Presentation to
Australian Construction
Creating value
Eliminating waste
Industry Conference
Sydney, Australia
18 July 2005
Sutter Healths Challenge
Dean Reed
DPR Construction, Inc.
2
3 4
5 6
The Five Big Ideas of Lean Project Delivery Translating into Action on Camino
#1 Collaborate; really collaborate, throughout
design, planning, and execution Collaborate; Really Collaborate
Constructable, maintainable, and affordable design
requires the participation of the range of project
performers and constituencies. Since abandoning the
master-builder concept, and separating design from
construction, we have been patching a poorly
conceived design practice. Value engineering, design Share incomplete information early and often
assist, and constructability reviews mask an underlying Identify the Last Responsible Moment for taking action and
assumption that design can be successful when use the time to make the best possible decision
separated from engineering and construction. Design Form cross functional teams of Designers and Builders for
is an iterative conversation; the choice of ends affects Site, Parking Structure, MOB Shell and Core, and MOB
means, and available means affects ends. Interiors
Collaborative design and planning maximizes positive Coordinate in 3 and 4D as design evolves
iterations and reduces negative iterations.
7 8
Parking Structure & Medical Office Building The Camino Medical Center
For the Camino Medical Group (CMG)
In Mountain View, California
Site & Infrastructure development (420,790sf)
Parking structure (1,110 stalls, 420,000sf)
Medical Office Building (110 Providers,
250,000sf)
Urgent Care Center (6,000sf)
Outpatient Surgery Center (5 Suites, 20,000sf)
Pharmacy (6,000sf)
Laboratory and Diagnostics Radiology Center
(30,000sf)
$100 million in construction costs
9 10
simultaneously
Design Process Detailed
Installation
Virtual Building
Criteria Design Engineering
Post-Occupancy
Evaluation
11 12
Objects assembled
just like the real thing
15 16
HVAC Model
Electrical Model
17 18
Sutter Health agreed to invest money in early All important design decisions are made during
collaboration and virtual building design phase:
DRR hired during Conceptual Design
MEP/FP, Skin and Steel subcontractors brought on in No misunderstanding
Schematic Design No conflict of systems
Architectural and construction budgets increased to No change orders
pay for additional expense of 3 / 4D modeling and
coordination
Construction costs will be reduced overall
Changes take
RFIs will be significantly reduced place during the
Change orders due to coordination conflicts will be design phase
eliminated not during
construction
21 22
23 24
SD SD DD
50% Collaboration 100% 50% Collaboration
29 30
31 32
33 34
39 40
41 42
45 50
Presentation to
Australian Construction
Creating value
Industry Conference
Eliminating waste Sydney, Australia
18 July 2005