.00 $ 50,135 $ 2,005,400
Suministro e instalacin de Cielorraso sonocor, Duracustic 60x1,2 sin perfileria M2
9.15 66.00 $ 172,317 $ 11,372,922
Suministro e instalacin de laminas de cielo raso en fibra Mineral, incluye perfileria M2
9.16 Sum. E Inst. Teja Eternit o asbesto cemento M2 50.00 $ 91,254 $ 4,562,700
9.17 Suministro e Instalacin de Cubierta Teja arquitectonica (metalica) M2 70.00 $ 76,734 $ 5,371,380
9.18 Caballetes Teja Eternit o Barro ML 20.00 $ 88,350 $ 1,767,000
PERENCO OIL AND GAS COLOMBIA LIMITED

SOLICITUD DE OFERTAS No. C166885BOQ

OBRAS DE CONSTRUCCIN Y DE MANTENIMIENTO DE VIAS, LOCACIONES Y FACILIDADES POR LLAMADO EN CAMPO GUANDO
ANEXO No. 2 CUADROS DE CANTIDADES Y TARIFAS

TEM DESCRIPCIN UNID CANT. VR. UNITARIO VR. TOTAL


(INC AIU) COP$ (INC AIU) COP$
9.19 Cubierta en Termoacustic. M2 61.00 $ 131,184 $ 8,002,224
9.20 Cubierta Teja Zinc. M2 40.00 $ 62,214 $ 2,488,560
9.21 Carpintera en Aluminio y Vidrio M2 15.00 $ 444,981 $ 6,674,715
9.22 Sum. E instalacin Vidrio claro 4 mm M2 8.00 $ 93,501 $ 748,008
9.23 Sum. E instalacin Vidrio claro 5 mm M2 8.00 $ 112,377 $ 899,016
9.24 Sum. E instalacin Vidrio bronce 4 mm M2 8.00 $ 118,432 $ 947,456
9.25 Sum. E instalacin Vidrio bronce 5 mm M2 8.00 $ 132,952 $ 1,063,616
9.26 Puerta en madera - economica con marco en lamina cal 18 o madera M2 4.00 $ 424,859 $ 1,699,436
9.27 Placa Aligerada 3000PSI entrepiso en Stildek M2 20.00 $ 337,492 $ 6,749,840
9.28 Muro en Ladrillo Tolete Prensado a la vista 2 caras. M2 60.00 $ 169,785 $ 10,187,100
9.29 Muro en Bloque M2 60.00 $ 101,145 $ 6,068,700
9.30 Muro en Ladrillo Tolete Comn M2 60.00 $ 151,305 $ 9,078,300
10.00 SUMINISTRO DE EQUIPOS Y PERSONAL
10.10 Buldzer (140-165) HP HORA 289.00 $ 209,766 $ 60,622,374
10.20 Buldzer (> 180 HP) HORA 219.00 $ 222,966 $ 48,829,554
10.30 Motoniveladora (min) 125 HP HORA 366.00 $ 194,629 $ 71,234,214
10.40 Retroexcavadora (min) 120 HP 1.5 y 3 HORA 1,200.00 $ 194,629 $ 233,554,800
10.50 Mini retro de orugas HORA 60.00 $ 155,029 $ 9,301,740
10.60 Retro Cargador (min) 100 HP 2.25 - Y3 cat 930 HORA 500.00 $ 141,829 $ 70,914,500
10.70 Vibro compactador (min) 8 Toneladas HORA 291.00 $ 141,829 $ 41,272,239
10.80 Mini-Cargador Frontal HORA 207.00 $ 116,749 $ 24,167,043
10.90 Vibrocompactador Benitin HORA 131.00 $ 103,549 $ 13,564,919
10.1 Carrotanque (min) 5000 gal DA 90.00 $ 1,072,429 $ 96,518,610
10.11 Volqueta Dobletroque (min) 14 M3 DA 60.00 $ 1,230,829 $ 73,849,740
10.12 Volqueta Sencilla (min 6 M3) DA 150.00 $ 1,032,829 $ 154,924,350
10.13 Camioneta doble cabina (4X4) Sin Conductor DA 40.00 $ 396,660 $ 15,866,400
10.14 Camioneta doble cabina (4X4) Incluye Conductor DA 40.00 $ 549,207 $ 21,968,280
10.15 Compresor (min.)220 CFM HORA 60.00 $ 126,649 $ 7,598,940
10.16 Herramienta menor (motosierra, Guadaa) DA 40.00 $ 278,849 $ 11,153,960
10.17 Compactador t Rana o Saltarn ING RX304 HORA 100.00 $ 100,939 $ 10,093,900
10.18 Martillo Hidrulico (incluye tafira retroexcavadora) HORA 100.00 $ 247,429 $ 24,742,900
10.19 Andamio certificado (seccin completa) por da UND 30.00 $ 67,395 $ 2,021,850
10.20 Suministro Personal NO Calificado (tipo obrero) DA 1,350.00 $ 149,357 $ 201,631,950
10.21 Suministro Personal NO Calificado da festivo (tipo obrero) DIA 45.00 $ 240,189 $ 10,808,505
10.22 Suministro Personal Calificado Oficial de Construccin DA 400.00 $ 170,238 $ 68,095,200
10.23 Suministro Personal Calificado Oficial de Construccin da festivo DA 45.00 $ 276,730 $ 12,452,850
10.24 Suministro Personal Tecnico / Profesional Calificado (Dia o Fraccion) DA 20.00 $ 222,989 $ 4,459,780
11.00 TRANSPORTE DE EQUIPOS BASE EXTERNA A CAMPO
11.10 Buldzer (> 180 HP) UND 8.00 $ 8,508,147 $ 68,065,176
11.20 Motoniveladora (min) 125 HP UND 15.00 $ 8,508,147 $ 127,622,205
11.30 Retroexcavadora (min) 120 HP 1.5 y 3 UND 15.00 $ 8,508,147 $ 127,622,205
11.40 Mini retro de orugas UND 8.00 $ 8,508,147 $ 68,065,176
11.50 Retro Cargador (min) 100 HP 2.25 - Y3 cat 930 UND 30.00 $ 8,508,147 $ 255,244,410
11.60 Vibro compactador (min) 8 Toneladas UND 15.00 $ 8,508,147 $ 127,622,205
11.70 Mini-Cargador Frontal UND 8.00 $ 4,548,147 $ 36,385,176
11.80 Vibrocompactador Benitin UND 8.00 $ 3,228,147 $ 25,825,176
12.00 TRANSPORTE DE EQUIPOS ENTRE AREA CAMPO GUANDO
12.10 Buldzer (> 180 HP) UND 4.00 $ 1,240,800 $ 4,963,200
12.20 Retroexcavadora (min) 120 HP 1.5 y 3 UND 8.00 $ 1,240,800 $ 9,926,400
12.30 Mini retro de orugas UND 4.00 $ 1,240,800 $ 4,963,200
12.40 Vibro compactador (min) 8 Toneladas UND 8.00 $ 1,240,800 $ 9,926,400
12.50 Mini-Cargador Frontal UND 4.00 $ 712,800 $ 2,851,200
12.60 Vibrocompactador Benitin UND 4.00 $ 712,800 $ 2,851,200
PERENCO OIL AND GAS COLOMBIA LIMITED

SOLICITUD DE OFERTAS No. C166885BOQ

OBRAS DE CONSTRUCCIN Y DE MANTENIMIENTO DE VIAS, LOCACIONES Y FACILIDADES POR LLAMADO EN CAMPO GUANDO
ANEXO No. 2 CUADROS DE CANTIDADES Y TARIFAS

TEM DESCRIPCIN UNID CANT. VR. UNITARIO VR. TOTAL


(INC AIU) COP$ (INC AIU) COP$

13.00 OBRAS DE MANTENIMIENTO DE VIAS Y LOCACIONES


13.10 Transporte de material metro cbico M3-KM 23,038.00 $ 1,323 $ 30,479,274
13.20 Mantenimiento Bsico de Vias (Moto, Vibro, Carrotk) KM 45.00 $ 4,580,659 $ 206,129,655
13.30 Sum de Afirmado o Recebo Suelto (Sin Transporte) M3 1,100.00 $ 19,746 $ 21,720,600
13.40 Suministro de Cemento Gris Bto 50kg UND 50.00 $ 39,546 $ 1,977,300
13.50 Suministro de Crudo de Rio (Sin Transporte) M3 130.00 $ 31,890 $ 4,145,700
13.60 Rocera de Va (ambos lados) KM 20.00 $ 2,654,779 $ 53,095,580
13.70 Seales de Trnsito (Verticales) UND 10.00 $ 507,494 $ 5,074,940
13.80 Cuadrilla Topografa (Incluye Vehiculo) DIA 12.00 $ 1,090,639 $ 13,087,668
13.90 Sum. Gravilla 3/4" (Planta de Trituracin / Sin Transporte) M3 20.00 $ 62,514 $ 1,250,280
13.10 Sum. Arena (Planta de Trituracin / Sin Transporte) M3 20.00 $ 57,920 $ 1,158,400
13.11 Sum. Piedra (media songa / Sin Transporte) M3 49.00 $ 40,866 $ 2,002,434
13.12 Hincado de Pilotes ML 40.00 $ 148,233 $ 5,929,320
13.13 Cerramiento con Malla Eslabonada, Angulos y Tuberia M2 80.00 $ 207,058 $ 16,564,640
13.14 Limpieza de Cunetas, Zanjas Coronacion, Desagues ML 1,179.00 $ 6,831 $ 8,053,749
13.15 Limpieza de Alcantarilla de 24" y 36" UND 20.00 $ 609,041 $ 12,180,820
13.16 Limpieza de Trampas y Cajas Hidrulicas. UND 40.00 $ 609,041 $ 24,361,640
13.17 Limpieza de Skimer UND 10.00 $ 609,041 $ 6,090,410
14.00 TUBERA
14.10 Alcantarilla de 24" Dimetro ML 5.00 $ 539,388 $ 2,696,940
14.20 Alcantarilla de 36" Dimetro sencilla ML 5.00 $ 891,585 $ 4,457,925
14.30 Alcantarilla de 36" Dimetro doble ML 6.00 $ 1,661,809 $ 9,970,854
14.40 Tubo Conductor (Diam 20" - Calibre 12) ML 5.00 $ 1,738,493 $ 8,692,465
14.50 Tubo Conductor (Diam 42" - Calibre 12) ML 5.00 $ 3,718,493 $ 18,592,465
14.60 Tubo Conductor (Diam 14" - Calibre 12) ML 5.00 $ 1,350,413 $ 6,752,065
14.70 Suministro e instalacin tubera PVC Presin de 1/2" ML 40.00 $ 14,653 $ 586,120
14.80 Suministro e instalacin tubera PVC Presin de 3/4" ML 40.00 $ 17,003 $ 680,120
14.90 Suministro e instalacin tubera PVC Presin de 1" ML 40.00 $ 22,445 $ 897,800
14.10 Suministro e instalacin tubera PVC Presin de 1 1/2" ML 40.00 $ 35,940 $ 1,437,600
14.11 Suministro e instalacin tubera PVC Presin de 2" ML 40.00 $ 47,797 $ 1,911,880
14.12 Suministro e instalacin tubera peerforada PVC 2" ML 93.00 $ 36,270 $ 3,373,110
14.13 Suministro e instalacin tubera peerforada PVC 4" ML 18.00 $ 51,727 $ 931,086
14.14 Suministro e instalacin tubera pvc Sanitaria de 3" y 2" ML 79.00 $ 48,668 $ 3,844,772
14.15 Suministro e instalacin tubera pvc Sanitaria de 4" ML 100.00 $ 64,828 $ 6,482,800
14.16 Suministro e instalacin tubera pvc Sanitaria de 8" ML 9.00 $ 194,018 $ 1,746,162
14.17 Suministro e instalacin tubera pvc Sanitaria de 10" ML 10.00 $ 378,336 $ 3,783,360
14.18 Suministro e instalacin tubera pvc Sanitaria de 12" ML 20.00 $ 355,586 $ 7,111,720
14.19 Suministro e instalacin tubera Galvanizada 1" ML 40.00 $ 28,362 $ 1,134,480
14.20 Suministro e instalacin tubera Galvanizada 1-1/2" ML 40.00 $ 39,575 $ 1,583,000
14.21 Suministro e instalacin tubera Galvanizada 2" ML 40.00 $ 60,682 $ 2,427,280
14.22 Suministro e instalacin tubera Galvanizada 2-1/2" ML 40.00 $ 83,770 $ 3,350,800
14.23 Suministro e instalacin tubera pvc Aguas LLuvias de 3" ML 20.00 $ 48,668 $ 973,360
14.24 Suministro e instalacin tubera pvc Aguas LLuvias de 4" ML 20.00 $ 64,828 $ 1,296,560
14.25 Suministro e instalacin tubera pvc Aguas LLuvias de 6" ML 20.00 $ 132,928 $ 2,658,560
14.26 Suministro e instalacin Vlvula de Bola 1/2" UND 20.00 $ 70,443 $ 1,408,860
14.27 Suministro e instalacin Vlvula de Bola 3/4" UND 31.00 $ 99,380 $ 3,080,780
14.28 Suministro e instalacin Vlvula de Bola 1" UND 6.00 $ 142,470 $ 854,820
14.29 Suministro e instalacin Vlvula de Bola 1 3/4" UND 6.00 $ 394,178 $ 2,365,068
14.30 Suministro e instalacin Vlvula de Bola 2 1/2" UND 6.00 $ 745,574 $ 4,473,444
14.31 Suministro e instalacin Vlvula de Cortina 3" UND 6.00 $ 1,483,432 $ 8,900,592
14.32 Suministro e instalacin Vlvula de Cortina 4" UND 6.00 $ 3,117,509 $ 18,705,054
14.33 Suministro e instalacin Vlvula de Cortina 6" UND 4.00 $ 5,012,864 $ 20,051,456
14.34 Suministro e instalacin Vlvula de Cortina de 3" PVC UND 6.00 $ 554,492 $ 3,326,952
PERENCO OIL AND GAS COLOMBIA LIMITED

SOLICITUD DE OFERTAS No. C166885BOQ

OBRAS DE CONSTRUCCIN Y DE MANTENIMIENTO DE VIAS, LOCACIONES Y FACILIDADES POR LLAMADO EN CAMPO GUANDO
ANEXO No. 2 CUADROS DE CANTIDADES Y TARIFAS

TEM DESCRIPCIN UNID CANT. VR. UNITARIO VR. TOTAL


(INC AIU) COP$ (INC AIU) COP$

14.35 Suministro e instalacin Vlvula de Cortina de 4" PVC UND 6.00 $ 815,852 $ 4,895,112
15.00 PAVIMENTOS
15.10 Corte de pavimento flexible y/o rgido ML 516.00 $ 36,053 $ 18,603,348
15.20 Imprimacin M2 378.00 $ 5,095 $ 1,925,910
15.30 Suministro e Instalacin de Asfalto caliente compacto M3 790.00 $ 883,362 $ 697,855,980
15.40 Sum. e Inst. Emulsin Asfaltica GL 1,516.00 $ 12,342 $ 18,710,472
15.50 Sealizacin Vial en Piso M2 606.00 $ 58,696 $ 35,569,776

SUBTOTAL COSTOS DIRECTOS (INC A.I.U) $ 6,262,908,883.00

ADMINISTRACIN (VALOR PORCENTUAL UTILIZADO PARA CALCULAR SUS PRECIOS) 27% $ 1,281,049,544
IMPREVISTOS (VALOR PORCENTUAL UTILIZADO PARA CALCULAR SUS PRECIOS) 1% $ 47,446,279
UTILIDAD (VALOR PORCENTUAL UTILIZADO PARA CALCULAR SUS PRECIOS) 4% $ 189,785,118

IVA (16% DE LA UTILIDAD) 16% $ 30,365,619

TOTAL PROYECTO (SUBTOTAL PROYECTO


$ 6,293,274,502
+ IVA)

PORCENTAJE DE ADMINISTRACION DE REEMBOLSABLES (MAX 10%) 10%

LUIS EFRAIN VARGAS MORENO


REPRESENTANTE LEGAL
SERVICIOS DE INGENIERIA CIVIL S.A.
PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Movilizacin Inicial Equipos y Facilida
1.10
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 8 1.00
CAMIONETA 8 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 8.00
ACPM Galon 40.00

CANT. REND.
MANO DE OBRA
(f) (g)
OPERADOR O CONDUCTOR 8 1.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Localizacin y Replan
1.20
CANT. REND.
EQUIPO
(a) (b)
ESTACIN TOPOGRFICA 1 150.00
EQUIPO DE COMPUTO 1 150.00
CAMIONETA 1 150.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.03

CANT. REND.
MANO DE OBRA
(f) (g)
TOPOGRAFO 1 150.00
CADENERO 2 150.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Desmonte y Limpieza (Incluye acarreo
1.30
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 0.80
MOTOSIERRA 1 0.80
Guadaa 1 0.80
HERRAMIENTA MENOR 1 0.80
VOLQUETA DOBLETROQUE 1 0.80

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 87.50

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 4 0.80
OFICIAL 2 0.80
OPERADOR O CONDUCTOR 2 0.80

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Descapote
1.40
CANT. REND.
EQUIPO
(a) (b)
RETROEXCAVADORA 1 400.00
BULLDOZER 1 400.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.30
Transporte Volqueta m3/km 18.75

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 400.00
OPERADOR O CONDUCTOR 2 400.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Excavacin Mecanica en
2.10
CANT. REND.
EQUIPO
(a) (b)
RETROEXCAVADORA 1 400.00
BULLDOZER 1 400.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.30

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 400.00
OPERADOR O CONDUCTOR 2 400.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Excavacn Mecanica en
2.20
CANT. REND.
EQUIPO
(a) (b)
RETROEXCAV. Y MARTILLO HIDRAULICO 1 60.00
BULLDOZER 1 300.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 1.20
Transporte Volqueta m3/km 18.75

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 60.00
OPERADOR O CONDUCTOR 1 60.00
OPERADOR O CONDUCTOR 1.00 300.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Excavacin Manual en
2.30
CANT. REND.
EQUIPO
(a) (b)
RETROEXCAVADORA 1 300.00
BULLDOZER 1 300.00
HERRAMIENTA MENOR 1 3.00
Rotomartillo 1 3.00
Fuente generadora MV 0 a 64 1 3.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.73
Transporte Volqueta m3/km 18.75

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 3.00
OFICIAL 1 3.00
OPERADOR O CONDUCTOR 2 300.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Excavacin Manual en suelo
2.40
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 200.00
VOLQUETA DOBLETROQUE 1 200.00
HERRAMIENTA MENOR 1 8.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.35

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 8.00
OFICIAL 1 8.00
OPERADOR O CONDUCTOR 2 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Demolicin Concreto M
3.10
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 300.00
HERRAMIENTA MENOR 1 2.00
Rotomartillo 1 2.00
Fuente generadora MV 0 a 64 1 2.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.20
Transporte Volqueta m3/km 18.75

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 3 2.00
OFICIAL 1 2.00
OPERADOR O CONDUCTOR 2 300.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Demolicin Concreto Me
3.20
CANT. REND.
EQUIPO
(a) (b)
RETROEXCAV. Y MARTILLO HIDRAULICO 1 50.00
HERRAMIENTA MENOR 1 50.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 2.40
Transporte Volqueta m3/km 18.75

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 50.00
OPERADOR O CONDUCTOR 1 50.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Demolicin Muros
3.30
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 300.00
HERRAMIENTA MENOR 1 4.00
Rotomartillo 1 4.00
Fuente generadora MV 0 a 64 1 4.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.20
Transporte Volqueta m3/km 18.75

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 3 4.00
OFICIAL 1 4.00
OPERADOR O CONDUCTOR 2 300.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Demolicin Manual de
3.40
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 300.00
HERRAMIENTA MENOR 1 2.00
Rotomartillo 1 2.00
Fuente generadora MV 0 a 64 1 2.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.20
Transporte Volqueta m3/km 18.75

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 3 2.00
OFICIAL 1 2.00
OPERADOR O CONDUCTOR 2 300.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Demolicin Mecanica R
3.50
CANT. REND.
EQUIPO
(a) (b)
RETROEXCAV. Y MARTILLO HIDRAULICO 1 50.00
HERRAMIENTA MENOR 1 50.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 2.40
Transporte Volqueta m3/km 18.75

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 50.00
OPERADOR O CONDUCTOR 1 50.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Acero de refuerzo
4.10
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 200.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
acero de refuerzo kg 1.05
Alambre negro Kg 0.05

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 200.00
OPERADOR O CONDUCTOR 1 200.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Malla Electrosoldad
4.20
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 200.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
malla electrosoldada kg 1.05
Alambre negro Kg 0.05

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 1 200.00
OPERADOR O CONDUCTOR 1 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Const. Estructuras Metlicas Soportes, Esc
4.30
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 200.00
MOTOSOLDADOR DIESEL 1 200.00
EQUIPO OXCICORTE 1 200.00
EQUIPO PINTURA 1 200.00
Camin gra 1 5,000.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
acero estructural Kg 1.05
OXIGENO bl 0.005
ACETILENO bl 0.005
Soldadura kg 0.05
Pintura Anticorrosivo gl 0.01
Pintura Esmalte gl 0.01
ACPM Galon 0.06

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 200.00
OFICIAL 2 200.00
ayudante tcnico 2 200.00
SOLDADOR 1 200.00
PINTOR 1 200.00
OPERADOR O CONDUCTOR 1 5,000.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin de pernos sin
4.40
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 4.00
Taladro 1 4.00
Fuente generadora MV 0 a 64 1 4.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Pernos de anclaje sin camisa kg 1.05
Sikadur AnchorFix-4 Cartucho 600cc 0.25

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 4.00
OFICIAL 1 4.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin de pernos con
4.50
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 4.00
Taladro 1 4.00
Fuente generadora MV 0 a 64 1 4.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Pernos de anclaje sin camisa kg 1.05

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 4.00
OFICIAL 1 4.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO Terraplen general con material de excavacion


hasta 5 km)
5.10
CANT. REND.
EQUIPO
(a) (b)
MOTONIVELADORA 1 400.00
VIBROCOMPACTADOR 1 400.00
CARROTANQUE 1 400.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.33

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 400.00
OPERADOR O CONDUCTOR 3 400.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Terrapln armado con geotextil T
5.20
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 200.00
VIBROCOMPACTADOR BENITIN 1 200.00
CARROTANQUE 1 200.00
PLANCHA VIBRATORIA 1 20.00
HERRAMIENTA MENOR 1 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.53
Getextil tipo GT2400 M2 5.50

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 20.00
OFICIAL 2 20.00
OPERADOR O CONDUCTOR 3 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Relleno de zanjas con materia
5.30
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 200.00
VIBROCOMPACTADOR BENITIN 1 200.00
CARROTANQUE 1 200.00
PLANCHA VIBRATORIA 1 20.00
HERRAMIENTA MENOR 1 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.53

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 20.00
OFICIAL 2 20.00
OPERADOR O CONDUCTOR 3 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Relleno Material Filtrante Piedra o crudo
5.40
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 200.00
VIBROCOMPACTADOR BENITIN 1 200.00
CARROTANQUE 1 200.00
HERRAMIENTA MENOR 1 200.00
PLANCHA VIBRATORIA 1 200.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.53
Crudo de rio m3 1.25
Transporte Volqueta m3/km 106.25

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 200.00
OFICIAL 1 200.00
OPERADOR O CONDUCTOR 3 200.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO Relleno estructural con material seleccinado


maquina
5.50
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 200.00
VIBROCOMPACTADOR BENITIN 1 200.00
CARROTANQUE 1 200.00
HERRAMIENTA MENOR 1 200.00
PLANCHA VIBRATORIA 1 200.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.53
Recebo m3 1.25

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 4 200.00
OFICIAL 2 200.00
OPERADOR O CONDUCTOR 3 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum. E Inst. Base granular comp
5.60
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 300.00
VIBROCOMPACTADOR 1 300.00
CARROTANQUE 1 300.00
HERRAMIENTA MENOR 1 300.00
PLANCHA VIBRATORIA 1 300.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.35
Base Triturada de 1 1/2" m3 1.25

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 300.00
OFICIAL 2 300.00
OPERADOR O CONDUCTOR 3 300.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum. E Inst. sub base granular com
5.70
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 200.00
VIBROCOMPACTADOR 1 200.00
CARROTANQUE 1 200.00
HERRAMIENTA MENOR 1 200.00
PLANCHA VIBRATORIA 1 200.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.53
Subbase Triturada de 1 1/2" m3 1.25

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 200.00
OFICIAL 2 200.00
OPERADOR O CONDUCTOR 3 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Colocacin y Compactacin de Af
5.80
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 200.00
VIBROCOMPACTADOR BENITIN 1 200.00
CARROTANQUE 1 200.00
HERRAMIENTA MENOR 1 25.00
PLANCHA VIBRATORIA 1 25.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.53
Recebo m3 1.25

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 25.00
OFICIAL 2 25.00
OPERADOR O CONDUCTOR 3 200.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Geotextiles No Tejido 2400
6.10
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 200.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Geotextil NT 2600 m2 1.05

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 1 200.00
OFICIAL 1 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Geotextiles No Tejido 1600
6.20
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 200.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Geotextil NT 1600 m2 1.05

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 200.00
OFICIAL 1 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Geotextil 2400 tejido Ins
6.30
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 200.00
UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Getextil tipo GT2400 M2 1.05

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 200.00
OFICIAL 1 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Geomembrana calibre 40 I
6.40
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Geomembrana calibre 40 M2 1.15

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 100.00
OFICIAL 1 100.00
Tecnico 1 100.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e inst de Geodre
6.50
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
geodren planar de 1m m 1.15

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 1 100.00
OFICIAL 1 100.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto simple 3000 PSI me
7.10
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
Vibrador para concreto 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto de 3000 psi m3 1.05
Aditivos Global 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 6.00
OFICIAL 2 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto simple 3000 PSI mez
7.20
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
Vibrador para concreto 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto 3000 psi planta m3 1.05
Aditivos Global 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 6.00
OFICIAL 2 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto simple 3000 PSI mezcla sitio
7.30
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
Vibrador para concreto 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto de 3000 psi m3 1.05
Aditivos Global 1.00
Formaleta Global 1.00
Acelerante Sikaset-L Kg 10.50

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 6.00
OFICIAL 2 6.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto simple 3000 PSI mezcla plan
7.40
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
Vibrador para concreto 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto 3000 psi planta acelerado a 3 dias m3 1.05
Aditivos Global 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 4 6.00
OFICIAL 2 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto 3.000 psi (tipo
7.50
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
Vibrador para concreto 1 6.00
Bombeo concreto 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto 3000 psi tipo tremie m3 1.05
Aditivos Global 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 6.00
OFICIAL 2 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto de 4000 PSI mezc
7.60
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
Vibrador para concreto 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto de 4000 psi m3 1.05
Aditivos Global 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 6.00
OFICIAL 2 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto de 4000 PSI mezcl
7.70
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
Vibrador para concreto 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto 4000 psi planta m3 1.05
Aditivos Global 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 6.00
OFICIAL 2 6.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto de 4000 PSI mezcla en sit
7.80
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
Vibrador para concreto 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto de 4000 psi m3 1.05
Aditivos Global 1.00
Formaleta Global 1.00
Acelerante Sikaset-L Kg 10.50

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 4 6.00
OFICIAL 2 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto de 4000 PSI con acelerante 3
7.90
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
Vibrador para concreto 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto 4000 psi planta acelarado a 3 dias m3 1.05
Aditivos Global 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 6.00
OFICIAL 2 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto ciclpeo 2500
7.10
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
Vibrador para concreto 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
concreto de 2500 psi m3 0.65
Aditivos Global 1.00
Formaleta Global 1.00
Piedra Rajon M3 0.45

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 6.00
OFICIAL 2 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto simple 2000
7.11
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
Vibrador para concreto 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto 2000 psi m3 0.65
Aditivos Global 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 6.00
OFICIAL 2 6.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto Simple de 2500 PSI pa
7.12
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 30.00
Vibrador para concreto 1 30.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto 2000 psi m3 0.19
Aditivos Global 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 4 30.00
OFICIAL 2 30.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto de 3000 PSI imperm
7.13
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
Vibrador para concreto 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto de 3000 psi m3 1.05
Aditivos Global 1.00
Formaleta global 1.00
Impermeabilizante concretos y morteros Kg 10.50

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 6.00
OFICIAL 2 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto simple 3000 PSI mezcla sitio para
7.14
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 4.00
Vibrador para concreto 1 4.00
Seccion de andamio 4 4.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto de 3000 psi m3 1.05
Aditivos Global 1.00
Formaleta global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 4.00
OFICIAL 2 4.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Canal Recolector en Piedra Pegada (co
7.15
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 4.00
1 4.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto de 3000 psi m3 0.65
Aditivos Global 1.00
Formaleta Global 1.00
Piedra Bolo M3 0.45

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 4.00
OFICIAL 2 4.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Disipadores de Energia en Concreto
7.16
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 2.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto de 3000 psi m3 1.05
Aditivos Global 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 4 2.00
OFICIAL 2 2.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Concreto Carcamo 3000 PSI Con Rejilla y M
7.17
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 30.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto de 3000 psi m3 0.15
malla electrosoldada kg 4.55
Aditivos Global 1.00
Formaleta Global 1.00
Rejilla ml 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 30.00
OFICIAL 2 30.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Bordillos en Concreto Contrapozos C
7.18
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 30.00
UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
concreto de 2500 psi m3 0.04
Aditivos Global 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 30.00
OFICIAL 2 30.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Grouting Epoxico
7.19
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 0.10

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Sikadur-42 CL Kg 2,000.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 0.10
OFICIAL 1 0.10
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Grouting Cementos
7.20
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 0.10

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
SikaGrout-212 - Grouting cementoso Kg 1,900.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 1 0.10
OFICIAL 1 0.10

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Acelerante (x m3 de concreto
7.21
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Acelerante Sikaset-L Kg 10.50

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 6.00
OFICIAL 1 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum. E Inst. SIKA DUR 32
7.22
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 10.00
UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Sikadur 32 primer kg 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 10.00
OFICIAL 1 10.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Paete Impermeabilizado con Sika (Mortero 1
7.23
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 15.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Mortero 1:3 M3 0.03
Impermeabilizante concretos y morteros Kg 0.32

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 15.00
OFICIAL 1 15.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Paete sobre Muro (Incluye Filos
7.24
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 15.00
Seccion de andamio 1 15.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Mortero 1:3 M3 0.03

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 1 15.00
OFICIAL 1 15.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Gaviones en piedra de
8.10
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Malla gavin Un. 0.50
alambre cal 9 kg 1.00
Piedra Bolo M3 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 5 6.00
OFICIAL 1 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Gaviones en piedra ra
8.20
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Malla gavin Un. 0.50
alambre cal 9 kg 1.00
Piedra Rajon M3 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 5 6.00
OFICIAL 1 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Gaviones en piedra ra
8.20
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Malla gavin Un. 0.50
alambre cal 9 kg 1.00
Piedra Rajon M3 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 5 6.00
OFICIAL 1 6.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Gaviones en sacos de suelo -cemen
8.30
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
RETROCARGADOR 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Malla gavin Un. 0.50
alambre cal 9 kg 1.00
Saco fique un 23.00
Cemento KG. 143.75
Formaleta Global 1.00
ACPM Galon 0.35

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 5 6.00
OFICIAL 1 6.00
OPERADOR O CONDUCTOR 1 100.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Gaviones tipo Colchoneta Tipo r
8.40
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Malla colchoneta Un. 1.00
alambre cal 9 kg 1.00
Piedra Rajon M3 1.00
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 5 6.00
OFICIAL 1 6.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Demolicin de Gavion
8.50
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
RETROCARGADOR 1 300.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.12

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 1 20.00
OPERADOR O CONDUCTOR 1 300.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Reconstruccin de Gav
8.60
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Malla gavin Un. 0.50
alambre cal 9 kg 1.00

Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 5 6.00
OFICIAL 1 6.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Cerramiento tipo I (alambre de puas 4
8.70
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 40.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
poste plastico reciclable cerca de 5 hilos 10*10 un. 0.46
Alambre de puas cal 12 ml 4.40
alambre cal 9 kg 0.20

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 4 40.00
OFICIAL 1 40.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Cerramiento tipo I (alambre de puas 4 h
8.80
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 40.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Poste de madera cerca de 4 hilos un. 0.46
Alambre de puas cal 12 ml 4.40
alambre cal 9 kg 0.20

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 40.00
OFICIAL 1 40.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin de postes en
8.90
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 40.00
UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
poste plastico reciclable cerca de 5 hilos 10*10 un. 0.46

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 40.00
OFICIAL 1 40.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Empradizacion con Ces
8.10
CANT. REND.
EQUIPO
(a) (b)
CARROTANQUE 1 200.00
HERRAMIENTA MENOR 1 200.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Cespedones m2 1.10
Tierra negra m3 0.05
Estacas UNIDAD 4.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 200.00
OFICIAL 1 200.00
OPERADOR O CONDUCTOR 1 200.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Empradizacin con Es
8.11
CANT. REND.
EQUIPO
(a) (b)
CARROTANQUE 1 200.00
HERRAMIENTA MENOR 1 200.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Estolones un 30.00
Tierra negra m3 0.05

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 4 200.00
OFICIAL 1 200.00
OPERADOR O CONDUCTOR 1 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Empradizacin con semilla
8.12
CANT. REND.
EQUIPO
(a) (b)
CARROTANQUE 1 200.00
HERRAMIENTA MENOR 1 200.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Semilla kg 0.01
Abonos Kg 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 200.00
OFICIAL 1 200.00
OPERADOR O CONDUCTOR 1 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Revegetalizacin con ar
8.13
CANT. REND.
EQUIPO
(a) (b)
CARROTANQUE 1 200.00
CAMION 1 200.00
HERRAMIENTA MENOR 1 40.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Arbol UNIDAD 1.00
Abonos Kg 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 200.00
OFICIAL 1 200.00
OPERADOR O CONDUCTOR 2 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Revegetalizacion con ag
8.14
CANT. REND.
EQUIPO
(a) (b)
CARROTANQUE 1 200.00
HERRAMIENTA MENOR 1 200.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Semilla kg 0.01
Geomanto m2 1.10
Tierra negra m3 0.05
Estacas UNIDAD 4.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 200.00
OFICIAL 1 200.00
OPERADOR O CONDUCTOR 1 200.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Tiegra Negra (incluye tran
8.15
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 100.00
HERRAMIENTA MENOR 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 5.83
Tierra negra m3 1.10

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 4 100.00
OFICIAL 1 100.00
OPERADOR O CONDUCTOR 1 100.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Barreras Sacos de fique rellenos con
8.16
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 100.00
HERRAMIENTA MENOR 1 10.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.35
Saco fique un 29.17
Cemento KG. 237.50

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 10.00
OFICIAL 1 10.00
OPERADOR O CONDUCTOR 1 100.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Barreras Sacos de fique rellen
8.17
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 100.00
HERRAMIENTA MENOR 1 10.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.35
Saco fique un 29.17

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 10.00
OFICIAL 1 10.00
OPERADOR O CONDUCTOR 1 100.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Filtro Frances (Incluye Tuberia Flexible
8.18
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 100.00
HERRAMIENTA MENOR 1 15.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.35
Piedra filtro m3 1.10
Tuberia PVC 4" perforada ml 2.92
Geotextil NT 1600 m2 9.72

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 15.00
OFICIAL 1 15.00
OPERADOR O CONDUCTOR 1 100.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Corta corrientes Tipo I en Sacos de Suelo
8.19
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Saco fique un 5.00
Cemento KG. 31.25

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 4 20.00
OFICIAL 1 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Canal en sacos fique suelo ce
8.20
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Saco fique un 4.20
Cemento KG. 26.25

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 20.00
OFICIAL 1 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Barreras o trinchos en m
8.21
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
CAMION 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Postes de madera 15cms*3m un 1.50
Tabla burra 28 cms*3m un 1.20
Puntilla libra 0.20
Grapas libra 0.20
Alambre dulce cal 12 kg 0.25

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 20.00
OFICIAL 1 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Bolsacreto
8.22
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 10.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Saco polipropileno un 1.00
concreto de 2500 psi m3 1.10

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 10.00
OFICIAL 1 10.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Fabricacion e instalacion de geoes
8.23
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 25.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Geomalla de refuerzo fortgrid m2 3.20
Cuerda Polimerica ml 12.00
Piedra Bolo M3 0.30
Formaleta Global 1.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 5 25.00
OFICIAL 1 25.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Impermeabilizacin Placas y Cubiertas
9.1
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 40.00
SOPLETE 1 40.00
andamios tipo layher 2 40.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Manto Asfltico con Foil de Aluminio ref. F/100 m2 1.05
Emulsin PX-900 o similar ml 0.05
Pintura Bituminosa Solarflex Gl 0.05

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 40.00
ayudante tcnico 2 40.00
Tecnico 1 40.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Pintura Muros Interiores Viniltex (3 Mano
9.20
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Estuco acrilico galon 0.20
Viniltex blanco galon 0.10

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 1 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Pintura Muros Exteriores Koraza (3 Mano
9.30
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Estuco acrilico galon 0.20
Pintura coraza galon 0.10

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 1 20.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Pintura para Techo, Placas y
9.40
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 15.00
andamios tipo layher 2 15.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Viniltex blanco galon 0.10

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 15.00
OFICIAL 1 15.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Pintura en Vinilo Sobre P
9.50
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 15.00
andamios tipo layher 2 15.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Viniltex blanco galon 0.20

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 15.00
OFICIAL 1 15.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Pintura Esmalte para Carpinte
9.60
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00
EQUIPO PINTURA 1 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Disolventes galon 0.10
Pintura anticorrosiva galon 0.10
Pintura esmaltes galon 0.10

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 1 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Pintura Carpintera Ma
9.70
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00
EQUIPO PINTURA 1 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Disolventes galon 0.10
Barniz galon 0.10
Pintura esmaltes galon 0.10

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 1 20.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Pintura Pisos, Vigas, Columnas, Guarda
9.80
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Pintura Epoxica gl 0.20

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 1 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Piso en Cermica
9.90
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Echape Tipo 1 m2 1.10
Pegante kg 5.00
Boquilla kg 0.25
0

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 1 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Cermica en Muro
9.10
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Echape Tipo 1 m2 1.10
Pegante kg 5.00
Boquilla kg 0.25
0

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 1 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Guardaescoba en Cera
9.11
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Echape Tipo 1 m2 0.20
Pegante kg 1.00
Boquilla kg 0.05
0

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 20.00
OFICIAL 1 20.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Desmonte de cielora
9.12
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 1 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin de Cielor
9.13
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 10.00
andamios tipo layher 2 10.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Laminas Drywall 1/2". (2.44 X 1.22) UN 0.38
Perfileria en Lmina Galvanizada y tornilleria ml 4.00
masilla plastica y sellante Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 10.00
OFICIAL 2 10.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO Suministro e instalacin de Cielorraso sono


perfileria
9.14
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Lamina Cielorraso Duracustic 60x1,2 un 0.38

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 2 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO Suministro e instalacin de laminas de cielo ra


perfileria
9.15
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Lamina mineral tipo Armstrong 60,5*60,5 un 3.19
Perfileria en Lmina Galvanizada ml 6.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 2 20.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum. E Inst. Teja Eternit o asbe
9.16
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Teja eternit fibrocemento ondulada m2 1.10
Ganchos de fijacion UNIDAD 4.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 2 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e Instalacin de Cubierta Teja a
9.17
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Teja arquitectonica acesco m2 1.10
Ganchos de fijacion UNIDAD 4.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 2 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Caballetes Teja Eternit o
9.18
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Caballete teja eternit ondulada ml 1.10
Ganchos de fijacion UNIDAD 4.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 2 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Cubierta en Termoacu
9.19
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Teja termoacustica m2 1.10
Ganchos de fijacion UNIDAD 4.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 2 20.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Cubierta Teja Zinc
9.20
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Teja de zinc m2 1.10
Ganchos de fijacion UNIDAD 4.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 2 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Carpintera en Aluminio y
9.21
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 10.00
andamios tipo layher 2 10.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Ventaneria en aluminio y vidrio de 4 mm m2 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 10.00
OFICIAL 1 10.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum. E instalacin Vidrio cl
9.22
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vidrio claro 4mm m2 1.10
Cartucho silicona UNIDAD 0.25

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 20.00
Tecnico 1 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum. E instalacin Vidrio cl
9.23
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vidrio claro 5mm m2 1.10
Cartucho silicona UNIDAD 0.25

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 20.00
Tecnico 1 20.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum. E instalacin Vidrio bro
9.24
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vidrio bronce 4mm m2 1.10
Cartucho silicona UNIDAD 0.25

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
Tecnico 1 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum. E instalacin Vidrio bro
9.25
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
andamios tipo layher 2 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vidrio bronce 5mm m2 1.10
Cartucho silicona UNIDAD 0.25

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
Tecnico 1 20.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Puerta en madera - economica con marco e
9.26
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 5.00
UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Puerta emtamborada en madera m2 1.00
Marco en lamina cal 18 m2 1.00
Cerradura de bola yale UNIDAD 0.50

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 5.00
OFICIAL 1 5.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Placa Aligerada 3000PSI entrep
9.27
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 10.00
andamios tipo layher 2 10.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Concreto de 3000 psi m3 0.11
Laminas de Steel deck cal 22 m2 1.10
malla electrosoldada kg 3.00
Perfileria ml 2.00
Formaleta global 0.20
0

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 10.00
OFICIAL 2 10.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Muro en Ladrillo Tolete Prensado a
9.28
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 15.00
andamios tipo layher 2 15.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Ladrillo Tolete la vista un 70.00
Mortero Pega M3 0.02

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 15.00
OFICIAL 2 15.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Muro en Bloque
9.29
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 15.00
andamios tipo layher 2 15.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Bloque N5 un 16.00
Mortero Pega M3 0.02

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 15.00
OFICIAL 2 15.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Muro en Ladrillo Tolete C
9.30
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 15.00
andamios tipo layher 2 15.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Ladrillo Tolete comun un 70.00
Mortero Pega M3 0.02

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 15.00
OFICIAL 2 15.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Buldzer (140-165) H
10.10
CANT. REND.
EQUIPO
(a) (b)
BULLDOZER 1 10.00
BUSETA 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 6.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 8.00
OPERADOR O CONDUCTOR 1 8.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Buldzer (> 180 HP
10.20
CANT. REND.
EQUIPO
(a) (b)
BULLDOZER > 180 hp 1 10.00
BUSETA 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 6.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 1 8.00
OPERADOR O CONDUCTOR 1 8.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Motoniveladora (min) 12
10.30
CANT. REND.
EQUIPO
(a) (b)
MOTONIVELADORA 1 10.00
BUSETA 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 6.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 8.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Retroexcavadora (min) 120
10.40
CANT. REND.
EQUIPO
(a) (b)
RETROEXCAVADORA 1 10.00
BUSETA 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 6.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 8.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Mini retro de oruga
10.50
CANT. REND.
EQUIPO
(a) (b)
MiniExcavadora 1 10.00
BUSETA 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 3.50

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 8.00


D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Retro Cargador (min) 100 HP 2.2
10.60
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 10.00
BUSETA 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 3.50

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 8.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Vibro compactador (min) 8 T
10.70
CANT. REND.
EQUIPO
(a) (b)
VIBROCOMPACTADOR 1 10.00
BUSETA 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 3.50

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 8.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Mini-Cargador Front
10.80
CANT. REND.
EQUIPO
(a) (b)
MINICARGADOR BOCAT 1 10.00
BUSETA 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 3.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 8.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Vibrocompactador Ben
10.90
CANT. REND.
EQUIPO
(a) (b)
VIBROCOMPACTADOR BENITIN 1 10.00
BUSETA 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 3.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 8.00


D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Carrotanque (min) 500
10.10
CANT. REND.
EQUIPO
(a) (b)
CARROTANQUE 5000 gls 1 1.00
BUSETA 1 12.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 20.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 8.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Volqueta Dobletroque (min
10.11
CANT. REND.
EQUIPO
(a) (b)
VOLQUETA DOBLETROQUE 1 1.00
BUSETA 1 12.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 35.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 8.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Volqueta Sencilla (min 6
10.12
CANT. REND.
EQUIPO
(a) (b)
VOLQUETA PEQUEA 1 1.00
BUSETA 1 12.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 35.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 8.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Camioneta doble cabina (4X4) S
10.13
CANT. REND.
EQUIPO
(a) (b)
CAMIONETA 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 15.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 0 1.00


D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Camioneta doble cabina (4X4) Inc
10.14
CANT. REND.
EQUIPO
(a) (b)
CAMIONETA 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 15.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Compresor (min.)220 C
10.15
CANT. REND.
EQUIPO
(a) (b)
COMPRESOR CON MARTILLO 1 10.00
CAMION 1 40.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 2.00
PUNTAS un. 0.10

CANT. REND.
MANO DE OBRA
(f) (g)

OFICIAL 1 8.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Herramienta menor (motosierr
10.16
CANT. REND.
EQUIPO
(a) (b)
MOTOSIERRA 1 1.00
BUSETA 1 12.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.00

CANT. REND.
MANO DE OBRA
(f) (g)

OBRERO 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Compactador t Rana o Saltarn
10.17
CANT. REND.
EQUIPO
(a) (b)
SALTARIN 1 1.00
BUSETA 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.00

CANT. REND.
MANO DE OBRA
(f) (g)

OBRERO 1 8.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Martillo Hidrulico (incluye tafira re
10.18
CANT. REND.
EQUIPO
(a) (b)
RETROEXCAV. Y MARTILLO HIDRAULICO 1 10.00
BUSETA 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 6.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 8.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Andamio certificado (seccin com
10.19
CANT. REND.
EQUIPO
(a) (b)
andamios tipo layher 1 1.00
CAMION 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 10.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro Personal NO Calificad
10.20
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 25.00
BUSETA 1 25.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

OBRERO 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro Personal NO Calificado da
10.21
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 25.00
BUSETA 1 25.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

OBRERO 1 1.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro Personal Calificado Oficia
10.22
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 25.00
BUSETA 1 25.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)

OFICIAL 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro Personal Calificado Oficial de C
10.23
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 25.00
BUSETA 1 25.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

OFICIAL 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro Personal Tecnico / Profesional C
10.24
CANT. REND.
EQUIPO
(a) (b)
BUSETA 1 25.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

Tecnico 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Buldzer (> 180 HP
11.10
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 2 1.00
CAMIONETA 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 1.00


D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Motoniveladora (min) 12
11.20
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 2 1.00
CAMIONETA 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Retroexcavadora (min) 120
11.30
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 2 1.00
CAMIONETA 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Mini retro de oruga
11.40
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 2 1.00
CAMIONETA 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Retro Cargador (min) 100 HP 2.2
11.50
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 2 1.00
CAMIONETA 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 1.00


D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Vibro compactador (min) 8 T
11.60
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 2 1.00
CAMIONETA 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Mini-Cargador Front
11.70
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 2 1.00
CAMIONETA 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Vibrocompactador Ben
11.80
CANT. REND.
EQUIPO
(a) (b)
CAMION 2 1.00
CAMIONETA 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

OPERADOR O CONDUCTOR 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Buldzer (> 180 HP
12.10
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 1 1.00
CAMIONETA 1 2.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

1 1.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Retroexcavadora (min) 120
12.20
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 1 1.00
CAMIONETA 1 2.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)

1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Mini retro de oruga
12.30
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 1 1.00
CAMIONETA 1 2.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Vibro compactador (min) 8 T
12.40
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 1 1.00
CAMIONETA 1 2.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Mini-Cargador Front
12.50
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 1 2.00
CAMIONETA 1 2.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)

1 1.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Vibrocompactador Ben
12.60
CANT. REND.
EQUIPO
(a) (b)
CAMA BAJA 1 2.00
CAMIONETA 1 2.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)

1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Transporte de material met
13.10
CANT. REND.
EQUIPO
(a) (b)
1 15.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Transporte Volqueta m3/km 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 1,000.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Mantenimiento Bsico de Vias (Mot
13.20
CANT. REND.
EQUIPO
(a) (b)
MOTONIVELADORA 1 1.00
VIBROCOMPACTADOR 1 1.00
CARROTANQUE 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 130.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 1.00
OPERADOR O CONDUCTOR 3 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum de Afirmado o Recebo Suelto
13.30
CANT. REND.
EQUIPO
(a) (b)
1 1.00
1 1.00
1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Recebo m3 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 200.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro de Cemento Gris
13.40
CANT. REND.
EQUIPO
(a) (b)
1 1.00
1 1.00
1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Cemento KG. 50.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 1 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro de Crudo de Rio (Si
13.50
CANT. REND.
EQUIPO
(a) (b)
1 1.00
1 1.00
1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Crudo de rio m3 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Rocera de Va (ambos
13.60
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 1.00
Guadaa 2 1.00
MOTOSIERRA 1 1.00
VOLQUETA PEQUEA 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 35.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 6 1.00
OFICIAL 2 1.00
OPERADOR O CONDUCTOR 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Seales de Trnsito (Ver
13.70
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 5.00
CAMION 1 50.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Seal vertical tipo INV un. 1.00
Concreto de 3000 psi m3 0.05

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 5.00
OFICIAL 1 5.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Cuadrilla Topografa (Incluye
13.80
CANT. REND.
EQUIPO
(a) (b)
EQUIPO DE COMPUTO 1 1.00
ESTACIN TOPOGRFICA 1 1.00
Nivel de precision 1 1.00
CAMIONETA 1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 10.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
CADENERO 2 1.00
TOPOGRAFO 1 1.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum. Gravilla 3/4" (Planta de Trituraci
13.90
CANT. REND.
EQUIPO
(a) (b)
1 1.00
1 1.00
1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Gravilla para concretos sin transporte m3 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum. Arena (Planta de Trituracin
13.10
CANT. REND.
EQUIPO
(a) (b)
1 1.00
1 1.00
1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
arena sin transporte m3 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 200.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum. Piedra (media songa / Sin
13.11
CANT. REND.
EQUIPO
(a) (b)
1 1.00
1 1.00
1 1.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Piedra Rajon sin transporte M3 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 200.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Hincado de Pilotes
13.12
CANT. REND.
EQUIPO
(a) (b)
RETROEXCAV. Y MARTILLO HIDRAULICO 1 60.00
Camin gra 1 60.00
HERRAMIENTA MENOR 1 30.00
MOTOSOLDADOR DIESEL 1 30.00
EQUIPO OXCICORTE 1 30.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 1.58
ACETILENO bl 0.10
OXIGENO bl 0.10
Soldadura kg 0.10

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 30.00
OFICIAL 1 30.00
OPERADOR O CONDUCTOR 2 60.00
SOLDADOR 1 30.00
ayudante tcnico 2 30.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Cerramiento con Malla Eslabonada,
13.13
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 40.00
MOTOSOLDADOR DIESEL 1 40.00
EQUIPO OXCICORTE 1 40.00
EQUIPO PINTURA 1 40.00
Pulidora con extensin de 30 mts 1 40.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Malla eslabonada Galv. Cal 9*2" m2 1.05
Tuberia galvanizada 2"*3mm ml 0.86
Concreto de 3000 psi m3 0.03
Alambre de puas cal 12 ml 1.65
acero de refuerzo kg 1.18
Pintura Anticorrosivo gl 0.25
Pintura Esmalte gl 0.25
alambre cal 9 kg 0.25
Soldadura kg 0.25

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 40.00
OFICIAL 1 40.00
SOLDADOR 1 40.00
ayudante tcnico 2 40.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Limpieza de Cunetas, Zanjas Coron
13.14
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 200.00
RETROCARGADOR 1 800.00
VOLQUETA PEQUEA 1 800.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 0.09

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 200.00
OFICIAL 1 200.00
OPERADOR O CONDUCTOR 2 800.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Limpieza de Alcantarilla de
13.15
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 2.00
RETROCARGADOR 1 10.00
VOLQUETA PEQUEA 1 10.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 7.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 2.00
OFICIAL 1 2.00
OPERADOR O CONDUCTOR 2 10.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Limpieza de Trampas y Cajas
13.16
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 2.00
RETROCARGADOR 1 10.00
VOLQUETA PEQUEA 1 10.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 7.00

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 4 2.00
OFICIAL 1 2.00
OPERADOR O CONDUCTOR 2 10.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Limpieza de Skime
13.17
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 2.00
RETROCARGADOR 1 10.00
VOLQUETA PEQUEA 1 10.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ACPM Galon 7.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 2.00
OFICIAL 1 2.00
OPERADOR O CONDUCTOR 2 10.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Alcantarilla de 24" Dim
14.10
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 8.00
PLANCHA VIBRATORIA 1 8.00
RETROCARGADOR 1 50.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia concreto 24" ml 1.05
Mortero Pega M3 0.03
concreto de 2500 psi m3 0.13
concreto ciclpeo m3 0.24
ACPM Galon 0.70

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 8.00
OFICIAL 2 8.00
OPERADOR O CONDUCTOR 1 50.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Alcantarilla de 36" Dimetr
14.20
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00
PLANCHA VIBRATORIA 1 6.00
RETROCARGADOR 1 40.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia concreto 36" ml 1.05
Mortero Pega M3 0.05
concreto de 2500 psi m3 0.18
concreto ciclpeo m3 0.34
ACPM Galon 0.88

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 6.00
OFICIAL 2 6.00
OPERADOR O CONDUCTOR 1 40.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Alcantarilla de 36" Dimet
14.30
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 4.00
PLANCHA VIBRATORIA 1 4.00
RETROCARGADOR 1 30.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia concreto 36" ml 2.10
Mortero Pega M3 0.10
concreto de 2500 psi m3 0.33
concreto ciclpeo m3 0.62
ACPM Galon 1.17

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 4.00
OFICIAL 2 4.00
OPERADOR O CONDUCTOR 1 30.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Tubo Conductor (Diam 20" -
14.40
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 5.00
MOTOSOLDADOR DIESEL 1 5.00
RETROEXCAVADORA 1 5.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia metalica A/C 3/8 20" ml 1.05
ACPM Galon 12.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 5.00
OFICIAL 1 5.00
OPERADOR O CONDUCTOR 1 5.00
SOLDADOR 1 5.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Tubo Conductor (Diam 42" -
14.50
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 5.00
MOTOSOLDADOR DIESEL 1 5.00
RETROEXCAVADORA 1 5.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia metalica A/C 3/8 42" ml 1.05
ACPM Galon 12.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 5.00
OFICIAL 1 5.00
OPERADOR O CONDUCTOR 1 5.00
SOLDADOR 1 5.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Tubo Conductor (Diam 14" -
14.60
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 5.00
MOTOSOLDADOR DIESEL 1 5.00
RETROEXCAVADORA 1 5.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia metalica A/C 3/8 14" ml 1.05
ACPM Galon 12.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 5.00
OFICIAL 1 5.00
OPERADOR O CONDUCTOR 1 5.00
SOLDADOR 1 5.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera PV
14.70
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 60.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVCP 1/2" RDE 9 ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.003
Limpiador tuberia pvc 1/4 galon 0.003

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 60.00
OFICIAL 1 60.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera PV
14.80
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 60.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVCP 3/4" RDE 11 ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.003
Limpiador tuberia pvc 1/4 galon 0.003

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 60.00
OFICIAL 1 60.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera PV
14.90
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 50.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVCP 1" RDE 21 ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.003
Limpiador tuberia pvc 1/4 galon 0.003

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 50.00
OFICIAL 1 50.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera PVC
14.10
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 40.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVCP 1 1/2" RDE 21 ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.005
Limpiador tuberia pvc 1/4 galon 0.005

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 40.00
OFICIAL 1 40.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera PV
14.11
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 35.00
UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVCP 2" RDE 21 ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.010
Limpiador tuberia pvc 1/4 galon 0.010

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 35.00
OFICIAL 1 35.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera pe
14.12
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 40.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVC 2" perforada ml 1.10
Accesorios UNIDAD 0.20

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 40.00
OFICIAL 1 40.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL

PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera pe
14.13
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 40.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVC 4" perforada ml 1.10
Accesorios UNIDAD 0.20

CANT. REND.
MANO DE OBRA
MANO DE OBRA
(f) (g)
OBRERO 2 40.00
OFICIAL 1 40.00

D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera pvc S
14.14
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 35.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVCS 2 y 3" ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.010
Limpiador tuberia pvc 1/4 galon 0.010

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 35.00
OFICIAL 1 35.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera pv
14.15
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 30.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVCS 4" ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.013
Limpiador tuberia pvc 1/4 galon 0.013

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 30.00
OFICIAL 1 30.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera pv
14.16
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 25.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVCS 8" ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.020
Limpiador tuberia pvc 1/4 galon 0.020

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 25.00
OFICIAL 1 25.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera pvc
14.17
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVCS 10" ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.050
Limpiador tuberia pvc 1/4 galon 0.050

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 1 20.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera pvc
14.18
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVCS 12" NOVAFORT ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.100
Limpiador tuberia pvc 1/4 galon 0.100

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
OFICIAL 1 20.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera G
14.19
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 40.00
Terraja-Juegos de dados 1/2" a 2 1/2" 1 40.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tubera Galvanizada 1" cal 16 0 1.10
Accesorios UNIDAD 0.30

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 40.00
Tecnico 1 40.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera Ga
14.20
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 30.00
Terraja-Juegos de dados 1/2" a 2 1/2" 1 30.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tubera Galvanizada 1-1/2" cal 16 0 1.10
Accesorios UNIDAD 0.30

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 30.00
Tecnico 1 30.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera G
14.21
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00
Terraja-Juegos de dados 1/2" a 2 1/2" 1 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tubera Galvanizada 2" cal 16 0 1.10
Accesorios UNIDAD 0.30

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 20.00
Tecnico 1 20.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera Ga
14.22
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 15.00
Terraja-Juegos de dados 1/2" a 2 1/2" 1 15.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tubera Galvanizada 2-1/2" cal 16 0 1.10
Accesorios UNIDAD 0.30

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 15.00
Tecnico 1 15.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera pvc A
14.23
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 35.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVC AGUAS LLUVIAS 3" ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.010
Limpiador tuberia pvc 1/4 galon 0.010

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 35.00
OFICIAL 1 35.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera pvc A
14.24
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 30.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVC AGUAS LLUVIAS 4" ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.013
Limpiador tuberia pvc 1/4 galon 0.013

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 30.00
OFICIAL 1 30.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin tubera pvc A
14.25
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 25.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Tuberia PVC AGUAS LLUVIAS 6" ml 1.10
Accesorios UNIDAD 0.50
Soldadura tuberia PVC 1/4 galon 0.020
Limpiador tuberia pvc 1/4 galon 0.020

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 2 25.00
OFICIAL 1 25.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin Vlvula
14.26
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 20.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vlvula de Bola 1/2" un 1.00
Union 1/2" UNIDAD 2.00
Niple 1/2" UNIDAD 2.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 20.00
OFICIAL 1 20.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin Vlvula
14.27
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 15.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vlvula de Bola 3/4" un 1.00
Union 3/4" UNIDAD 2.00
Niple 3/4" UNIDAD 2.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 15.00
OFICIAL 1 15.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin Vlvul
14.28
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 10.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vlvula de Bola 1" un 1.00
Union 1" UNIDAD 2.00
Niple 1" UNIDAD 2.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 10.00
OFICIAL 1 10.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin Vlvula
14.29
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vlvula de Bola 1 3/4" un 1.00
Union 1 3/4" UNIDAD 2.00
Niple 1 3/4" UNIDAD 2.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 6.00
OFICIAL 1 6.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin Vlvula
14.30
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 4.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vlvula de Bola 2 1/2" un 1.00
Union 2 1/2" UNIDAD 2.00
Niple 2 1/2" UNIDAD 2.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 4.00
OFICIAL 1 4.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin Vlvula
14.31
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 4.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vlvula de Cortina 3" A/C un 1.00
Union 3" UNIDAD 2.00
Niple 3" UNIDAD 2.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 4.00
OFICIAL 1 4.00
Tecnico 1 4.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin Vlvula
14.32
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 3.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vlvula de Cortina 4" A/C un 1.00
Union 4" UNIDAD 2.00
Niple 4" UNIDAD 2.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 3.00
OFICIAL 1 3.00
Tecnico 1 3.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin Vlvula
14.33
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 2.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vlvula de Cortina 6" A/C un 1.00
Union 6" UNIDAD 2.00
Niple 6" UNIDAD 2.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 2.00
OFICIAL 1 2.00
Tecnico 1 2.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin Vlvula de C
14.34
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vlvula de Cortina de 3" PVC un 1.00
Union 3" UNIDAD 2.00
Adaptador 3" UNIDAD 2.00
Soldadura tuberia PVC 1/4 galon 0.013
Limpiador tuberia pvc 1/4 galon 0.013

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 6.00
OFICIAL 1 6.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e instalacin Vlvula de C
14.35
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 6.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Vlvula de Cortina de 4" PVC un 1.00
Union 4" UNIDAD 2.00
Adaptador 4" UNIDAD 2.00
Soldadura tuberia PVC 1/4 galon 0.013
Limpiador tuberia pvc 1/4 galon 0.013

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 1 6.00
OFICIAL 1 6.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Corte de pavimento flexible
15.10
CANT. REND.
EQUIPO
(a) (b)
HERRAMIENTA MENOR 1 25.00
Cortadora con disco diamantado 1 25.00
CAMION 1 250.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 3 25.00
OFICIAL 1 25.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Imprimacin
15.20
CANT. REND.
EQUIPO
(a) (b)
CARROTANQUE IRRIGADOR DE ASFALTO 1 1,000.00
COMPRESOR 1 1,000.00
HERRAMIENTA MENOR 1 1,000.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Emulsin asfaltica CRL-1 Lts 0.75
ACPM Galon 0.07

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 1,000.00
OFICIAL 1 1,000.00
OPERADOR O CONDUCTOR 1 1,000.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Suministro e Instalacin de Asfalto c
15.30
CANT. REND.
EQUIPO
(a) (b)
RETROCARGADOR 1 50.00
VIBROCOMPACTADOR 1 50.00
COMPRESOR 1 50.00
HERRAMIENTA MENOR 1 50.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Mezcla asfaltica MDC-2 M3 1.30
ACPM Galon 2.10

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 6 50.00
OFICIAL 4 50.00
OPERADOR O CONDUCTOR 2 50.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sum. e Inst. Emulsin As
15.40
CANT. REND.
EQUIPO
(a) (b)
CARROTANQUE IRRIGADOR DE ASFALTO 1 1,000.00
COMPRESOR 1 1,000.00
HERRAMIENTA MENOR 1 1,000.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
Emulsin asfaltica CRL-1 Lts 3.80
ACPM Galon 0.07

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 1,000.00
OFICIAL 1 1,000.00
OPERADOR O CONDUCTOR 1 1,000.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


PERENCO OIL AND GAS COLOMBIA LIMITED

FIRMA SERVICIOS D

UNITARIO
Sealizacin Vial en P
15.50
CANT. REND.
EQUIPO
(a) (b)
CAMION 1 100.00
EQUIPO PINTURA 1 100.00
HERRAMIENTA MENOR 1 100.00

UNIDAD CANT.
MATERIALES
(d)
Consumibles Global 1.00
ESFERAS REFLECTIVAS KG 0.75
PINTURA ACRILICA PURA PARA TRAFICO GALON 0.20
ACPM Galon 0.35

CANT. REND.
MANO DE OBRA
(f) (g)
OBRERO 4 100.00
PINTOR 2 100.00
D= COSTOS DIRECTOS = A+B+C

V. COSTOS INDIRECTOS
DESCRIPCIN
ADMINISTRACION
IMPREVISTOS
UTILIDAD

PRECIO UNITARIO TOTAL


FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
ovilizacin Inicial Equipos y Facilidades Base a Campo
GLB
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$2,000,000.00 16,000,000.00
$180,000.00 1,440,000.00

SUB-TOTAL (A)
$ 17,440,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
250,000.00 2,000,000.00
8,000.00 320,000.00

SUB-TOTAL (B)
$ 2,320,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$115,566.00 924,528.00

SUB-TOTAL (C)
$ 924,528.00
COSTOS DIRECTOS = A+B+C $ 20,684,528.00

PORCENTAJE VR. TOTAL


27% $ 5,584,822.56
1% $ 206,845.28
4% $ 827,381.12
SUB-TOTAL $ 6,619,049.00
PRECIO UNITARIO TOTAL $ 27,303,577.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Localizacin y Replanteo
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$100,000.00 667
$10,000.00 66.67
$180,000.00 1,200

SUB-TOTAL (A)
$ 1,933.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100.00 100.00
8,000.00 266.67

SUB-TOTAL (B)
$ 367.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$166,566.00 1110.44
$107,338.00 1,431

SUB-TOTAL (C)
$ 2,542.00
COSTOS DIRECTOS = A+B+C $ 4,842.00

PORCENTAJE VR. TOTAL


27% $ 1,307.34
1% $ 48.42
4% $ 193.68
SUB-TOTAL $ 1,549.00
PRECIO UNITARIO TOTAL $ 6,391.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
smonte y Limpieza (Incluye acarreo y disposicion final)
HA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 750,000
$80,000.00 100000
$80,000.00 100,000
$60,000.00 75,000
$600,000.00 750,000

SUB-TOTAL (A)
$ 1,775,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100,000.00 100,000.00
8,000.00 700,000.00

SUB-TOTAL (B)
$ 800,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 458,745.00
$107,568.00 268,920.00
$115,566.00 288,915.00

SUB-TOTAL (C)
$ 1,016,580.00

COSTOS DIRECTOS = A+B+C $ 3,591,580.00

PORCENTAJE VR. TOTAL


27% $ 969,726.60
1% $ 35,915.80
4% $ 143,663.20
SUB-TOTAL $ 1,149,306.00
PRECIO UNITARIO TOTAL $ 4,740,886.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Descapote
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 2,000
$800,000.00 2,000

SUB-TOTAL (A)
$ 4,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100.00 100
8,000.00 2,400
900.00 16,875

SUB-TOTAL (B)
$ 19,375.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459
$115,566.00 578

SUB-TOTAL (C)
$ 1,037.00

COSTOS DIRECTOS = A+B+C $ 24,412.00

PORCENTAJE VR. TOTAL


27% $ 6,591.24
1% $ 244.12
4% $ 976.48
SUB-TOTAL $ 7,812.00
PRECIO UNITARIO TOTAL $ 32,224.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Excavacin Mecanica en suelo
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 2,000
$800,000.00 2,000

SUB-TOTAL (A)
$ 4,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100.00 100
8,000.00 2,400

SUB-TOTAL (B)
$ 2,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459
$115,566.00 578

SUB-TOTAL (C)
$ 1,037.00

COSTOS DIRECTOS = A+B+C $ 7,537.00

PORCENTAJE VR. TOTAL


27% $ 2,034.99
1% $ 75.37
4% $ 301.48
SUB-TOTAL $ 2,412.00
PRECIO UNITARIO TOTAL $ 9,949.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Excavacn Mecanica en roca
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$1,200,000.00 20,000
$800,000.00 2,667

SUB-TOTAL (A)
$ 22,667.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100.00 100
8,000.00 9,600
900.00 16,875

SUB-TOTAL (B)
$ 26,575.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 3,058
$115,566.00 1,926
$115,566.00 385

SUB-TOTAL (C)
$ 5,370.00
COSTOS DIRECTOS = A+B+C $ 54,612.00

PORCENTAJE VR. TOTAL


27% $ 14,745.24
1% $ 546.12
4% $ 2,184.48
SUB-TOTAL $ 17,476.00
PRECIO UNITARIO TOTAL $ 72,088.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Excavacin Manual en roca
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 2,667
$800,000.00 2,667
$60,000.00 20,000
$60,000.00 20,000
$60,000.00 20,000

SUB-TOTAL (A)
$ 65,333.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,500.00 2,500
8,000.00 5,867
900.00 16,875

SUB-TOTAL (B)
$ 25,242.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856
$115,566.00 770

SUB-TOTAL (C)
$ 97,792.00

COSTOS DIRECTOS = A+B+C $ 188,367.00

PORCENTAJE VR. TOTAL


27% $ 50,859.09
1% $ 1,883.67
4% $ 7,534.68
SUB-TOTAL $ 60,277.00
PRECIO UNITARIO TOTAL $ 248,644.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Excavacin Manual en suelo compacto
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 3,000
$600,000.00 3,000
$60,000.00 7,500

SUB-TOTAL (A)
$ 13,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 2,800

SUB-TOTAL (B)
$ 3,300.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 45,875
$107,568.00 13,446
$115,566.00 1,156

SUB-TOTAL (C)
$ 60,476.00

COSTOS DIRECTOS = A+B+C $ 77,276.00

PORCENTAJE VR. TOTAL


27% $ 20,864.52
1% $ 772.76
4% $ 3,091.04
SUB-TOTAL $ 24,728.00
PRECIO UNITARIO TOTAL $ 102,004.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Demolicin Concreto Manual
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 2,000
$60,000.00 30,000
$60,000.00 30,000
$60,000.00 30,000

SUB-TOTAL (A)
$ 92,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,500.00 2,500
8,000.00 1,600
900.00 16,875

SUB-TOTAL (B)
$ 20,975.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 137,624
$107,568.00 53,784
$115,566.00 770

SUB-TOTAL (C)
$ 192,178.00

COSTOS DIRECTOS = A+B+C $ 305,153.00

PORCENTAJE VR. TOTAL


27% $ 82,391.31
1% $ 3,051.53
4% $ 12,206.12
SUB-TOTAL $ 97,649.00
PRECIO UNITARIO TOTAL $ 402,802.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Demolicin Concreto Mecanica
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$1,200,000.00 24,000
$60,000.00 1,200

SUB-TOTAL (A)
$ 25,200.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100.00 100
8,000.00 19,200
900.00 16,875

SUB-TOTAL (B)
$ 36,175.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 7,340
$115,566.00 2,311

SUB-TOTAL (C)
$ 9,651.00
COSTOS DIRECTOS = A+B+C $ 71,026.00

PORCENTAJE VR. TOTAL


27% $ 19,177.02
1% $ 710.26
4% $ 2,841.04
SUB-TOTAL $ 22,728.00
PRECIO UNITARIO TOTAL $ 93,754.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Demolicin Muros
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 2,000
$60,000.00 15,000
$60,000.00 15,000
$60,000.00 15,000

SUB-TOTAL (A)
$ 47,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,500.00 2,500
8,000.00 1,600
900.00 16,875

SUB-TOTAL (B)
$ 20,975.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 68,812
$107,568.00 26,892
$115,566.00 770

SUB-TOTAL (C)
$ 96,474.00

COSTOS DIRECTOS = A+B+C $ 164,449.00

PORCENTAJE VR. TOTAL


27% $ 44,401.23
1% $ 1,644.49
4% $ 6,577.96
SUB-TOTAL $ 52,624.00
PRECIO UNITARIO TOTAL $ 217,073.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Demolicin Manual de roca
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 2,000
$60,000.00 30,000
$60,000.00 30,000
$60,000.00 30,000

SUB-TOTAL (A)
$ 92,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,500.00 2,500
8,000.00 1,600
900.00 16,875

SUB-TOTAL (B)
$ 20,975.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 137,624
$107,568.00 53,784
$115,566.00 770

SUB-TOTAL (C)
$ 192,178.00

COSTOS DIRECTOS = A+B+C $ 305,153.00

PORCENTAJE VR. TOTAL


27% $ 82,391.31
1% $ 3,051.53
4% $ 12,206.12
SUB-TOTAL $ 97,649.00
PRECIO UNITARIO TOTAL $ 402,802.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Demolicin Mecanica Roca
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$1,200,000.00 24,000
$60,000.00 1,200

SUB-TOTAL (A)
$ 25,200.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100.00 100
8,000.00 19,200
900.00 16,875

SUB-TOTAL (B)
$ 36,175.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 7,340
$115,566.00 2,311

SUB-TOTAL (C)
$ 9,651.00

COSTOS DIRECTOS = A+B+C $ 71,026.00

PORCENTAJE VR. TOTAL


27% $ 19,177.02
1% $ 710.26
4% $ 2,841.04
SUB-TOTAL $ 22,728.00
PRECIO UNITARIO TOTAL $ 93,754.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Acero de refuerzo
KG
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 300

SUB-TOTAL (A)
$ 300.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50.00 50
2,800.00 2,940
3,800.00 190

SUB-TOTAL (B)
$ 3,180.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459
$115,566.00 578

SUB-TOTAL (C)
$ 1,037.00
COSTOS DIRECTOS = A+B+C $ 4,517.00

PORCENTAJE VR. TOTAL


27% $ 1,219.59
1% $ 45.17
4% $ 180.68
SUB-TOTAL $ 1,445.00
PRECIO UNITARIO TOTAL $ 5,962.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Malla Electrosoldada
KG
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 300

SUB-TOTAL (A)
$ 300.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50.00 50
3,000.00 3,150
3,800.00 190

SUB-TOTAL (B)
$ 3,390.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459
$115,566.00 578

SUB-TOTAL (C)
$ 1,037.00

COSTOS DIRECTOS = A+B+C $ 4,727.00

PORCENTAJE VR. TOTAL


27% $ 1,276.29
1% $ 47.27
4% $ 189.08
SUB-TOTAL $ 1,513.00
PRECIO UNITARIO TOTAL $ 6,240.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
structuras Metlicas Soportes, Escalera, Tapas, Rejillas etc.
KG
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 300
$120,000.00 600
$100,000.00 500
$100,000.00 500
$550,000.00 110

SUB-TOTAL (A)
$ 2,010.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
200.00 200
3,800.00 3,990
100,000.00 500
120,000.00 600
12,000.00 600
68,000.00 340
89,000.00 445
8,000.00 448

SUB-TOTAL (B)
$ 7,123.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 917
$107,568.00 1,076
$156,366.00 1,564
$268,566.00 1,343
$107,338.00 537
$115,566.00 23

SUB-TOTAL (C)
$ 5,459.00

COSTOS DIRECTOS = A+B+C $ 14,592.00

PORCENTAJE VR. TOTAL


27% $ 3,939.84
1% $ 145.92
4% $ 583.68
SUB-TOTAL $ 4,669.00
PRECIO UNITARIO TOTAL $ 19,261.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
ministro e instalacin de pernos sin camisa para anclaje
KG
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 15,000
$30,000.00 7,500
$60,000.00 15,000

SUB-TOTAL (A)
$ 37,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
15,000.00 15,000
100,000.00 105,000
60,436.00 15,109

SUB-TOTAL (B)
$ 135,109.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 22,937
$107,568.00 26,892

SUB-TOTAL (C)
$ 49,829.00

COSTOS DIRECTOS = A+B+C $ 222,438.00

PORCENTAJE VR. TOTAL


27% $ 60,058.26
1% $ 2,224.38
4% $ 8,897.52
SUB-TOTAL $ 71,180.00
PRECIO UNITARIO TOTAL $ 293,618.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
ministro e instalacin de pernos con camisa para anclaje
KG
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 15,000
$30,000.00 7,500
$60,000.00 15,000

SUB-TOTAL (A)
$ 37,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
15,000.00 15,000
100,000.00 105,000

SUB-TOTAL (B)
$ 120,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 22,937
$107,568.00 26,892

SUB-TOTAL (C)
$ 49,829.00
COSTOS DIRECTOS = A+B+C $ 207,329.00

PORCENTAJE VR. TOTAL


27% $ 55,978.83
1% $ 2,073.29
4% $ 8,293.16
SUB-TOTAL $ 66,345.00
PRECIO UNITARIO TOTAL $ 273,674.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

general con material de excavacion (prestamo lateral acarreo UNIDAD:


hasta 5 km)
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 2,000
$600,000.00 1,500
$450,000.00 1,125

SUB-TOTAL (A)
$ 4,625.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100.00 100
8,000.00 2,600

SUB-TOTAL (B)
$ 2,700.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459
$115,566.00 867

SUB-TOTAL (C)
$ 1,325.00

COSTOS DIRECTOS = A+B+C $ 8,650.00

PORCENTAJE VR. TOTAL


27% $ 2,335.50
1% $ 86.50
4% $ 346.00
SUB-TOTAL $ 2,768.00
PRECIO UNITARIO TOTAL $ 11,418.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Terrapln armado con geotextil T 2400 o similar
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 3,000
$350,000.00 1,750
$450,000.00 2,250
$60,000.00 3,000
$60,000.00 3,000

SUB-TOTAL (A)
$ 13,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 4,200
5,072.00 27,896

SUB-TOTAL (B)
$ 32,596.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 18,350
$107,568.00 10,757
$115,566.00 1,733

SUB-TOTAL (C)
$ 30,840.00

COSTOS DIRECTOS = A+B+C $ 76,436.00

PORCENTAJE VR. TOTAL


27% $ 20,637.72
1% $ 764.36
4% $ 3,057.44
SUB-TOTAL $ 24,460.00
PRECIO UNITARIO TOTAL $ 100,896.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Relleno de zanjas con material excavacion
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 3,000
$350,000.00 1,750
$450,000.00 2,250
$60,000.00 3,000
$60,000.00 3,000

SUB-TOTAL (A)
$ 13,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 4,200

SUB-TOTAL (B)
$ 4,700.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 18,350
$107,568.00 10,757
$115,566.00 1,733

SUB-TOTAL (C)
$ 30,840.00

COSTOS DIRECTOS = A+B+C $ 48,540.00

PORCENTAJE VR. TOTAL


27% $ 13,105.80
1% $ 485.40
4% $ 1,941.60
SUB-TOTAL $ 15,533.00
PRECIO UNITARIO TOTAL $ 64,073.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
no Material Filtrante Piedra o crudo de rio incluido acarreo
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 3,000
$350,000.00 1,750
$450,000.00 2,250
$60,000.00 300
$60,000.00 300

SUB-TOTAL (A)
$ 7,600.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 4,200
23,200.00 29,000
900.00 95,625

SUB-TOTAL (B)
$ 129,325.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 917
$107,568.00 538
$115,566.00 1,733

SUB-TOTAL (C)
$ 3,189.00
COSTOS DIRECTOS = A+B+C $ 140,114.00

PORCENTAJE VR. TOTAL


27% $ 37,830.78
1% $ 1,401.14
4% $ 5,604.56
SUB-TOTAL $ 44,836.00
PRECIO UNITARIO TOTAL $ 184,950.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

ructural con material seleccinado incluido acarreo compacto a UNIDAD:


maquina
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 3,000
$350,000.00 1,750
$450,000.00 2,250
$60,000.00 300
$60,000.00 300

SUB-TOTAL (A)
$ 7,600.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 4,200
14,000.00 17,500

SUB-TOTAL (B)
$ 22,200.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 1,835
$107,568.00 1,076
$115,566.00 1,733

SUB-TOTAL (C)
$ 4,644.00

COSTOS DIRECTOS = A+B+C $ 34,444.00

PORCENTAJE VR. TOTAL


27% $ 9,299.88
1% $ 344.44
4% $ 1,377.76
SUB-TOTAL $ 11,022.00
PRECIO UNITARIO TOTAL $ 45,466.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sum. E Inst. Base granular compacto a maquina
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 2,000
$600,000.00 2,000
$450,000.00 1,500
$60,000.00 200
$60,000.00 200

SUB-TOTAL (A)
$ 5,900.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 2,800
45,240.00 56,550

SUB-TOTAL (B)
$ 59,850.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 1,223
$107,568.00 717
$115,566.00 1,156

SUB-TOTAL (C)
$ 3,096.00

COSTOS DIRECTOS = A+B+C $ 68,846.00

PORCENTAJE VR. TOTAL


27% $ 18,588.42
1% $ 688.46
4% $ 2,753.84
SUB-TOTAL $ 22,031.00
PRECIO UNITARIO TOTAL $ 90,877.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sum. E Inst. sub base granular compacto a maquina
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 3,000
$600,000.00 3,000
$450,000.00 2,250
$60,000.00 300
$60,000.00 300

SUB-TOTAL (A)
$ 8,850.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 4,200
42,920.00 53,650

SUB-TOTAL (B)
$ 58,350.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 1,835
$107,568.00 1,076
$115,566.00 1,733

SUB-TOTAL (C)
$ 4,644.00

COSTOS DIRECTOS = A+B+C $ 71,844.00

PORCENTAJE VR. TOTAL


27% $ 19,397.88
1% $ 718.44
4% $ 2,873.76
SUB-TOTAL $ 22,990.00
PRECIO UNITARIO TOTAL $ 94,834.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Colocacin y Compactacin de Afirmado manual.
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 3,000
$350,000.00 1,750
$450,000.00 2,250
$60,000.00 2,400
$60,000.00 2,400

SUB-TOTAL (A)
$ 11,800.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 4,200
14,000.00 17,500

SUB-TOTAL (B)
$ 22,200.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 14,680
$107,568.00 8,605
$115,566.00 1,733

SUB-TOTAL (C)
$ 25,019.00
COSTOS DIRECTOS = A+B+C $ 59,019.00

PORCENTAJE VR. TOTAL


27% $ 15,935.13
1% $ 590.19
4% $ 2,360.76
SUB-TOTAL $ 18,886.00
PRECIO UNITARIO TOTAL $ 77,905.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Geotextiles No Tejido 2400 Instalado
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 300

SUB-TOTAL (A)
$ 300.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100.00 100
4,292.00 4,507

SUB-TOTAL (B)
$ 4,607.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459
$107,568.00 538

SUB-TOTAL (C)
$ 997.00

COSTOS DIRECTOS = A+B+C $ 5,904.00

PORCENTAJE VR. TOTAL


27% $ 1,594.08
1% $ 59.04
4% $ 236.16
SUB-TOTAL $ 1,889.00
PRECIO UNITARIO TOTAL $ 7,793.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Geotextiles No Tejido 1600 Instalado
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 300

SUB-TOTAL (A)
$ 300.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100.00 100
3,248.00 3,410

SUB-TOTAL (B)
$ 3,510.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459
$107,568.00 538

SUB-TOTAL (C)
$ 997.00

COSTOS DIRECTOS = A+B+C $ 4,807.00

PORCENTAJE VR. TOTAL


27% $ 1,297.89
1% $ 48.07
4% $ 192.28
SUB-TOTAL $ 1,538.00
PRECIO UNITARIO TOTAL $ 6,345.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Geotextil 2400 tejido Instalado
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 300
SUB-TOTAL (A)
$ 300.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100.00 100
5,072.00 5,326

SUB-TOTAL (B)
$ 5,426.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459
$107,568.00 538

SUB-TOTAL (C)
$ 997.00

COSTOS DIRECTOS = A+B+C $ 6,723.00

PORCENTAJE VR. TOTAL


27% $ 1,815.21
1% $ 67.23
4% $ 268.92
SUB-TOTAL $ 2,151.00
PRECIO UNITARIO TOTAL $ 8,874.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Geomembrana calibre 40 Instalada
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 600

SUB-TOTAL (A)
$ 600.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100.00 100
13,000.00 14,950

SUB-TOTAL (B)
$ 15,050.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 3,670
$107,568.00 1,076
$135,931.10 1,359

SUB-TOTAL (C)
$ 6,105.00
COSTOS DIRECTOS = A+B+C $ 21,755.00

PORCENTAJE VR. TOTAL


27% $ 5,873.85
1% $ 217.55
4% $ 870.20
SUB-TOTAL $ 6,962.00
PRECIO UNITARIO TOTAL $ 28,717.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e inst de Geodren planar
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 600

SUB-TOTAL (A)
$ 600.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100.00 100
31,000.00 35,650

SUB-TOTAL (B)
$ 35,750.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 917
$107,568.00 1,076

SUB-TOTAL (C)
$ 1,993.00

COSTOS DIRECTOS = A+B+C $ 38,343.00

PORCENTAJE VR. TOTAL


27% $ 10,352.61
1% $ 383.43
4% $ 1,533.72
SUB-TOTAL $ 12,270.00
PRECIO UNITARIO TOTAL $ 50,613.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Concreto simple 3000 PSI mezcla en sitio
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
452,030.00 474,632
15,000.00 15,000
100,000.00 100,000

SUB-TOTAL (B)
$ 599,632.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856

SUB-TOTAL (C)
$ 97,022.00

COSTOS DIRECTOS = A+B+C $ 716,654.00

PORCENTAJE VR. TOTAL


27% $ 193,496.58
1% $ 7,166.54
4% $ 28,666.16
SUB-TOTAL $ 229,329.00
PRECIO UNITARIO TOTAL $ 945,983.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Concreto simple 3000 PSI mezcla en planta
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
483,074.27 507,228
15,000.00 15,000
100,000.00 100,000

SUB-TOTAL (B)
$ 632,228.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856

SUB-TOTAL (C)
$ 97,022.00

COSTOS DIRECTOS = A+B+C $ 749,250.00

PORCENTAJE VR. TOTAL


27% $ 202,297.50
1% $ 7,492.50
4% $ 29,970.00
SUB-TOTAL $ 239,760.00
PRECIO UNITARIO TOTAL $ 989,010.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
reto simple 3000 PSI mezcla sitio con acelerante 3 dias
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
452,030.00 474,632
15,000.00 15,000
100,000.00 100,000
9,580.00 100,590

SUB-TOTAL (B)
$ 700,222.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856

SUB-TOTAL (C)
$ 97,022.00
COSTOS DIRECTOS = A+B+C $ 817,244.00

PORCENTAJE VR. TOTAL


27% $ 220,655.88
1% $ 8,172.44
4% $ 32,689.76
SUB-TOTAL $ 261,518.00
PRECIO UNITARIO TOTAL $ 1,078,762.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
ncreto simple 3000 PSI mezcla planta acelerado 3 das
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
558,712.07 586,648
15,000.00 15,000
100,000.00 100,000

SUB-TOTAL (B)
$ 711,648.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856

SUB-TOTAL (C)
$ 97,022.00

COSTOS DIRECTOS = A+B+C $ 828,670.00

PORCENTAJE VR. TOTAL


27% $ 223,740.90
1% $ 8,286.70
4% $ 33,146.80
SUB-TOTAL $ 265,174.00
PRECIO UNITARIO TOTAL $ 1,093,844.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Concreto 3.000 psi (tipo tremie)
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000
$35,000.00 35,000

SUB-TOTAL (A)
$ 55,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
498,548.67 523,476
15,000.00 15,000
100,000.00 100,000

SUB-TOTAL (B)
$ 648,476.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856

SUB-TOTAL (C)
$ 97,022.00

COSTOS DIRECTOS = A+B+C $ 800,498.00

PORCENTAJE VR. TOTAL


27% $ 216,134.46
1% $ 8,004.98
4% $ 32,019.92
SUB-TOTAL $ 256,159.00
PRECIO UNITARIO TOTAL $ 1,056,657.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Concreto de 4000 PSI mezcla en sitio
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
479,030.00 502,982
15,000.00 15,000
100,000.00 100,000

SUB-TOTAL (B)
$ 627,982.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856

SUB-TOTAL (C)
$ 97,022.00

COSTOS DIRECTOS = A+B+C $ 745,004.00

PORCENTAJE VR. TOTAL


27% $ 201,151.08
1% $ 7,450.04
4% $ 29,800.16
SUB-TOTAL $ 238,401.00
PRECIO UNITARIO TOTAL $ 983,405.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Concreto de 4000 PSI mezcla en planta
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
507,086.27 532,441
15,000.00 15,000
100,000.00 100,000

SUB-TOTAL (B)
$ 657,441.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856

SUB-TOTAL (C)
$ 97,022.00
COSTOS DIRECTOS = A+B+C $ 774,463.00

PORCENTAJE VR. TOTAL


27% $ 209,105.01
1% $ 7,744.63
4% $ 30,978.52
SUB-TOTAL $ 247,828.00
PRECIO UNITARIO TOTAL $ 1,022,291.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
oncreto de 4000 PSI mezcla en sitio acelerado 3 dias
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
479,030.00 502,982
15,000.00 15,000
100,000.00 100,000
9,580.00 100,590

SUB-TOTAL (B)
$ 728,572.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856

SUB-TOTAL (C)
$ 97,022.00

COSTOS DIRECTOS = A+B+C $ 845,594.00

PORCENTAJE VR. TOTAL


27% $ 228,310.38
1% $ 8,455.94
4% $ 33,823.76
SUB-TOTAL $ 270,590.00
PRECIO UNITARIO TOTAL $ 1,116,184.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
reto de 4000 PSI con acelerante 3 dias mezcla en planta
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
594,730.07 624,467
15,000.00 15,000
100,000.00 100,000

SUB-TOTAL (B)
$ 749,467.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856

SUB-TOTAL (C)
$ 97,022.00

COSTOS DIRECTOS = A+B+C $ 866,489.00

PORCENTAJE VR. TOTAL


27% $ 233,952.03
1% $ 8,664.89
4% $ 34,659.56
SUB-TOTAL $ 277,276.00
PRECIO UNITARIO TOTAL $ 1,143,765.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Concreto ciclpeo 2500 PSI
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
425,030.00 276,270
15,000.00 15,000
100,000.00 100,000
72,300.00 32,535

SUB-TOTAL (B)
$ 433,805.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856

SUB-TOTAL (C)
$ 97,022.00

COSTOS DIRECTOS = A+B+C $ 550,827.00

PORCENTAJE VR. TOTAL


27% $ 148,723.29
1% $ 5,508.27
4% $ 22,033.08
SUB-TOTAL $ 176,265.00
PRECIO UNITARIO TOTAL $ 727,092.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Concreto simple 2000 PSI
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
411,530.00 267,495
15,000.00 15,000
100,000.00 100,000

SUB-TOTAL (B)
$ 392,495.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856

SUB-TOTAL (C)
$ 97,022.00
COSTOS DIRECTOS = A+B+C $ 509,517.00

PORCENTAJE VR. TOTAL


27% $ 137,569.59
1% $ 5,095.17
4% $ 20,380.68
SUB-TOTAL $ 163,045.00
PRECIO UNITARIO TOTAL $ 672,562.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Concreto Simple de 2500 PSI para Sardineles
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,000
$60,000.00 2,000

SUB-TOTAL (A)
$ 4,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
411,530.00 79,220
3,000.00 3,000
10,000.00 10,000

SUB-TOTAL (B)
$ 94,220.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 12,233
$107,568.00 7,171

SUB-TOTAL (C)
$ 19,404.00

COSTOS DIRECTOS = A+B+C $ 117,624.00

PORCENTAJE VR. TOTAL


27% $ 31,758.48
1% $ 1,176.24
4% $ 4,704.96
SUB-TOTAL $ 37,640.00
PRECIO UNITARIO TOTAL $ 155,264.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Concreto de 3000 PSI impermeabilizado
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
452,030.00 474,632
15,000.00 15,000
100,000.00 100,000
10,324.00 108,402

SUB-TOTAL (B)
$ 708,034.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 61,166
$107,568.00 35,856

SUB-TOTAL (C)
$ 97,022.00

COSTOS DIRECTOS = A+B+C $ 825,056.00

PORCENTAJE VR. TOTAL


27% $ 222,765.12
1% $ 8,250.56
4% $ 33,002.24
SUB-TOTAL $ 264,018.00
PRECIO UNITARIO TOTAL $ 1,089,074.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
simple 3000 PSI mezcla sitio para Vigas Areas y Columnas.
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 15,000
$60,000.00 15,000
$30,000.00 30,000

SUB-TOTAL (A)
$ 60,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
15,000.00 15,000
452,030.00 474,632
15,000.00 15,000
125,000.00 125,000

SUB-TOTAL (B)
$ 629,632.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 91,749
$107,568.00 53,784

SUB-TOTAL (C)
$ 145,533.00

COSTOS DIRECTOS = A+B+C $ 835,165.00

PORCENTAJE VR. TOTAL


27% $ 225,494.55
1% $ 8,351.65
4% $ 33,406.60
SUB-TOTAL $ 267,253.00
PRECIO UNITARIO TOTAL $ 1,102,418.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
al Recolector en Piedra Pegada (concreto de 3000 PSI)
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 15,000
0 0

SUB-TOTAL (A)
$ 15,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
452,030.00 293,820
15,000.00 15,000
50,000.00 50,000
104,600.00 47,070

SUB-TOTAL (B)
$ 415,890.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 91,749
$107,568.00 53,784

SUB-TOTAL (C)
$ 145,533.00
COSTOS DIRECTOS = A+B+C $ 576,423.00

PORCENTAJE VR. TOTAL


27% $ 155,634.21
1% $ 5,764.23
4% $ 23,056.92
SUB-TOTAL $ 184,455.00
PRECIO UNITARIO TOTAL $ 760,878.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Disipadores de Energia en Concreto Simple 3000 PSI
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 30,000

SUB-TOTAL (A)
$ 30,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000
452,030.00 474,632
15,000.00 15,000
100,000.00 100,000

SUB-TOTAL (B)
$ 599,632.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 183,498
$107,568.00 107,568

SUB-TOTAL (C)
$ 291,066.00

COSTOS DIRECTOS = A+B+C $ 920,698.00

PORCENTAJE VR. TOTAL


27% $ 248,588.46
1% $ 9,206.98
4% $ 36,827.92
SUB-TOTAL $ 294,623.00
PRECIO UNITARIO TOTAL $ 1,215,321.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
o Carcamo 3000 PSI Con Rejilla y Marco (Prof aprox 40 cm)
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,000

SUB-TOTAL (A)
$ 2,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
452,030.00 66,448
3,000.00 13,650
3,000.00 3,000
5,000.00 5,000
200,000.00 200,000

SUB-TOTAL (B)
$ 290,098.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 12,233
$107,568.00 7,171

SUB-TOTAL (C)
$ 19,404.00

COSTOS DIRECTOS = A+B+C $ 311,502.00

PORCENTAJE VR. TOTAL


27% $ 84,105.54
1% $ 3,115.02
4% $ 12,460.08
SUB-TOTAL $ 99,681.00
PRECIO UNITARIO TOTAL $ 411,183.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
ordillos en Concreto Contrapozos Concreto 2500 PSI
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,000
SUB-TOTAL (A)
$ 2,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
425,030.00 18,701
3,000.00 3,000
5,000.00 5,000

SUB-TOTAL (B)
$ 28,701.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 6,117
$107,568.00 7,171

SUB-TOTAL (C)
$ 13,288.00

COSTOS DIRECTOS = A+B+C $ 43,989.00

PORCENTAJE VR. TOTAL


27% $ 11,877.03
1% $ 439.89
4% $ 1,759.56
SUB-TOTAL $ 14,076.00
PRECIO UNITARIO TOTAL $ 58,065.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Grouting Epoxico
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 600,000

SUB-TOTAL (A)
$ 600,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50,000.00 50,000
25,000.00 50,000,000
100,000.00 100,000

SUB-TOTAL (B)
$ 50,150,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 917,490
$107,568.00 1,075,680

SUB-TOTAL (C)
$ 1,993,170.00
COSTOS DIRECTOS = A+B+C $ 52,743,170.00

PORCENTAJE VR. TOTAL


27% $ 14,240,655.90
1% $ 527,431.70
4% $ 2,109,726.80
SUB-TOTAL $ 16,877,814.00
PRECIO UNITARIO TOTAL $ 69,620,984.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Grouting Cementoso
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 600,000

SUB-TOTAL (A)
$ 600,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50,000.00 50,000
3,000.00 5,700,000
100,000.00 100,000

SUB-TOTAL (B)
$ 5,850,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 917,490
$107,568.00 1,075,680

SUB-TOTAL (C)
$ 1,993,170.00

COSTOS DIRECTOS = A+B+C $ 8,443,170.00

PORCENTAJE VR. TOTAL


27% $ 2,279,655.90
1% $ 84,431.70
4% $ 337,726.80
SUB-TOTAL $ 2,701,814.00
PRECIO UNITARIO TOTAL $ 11,144,984.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Acelerante (x m3 de concreto instalado)
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000

SUB-TOTAL (A)
$ 10,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
5,000.00 5,000
9,580.00 100,590

SUB-TOTAL (B)
$ 105,590.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 15,292
$107,568.00 17,928

SUB-TOTAL (C)
$ 33,220.00

COSTOS DIRECTOS = A+B+C $ 148,810.00

PORCENTAJE VR. TOTAL


27% $ 40,178.70
1% $ 1,488.10
4% $ 5,952.40
SUB-TOTAL $ 47,619.00
PRECIO UNITARIO TOTAL $ 196,429.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sum. E Inst. SIKA DUR 32 PRIMER
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 6,000
SUB-TOTAL (A)
$ 6,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
69,820.40 69,820

SUB-TOTAL (B)
$ 71,820.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 10,757

SUB-TOTAL (C)
$ 19,932.00

COSTOS DIRECTOS = A+B+C $ 97,752.00

PORCENTAJE VR. TOTAL


27% $ 26,393.04
1% $ 977.52
4% $ 3,910.08
SUB-TOTAL $ 31,281.00
PRECIO UNITARIO TOTAL $ 129,033.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
permeabilizado con Sika (Mortero 1:4 Inc. Filos y Dilataciones)
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 4,000

SUB-TOTAL (A)
$ 4,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
384,179.00 11,525
10,324.00 3,252

SUB-TOTAL (B)
$ 15,777.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 6,117
$107,568.00 7,171

SUB-TOTAL (C)
$ 13,288.00
COSTOS DIRECTOS = A+B+C $ 33,065.00

PORCENTAJE VR. TOTAL


27% $ 8,927.55
1% $ 330.65
4% $ 1,322.60
SUB-TOTAL $ 10,581.00
PRECIO UNITARIO TOTAL $ 43,646.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Paete sobre Muro (Incluye Filos y Dilataciones)
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 4,000
$30,000.00 2,000

SUB-TOTAL (A)
$ 6,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
384,179.00 11,525

SUB-TOTAL (B)
$ 12,525.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 6,117
$107,568.00 7,171

SUB-TOTAL (C)
$ 13,288.00

COSTOS DIRECTOS = A+B+C $ 31,813.00

PORCENTAJE VR. TOTAL


27% $ 8,589.51
1% $ 318.13
4% $ 1,272.52
SUB-TOTAL $ 10,180.00
PRECIO UNITARIO TOTAL $ 41,993.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Gaviones en piedra de rio
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000

SUB-TOTAL (A)
$ 10,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
135,920.00 67,960
4,400.00 4,400
104,600.00 104,600
10,000.00 10,000

SUB-TOTAL (B)
$ 187,960.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 76,458
$107,568.00 17,928

SUB-TOTAL (C)
$ 94,386.00

COSTOS DIRECTOS = A+B+C $ 292,346.00

PORCENTAJE VR. TOTAL


27% $ 78,933.42
1% $ 2,923.46
4% $ 11,693.84
SUB-TOTAL $ 93,551.00
PRECIO UNITARIO TOTAL $ 385,897.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Gaviones en piedra rajon
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
SUB-TOTAL (A)
$ 10,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
135,920.00 67,960
4,400.00 4,400
72,300.00 72,300
10,000.00 10,000

SUB-TOTAL (B)
$ 155,660.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 76,458
$107,568.00 17,928

SUB-TOTAL (C)
$ 94,386.00

COSTOS DIRECTOS = A+B+C $ 260,046.00

PORCENTAJE VR. TOTAL


27% $ 70,212.42
1% $ 2,600.46
4% $ 10,401.84
SUB-TOTAL $ 83,215.00
PRECIO UNITARIO TOTAL $ 343,261.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Gaviones en piedra rajon
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000

SUB-TOTAL (A)
$ 10,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
135,920.00 67,960
4,400.00 4,400
72,300.00 72,300
10,000.00 10,000

SUB-TOTAL (B)
$ 155,660.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 76,458
$107,568.00 17,928

SUB-TOTAL (C)
$ 94,386.00
COSTOS DIRECTOS = A+B+C $ 260,046.00

PORCENTAJE VR. TOTAL


27% $ 70,212.42
1% $ 2,600.46
4% $ 10,401.84
SUB-TOTAL $ 83,215.00
PRECIO UNITARIO TOTAL $ 343,261.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Gaviones en sacos de suelo -cemento Proporcin 1:8
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$600,000.00 6,000

SUB-TOTAL (A)
$ 16,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
135,920.00 67,960
4,400.00 4,400
2,500.00 57,500
580.00 83,375
10,000.00 10,000
8,000.00 2,800

SUB-TOTAL (B)
$ 227,035.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 76,458
$107,568.00 17,928
$115,566.00 1,156

SUB-TOTAL (C)
$ 95,541.00

COSTOS DIRECTOS = A+B+C $ 338,576.00

PORCENTAJE VR. TOTAL


27% $ 91,415.52
1% $ 3,385.76
4% $ 13,543.04
SUB-TOTAL $ 108,344.00
PRECIO UNITARIO TOTAL $ 446,920.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Gaviones tipo Colchoneta Tipo reno en Piedra
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000

SUB-TOTAL (A)
$ 10,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
72,600.00 72,600
4,400.00 4,400
72,300.00 72,300
10,000.00 10,000

SUB-TOTAL (B)
$ 160,300.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 76,458
$107,568.00 17,928

SUB-TOTAL (C)
$ 94,386.00

COSTOS DIRECTOS = A+B+C $ 264,686.00

PORCENTAJE VR. TOTAL


27% $ 71,465.22
1% $ 2,646.86
4% $ 10,587.44
SUB-TOTAL $ 84,700.00
PRECIO UNITARIO TOTAL $ 349,386.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Demolicin de Gaviones
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$600,000.00 2,000

SUB-TOTAL (A)
$ 5,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
8,000.00 933

SUB-TOTAL (B)
$ 1,933.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 5,378
$115,566.00 385

SUB-TOTAL (C)
$ 14,939.00

COSTOS DIRECTOS = A+B+C $ 21,872.00

PORCENTAJE VR. TOTAL


27% $ 5,905.44
1% $ 218.72
4% $ 874.88
SUB-TOTAL $ 6,999.00
PRECIO UNITARIO TOTAL $ 28,871.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Reconstruccin de Gaviones
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000

SUB-TOTAL (A)
$ 10,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
135,920.00 67,960
4,400.00 4,400

10,000.00 10,000

SUB-TOTAL (B)
$ 83,360.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 76,458
$107,568.00 17,928

SUB-TOTAL (C)
$ 94,386.00
COSTOS DIRECTOS = A+B+C $ 187,746.00

PORCENTAJE VR. TOTAL


27% $ 50,691.42
1% $ 1,877.46
4% $ 7,509.84
SUB-TOTAL $ 60,079.00
PRECIO UNITARIO TOTAL $ 247,825.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
amiento tipo I (alambre de puas 4 hilos y poste plastico)
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,500

SUB-TOTAL (A)
$ 1,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
48,000.00 22,080
450.00 1,980
4,400.00 880

SUB-TOTAL (B)
$ 25,940.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 2,689

SUB-TOTAL (C)
$ 11,864.00

COSTOS DIRECTOS = A+B+C $ 39,304.00

PORCENTAJE VR. TOTAL


27% $ 10,612.08
1% $ 393.04
4% $ 1,572.16
SUB-TOTAL $ 12,577.00
PRECIO UNITARIO TOTAL $ 51,881.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
amiento tipo I (alambre de puas 4 hilos y madera rolliza)
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,500

SUB-TOTAL (A)
$ 1,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
12,000.00 5,520
450.00 1,980
4,400.00 880

SUB-TOTAL (B)
$ 9,380.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 2,689

SUB-TOTAL (C)
$ 11,864.00

COSTOS DIRECTOS = A+B+C $ 22,744.00

PORCENTAJE VR. TOTAL


27% $ 6,140.88
1% $ 227.44
4% $ 909.76
SUB-TOTAL $ 7,278.00
PRECIO UNITARIO TOTAL $ 30,022.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
uministro e instalacin de postes en plastico reciclado
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,500
SUB-TOTAL (A)
$ 1,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
48,000.00 22,080

SUB-TOTAL (B)
$ 23,080.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 4,587
$107,568.00 2,689

SUB-TOTAL (C)
$ 7,277.00

COSTOS DIRECTOS = A+B+C $ 31,857.00

PORCENTAJE VR. TOTAL


27% $ 8,601.39
1% $ 318.57
4% $ 1,274.28
SUB-TOTAL $ 10,194.00
PRECIO UNITARIO TOTAL $ 42,051.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Empradizacion con Cespedon
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$450,000.00 2,250
$60,000.00 300

SUB-TOTAL (A)
$ 2,550.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
8,000.00 8,800
150,000.00 7,500
500.00 2,000

SUB-TOTAL (B)
$ 19,300.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 1,835
$107,568.00 538
$115,566.00 578

SUB-TOTAL (C)
$ 2,951.00
COSTOS DIRECTOS = A+B+C $ 24,801.00

PORCENTAJE VR. TOTAL


27% $ 6,696.27
1% $ 248.01
4% $ 992.04
SUB-TOTAL $ 7,936.00
PRECIO UNITARIO TOTAL $ 32,737.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Empradizacin con Estoln
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$450,000.00 2,250
$60,000.00 300

SUB-TOTAL (A)
$ 2,550.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
300.00 9,000
150,000.00 7,500

SUB-TOTAL (B)
$ 17,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 1,835
$107,568.00 538
$115,566.00 578

SUB-TOTAL (C)
$ 2,951.00

COSTOS DIRECTOS = A+B+C $ 23,001.00

PORCENTAJE VR. TOTAL


27% $ 6,210.27
1% $ 230.01
4% $ 920.04
SUB-TOTAL $ 7,360.00
PRECIO UNITARIO TOTAL $ 30,361.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Empradizacin con semilla al voleo
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$450,000.00 2,250
$60,000.00 300

SUB-TOTAL (A)
$ 2,550.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
80,000.00 800
1,500.00 1,500

SUB-TOTAL (B)
$ 3,300.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 1,835
$107,568.00 538
$115,566.00 578

SUB-TOTAL (C)
$ 2,951.00

COSTOS DIRECTOS = A+B+C $ 8,801.00

PORCENTAJE VR. TOTAL


27% $ 2,376.27
1% $ 88.01
4% $ 352.04
SUB-TOTAL $ 2,816.00
PRECIO UNITARIO TOTAL $ 11,617.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Revegetalizacin con arbustos
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$450,000.00 2,250
$400,000.00 2,000
$60,000.00 1,500

SUB-TOTAL (A)
$ 5,750.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
20,000.00 20,000
1,500.00 1,500

SUB-TOTAL (B)
$ 22,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 1,835
$107,568.00 538
$115,566.00 1,156

SUB-TOTAL (C)
$ 3,528.00

COSTOS DIRECTOS = A+B+C $ 31,778.00

PORCENTAJE VR. TOTAL


27% $ 8,580.06
1% $ 317.78
4% $ 1,271.12
SUB-TOTAL $ 10,169.00
PRECIO UNITARIO TOTAL $ 41,947.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Revegetalizacion con agrotextil
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$450,000.00 2,250
$60,000.00 300

SUB-TOTAL (A)
$ 2,550.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
80,000.00 800
7,000.00 7,700
150,000.00 7,500
500.00 2,000

SUB-TOTAL (B)
$ 19,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 1,835
$107,568.00 538
$115,566.00 578

SUB-TOTAL (C)
$ 2,951.00
COSTOS DIRECTOS = A+B+C $ 24,501.00

PORCENTAJE VR. TOTAL


27% $ 6,615.27
1% $ 245.01
4% $ 980.04
SUB-TOTAL $ 7,840.00
PRECIO UNITARIO TOTAL $ 32,341.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Tiegra Negra (incluye transporte)
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 6,000
$60,000.00 10,000

SUB-TOTAL (A)
$ 16,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
8,000.00 46,667
150,000.00 165,000

SUB-TOTAL (B)
$ 212,667.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 3,670
$107,568.00 1,076
$115,566.00 1,156

SUB-TOTAL (C)
$ 5,901.00

COSTOS DIRECTOS = A+B+C $ 234,568.00

PORCENTAJE VR. TOTAL


27% $ 63,333.36
1% $ 2,345.68
4% $ 9,382.72
SUB-TOTAL $ 75,062.00
PRECIO UNITARIO TOTAL $ 309,630.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
arreras Sacos de fique rellenos con suelo cemento 1:8
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 6,000
$60,000.00 6,000

SUB-TOTAL (A)
$ 12,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
8,000.00 2,800
2,500.00 72,917
580.00 137,750

SUB-TOTAL (B)
$ 214,467.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 36,700
$107,568.00 10,757
$115,566.00 1,156

SUB-TOTAL (C)
$ 48,612.00

COSTOS DIRECTOS = A+B+C $ 275,079.00

PORCENTAJE VR. TOTAL


27% $ 74,271.33
1% $ 2,750.79
4% $ 11,003.16
SUB-TOTAL $ 88,025.00
PRECIO UNITARIO TOTAL $ 363,104.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Barreras Sacos de fique rellenos con suelo
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 6,000
$60,000.00 6,000

SUB-TOTAL (A)
$ 12,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
8,000.00 2,800
2,500.00 72,917

SUB-TOTAL (B)
$ 76,717.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 36,700
$107,568.00 10,757
$115,566.00 1,156

SUB-TOTAL (C)
$ 48,612.00

COSTOS DIRECTOS = A+B+C $ 137,329.00

PORCENTAJE VR. TOTAL


27% $ 37,078.83
1% $ 1,373.29
4% $ 5,493.16
SUB-TOTAL $ 43,945.00
PRECIO UNITARIO TOTAL $ 181,274.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Frances (Incluye Tuberia Flexible Perforada y Geotextil)
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 6,000
$60,000.00 4,000

SUB-TOTAL (A)
$ 10,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
8,000.00 2,800
77,300.00 85,030
24,100.00 70,292
3,248.00 31,578

SUB-TOTAL (B)
$ 190,699.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 24,466
$107,568.00 7,171
$115,566.00 1,156

SUB-TOTAL (C)
$ 32,793.00
COSTOS DIRECTOS = A+B+C $ 233,492.00

PORCENTAJE VR. TOTAL


27% $ 63,042.84
1% $ 2,334.92
4% $ 9,339.68
SUB-TOTAL $ 74,717.00
PRECIO UNITARIO TOTAL $ 308,209.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
orrientes Tipo I en Sacos de Suelo Cemento Proporcin 1-8
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000

SUB-TOTAL (A)
$ 3,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
2,500.00 12,500
580.00 18,125

SUB-TOTAL (B)
$ 31,625.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 18,350
$107,568.00 5,378

SUB-TOTAL (C)
$ 23,728.00

COSTOS DIRECTOS = A+B+C $ 58,353.00

PORCENTAJE VR. TOTAL


27% $ 15,755.31
1% $ 583.53
4% $ 2,334.12
SUB-TOTAL $ 18,673.00
PRECIO UNITARIO TOTAL $ 77,026.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Canal en sacos fique suelo cemento. 1:8
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000

SUB-TOTAL (A)
$ 3,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
2,500.00 10,500
580.00 15,225

SUB-TOTAL (B)
$ 26,725.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 18,350
$107,568.00 5,378

SUB-TOTAL (C)
$ 23,728.00

COSTOS DIRECTOS = A+B+C $ 53,453.00

PORCENTAJE VR. TOTAL


27% $ 14,432.31
1% $ 534.53
4% $ 2,138.12
SUB-TOTAL $ 17,105.00
PRECIO UNITARIO TOTAL $ 70,558.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Barreras o trinchos en madera
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$400,000.00 4,000

SUB-TOTAL (A)
$ 7,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
20,000.00 30,000
21,000.00 25,200
3,000.00 600
3,000.00 600
4,400.00 1,100

SUB-TOTAL (B)
$ 58,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 18,350
$107,568.00 5,378

SUB-TOTAL (C)
$ 23,728.00

COSTOS DIRECTOS = A+B+C $ 89,228.00

PORCENTAJE VR. TOTAL


27% $ 24,091.56
1% $ 892.28
4% $ 3,569.12
SUB-TOTAL $ 28,553.00
PRECIO UNITARIO TOTAL $ 117,781.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Bolsacreto
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 6,000

SUB-TOTAL (A)
$ 6,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
22,000.00 22,000
425,030.00 467,533

SUB-TOTAL (B)
$ 490,533.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 36,700
$107,568.00 10,757

SUB-TOTAL (C)
$ 47,456.00
COSTOS DIRECTOS = A+B+C $ 543,989.00

PORCENTAJE VR. TOTAL


27% $ 146,877.03
1% $ 5,439.89
4% $ 21,759.56
SUB-TOTAL $ 174,076.00
PRECIO UNITARIO TOTAL $ 718,065.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Fabricacion e instalacion de geoesteras e= 0.20 m
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,400

SUB-TOTAL (A)
$ 2,400.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
20,000.00 64,000
2,400.00 28,800
104,600.00 31,380
10,000.00 10,000

SUB-TOTAL (B)
$ 135,180.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 18,350
$107,568.00 4,303

SUB-TOTAL (C)
$ 22,653.00

COSTOS DIRECTOS = A+B+C $ 160,233.00

PORCENTAJE VR. TOTAL


27% $ 43,262.91
1% $ 1,602.33
4% $ 6,409.32
SUB-TOTAL $ 51,275.00
PRECIO UNITARIO TOTAL $ 211,508.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
ermeabilizacin Placas y Cubiertas con Manto Asfltico
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,500
$50,000.00 1,250
$35,000.00 1,750

SUB-TOTAL (A)
$ 4,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
4,000.00 4,000
20,000.00 21,000
2,400.00 120
75,000.00 3,750

SUB-TOTAL (B)
$ 28,870.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 2,294
$156,366.00 7,818
$135,931.10 3,398

SUB-TOTAL (C)
$ 13,510.00

COSTOS DIRECTOS = A+B+C $ 46,880.00

PORCENTAJE VR. TOTAL


27% $ 12,657.60
1% $ 468.80
4% $ 1,875.20
SUB-TOTAL $ 15,002.00
PRECIO UNITARIO TOTAL $ 61,882.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
a Muros Interiores Viniltex (3 Manos y Resane Estucos))
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
17,052.00 3,410
62,640.00 6,264

SUB-TOTAL (B)
$ 11,674.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 5,378

SUB-TOTAL (C)
$ 14,553.00

COSTOS DIRECTOS = A+B+C $ 32,727.00

PORCENTAJE VR. TOTAL


27% $ 8,836.29
1% $ 327.27
4% $ 1,309.08
SUB-TOTAL $ 10,473.00
PRECIO UNITARIO TOTAL $ 43,200.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
a Muros Exteriores Koraza (3 Manos y Resane Estucos))
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
17,052.00 3,410
75,284.00 7,528

SUB-TOTAL (B)
$ 12,939.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 5,378

SUB-TOTAL (C)
$ 14,553.00
COSTOS DIRECTOS = A+B+C $ 33,992.00

PORCENTAJE VR. TOTAL


27% $ 9,177.84
1% $ 339.92
4% $ 1,359.68
SUB-TOTAL $ 10,877.00
PRECIO UNITARIO TOTAL $ 44,869.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Pintura para Techo, Placas y Cielorraso
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 4,000
$35,000.00 4,667

SUB-TOTAL (A)
$ 8,667.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
62,640.00 6,264

SUB-TOTAL (B)
$ 8,264.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 12,233
$107,568.00 7,171

SUB-TOTAL (C)
$ 19,404.00

COSTOS DIRECTOS = A+B+C $ 36,335.00

PORCENTAJE VR. TOTAL


27% $ 9,810.45
1% $ 363.35
4% $ 1,453.40
SUB-TOTAL $ 11,627.00
PRECIO UNITARIO TOTAL $ 47,962.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Pintura en Vinilo Sobre Paete
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 4,000
$35,000.00 4,667

SUB-TOTAL (A)
$ 8,667.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
62,640.00 12,528

SUB-TOTAL (B)
$ 14,528.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 12,233
$107,568.00 7,171

SUB-TOTAL (C)
$ 19,404.00

COSTOS DIRECTOS = A+B+C $ 42,599.00

PORCENTAJE VR. TOTAL


27% $ 11,501.73
1% $ 425.99
4% $ 1,703.96
SUB-TOTAL $ 13,632.00
PRECIO UNITARIO TOTAL $ 56,231.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Pintura Esmalte para Carpintera Metlica.
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500
$100,000.00 5,000

SUB-TOTAL (A)
$ 11,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
15,000.00 1,500
65,000.00 6,500
85,000.00 8,500

SUB-TOTAL (B)
$ 18,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 5,378

SUB-TOTAL (C)
$ 14,553.00

COSTOS DIRECTOS = A+B+C $ 44,553.00

PORCENTAJE VR. TOTAL


27% $ 12,029.31
1% $ 445.53
4% $ 1,782.12
SUB-TOTAL $ 14,257.00
PRECIO UNITARIO TOTAL $ 58,810.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Pintura Carpintera Madera
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500
$100,000.00 5,000

SUB-TOTAL (A)
$ 11,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
15,000.00 1,500
65,000.00 6,500
85,000.00 8,500

SUB-TOTAL (B)
$ 18,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 5,378

SUB-TOTAL (C)
$ 14,553.00
COSTOS DIRECTOS = A+B+C $ 44,553.00

PORCENTAJE VR. TOTAL


27% $ 12,029.31
1% $ 445.53
4% $ 1,782.12
SUB-TOTAL $ 14,257.00
PRECIO UNITARIO TOTAL $ 58,810.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
ra Pisos, Vigas, Columnas, Guarda escoba y Sardineles
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
220,000.00 44,000

SUB-TOTAL (B)
$ 46,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 5,378

SUB-TOTAL (C)
$ 14,553.00

COSTOS DIRECTOS = A+B+C $ 67,053.00

PORCENTAJE VR. TOTAL


27% $ 18,104.31
1% $ 670.53
4% $ 2,682.12
SUB-TOTAL $ 21,457.00
PRECIO UNITARIO TOTAL $ 88,510.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Piso en Cermica
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000

SUB-TOTAL (A)
$ 3,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
38,000.00 41,800
3,000.00 15,000
5,000.00 1,250

SUB-TOTAL (B)
$ 60,050.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 5,378

SUB-TOTAL (C)
$ 14,553.00

COSTOS DIRECTOS = A+B+C $ 77,603.00

PORCENTAJE VR. TOTAL


27% $ 20,952.81
1% $ 776.03
4% $ 3,104.12
SUB-TOTAL $ 24,833.00
PRECIO UNITARIO TOTAL $ 102,436.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Cermica en Muros
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
38,000.00 41,800
3,000.00 15,000
5,000.00 1,250

SUB-TOTAL (B)
$ 60,050.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 5,378

SUB-TOTAL (C)
$ 14,553.00

COSTOS DIRECTOS = A+B+C $ 81,103.00

PORCENTAJE VR. TOTAL


27% $ 21,897.81
1% $ 811.03
4% $ 3,244.12
SUB-TOTAL $ 25,953.00
PRECIO UNITARIO TOTAL $ 107,056.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Guardaescoba en Ceramica
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000

SUB-TOTAL (A)
$ 3,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
38,000.00 7,600
3,000.00 3,000
5,000.00 250

SUB-TOTAL (B)
$ 11,350.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 4,587
$107,568.00 5,378

SUB-TOTAL (C)
$ 9,966.00
COSTOS DIRECTOS = A+B+C $ 24,316.00

PORCENTAJE VR. TOTAL


27% $ 6,565.32
1% $ 243.16
4% $ 972.64
SUB-TOTAL $ 7,781.00
PRECIO UNITARIO TOTAL $ 32,097.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Desmonte de cieloraso
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000

SUB-TOTAL (B)
$ 2,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 5,378

SUB-TOTAL (C)
$ 14,553.00

COSTOS DIRECTOS = A+B+C $ 23,053.00

PORCENTAJE VR. TOTAL


27% $ 6,224.31
1% $ 230.53
4% $ 922.12
SUB-TOTAL $ 7,377.00
PRECIO UNITARIO TOTAL $ 30,430.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin de Cielorraso en Drywall
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 6,000
$35,000.00 7,000

SUB-TOTAL (A)
$ 13,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
47,212.00 18,032
9,000.00 36,000
10,000.00 10,000

SUB-TOTAL (B)
$ 66,032.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 18,350
$107,568.00 21,514

SUB-TOTAL (C)
$ 39,863.00

COSTOS DIRECTOS = A+B+C $ 118,895.00

PORCENTAJE VR. TOTAL


27% $ 32,101.65
1% $ 1,188.95
4% $ 4,755.80
SUB-TOTAL $ 38,046.00
PRECIO UNITARIO TOTAL $ 156,941.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

ro e instalacin de Cielorraso sonocor, Duracustic 60x1,2 sin UNIDAD:


perfileria
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
25,000.00 9,549

SUB-TOTAL (B)
$ 11,549.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 10,757

SUB-TOTAL (C)
$ 19,932.00

COSTOS DIRECTOS = A+B+C $ 37,981.00

PORCENTAJE VR. TOTAL


27% $ 10,254.87
1% $ 379.81
4% $ 1,519.24
SUB-TOTAL $ 12,154.00
PRECIO UNITARIO TOTAL $ 50,135.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

e instalacin de laminas de cielo raso en fibra Mineral, incluye UNIDAD:


perfileria
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
5,000.00 5,000
16,000.00 51,111
8,000.00 48,000

SUB-TOTAL (B)
$ 104,111.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 10,757

SUB-TOTAL (C)
$ 19,932.00
COSTOS DIRECTOS = A+B+C $ 130,543.00

PORCENTAJE VR. TOTAL


27% $ 35,246.61
1% $ 1,305.43
4% $ 5,221.72
SUB-TOTAL $ 41,774.00
PRECIO UNITARIO TOTAL $ 172,317.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sum. E Inst. Teja Eternit o asbesto cemento
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
35,000.00 38,500
800.00 3,200

SUB-TOTAL (B)
$ 42,700.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 10,757

SUB-TOTAL (C)
$ 19,932.00

COSTOS DIRECTOS = A+B+C $ 69,132.00

PORCENTAJE VR. TOTAL


27% $ 18,665.64
1% $ 691.32
4% $ 2,765.28
SUB-TOTAL $ 22,122.00
PRECIO UNITARIO TOTAL $ 91,254.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
stro e Instalacin de Cubierta Teja arquitectonica (metalica)
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
25,000.00 27,500
800.00 3,200

SUB-TOTAL (B)
$ 31,700.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 10,757

SUB-TOTAL (C)
$ 19,932.00

COSTOS DIRECTOS = A+B+C $ 58,132.00

PORCENTAJE VR. TOTAL


27% $ 15,695.64
1% $ 581.32
4% $ 2,325.28
SUB-TOTAL $ 18,602.00
PRECIO UNITARIO TOTAL $ 76,734.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Caballetes Teja Eternit o Barro
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
33,000.00 36,300
800.00 3,200

SUB-TOTAL (B)
$ 40,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 10,757

SUB-TOTAL (C)
$ 19,932.00

COSTOS DIRECTOS = A+B+C $ 66,932.00

PORCENTAJE VR. TOTAL


27% $ 18,071.64
1% $ 669.32
4% $ 2,677.28
SUB-TOTAL $ 21,418.00
PRECIO UNITARIO TOTAL $ 88,350.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Cubierta en Termoacustic.
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
62,500.00 68,750
800.00 3,200

SUB-TOTAL (B)
$ 72,950.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 10,757

SUB-TOTAL (C)
$ 19,932.00
COSTOS DIRECTOS = A+B+C $ 99,382.00

PORCENTAJE VR. TOTAL


27% $ 26,833.14
1% $ 993.82
4% $ 3,975.28
SUB-TOTAL $ 31,802.00
PRECIO UNITARIO TOTAL $ 131,184.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Cubierta Teja Zinc.
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000
15,000.00 16,500
800.00 3,200

SUB-TOTAL (B)
$ 20,700.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$107,568.00 10,757

SUB-TOTAL (C)
$ 19,932.00

COSTOS DIRECTOS = A+B+C $ 47,132.00

PORCENTAJE VR. TOTAL


27% $ 12,725.64
1% $ 471.32
4% $ 1,885.28
SUB-TOTAL $ 15,082.00
PRECIO UNITARIO TOTAL $ 62,214.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Carpintera en Aluminio y Vidrio
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 6,000
$35,000.00 7,000

SUB-TOTAL (A)
$ 13,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
5,000.00 5,000
290,000.00 290,000

SUB-TOTAL (B)
$ 295,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 18,350
$107,568.00 10,757

SUB-TOTAL (C)
$ 29,107.00

COSTOS DIRECTOS = A+B+C $ 337,107.00

PORCENTAJE VR. TOTAL


27% $ 91,018.89
1% $ 3,371.07
4% $ 13,484.28
SUB-TOTAL $ 107,874.00
PRECIO UNITARIO TOTAL $ 444,981.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sum. E instalacin Vidrio claro 4 mm
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
3,000.00 3,000
42,000.00 46,200
15,000.00 3,750

SUB-TOTAL (B)
$ 52,950.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 4,587
$135,931.10 6,797

SUB-TOTAL (C)
$ 11,384.00

COSTOS DIRECTOS = A+B+C $ 70,834.00

PORCENTAJE VR. TOTAL


27% $ 19,125.18
1% $ 708.34
4% $ 2,833.36
SUB-TOTAL $ 22,667.00
PRECIO UNITARIO TOTAL $ 93,501.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sum. E instalacin Vidrio claro 5 mm
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
3,000.00 3,000
55,000.00 60,500
15,000.00 3,750

SUB-TOTAL (B)
$ 67,250.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 4,587
$135,931.10 6,797

SUB-TOTAL (C)
$ 11,384.00
COSTOS DIRECTOS = A+B+C $ 85,134.00

PORCENTAJE VR. TOTAL


27% $ 22,986.18
1% $ 851.34
4% $ 3,405.36
SUB-TOTAL $ 27,243.00
PRECIO UNITARIO TOTAL $ 112,377.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sum. E instalacin Vidrio bronce 4 mm
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
3,000.00 3,000
55,000.00 60,500
15,000.00 3,750

SUB-TOTAL (B)
$ 67,250.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$135,931.10 6,797

SUB-TOTAL (C)
$ 15,971.00

COSTOS DIRECTOS = A+B+C $ 89,721.00

PORCENTAJE VR. TOTAL


27% $ 24,224.67
1% $ 897.21
4% $ 3,588.84
SUB-TOTAL $ 28,711.00
PRECIO UNITARIO TOTAL $ 118,432.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sum. E instalacin Vidrio bronce 5 mm
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$35,000.00 3,500

SUB-TOTAL (A)
$ 6,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
3,000.00 3,000
65,000.00 71,500
15,000.00 3,750

SUB-TOTAL (B)
$ 78,250.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,175
$135,931.10 6,797

SUB-TOTAL (C)
$ 15,971.00

COSTOS DIRECTOS = A+B+C $ 100,721.00

PORCENTAJE VR. TOTAL


27% $ 27,194.67
1% $ 1,007.21
4% $ 4,028.84
SUB-TOTAL $ 32,231.00
PRECIO UNITARIO TOTAL $ 132,952.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
n madera - economica con marco en lamina cal 18 o madera
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 12,000
SUB-TOTAL (A)
$ 12,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
15,000.00 15,000
170,000.00 170,000
60,000.00 60,000
50,000.00 25,000

SUB-TOTAL (B)
$ 270,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 18,350
$107,568.00 21,514

SUB-TOTAL (C)
$ 39,863.00

COSTOS DIRECTOS = A+B+C $ 321,863.00

PORCENTAJE VR. TOTAL


27% $ 86,903.01
1% $ 3,218.63
4% $ 12,874.52
SUB-TOTAL $ 102,996.00
PRECIO UNITARIO TOTAL $ 424,859.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Placa Aligerada 3000PSI entrepiso en Stildek
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 6,000
$35,000.00 7,000

SUB-TOTAL (A)
$ 13,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
5,000.00 5,000
452,030.00 47,463
30,000.00 33,000
3,000.00 9,000
35,000.00 70,000
100,000.00 20,000

SUB-TOTAL (B)
$ 184,463.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 36,700
$107,568.00 21,514

SUB-TOTAL (C)
$ 58,213.00
COSTOS DIRECTOS = A+B+C $ 255,676.00

PORCENTAJE VR. TOTAL


27% $ 69,032.52
1% $ 2,556.76
4% $ 10,227.04
SUB-TOTAL $ 81,816.00
PRECIO UNITARIO TOTAL $ 337,492.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Muro en Ladrillo Tolete Prensado a la vista 2 caras.
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 4,000
$35,000.00 4,667

SUB-TOTAL (A)
$ 8,667.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
1,200.00 84,000
369,083.00 7,382

SUB-TOTAL (B)
$ 93,382.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 12,233
$107,568.00 14,342

SUB-TOTAL (C)
$ 26,576.00

COSTOS DIRECTOS = A+B+C $ 128,625.00

PORCENTAJE VR. TOTAL


27% $ 34,728.75
1% $ 1,286.25
4% $ 5,145.00
SUB-TOTAL $ 41,160.00
PRECIO UNITARIO TOTAL $ 169,785.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Muro en Bloque
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 4,000
$35,000.00 4,667

SUB-TOTAL (A)
$ 8,667.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
2,000.00 32,000
369,083.00 7,382

SUB-TOTAL (B)
$ 41,382.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 12,233
$107,568.00 14,342

SUB-TOTAL (C)
$ 26,576.00

COSTOS DIRECTOS = A+B+C $ 76,625.00

PORCENTAJE VR. TOTAL


27% $ 20,688.75
1% $ 766.25
4% $ 3,065.00
SUB-TOTAL $ 24,520.00
PRECIO UNITARIO TOTAL $ 101,145.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Muro en Ladrillo Tolete Comn
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 4,000
$35,000.00 4,667

SUB-TOTAL (A)
$ 8,667.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
1,000.00 70,000
369,083.00 7,382

SUB-TOTAL (B)
$ 79,382.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 12,233
$107,568.00 14,342

SUB-TOTAL (C)
$ 26,576.00

COSTOS DIRECTOS = A+B+C $ 114,625.00

PORCENTAJE VR. TOTAL


27% $ 30,948.75
1% $ 1,146.25
4% $ 4,585.00
SUB-TOTAL $ 36,680.00
PRECIO UNITARIO TOTAL $ 151,305.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Buldzer (140-165) HP
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 80,000
$450,000.00 4,500

SUB-TOTAL (A)
$ 84,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 48,000

SUB-TOTAL (B)
$ 48,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 11,469
$115,566.00 14,446

SUB-TOTAL (C)
$ 25,914.00
COSTOS DIRECTOS = A+B+C $ 158,914.00

PORCENTAJE VR. TOTAL


27% $ 42,906.78
1% $ 1,589.14
4% $ 6,356.56
SUB-TOTAL $ 50,852.00
PRECIO UNITARIO TOTAL $ 209,766.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Buldzer (> 180 HP)
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$900,000.00 90,000
$450,000.00 4,500

SUB-TOTAL (A)
$ 94,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 48,000

SUB-TOTAL (B)
$ 48,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 11,469
$115,566.00 14,446

SUB-TOTAL (C)
$ 25,914.00

COSTOS DIRECTOS = A+B+C $ 168,914.00

PORCENTAJE VR. TOTAL


27% $ 45,606.78
1% $ 1,689.14
4% $ 6,756.56
SUB-TOTAL $ 54,052.00
PRECIO UNITARIO TOTAL $ 222,966.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Motoniveladora (min) 125 HP
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 80,000
$450,000.00 4,500

SUB-TOTAL (A)
$ 84,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 48,000

SUB-TOTAL (B)
$ 48,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 14,446

SUB-TOTAL (C)
$ 14,446.00

COSTOS DIRECTOS = A+B+C $ 147,446.00

PORCENTAJE VR. TOTAL


27% $ 39,810.42
1% $ 1,474.46
4% $ 5,897.84
SUB-TOTAL $ 47,183.00
PRECIO UNITARIO TOTAL $ 194,629.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Retroexcavadora (min) 120 HP 1.5 y 3
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 80,000
$450,000.00 4,500

SUB-TOTAL (A)
$ 84,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 48,000

SUB-TOTAL (B)
$ 48,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 14,446

SUB-TOTAL (C)
$ 14,446.00

COSTOS DIRECTOS = A+B+C $ 147,446.00

PORCENTAJE VR. TOTAL


27% $ 39,810.42
1% $ 1,474.46
4% $ 5,897.84
SUB-TOTAL $ 47,183.00
PRECIO UNITARIO TOTAL $ 194,629.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Mini retro de orugas
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$700,000.00 70,000
$450,000.00 4,500

SUB-TOTAL (A)
$ 74,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 28,000

SUB-TOTAL (B)
$ 28,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 14,446

SUB-TOTAL (C)
$ 14,446.00
COSTOS DIRECTOS = A+B+C $ 117,446.00

PORCENTAJE VR. TOTAL


27% $ 31,710.42
1% $ 1,174.46
4% $ 4,697.84
SUB-TOTAL $ 37,583.00
PRECIO UNITARIO TOTAL $ 155,029.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Retro Cargador (min) 100 HP 2.25 - Y3 cat 930
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 60,000
$450,000.00 4,500

SUB-TOTAL (A)
$ 64,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 28,000

SUB-TOTAL (B)
$ 28,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 14,446

SUB-TOTAL (C)
$ 14,446.00

COSTOS DIRECTOS = A+B+C $ 107,446.00

PORCENTAJE VR. TOTAL


27% $ 29,010.42
1% $ 1,074.46
4% $ 4,297.84
SUB-TOTAL $ 34,383.00
PRECIO UNITARIO TOTAL $ 141,829.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Vibro compactador (min) 8 Toneladas
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 60,000
$450,000.00 4,500

SUB-TOTAL (A)
$ 64,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 28,000

SUB-TOTAL (B)
$ 28,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 14,446

SUB-TOTAL (C)
$ 14,446.00

COSTOS DIRECTOS = A+B+C $ 107,446.00

PORCENTAJE VR. TOTAL


27% $ 29,010.42
1% $ 1,074.46
4% $ 4,297.84
SUB-TOTAL $ 34,383.00
PRECIO UNITARIO TOTAL $ 141,829.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Mini-Cargador Frontal
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$450,000.00 45,000
$450,000.00 4,500

SUB-TOTAL (A)
$ 49,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 24,000

SUB-TOTAL (B)
$ 24,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 14,446

SUB-TOTAL (C)
$ 14,446.00

COSTOS DIRECTOS = A+B+C $ 88,446.00

PORCENTAJE VR. TOTAL


27% $ 23,880.42
1% $ 884.46
4% $ 3,537.84
SUB-TOTAL $ 28,303.00
PRECIO UNITARIO TOTAL $ 116,749.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Vibrocompactador Benitin
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$350,000.00 35,000
$450,000.00 4,500

SUB-TOTAL (A)
$ 39,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 24,000

SUB-TOTAL (B)
$ 24,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 14,446

SUB-TOTAL (C)
$ 14,446.00
COSTOS DIRECTOS = A+B+C $ 78,446.00

PORCENTAJE VR. TOTAL


27% $ 21,180.42
1% $ 784.46
4% $ 3,137.84
SUB-TOTAL $ 25,103.00
PRECIO UNITARIO TOTAL $ 103,549.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Carrotanque (min) 5000 gal
DA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 600,000
$450,000.00 37,500

SUB-TOTAL (A)
$ 637,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 160,000

SUB-TOTAL (B)
$ 160,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 14,446

SUB-TOTAL (C)
$ 14,446.00

COSTOS DIRECTOS = A+B+C $ 812,446.00

PORCENTAJE VR. TOTAL


27% $ 219,360.42
1% $ 8,124.46
4% $ 32,497.84
SUB-TOTAL $ 259,983.00
PRECIO UNITARIO TOTAL $ 1,072,429.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Volqueta Dobletroque (min) 14 M3
DA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 600,000
$450,000.00 37,500

SUB-TOTAL (A)
$ 637,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 280,000

SUB-TOTAL (B)
$ 280,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 14,446

SUB-TOTAL (C)
$ 14,446.00

COSTOS DIRECTOS = A+B+C $ 932,446.00

PORCENTAJE VR. TOTAL


27% $ 251,760.42
1% $ 9,324.46
4% $ 37,297.84
SUB-TOTAL $ 298,383.00
PRECIO UNITARIO TOTAL $ 1,230,829.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Volqueta Sencilla (min 6 M3)
DA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$450,000.00 450,000
$450,000.00 37,500

SUB-TOTAL (A)
$ 487,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 280,000

SUB-TOTAL (B)
$ 280,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 14,446

SUB-TOTAL (C)
$ 14,446.00

COSTOS DIRECTOS = A+B+C $ 782,446.00

PORCENTAJE VR. TOTAL


27% $ 211,260.42
1% $ 7,824.46
4% $ 31,297.84
SUB-TOTAL $ 250,383.00
PRECIO UNITARIO TOTAL $ 1,032,829.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Camioneta doble cabina (4X4) Sin Conductor
DA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$180,000.00 180,000

SUB-TOTAL (A)
$ 180,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 120,000

SUB-TOTAL (B)
$ 120,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 -

SUB-TOTAL (C)
$ -
COSTOS DIRECTOS = A+B+C $ 300,500.00

PORCENTAJE VR. TOTAL


27% $ 81,135.00
1% $ 3,005.00
4% $ 12,020.00
SUB-TOTAL $ 96,160.00
PRECIO UNITARIO TOTAL $ 396,660.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Camioneta doble cabina (4X4) Incluye Conductor
DA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$180,000.00 180,000

SUB-TOTAL (A)
$ 180,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 120,000

SUB-TOTAL (B)
$ 120,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 115,566

SUB-TOTAL (C)
$ 115,566.00

COSTOS DIRECTOS = A+B+C $ 416,066.00

PORCENTAJE VR. TOTAL


27% $ 112,337.82
1% $ 4,160.66
4% $ 16,642.64
SUB-TOTAL $ 133,141.00
PRECIO UNITARIO TOTAL $ 549,207.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Compresor (min.)220 CFM
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$500,000.00 50,000
$400,000.00 10,000

SUB-TOTAL (A)
$ 60,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 16,000
60,000.00 6,000

SUB-TOTAL (B)
$ 22,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$107,568.00 13,446

SUB-TOTAL (C)
$ 13,446.00

COSTOS DIRECTOS = A+B+C $ 95,946.00

PORCENTAJE VR. TOTAL


27% $ 25,905.42
1% $ 959.46
4% $ 3,837.84
SUB-TOTAL $ 30,703.00
PRECIO UNITARIO TOTAL $ 126,649.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Herramienta menor (motosierra, Guadaa)
DA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$80,000.00 80,000
$450,000.00 37,500

SUB-TOTAL (A)
$ 117,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
8,000.00 -

SUB-TOTAL (B)
$ 2,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$91,749.00 91,749

SUB-TOTAL (C)
$ 91,749.00

COSTOS DIRECTOS = A+B+C $ 211,249.00

PORCENTAJE VR. TOTAL


27% $ 57,037.23
1% $ 2,112.49
4% $ 8,449.96
SUB-TOTAL $ 67,600.00
PRECIO UNITARIO TOTAL $ 278,849.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Compactador t Rana o Saltarn ING RX304
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 60,000
$450,000.00 4,500

SUB-TOTAL (A)
$ 64,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 -

SUB-TOTAL (B)
$ 500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$91,749.00 11,469

SUB-TOTAL (C)
$ 11,469.00
COSTOS DIRECTOS = A+B+C $ 76,469.00

PORCENTAJE VR. TOTAL


27% $ 20,646.63
1% $ 764.69
4% $ 3,058.76
SUB-TOTAL $ 24,470.00
PRECIO UNITARIO TOTAL $ 100,939.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Martillo Hidrulico (incluye tafira retroexcavadora)
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$1,200,000.00 120,000
$450,000.00 4,500

SUB-TOTAL (A)
$ 124,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
8,000.00 48,000

SUB-TOTAL (B)
$ 48,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 14,446

SUB-TOTAL (C)
$ 14,446.00

COSTOS DIRECTOS = A+B+C $ 187,446.00

PORCENTAJE VR. TOTAL


27% $ 50,610.42
1% $ 1,874.46
4% $ 7,497.84
SUB-TOTAL $ 59,983.00
PRECIO UNITARIO TOTAL $ 247,429.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Andamio certificado (seccin completa) por da
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$35,000.00 35,000
$400,000.00 4,000

SUB-TOTAL (A)
$ 39,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500

SUB-TOTAL (B)
$ 500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 11,557

SUB-TOTAL (C)
$ 11,557.00

COSTOS DIRECTOS = A+B+C $ 51,057.00

PORCENTAJE VR. TOTAL


27% $ 13,785.39
1% $ 510.57
4% $ 2,042.28
SUB-TOTAL $ 16,338.00
PRECIO UNITARIO TOTAL $ 67,395.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro Personal NO Calificado (tipo obrero)
HORA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,400
$450,000.00 18,000

SUB-TOTAL (A)
$ 20,400.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000

SUB-TOTAL (B)
$ 1,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$91,749.00 91,749

SUB-TOTAL (C)
$ 91,749.00

COSTOS DIRECTOS = A+B+C $ 113,149.00

PORCENTAJE VR. TOTAL


27% $ 30,550.23
1% $ 1,131.49
4% $ 4,525.96
SUB-TOTAL $ 36,208.00
PRECIO UNITARIO TOTAL $ 149,357.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
ministro Personal NO Calificado da festivo (tipo obrero)
DIA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,400
$450,000.00 18,000

SUB-TOTAL (A)
$ 20,400.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000

SUB-TOTAL (B)
$ 1,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$160,560.75 160,561

SUB-TOTAL (C)
$ 160,561.00
COSTOS DIRECTOS = A+B+C $ 181,961.00

PORCENTAJE VR. TOTAL


27% $ 49,129.47
1% $ 1,819.61
4% $ 7,278.44
SUB-TOTAL $ 58,228.00
PRECIO UNITARIO TOTAL $ 240,189.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
uministro Personal Calificado Oficial de Construccin
DA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,400
$450,000.00 18,000

SUB-TOTAL (A)
$ 20,400.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000

SUB-TOTAL (B)
$ 1,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$107,568.00 107,568

SUB-TOTAL (C)
$ 107,568.00

COSTOS DIRECTOS = A+B+C $ 128,968.00

PORCENTAJE VR. TOTAL


27% $ 34,821.36
1% $ 1,289.68
4% $ 5,158.72
SUB-TOTAL $ 41,270.00
PRECIO UNITARIO TOTAL $ 170,238.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
stro Personal Calificado Oficial de Construccin da festivo
DA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,400
$450,000.00 18,000

SUB-TOTAL (A)
$ 20,400.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000

SUB-TOTAL (B)
$ 1,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$188,244.00 188,244

SUB-TOTAL (C)
$ 188,244.00

COSTOS DIRECTOS = A+B+C $ 209,644.00

PORCENTAJE VR. TOTAL


27% $ 56,603.88
1% $ 2,096.44
4% $ 8,385.76
SUB-TOTAL $ 67,086.00
PRECIO UNITARIO TOTAL $ 276,730.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
ro Personal Tecnico / Profesional Calificado (Dia o Fraccion)
DA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$450,000.00 18,000

SUB-TOTAL (A)
$ 18,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
15,000.00 15,000

SUB-TOTAL (B)
$ 15,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$135,931.10 135,931

SUB-TOTAL (C)
$ 135,931.00

COSTOS DIRECTOS = A+B+C $ 168,931.00

PORCENTAJE VR. TOTAL


27% $ 45,611.37
1% $ 1,689.31
4% $ 6,757.24
SUB-TOTAL $ 54,058.00
PRECIO UNITARIO TOTAL $ 222,989.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Buldzer (> 180 HP)
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$3,000,000.00 6,000,000
$180,000.00 180,000

SUB-TOTAL (A)
$ 6,180,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
150,000.00 150,000

SUB-TOTAL (B)
$ 150,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 115,566

SUB-TOTAL (C)
$ 115,566.00
COSTOS DIRECTOS = A+B+C $ 6,445,566.00

PORCENTAJE VR. TOTAL


27% $ 1,740,302.82
1% $ 64,455.66
4% $ 257,822.64
SUB-TOTAL $ 2,062,581.00
PRECIO UNITARIO TOTAL $ 8,508,147.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Motoniveladora (min) 125 HP
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$3,000,000.00 6,000,000
$180,000.00 180,000

SUB-TOTAL (A)
$ 6,180,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
150,000.00 150,000

SUB-TOTAL (B)
$ 150,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 115,566

SUB-TOTAL (C)
$ 115,566.00

COSTOS DIRECTOS = A+B+C $ 6,445,566.00

PORCENTAJE VR. TOTAL


27% $ 1,740,302.82
1% $ 64,455.66
4% $ 257,822.64
SUB-TOTAL $ 2,062,581.00
PRECIO UNITARIO TOTAL $ 8,508,147.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Retroexcavadora (min) 120 HP 1.5 y 3
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$3,000,000.00 6,000,000
$180,000.00 180,000

SUB-TOTAL (A)
$ 6,180,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
150,000.00 150,000

SUB-TOTAL (B)
$ 150,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 115,566

SUB-TOTAL (C)
$ 115,566.00

COSTOS DIRECTOS = A+B+C $ 6,445,566.00

PORCENTAJE VR. TOTAL


27% $ 1,740,302.82
1% $ 64,455.66
4% $ 257,822.64
SUB-TOTAL $ 2,062,581.00
PRECIO UNITARIO TOTAL $ 8,508,147.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Mini retro de orugas
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$3,000,000.00 6,000,000
$180,000.00 180,000

SUB-TOTAL (A)
$ 6,180,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
150,000.00 150,000

SUB-TOTAL (B)
$ 150,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 115,566

SUB-TOTAL (C)
$ 115,566.00

COSTOS DIRECTOS = A+B+C $ 6,445,566.00

PORCENTAJE VR. TOTAL


27% $ 1,740,302.82
1% $ 64,455.66
4% $ 257,822.64
SUB-TOTAL $ 2,062,581.00
PRECIO UNITARIO TOTAL $ 8,508,147.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Retro Cargador (min) 100 HP 2.25 - Y3 cat 930
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$3,000,000.00 6,000,000
$180,000.00 180,000

SUB-TOTAL (A)
$ 6,180,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
150,000.00 150,000

SUB-TOTAL (B)
$ 150,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 115,566

SUB-TOTAL (C)
$ 115,566.00
COSTOS DIRECTOS = A+B+C $ 6,445,566.00

PORCENTAJE VR. TOTAL


27% $ 1,740,302.82
1% $ 64,455.66
4% $ 257,822.64
SUB-TOTAL $ 2,062,581.00
PRECIO UNITARIO TOTAL $ 8,508,147.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Vibro compactador (min) 8 Toneladas
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$3,000,000.00 6,000,000
$180,000.00 180,000

SUB-TOTAL (A)
$ 6,180,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
150,000.00 150,000

SUB-TOTAL (B)
$ 150,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 115,566

SUB-TOTAL (C)
$ 115,566.00

COSTOS DIRECTOS = A+B+C $ 6,445,566.00

PORCENTAJE VR. TOTAL


27% $ 1,740,302.82
1% $ 64,455.66
4% $ 257,822.64
SUB-TOTAL $ 2,062,581.00
PRECIO UNITARIO TOTAL $ 8,508,147.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Mini-Cargador Frontal
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$1,500,000.00 3,000,000
$180,000.00 180,000

SUB-TOTAL (A)
$ 3,180,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
150,000.00 150,000

SUB-TOTAL (B)
$ 150,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 115,566

SUB-TOTAL (C)
$ 115,566.00

COSTOS DIRECTOS = A+B+C $ 3,445,566.00

PORCENTAJE VR. TOTAL


27% $ 930,302.82
1% $ 34,455.66
4% $ 137,822.64
SUB-TOTAL $ 1,102,581.00
PRECIO UNITARIO TOTAL $ 4,548,147.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Vibrocompactador Benitin
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$1,000,000.00 2,000,000
$180,000.00 180,000

SUB-TOTAL (A)
$ 2,180,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
150,000.00 150,000

SUB-TOTAL (B)
$ 150,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$115,566.00 115,566

SUB-TOTAL (C)
$ 115,566.00

COSTOS DIRECTOS = A+B+C $ 2,445,566.00

PORCENTAJE VR. TOTAL


27% $ 660,302.82
1% $ 24,455.66
4% $ 97,822.64
SUB-TOTAL $ 782,581.00
PRECIO UNITARIO TOTAL $ 3,228,147.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Buldzer (> 180 HP)
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 800,000
$180,000.00 90,000

SUB-TOTAL (A)
$ 890,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50,000.00 50,000

SUB-TOTAL (B)
$ 50,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$0.00 -

SUB-TOTAL (C)
$ -
COSTOS DIRECTOS = A+B+C $ 940,000.00

PORCENTAJE VR. TOTAL


27% $ 253,800.00
1% $ 9,400.00
4% $ 37,600.00
SUB-TOTAL $ 300,800.00
PRECIO UNITARIO TOTAL $ 1,240,800.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Retroexcavadora (min) 120 HP 1.5 y 3
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 800,000
$180,000.00 90,000

SUB-TOTAL (A)
$ 890,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50,000.00 50,000

SUB-TOTAL (B)
$ 50,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$0.00 -

SUB-TOTAL (C)
$ -

COSTOS DIRECTOS = A+B+C $ 940,000.00

PORCENTAJE VR. TOTAL


27% $ 253,800.00
1% $ 9,400.00
4% $ 37,600.00
SUB-TOTAL $ 300,800.00
PRECIO UNITARIO TOTAL $ 1,240,800.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Mini retro de orugas
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 800,000
$180,000.00 90,000

SUB-TOTAL (A)
$ 890,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50,000.00 50,000

SUB-TOTAL (B)
$ 50,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$0.00 -

SUB-TOTAL (C)
$ -

COSTOS DIRECTOS = A+B+C $ 940,000.00

PORCENTAJE VR. TOTAL


27% $ 253,800.00
1% $ 9,400.00
4% $ 37,600.00
SUB-TOTAL $ 300,800.00
PRECIO UNITARIO TOTAL $ 1,240,800.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Vibro compactador (min) 8 Toneladas
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 800,000
$180,000.00 90,000

SUB-TOTAL (A)
$ 890,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50,000.00 50,000

SUB-TOTAL (B)
$ 50,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$0.00 -

SUB-TOTAL (C)
$ -

COSTOS DIRECTOS = A+B+C $ 940,000.00

PORCENTAJE VR. TOTAL


27% $ 253,800.00
1% $ 9,400.00
4% $ 37,600.00
SUB-TOTAL $ 300,800.00
PRECIO UNITARIO TOTAL $ 1,240,800.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Mini-Cargador Frontal
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 400,000
$180,000.00 90,000

SUB-TOTAL (A)
$ 490,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50,000.00 50,000

SUB-TOTAL (B)
$ 50,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$0.00 -

SUB-TOTAL (C)
$ -
COSTOS DIRECTOS = A+B+C $ 540,000.00

PORCENTAJE VR. TOTAL


27% $ 145,800.00
1% $ 5,400.00
4% $ 21,600.00
SUB-TOTAL $ 172,800.00
PRECIO UNITARIO TOTAL $ 712,800.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Vibrocompactador Benitin
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 400,000
$180,000.00 90,000

SUB-TOTAL (A)
$ 490,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50,000.00 50,000

SUB-TOTAL (B)
$ 50,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)

$0.00 -

SUB-TOTAL (C)
$ -

COSTOS DIRECTOS = A+B+C $ 540,000.00

PORCENTAJE VR. TOTAL


27% $ 145,800.00
1% $ 5,400.00
4% $ 21,600.00
SUB-TOTAL $ 172,800.00
PRECIO UNITARIO TOTAL $ 712,800.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Transporte de material metro cbico
M3-KM
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
0 0

SUB-TOTAL (A)
$ -
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10.00 10
900.00 900

SUB-TOTAL (B)
$ 910.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 92

SUB-TOTAL (C)
$ 92.00

COSTOS DIRECTOS = A+B+C $ 1,002.00

PORCENTAJE VR. TOTAL


27% $ 270.54
1% $ 10.02
4% $ 40.08
SUB-TOTAL $ 321.00
PRECIO UNITARIO TOTAL $ 1,323.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Mantenimiento Bsico de Vias (Moto, Vibro, Carrotk)
KM
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$800,000.00 800,000
$600,000.00 600,000
$450,000.00 450,000

SUB-TOTAL (A)
$ 1,850,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50,000.00 50,000
8,000.00 1,040,000

SUB-TOTAL (B)
$ 1,090,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 183,498
$115,566.00 346,698

SUB-TOTAL (C)
$ 530,196.00

COSTOS DIRECTOS = A+B+C $ 3,470,196.00

PORCENTAJE VR. TOTAL


27% $ 936,952.92
1% $ 34,701.96
4% $ 138,807.84
SUB-TOTAL $ 1,110,463.00
PRECIO UNITARIO TOTAL $ 4,580,659.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sum de Afirmado o Recebo Suelto (Sin Transporte)
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
0 0
0 0
0 0

SUB-TOTAL (A)
$ -
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
14,000.00 14,000

SUB-TOTAL (B)
$ 14,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459

SUB-TOTAL (C)
$ 459.00
COSTOS DIRECTOS = A+B+C $ 14,959.00

PORCENTAJE VR. TOTAL


27% $ 4,038.93
1% $ 149.59
4% $ 598.36
SUB-TOTAL $ 4,787.00
PRECIO UNITARIO TOTAL $ 19,746.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro de Cemento Gris Bto 50kg
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
0 0
0 0
0 0

SUB-TOTAL (A)
$ -
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
580.00 29,000

SUB-TOTAL (B)
$ 29,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459

SUB-TOTAL (C)
$ 459.00

COSTOS DIRECTOS = A+B+C $ 29,959.00

PORCENTAJE VR. TOTAL


27% $ 8,088.93
1% $ 299.59
4% $ 1,198.36
SUB-TOTAL $ 9,587.00
PRECIO UNITARIO TOTAL $ 39,546.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro de Crudo de Rio (Sin Transporte)
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
0 0
0 0
0 0

SUB-TOTAL (A)
$ -
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
23,200.00 23,200

SUB-TOTAL (B)
$ 23,700.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459

SUB-TOTAL (C)
$ 459.00

COSTOS DIRECTOS = A+B+C $ 24,159.00

PORCENTAJE VR. TOTAL


27% $ 6,522.93
1% $ 241.59
4% $ 966.36
SUB-TOTAL $ 7,731.00
PRECIO UNITARIO TOTAL $ 31,890.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Rocera de Va (ambos lados)
KM
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 60,000
$80,000.00 160,000
$80,000.00 80,000
$450,000.00 450,000

SUB-TOTAL (A)
$ 750,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
100,000.00 100,000
8,000.00 280,000

SUB-TOTAL (B)
$ 380,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 550,494
$107,568.00 215,136
$115,566.00 115,566

SUB-TOTAL (C)
$ 881,196.00

COSTOS DIRECTOS = A+B+C $ 2,011,196.00

PORCENTAJE VR. TOTAL


27% $ 543,022.92
1% $ 20,111.96
4% $ 80,447.84
SUB-TOTAL $ 643,583.00
PRECIO UNITARIO TOTAL $ 2,654,779.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Seales de Trnsito (Verticales)
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 12,000
$400,000.00 8,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000
300,000.00 300,000
452,030.00 22,602

SUB-TOTAL (B)
$ 324,602.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 18,350
$107,568.00 21,514

SUB-TOTAL (C)
$ 39,863.00
COSTOS DIRECTOS = A+B+C $ 384,465.00

PORCENTAJE VR. TOTAL


27% $ 103,805.55
1% $ 3,844.65
4% $ 15,378.60
SUB-TOTAL $ 123,029.00
PRECIO UNITARIO TOTAL $ 507,494.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Cuadrilla Topografa (Incluye Vehiculo)
DIA
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$10,000.00 10,000
$100,000.00 100,000
$25,000.00 25,000
$180,000.00 180,000

SUB-TOTAL (A)
$ 315,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50,000.00 50,000
8,000.00 80,000

SUB-TOTAL (B)
$ 130,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$107,338.00 214,676
$166,566.00 166,566

SUB-TOTAL (C)
$ 381,242.00

COSTOS DIRECTOS = A+B+C $ 826,242.00

PORCENTAJE VR. TOTAL


27% $ 223,085.34
1% $ 8,262.42
4% $ 33,049.68
SUB-TOTAL $ 264,397.00
PRECIO UNITARIO TOTAL $ 1,090,639.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
m. Gravilla 3/4" (Planta de Trituracin / Sin Transporte)
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
0 0
0 0
0 0

SUB-TOTAL (A)
$ -
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
46,400.00 46,400

SUB-TOTAL (B)
$ 46,900.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459

SUB-TOTAL (C)
$ 459.00

COSTOS DIRECTOS = A+B+C $ 47,359.00

PORCENTAJE VR. TOTAL


27% $ 12,786.93
1% $ 473.59
4% $ 1,894.36
SUB-TOTAL $ 15,155.00
PRECIO UNITARIO TOTAL $ 62,514.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sum. Arena (Planta de Trituracin / Sin Transporte)
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
0 0
0 0
0 0

SUB-TOTAL (A)
$ -
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
42,920.00 42,920

SUB-TOTAL (B)
$ 43,420.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459

SUB-TOTAL (C)
$ 459.00

COSTOS DIRECTOS = A+B+C $ 43,879.00

PORCENTAJE VR. TOTAL


27% $ 11,847.33
1% $ 438.79
4% $ 1,755.16
SUB-TOTAL $ 14,041.00
PRECIO UNITARIO TOTAL $ 57,920.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sum. Piedra (media songa / Sin Transporte)
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
0 0
0 0
0 0

SUB-TOTAL (A)
$ -
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
500.00 500
30,000.00 30,000

SUB-TOTAL (B)
$ 30,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 459

SUB-TOTAL (C)
$ 459.00
COSTOS DIRECTOS = A+B+C $ 30,959.00

PORCENTAJE VR. TOTAL


27% $ 8,358.93
1% $ 309.59
4% $ 1,238.36
SUB-TOTAL $ 9,907.00
PRECIO UNITARIO TOTAL $ 40,866.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Hincado de Pilotes
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$1,200,000.00 20,000
$550,000.00 9,167
$60,000.00 2000
$120,000.00 4,000
$100,000.00 3,333

SUB-TOTAL (A)
$ 38,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
5,000.00 5,000.00
8,000.00 12,666.67
120,000.00 12,000.00
100,000.00 10,000.00
12,000.00 1,200.00

SUB-TOTAL (B)
$ 40,867.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 6,116.60
$107,568.00 3,585.60
$115,566.00 3,852.20
$268,566.00 8,952.20
$156,366.00 10,424.40

SUB-TOTAL (C)
$ 32,931.00

COSTOS DIRECTOS = A+B+C $ 112,298.00

PORCENTAJE VR. TOTAL


27% $ 30,320.46
1% $ 1,122.98
4% $ 4,491.92
SUB-TOTAL $ 35,935.00
PRECIO UNITARIO TOTAL $ 148,233.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
erramiento con Malla Eslabonada, Angulos y Tuberia
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,500
$120,000.00 3,000
$100,000.00 2500
$100,000.00 2,500
$30,000.00 750

SUB-TOTAL (A)
$ 10,250.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
5,000.00 5,000.00
28,000.00 29,400.00
28,000.00 24,010.00
452,030.00 14,419.76
450.00 742.50
2,800.00 3,292.80
68,000.00 17,000.00
89,000.00 22,250.00
4,400.00 1,100.00
12,000.00 3,000.00 SUB-TOTAL (B)
$ 120,215.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,174.90
$107,568.00 2,689.20
$268,566.00 6,714.15
$156,366.00 7,818.30

SUB-TOTAL (C)
$ 26,397.00

COSTOS DIRECTOS = A+B+C $ 156,862.00

PORCENTAJE VR. TOTAL


27% $ 42,352.74
1% $ 1,568.62
4% $ 6,274.48
SUB-TOTAL $ 50,196.00
PRECIO UNITARIO TOTAL $ 207,058.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
impieza de Cunetas, Zanjas Coronacion, Desagues
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 300
$600,000.00 750
$450,000.00 562.5

SUB-TOTAL (A)
$ 1,613.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
200.00 200.00
8,000.00 700.00

SUB-TOTAL (B)
$ 900.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 1,834.98
$107,568.00 537.84
$115,566.00 288.92

SUB-TOTAL (C)
$ 2,662.00

COSTOS DIRECTOS = A+B+C $ 5,175.00

PORCENTAJE VR. TOTAL


27% $ 1,397.25
1% $ 51.75
4% $ 207.00
SUB-TOTAL $ 1,656.00
PRECIO UNITARIO TOTAL $ 6,831.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Limpieza de Alcantarilla de 24" y 36"
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 30,000
$600,000.00 60,000
$450,000.00 45000

SUB-TOTAL (A)
$ 135,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000.00
8,000.00 56,000.00

SUB-TOTAL (B)
$ 66,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 183,498.00
$107,568.00 53,784.00
$115,566.00 23,113.20

SUB-TOTAL (C)
$ 260,395.00
COSTOS DIRECTOS = A+B+C $ 461,395.00

PORCENTAJE VR. TOTAL


27% $ 124,576.65
1% $ 4,613.95
4% $ 18,455.80
SUB-TOTAL $ 147,646.00
PRECIO UNITARIO TOTAL $ 609,041.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Limpieza de Trampas y Cajas Hidrulicas.
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 30,000
$600,000.00 60,000
$450,000.00 45000

SUB-TOTAL (A)
$ 135,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000.00
8,000.00 56,000.00

SUB-TOTAL (B)
$ 66,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 183,498.00
$107,568.00 53,784.00
$115,566.00 23,113.20

SUB-TOTAL (C)
$ 260,395.00

COSTOS DIRECTOS = A+B+C $ 461,395.00

PORCENTAJE VR. TOTAL


27% $ 124,576.65
1% $ 4,613.95
4% $ 18,455.80
SUB-TOTAL $ 147,646.00
PRECIO UNITARIO TOTAL $ 609,041.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Limpieza de Skimer
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 30,000
$600,000.00 60,000
$450,000.00 45000

SUB-TOTAL (A)
$ 135,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000.00
8,000.00 56,000.00

SUB-TOTAL (B)
$ 66,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 183,498.00
$107,568.00 53,784.00
$115,566.00 23,113.20

SUB-TOTAL (C)
$ 260,395.00

COSTOS DIRECTOS = A+B+C $ 461,395.00

PORCENTAJE VR. TOTAL


27% $ 124,576.65
1% $ 4,613.95
4% $ 18,455.80
SUB-TOTAL $ 147,646.00
PRECIO UNITARIO TOTAL $ 609,041.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Alcantarilla de 24" Dimetro
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 7,500
$60,000.00 7,500
$600,000.00 12,000

SUB-TOTAL (A)
$ 27,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000.00
166,000.00 174,300.00
369,083.00 11,072.49
425,030.00 53,553.78
312,331.80 74,959.63
8,000.00 5,600.00

SUB-TOTAL (B)
$ 329,486.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 22,937.25
$107,568.00 26,892.00
$115,566.00 2,311.32

SUB-TOTAL (C)
$ 52,141.00

COSTOS DIRECTOS = A+B+C $ 408,627.00

PORCENTAJE VR. TOTAL


27% $ 110,329.29
1% $ 4,086.27
4% $ 16,345.08
SUB-TOTAL $ 130,761.00
PRECIO UNITARIO TOTAL $ 539,388.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Alcantarilla de 36" Dimetro sencilla
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000
$60,000.00 10,000
$600,000.00 15,000

SUB-TOTAL (A)
$ 35,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
15,000.00 15,000.00
332,000.00 348,600.00
369,083.00 18,454.15
425,030.00 75,867.86
312,331.80 106,192.81
8,000.00 7,000.00

SUB-TOTAL (B)
$ 571,115.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 30,583.00
$107,568.00 35,856.00
$115,566.00 2,889.15

SUB-TOTAL (C)
$ 69,328.00
COSTOS DIRECTOS = A+B+C $ 675,443.00

PORCENTAJE VR. TOTAL


27% $ 182,369.61
1% $ 6,754.43
4% $ 27,017.72
SUB-TOTAL $ 216,142.00
PRECIO UNITARIO TOTAL $ 891,585.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Alcantarilla de 36" Dimetro doble
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 15,000
$60,000.00 15,000
$600,000.00 20,000

SUB-TOTAL (A)
$ 50,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
30,000.00 30,000.00
332,000.00 697,200.00
369,083.00 36,908.30
425,030.00 138,347.27
312,331.80 193,645.72
8,000.00 9,333.33

SUB-TOTAL (B)
$ 1,105,435.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 45,874.50
$107,568.00 53,784.00
$115,566.00 3,852.20

SUB-TOTAL (C)
$ 103,511.00

COSTOS DIRECTOS = A+B+C $ 1,258,946.00

PORCENTAJE VR. TOTAL


27% $ 339,915.42
1% $ 12,589.46
4% $ 50,357.84
SUB-TOTAL $ 402,863.00
PRECIO UNITARIO TOTAL $ 1,661,809.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Tubo Conductor (Diam 20" - Calibre 12)
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 12,000
$120,000.00 24,000
$800,000.00 160,000

SUB-TOTAL (A)
$ 196,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50,000.00 50,000.00
800,000.00 840,000.00
8,000.00 96,000.00

SUB-TOTAL (B)
$ 986,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 36,699.60
$107,568.00 21,513.60
$115,566.00 23,113.20
$268,566.00 53,713.20

SUB-TOTAL (C)
$ 135,040.00

COSTOS DIRECTOS = A+B+C $ 1,317,040.00

PORCENTAJE VR. TOTAL


27% $ 355,600.80
1% $ 13,170.40
4% $ 52,681.60
SUB-TOTAL $ 421,453.00
PRECIO UNITARIO TOTAL $ 1,738,493.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Tubo Conductor (Diam 42" - Calibre 12)
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 12,000
$120,000.00 24,000
$800,000.00 160,000

SUB-TOTAL (A)
$ 196,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
80,000.00 80,000.00
2,200,000.00 2,310,000.00
8,000.00 96,000.00

SUB-TOTAL (B)
$ 2,486,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 36,699.60
$107,568.00 21,513.60
$115,566.00 23,113.20
$268,566.00 53,713.20

SUB-TOTAL (C)
$ 135,040.00

COSTOS DIRECTOS = A+B+C $ 2,817,040.00

PORCENTAJE VR. TOTAL


27% $ 760,600.80
1% $ 28,170.40
4% $ 112,681.60
SUB-TOTAL $ 901,453.00
PRECIO UNITARIO TOTAL $ 3,718,493.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Tubo Conductor (Diam 14" - Calibre 12)
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 12,000
$120,000.00 24,000
$800,000.00 160,000

SUB-TOTAL (A)
$ 196,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50,000.00 50,000.00
520,000.00 546,000.00
8,000.00 96,000.00

SUB-TOTAL (B)
$ 692,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 36,699.60
$107,568.00 21,513.60
$115,566.00 23,113.20
$268,566.00 53,713.20

SUB-TOTAL (C)
$ 135,040.00
COSTOS DIRECTOS = A+B+C $ 1,023,040.00

PORCENTAJE VR. TOTAL


27% $ 276,220.80
1% $ 10,230.40
4% $ 40,921.60
SUB-TOTAL $ 327,373.00
PRECIO UNITARIO TOTAL $ 1,350,413.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera PVC Presin de 1/2"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,000

SUB-TOTAL (A)
$ 1,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
200.00 200.00
3,800.00 4,180.00
1,000.00 500.00
100,000.00 250.00
48,000.00 120.00

SUB-TOTAL (B)
$ 5,250.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 3,058.30
$107,568.00 1,792.80

SUB-TOTAL (C)
$ 4,851.00

COSTOS DIRECTOS = A+B+C $ 11,101.00

PORCENTAJE VR. TOTAL


27% $ 2,997.27
1% $ 111.01
4% $ 444.04
SUB-TOTAL $ 3,552.00
PRECIO UNITARIO TOTAL $ 14,653.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera PVC Presin de 3/4"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,000

SUB-TOTAL (A)
$ 1,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
400.00 400.00
5,100.00 5,610.00
1,300.00 650.00
100,000.00 250.00
48,000.00 120.00

SUB-TOTAL (B)
$ 7,030.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 3,058.30
$107,568.00 1,792.80

SUB-TOTAL (C)
$ 4,851.00
COSTOS DIRECTOS = A+B+C $ 12,881.00

PORCENTAJE VR. TOTAL


27% $ 3,477.87
1% $ 128.81
4% $ 515.24
SUB-TOTAL $ 4,122.00
PRECIO UNITARIO TOTAL $ 17,003.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera PVC Presin de 1"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,200

SUB-TOTAL (A)
$ 1,200.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
600.00 600.00
6,900.00 7,590.00
2,600.00 1,300.00
100,000.00 333.33
48,000.00 160.00

SUB-TOTAL (B)
$ 9,983.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 3,669.96
$107,568.00 2,151.36

SUB-TOTAL (C)
$ 5,821.00

COSTOS DIRECTOS = A+B+C $ 17,004.00

PORCENTAJE VR. TOTAL


27% $ 4,591.08
1% $ 170.04
4% $ 680.16
SUB-TOTAL $ 5,441.00
PRECIO UNITARIO TOTAL $ 22,445.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
uministro e instalacin tubera PVC Presin de 1 1/2"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,500

SUB-TOTAL (A)
$ 1,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,000.00 1,000.00
11,100.00 12,210.00
9,000.00 4,500.00
100,000.00 500.00
48,000.00 240.00

SUB-TOTAL (B)
$ 18,450.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 4,587.45
$107,568.00 2,689.20

SUB-TOTAL (C)
$ 7,277.00

COSTOS DIRECTOS = A+B+C $ 27,227.00

PORCENTAJE VR. TOTAL


27% $ 7,351.29
1% $ 272.27
4% $ 1,089.08
SUB-TOTAL $ 8,713.00
PRECIO UNITARIO TOTAL $ 35,940.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera PVC Presin de 2"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,714
SUB-TOTAL (A)
$ 1,714.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,500.00 1,500.00
17,000.00 18,700.00
9,000.00 4,500.00
100,000.00 1,000.00
48,000.00 480.00

SUB-TOTAL (B)
$ 26,180.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 5,242.80
$107,568.00 3,073.37

SUB-TOTAL (C)
$ 8,316.00

COSTOS DIRECTOS = A+B+C $ 36,210.00

PORCENTAJE VR. TOTAL


27% $ 9,776.70
1% $ 362.10
4% $ 1,448.40
SUB-TOTAL $ 11,587.00
PRECIO UNITARIO TOTAL $ 47,797.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera peerforada PVC 2"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,500

SUB-TOTAL (A)
$ 1,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,500.00 1,500.00
14,000.00 15,400.00
9,000.00 1,800.00

SUB-TOTAL (B)
$ 18,700.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 4,587.45
$107,568.00 2,689.20

SUB-TOTAL (C)
$ 7,277.00
COSTOS DIRECTOS = A+B+C $ 27,477.00

PORCENTAJE VR. TOTAL


27% $ 7,418.79
1% $ 274.77
4% $ 1,099.08
SUB-TOTAL $ 8,793.00
PRECIO UNITARIO TOTAL $ 36,270.00

FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera peerforada PVC 4"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,500

SUB-TOTAL (A)
$ 1,500.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,500.00 1,500.00
24,100.00 26,510.00
12,000.00 2,400.00

SUB-TOTAL (B)
$ 30,410.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 4,587.45
$107,568.00 2,689.20

SUB-TOTAL (C)
$ 7,277.00

COSTOS DIRECTOS = A+B+C $ 39,187.00

PORCENTAJE VR. TOTAL


27% $ 10,580.49
1% $ 391.87
4% $ 1,567.48
SUB-TOTAL $ 12,540.00
PRECIO UNITARIO TOTAL $ 51,727.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
uministro e instalacin tubera pvc Sanitaria de 3" y 2"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,714

SUB-TOTAL (A)
$ 1,714.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,500.00 1,500.00
17,600.00 19,360.00
9,000.00 4,500.00
100,000.00 1,000.00
48,000.00 480.00

SUB-TOTAL (B)
$ 26,840.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 5,242.80
$107,568.00 3,073.37

SUB-TOTAL (C)
$ 8,316.00
COSTOS DIRECTOS = A+B+C $ 36,870.00

PORCENTAJE VR. TOTAL


27% $ 9,954.90
1% $ 368.70
4% $ 1,474.80
SUB-TOTAL $ 11,798.00
PRECIO UNITARIO TOTAL $ 48,668.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera pvc Sanitaria de 4"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,000

SUB-TOTAL (A)
$ 2,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,500.00 2,500.00
24,600.00 27,060.00
12,000.00 6,000.00
100,000.00 1,250.00
48,000.00 600.00

SUB-TOTAL (B)
$ 37,410.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 6,116.60
$107,568.00 3,585.60

SUB-TOTAL (C)
$ 9,702.00
COSTOS DIRECTOS = A+B+C $ 49,112.00

PORCENTAJE VR. TOTAL


27% $ 13,260.24
1% $ 491.12
4% $ 1,964.48
SUB-TOTAL $ 15,716.00
PRECIO UNITARIO TOTAL $ 64,828.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera pvc Sanitaria de 8"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,400

SUB-TOTAL (A)
$ 2,400.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
4,000.00 4,000.00
91,800.00 100,980.00
50,000.00 25,000.00
100,000.00 2,000.00
48,000.00 960.00

SUB-TOTAL (B)
$ 132,940.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 7,339.92
$107,568.00 4,302.72

SUB-TOTAL (C)
$ 11,643.00
COSTOS DIRECTOS = A+B+C $ 146,983.00

PORCENTAJE VR. TOTAL


27% $ 39,685.41
1% $ 1,469.83
4% $ 5,879.32
SUB-TOTAL $ 47,035.00
PRECIO UNITARIO TOTAL $ 194,018.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera pvc Sanitaria de 10"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000

SUB-TOTAL (A)
$ 3,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
4,000.00 4,000.00
143,332.00 157,665.20
200,000.00 100,000.00
100,000.00 5,000.00
48,000.00 2,400.00

SUB-TOTAL (B)
$ 269,065.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,174.90
$107,568.00 5,378.40

SUB-TOTAL (C)
$ 14,553.00
COSTOS DIRECTOS = A+B+C $ 286,618.00

PORCENTAJE VR. TOTAL


27% $ 77,386.86
1% $ 2,866.18
4% $ 11,464.72
SUB-TOTAL $ 91,718.00
PRECIO UNITARIO TOTAL $ 378,336.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera pvc Sanitaria de 12"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000

SUB-TOTAL (A)
$ 3,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
5,000.00 5,000.00
97,300.00 107,030.00
250,000.00 125,000.00
100,000.00 10,000.00
48,000.00 4,800.00

SUB-TOTAL (B)
$ 251,830.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,174.90
$107,568.00 5,378.40

SUB-TOTAL (C)
$ 14,553.00
COSTOS DIRECTOS = A+B+C $ 269,383.00

PORCENTAJE VR. TOTAL


27% $ 72,733.41
1% $ 2,693.83
4% $ 10,775.32
SUB-TOTAL $ 86,203.00
PRECIO UNITARIO TOTAL $ 355,586.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera Galvanizada 1"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,500
$100,000.00 2,500

SUB-TOTAL (A)
$ 4,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
5,000.00 5,000.00
- -
15,000.00 4,500.00

SUB-TOTAL (B)
$ 9,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 4,587.45
$135,931.10 3,398.28

SUB-TOTAL (C)
$ 7,986.00
COSTOS DIRECTOS = A+B+C $ 21,486.00

PORCENTAJE VR. TOTAL


27% $ 5,801.22
1% $ 214.86
4% $ 859.44
SUB-TOTAL $ 6,876.00
PRECIO UNITARIO TOTAL $ 28,362.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera Galvanizada 1-1/2"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,000
$100,000.00 3,333

SUB-TOTAL (A)
$ 5,333.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
5,000.00 5,000.00
- -
30,000.00 9,000.00

SUB-TOTAL (B)
$ 14,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 6,116.60
$135,931.10 4,531.04

SUB-TOTAL (C)
$ 10,648.00
COSTOS DIRECTOS = A+B+C $ 29,981.00

PORCENTAJE VR. TOTAL


27% $ 8,094.87
1% $ 299.81
4% $ 1,199.24
SUB-TOTAL $ 9,594.00
PRECIO UNITARIO TOTAL $ 39,575.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera Galvanizada 2"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000
$100,000.00 5,000

SUB-TOTAL (A)
$ 8,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000.00
- -
40,000.00 12,000.00

SUB-TOTAL (B)
$ 22,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,174.90
$135,931.10 6,796.56

SUB-TOTAL (C)
$ 15,971.00
COSTOS DIRECTOS = A+B+C $ 45,971.00

PORCENTAJE VR. TOTAL


27% $ 12,412.17
1% $ 459.71
4% $ 1,838.84
SUB-TOTAL $ 14,711.00
PRECIO UNITARIO TOTAL $ 60,682.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin tubera Galvanizada 2-1/2"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 4,000
$100,000.00 6,667

SUB-TOTAL (A)
$ 10,667.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
15,000.00 15,000.00
- -
55,000.00 16,500.00

SUB-TOTAL (B)
$ 31,500.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 12,233.20
$135,931.10 9,062.07

SUB-TOTAL (C)
$ 21,295.00
COSTOS DIRECTOS = A+B+C $ 63,462.00

PORCENTAJE VR. TOTAL


27% $ 17,134.74
1% $ 634.62
4% $ 2,538.48
SUB-TOTAL $ 20,308.00
PRECIO UNITARIO TOTAL $ 83,770.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
ministro e instalacin tubera pvc Aguas LLuvias de 3"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 1,714

SUB-TOTAL (A)
$ 1,714.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,500.00 1,500.00
17,600.00 19,360.00
9,000.00 4,500.00
100,000.00 1,000.00
48,000.00 480.00

SUB-TOTAL (B)
$ 26,840.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 5,242.80
$107,568.00 3,073.37

SUB-TOTAL (C)
$ 8,316.00
COSTOS DIRECTOS = A+B+C $ 36,870.00

PORCENTAJE VR. TOTAL


27% $ 9,954.90
1% $ 368.70
4% $ 1,474.80
SUB-TOTAL $ 11,798.00
PRECIO UNITARIO TOTAL $ 48,668.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
ministro e instalacin tubera pvc Aguas LLuvias de 4"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,000

SUB-TOTAL (A)
$ 2,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,500.00 2,500.00
24,600.00 27,060.00
12,000.00 6,000.00
100,000.00 1,250.00
48,000.00 600.00

SUB-TOTAL (B)
$ 37,410.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 6,116.60
$107,568.00 3,585.60

SUB-TOTAL (C)
$ 9,702.00
COSTOS DIRECTOS = A+B+C $ 49,112.00

PORCENTAJE VR. TOTAL


27% $ 13,260.24
1% $ 491.12
4% $ 1,964.48
SUB-TOTAL $ 15,716.00
PRECIO UNITARIO TOTAL $ 64,828.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
ministro e instalacin tubera pvc Aguas LLuvias de 6"
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,400

SUB-TOTAL (A)
$ 2,400.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
4,000.00 4,000.00
52,000.00 57,200.00
45,000.00 22,500.00
100,000.00 2,000.00
48,000.00 960.00

SUB-TOTAL (B)
$ 86,660.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 7,339.92
$107,568.00 4,302.72

SUB-TOTAL (C)
$ 11,643.00
COSTOS DIRECTOS = A+B+C $ 100,703.00

PORCENTAJE VR. TOTAL


27% $ 27,189.81
1% $ 1,007.03
4% $ 4,028.12
SUB-TOTAL $ 32,225.00
PRECIO UNITARIO TOTAL $ 132,928.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin Vlvula de Bola 1/2"
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 3,000

SUB-TOTAL (A)
$ 3,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
4,000.00 4,000.00
20,000.00 20,000.00
7,000.00 14,000.00
1,200.00 2,400.00

SUB-TOTAL (B)
$ 40,400.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 4,587.45
$107,568.00 5,378.40

SUB-TOTAL (C)
$ 9,966.00
COSTOS DIRECTOS = A+B+C $ 53,366.00

PORCENTAJE VR. TOTAL


27% $ 14,408.82
1% $ 533.66
4% $ 2,134.64
SUB-TOTAL $ 17,077.00
PRECIO UNITARIO TOTAL $ 70,443.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin Vlvula de Bola 3/4"
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 4,000

SUB-TOTAL (A)
$ 4,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
5,000.00 5,000.00
32,000.00 32,000.00
8,700.00 17,400.00
1,800.00 3,600.00

SUB-TOTAL (B)
$ 58,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 6,116.60
$107,568.00 7,171.20

SUB-TOTAL (C)
$ 13,288.00
COSTOS DIRECTOS = A+B+C $ 75,288.00

PORCENTAJE VR. TOTAL


27% $ 20,327.76
1% $ 752.88
4% $ 3,011.52
SUB-TOTAL $ 24,092.00
PRECIO UNITARIO TOTAL $ 99,380.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin Vlvula de Bola 1"
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 6,000

SUB-TOTAL (A)
$ 6,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
10,000.00 10,000.00
46,000.00 46,000.00
10,500.00 21,000.00
2,500.00 5,000.00

SUB-TOTAL (B)
$ 82,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 9,174.90
$107,568.00 10,756.80

SUB-TOTAL (C)
$ 19,932.00
COSTOS DIRECTOS = A+B+C $ 107,932.00

PORCENTAJE VR. TOTAL


27% $ 29,141.64
1% $ 1,079.32
4% $ 4,317.28
SUB-TOTAL $ 34,538.00
PRECIO UNITARIO TOTAL $ 142,470.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin Vlvula de Bola 1 3/4"
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000

SUB-TOTAL (A)
$ 10,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
15,000.00 15,000.00
155,000.00 155,000.00
35,500.00 71,000.00
7,200.00 14,400.00

SUB-TOTAL (B)
$ 255,400.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 15,291.50
$107,568.00 17,928.00

SUB-TOTAL (C)
$ 33,220.00
COSTOS DIRECTOS = A+B+C $ 298,620.00

PORCENTAJE VR. TOTAL


27% $ 80,627.40
1% $ 2,986.20
4% $ 11,944.80
SUB-TOTAL $ 95,558.00
PRECIO UNITARIO TOTAL $ 394,178.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin Vlvula de Bola 2 1/2"
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 15,000

SUB-TOTAL (A)
$ 15,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
20,000.00 20,000.00
330,000.00 330,000.00
62,000.00 124,000.00
13,000.00 26,000.00

SUB-TOTAL (B)
$ 500,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 22,937.25
$107,568.00 26,892.00

SUB-TOTAL (C)
$ 49,829.00
COSTOS DIRECTOS = A+B+C $ 564,829.00

PORCENTAJE VR. TOTAL


27% $ 152,503.83
1% $ 5,648.29
4% $ 22,593.16
SUB-TOTAL $ 180,745.00
PRECIO UNITARIO TOTAL $ 745,574.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin Vlvula de Cortina 3"
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 15,000

SUB-TOTAL (A)
$ 15,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
25,000.00 25,000.00
750,000.00 750,000.00
101,000.00 202,000.00
24,000.00 48,000.00

SUB-TOTAL (B)
$ 1,025,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 22,937.25
$107,568.00 26,892.00
$135,931.10 33,982.78

SUB-TOTAL (C)
$ 83,812.00
COSTOS DIRECTOS = A+B+C $ 1,123,812.00

PORCENTAJE VR. TOTAL


27% $ 303,429.24
1% $ 11,238.12
4% $ 44,952.48
SUB-TOTAL $ 359,620.00
PRECIO UNITARIO TOTAL $ 1,483,432.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin Vlvula de Cortina 4"
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 20,000

SUB-TOTAL (A)
$ 20,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
40,000.00 40,000.00
1,720,000.00 1,720,000.00
200,000.00 400,000.00
35,000.00 70,000.00

SUB-TOTAL (B)
$ 2,230,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 30,583.00
$107,568.00 35,856.00
$135,931.10 45,310.37

SUB-TOTAL (C)
$ 111,749.00
COSTOS DIRECTOS = A+B+C $ 2,361,749.00

PORCENTAJE VR. TOTAL


27% $ 637,672.23
1% $ 23,617.49
4% $ 94,469.96
SUB-TOTAL $ 755,760.00
PRECIO UNITARIO TOTAL $ 3,117,509.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e instalacin Vlvula de Cortina 6"
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 30,000

SUB-TOTAL (A)
$ 30,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
60,000.00 60,000.00
2,500,000.00 2,500,000.00
467,000.00 934,000.00
53,000.00 106,000.00

SUB-TOTAL (B)
$ 3,600,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 45,874.50
$107,568.00 53,784.00
$135,931.10 67,965.55

SUB-TOTAL (C)
$ 167,624.00
COSTOS DIRECTOS = A+B+C $ 3,797,624.00

PORCENTAJE VR. TOTAL


27% $ 1,025,358.48
1% $ 37,976.24
4% $ 151,904.96
SUB-TOTAL $ 1,215,240.00
PRECIO UNITARIO TOTAL $ 5,012,864.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
uministro e instalacin Vlvula de Cortina de 3" PVC
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000

SUB-TOTAL (A)
$ 10,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
15,000.00 15,000.00
240,000.00 240,000.00
30,000.00 60,000.00
30,000.00 60,000.00
100,000.00 1,250.00
48,000.00 600.00

SUB-TOTAL (B)
$ 376,850.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 15,291.50
$107,568.00 17,928.00

SUB-TOTAL (C)
$ 33,220.00
COSTOS DIRECTOS = A+B+C $ 420,070.00

PORCENTAJE VR. TOTAL


27% $ 113,418.90
1% $ 4,200.70
4% $ 16,802.80
SUB-TOTAL $ 134,422.00
PRECIO UNITARIO TOTAL $ 554,492.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
uministro e instalacin Vlvula de Cortina de 4" PVC
UND
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 10,000

SUB-TOTAL (A)
$ 10,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
25,000.00 25,000.00
360,000.00 360,000.00
47,000.00 94,000.00
47,000.00 94,000.00
100,000.00 1,250.00
48,000.00 600.00

SUB-TOTAL (B)
$ 574,850.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 15,291.50
$107,568.00 17,928.00

SUB-TOTAL (C)
$ 33,220.00
COSTOS DIRECTOS = A+B+C $ 618,070.00

PORCENTAJE VR. TOTAL


27% $ 166,878.90
1% $ 6,180.70
4% $ 24,722.80
SUB-TOTAL $ 197,782.00
PRECIO UNITARIO TOTAL $ 815,852.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Corte de pavimento flexible y/o rgido
ML
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$60,000.00 2,400
$150,000.00 6,000
$400,000.00 1,600

SUB-TOTAL (A)
$ 10,000.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
2,000.00 2,000.00

SUB-TOTAL (B)
$ 2,000.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 11,009.88
$107,568.00 4,302.72

SUB-TOTAL (C)
$ 15,313.00
COSTOS DIRECTOS = A+B+C $ 27,313.00

PORCENTAJE VR. TOTAL


27% $ 7,374.51
1% $ 273.13
4% $ 1,092.52
SUB-TOTAL $ 8,740.00
PRECIO UNITARIO TOTAL $ 36,053.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Imprimacin
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$700,000.00 700
$550,000.00 550
$60,000.00 60

SUB-TOTAL (A)
$ 1,310.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50.00 50.00
1,800.00 1,350.00
8,000.00 560.00

SUB-TOTAL (B)
$ 1,960.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 367.00
$107,568.00 107.57
$115,566.00 115.57

SUB-TOTAL (C)
$ 590.00
COSTOS DIRECTOS = A+B+C $ 3,860.00

PORCENTAJE VR. TOTAL


27% $ 1,042.20
1% $ 38.60
4% $ 154.40
SUB-TOTAL $ 1,235.00
PRECIO UNITARIO TOTAL $ 5,095.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Suministro e Instalacin de Asfalto caliente compacto
M3
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$600,000.00 12,000
$600,000.00 12,000
$550,000.00 11,000
$60,000.00 1,200

SUB-TOTAL (A)
$ 36,200.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
5,000.00 5,000.00
451,520.00 586,976.00
8,000.00 16,800.00

SUB-TOTAL (B)
$ 608,776.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 11,009.88
$107,568.00 8,605.44
$115,566.00 4,622.64

SUB-TOTAL (C)
$ 24,238.00
COSTOS DIRECTOS = A+B+C $ 669,214.00

PORCENTAJE VR. TOTAL


27% $ 180,687.78
1% $ 6,692.14
4% $ 26,768.56
SUB-TOTAL $ 214,148.00
PRECIO UNITARIO TOTAL $ 883,362.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sum. e Inst. Emulsin Asfaltica
GL
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$700,000.00 700
$550,000.00 550
$60,000.00 60

SUB-TOTAL (A)
$ 1,310.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
50.00 50.00
1,800.00 6,840.00
8,000.00 560.00

SUB-TOTAL (B)
$ 7,450.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 367.00
$107,568.00 107.57
$115,566.00 115.57

SUB-TOTAL (C)
$ 590.00
COSTOS DIRECTOS = A+B+C $ 9,350.00

PORCENTAJE VR. TOTAL


27% $ 2,524.50
1% $ 93.50
4% $ 374.00
SUB-TOTAL $ 2,992.00
PRECIO UNITARIO TOTAL $ 12,342.00
FECHA
COLOMBIA LIMITED
16/12/2016

SERVICIOS DE INGENIERIA CIVIL S.A.

UNIDAD:
Sealizacin Vial en Piso
M2
TARIFA DIA V/R UNITARIO
(c) (c * a/b)
$400,000.00 4,000
$100,000.00 1,000
$60,000.00 600

SUB-TOTAL (A)
$ 5,600.00
PRECIO GLOBAL VALOR UNIT.
(e) (d*e)
1,500.00 1,500.00
13,000.00 9,750.00
95,000.00 19,000.00
8,000.00 2,800.00

SUB-TOTAL (B)
$ 33,050.00
TARIFA DIA V/R UNITARIO
(h) (h * f/g)
$91,749.00 3,669.96
$107,338.00 2,146.76

SUB-TOTAL (C)
$ 5,817.00
COSTOS DIRECTOS = A+B+C $ 44,467.00

PORCENTAJE VR. TOTAL


27% $ 12,006.09
1% $ 444.67
4% $ 1,778.68
SUB-TOTAL $ 14,229.00
PRECIO UNITARIO TOTAL $ 58,696.00
CLCULO DE ADMINISTRACIN

OBRAS DE CONSTRUCCIN Y DE MANTENIMIENTO DE VIAS, LOCACIONES Y FACILIDADES POR LLAMADO EN CAMPO GUANDO

SOLICITUD DE OFERTAS No. c166885boq PROPONENTE:


CALENDARIO PROYECTO: Das laborales a la semana: 6 Horas laborales al da: 8

ADMINISTRACIN
TARIFA
DESCRIPCIN UNIDAD CANTIDAD % incidenca total
($/Un)
PERSONAL 0 0 0
Director de obra un 0.25 $ 7,527,083 0.95% $ 45,162,498
Ingeniero Residente un 1 $ 6,047,917 3.06% $ 145,150,008
Supervisor Civil un 1 $ 3,302,965 1.25% $ 59,453,370
Coordinador HSE un 1 $ 4,547,917 2.30% $ 109,150,008
Supervisor HSE un 1 $ 3,302,965 1.25% $ 59,453,370
Programador de Obra un 1 $ 4,547,917 2.30% $ 109,150,008
Administrador un 1 $ 3,286,993 1.66% $ 78,887,832
Secretaria un 1 $ 1,563,889 0.59% $ 28,150,002
Alimentacion Administativos y Operadores un 7 $ 364,000 1.29% $ 61,152,000
TRANSPORTES Y VEHICULOS 0 0 $ - 0.00% $ -
Camionetas un 1 $ 4,500,000 2.28% $ 108,000,000
Buseta Personal 12 pasajeros un 1 $ 5,000,000 2.53% $ 120,000,000
Transportes un 1 $ 800,000 0.40% $ 19,200,000
Camion doblecabina un 1 $ 2,600,000 1.32% $ 62,400,000
COMUNICACIONES 0 0 $ - 0.00% $ -
Comunicaciones AVANTEL un 2 $ 100,000 0.10% $ 4,800,000
Comunicaciones CELULAR un 2 $ 100,000 0.10% $ 4,800,000
Comunicaciones Internet un 1 $ 100,000 0.05% $ 2,400,000
INSTALACIONES 0 0 $ - 0.00% $ -
Arriendo campamento un 1 $ 1,800,000 0.91% $ 43,200,000
Oficina un 1 $ 800,000 0.40% $ 19,200,000
Servicios Oficina (Agua, gas, luz y telfono) un 1 $ 600,000 0.30% $ 14,400,000
Hospedajes Un 1 $ 600,000 0.30% $ 14,400,000
COSTOS POR SEGURIDAD, SALUD OCUPACIONAL, MEDIO AMBIENTE, SOCIAL 0 0 $ - 0.00% $ -
Baos (Alquiler y Aseo) un 1.5 $ 850,000 0.65% $ 30,600,000
Agua - Hielo un 1 $ 2,954,652 0.06% $ 2,954,652
Disposicin de basuras Un 1 $ 150,000 0.08% $ 3,600,000
Sealizacion temporal gl 1 $ 200,000 0.10% $ 4,800,000
Elementos atencion de emergencias gl 1 $ 500,000 0.25% $ 12,000,000
IMPUESTOS 0 0 $ - 0.00% $ -
ICA gl 0.008 $ 50,098,308 1.06% $ 50,098,308
Polizas gl 0.004 $ 25,049,154 0.53% $ 25,049,154
Otros gl 0.005 $ 31,311,443 0.66% $ 31,311,443
OTROS 0 0 $ - 0.00% $ -
Laboratorio Un 1 $ 500,000 0.19% $ 12,000,000

SUBTOTAL 21% $ 1,280,922,653

TOTAL COSTOS ADMINISTRATIVOS 1,280,922,653.0


VALOR DEL CONTRATO COSTO DIRECTO 4,744,157,973