Sei sulla pagina 1di 13

CLIENT CONTRACTOR

GAMBAT SOUTH GAS PROCESSING FACILITY (GPF III)

Document MECHANlCAL DATA SHEET FOR


Title: GAS LIQUID EXCHANGER (EX-110-03)

Document
Project: 15250 15250-ME-DAS-021 Rev-A SHEET 1 OF 4
Number

MECHANlCAL DATA SHEET FOR


GAS LIQUID EXCHANGER (EX-110-03)

I ACCEPTED FOR INFORMATION ONLY.

R RETURNED WITH COMMENTS. REVISE & RESUBMIT WORK SHALL NOT PROCEED

C APPROVED & ACCEPTED AS MARKED. REVISE & RE-SUBMIT WORK MAY PROCEED

A APPROVED NO COMMENTS.

REVIEWING ENGINEERS NAME & DATE:

NAME :

DATE :

A Issued for Review 21-Feb-2017 SW MA JG

Rev. Revision Description Date Prepared By Checked By Approved By. SPEC


GAMBAT SOUTH GAS PROCESSING FACILITY (GPF

Document Title: MECHANlCAL DATA SHEET FOR GAS LIQUID EXCHANGER (E

Project: 15250 15250-ME-DAS-021 Rev

Orientation Horizontal
Service GAS/LIQUID EXCHANGER
Type BEM Horz. Size NPS 8" x 3048 (Tube length) Connected In 1 PARALEL
Shell/Unit Surf/Unit (Eff) 5.5 m Surf/Shell (Eff)
1 PERFORMANCE OF ONE UNIT
2 Fluid allocation SHELL SIDE
3 Fluid name HCDP LIQUID
Fluid quantity, Total
4 kg/s(lb/h) 0.917(7277)
5 Vapor (In/Out) kg/s 0 0.019
6 Liquid kg/s 0.917 0.898
7 Noncondensable kg/s 0 0
8
9 Temperature (In/Out) C(F) -23.3(-10) -11.2(11.76)
10 Dew/Bubble point C(F) 533.8(992.99) -23.3(-9.99)
102.3(6.384) /
11 Density Vapor/Liquid kg/m3(lb/ft3) - /35.883(574.791) 565.4(35.294)
12 Viscosity - / 0.1936 0.0143 / 0.1791
13 Molecular wt, Vap 21.15
14 Molecular wt, NC
2.64(0.6324) /
15 Specific heat kJ/(kg-K)(BTU/lb-F) - / 2.23(0.5347) 2.29(0.5479)
0.034(0.02) /
16 Thermal conductivity W/mK (BTU/ft-h-F) - / 0.097(0.056) 0.156(0.09)
17 Latent heat kJ/kg (BTU/lb) 126.8(54.5) 126.8(54.5)
18 Pressure (abs) bar (psi) 78.23(1134.7) 78.23(1134.5)
19 Velocity (Mean/Max) m/s (ft/s) 0.18(0.6) / 0.29(0.96)
20 Pressure drop, allow./calc. bar (psi) 0.483 (7) 0.012(0.17)
21 Fouling resistance (min) m2.K/kW(ft2-h-F/BTU) 0.088 (0.0005)
22 Heat exchanged 27.6 KW MTD (corrected) -4.92 C
23 Transfer rate, Service 2214 (390) Dirty 2694.3 (474.5) Clean 2978.82 (524.6) W/m 2.K (BTU/(h-ft2-F))
CONSTRUCTION OF ONE SHELL

24 SHELL SIDE

25 Design Pressure (int/ext) bar (psig) 89.63(1300)


26 Design temperature C(F) 66 (150)
27 MAWP (Internal) bar (psig) 89.63 @ 66
28 Shell Thickness (mm) 12.7 / 11.11 (min)
29 Head Thickness (mm) 11.
30 Insulation (mm) 75 mm (COLD)
31 Number passes per shell 1
32 Corrosion allowance mm 3
33 In mm 1 / 50 / 600#
Connections No/ Size/Rating
34 Out mm 1 / 50 / 600#
35 Nominal Intermediate
36 Tube No.: 31 OD: 19.05 mm Thk. Average: 2.11 mm
37 Tube: type Plain #/in Material: SA-334 Gr.6 (SMLS) Tube pattern: 30
38 Shell: SA-333 Gr.6 (SMLS) Shell cover -
39 Channel Flange: SA-350 LF2 CL.1 Channel/front channel shell: SA-420 WPL6 / SA-333 Gr.6

Page 2 of 13
40 Channel/rear channel shell: SA-420 WPL6 / SA-333 Gr.6 Tubesheet-floating: -
41 Tubesheets-stationary: SA-350 LF2 Cl. 1 Impingement protection: None
42 Floating head cover: -
43 Baffle-cross SA-516 Gr.485 Baffle No.: 16 Type: Single segmental Cut(%d) 38.6
44 Baffle-long.: -
45 Supports-tube U-bend: 0 Type: -
46 Tube-tubesheet joint: Partial strength weld
47 Expansion joint: Type None
48 RhoV2-Inlet nozzle 473 Bundle entrance 13 Bundle exit 30 lb/(ft-s2)
49 Gaskets - Flexitalic spiral wound 316 SS non-asbestos graphite filler with 316 SS inner & CS outer ring.
50 Floating head: -
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66

Page 3 of 13
ROCESSING FACILITY (GPF III)

DATA SHEET FOR GAS LIQUID EXCHANGER (EX-110-03)

Rev-A SHEET 2 OF 4

Horizontal
GAS/LIQUID EXCHANGER
1 PARALEL 1 Series
5.5 m
RFORMANCE OF ONE UNIT
TUBE SIDE
HCDP GAS
3.663(29073)
3.39 3.38
0.274 0.285
0 0

-2.35(27.77) -5.37(22.33)
82.2(179.99) -216.778(-358.2)

94.3(5.887)/772.5(48.226) 95.7(5.979)/763(47.631)

0.0144 / 0.7446 0.0144 / 0.692


21.29 21.27

2.4(0.5733)/2.49(0.5944) 2.42(0.5797)/2.47(0.5909)

0.034(0.02)/0.141(0.082) 0.034(0.02)/0.138(0.08)

168.9(72.6) 145.6(62.6)
78.9(1144.7) 78.6(1140.56)
6.74(22.03) / 6.78(22.23)
0.348(5) 0.285(4.14)
0.088 (0.0005) 0.0006 A based

K (BTU/(h-ft2-F))
STRUCTION OF ONE SHELL

TUBE SIDE

89.63(1300)
66 (150)
89.63 @ 66
12.7 / 11.11 (min)
11.11 (min)
50 mm (COLD)
1
3
1 / 80 / 600#
1 / 80 / 600#

Tube length: 3048 mm Tube pitch: 23.81 mm


Tube pattern: 30
Shell cover -
Channel/front channel shell: SA-420 WPL6 / SA-333 Gr.6

Page 4 of 13
Tubesheet-floating: -
Impingement protection: None

ingle segmental Cut(%d) 38.6 Vertical Spacing: c/c 165 mm

ter ring.

Page 5 of 13
GAMBAT SOUTH GAS PROCESSING FACILITY (GPF II

Document Title: MECHANlCAL DATA SHEET FOR GAS LIQUID EXCHANG

Project: 15250 15250-ME-DAS-021

1 FABRICATION AND TESTING REQUIREMENTS

2 Fabrication Code ASME Sec VIII Div 1 2015 Impact Testing

3 Design 15250-194-EN04-DB-001 Special Heat Treatment


Specification
4 Painting & Coating 15250-194-EN04-SP-013 Radiography

5 Insulation Yes Pressure Test

6 Fire Proofing N/A PWHT

7 Fabrication Inspection Required Dimensional Control

8 Third Party Inspection Required Visual Inspection

ISO 10474 - 3.1 B /


Pressure Parts
EN10204:2004 Type 3.1
9 Material Certification
ISO 10474 - 2.2 /
Non Pressure Parts
10 EN 10204:2004 Type 2.2

11
12 ESTIMATED WEIGHT AND VOLUME

13 Volume Shell/Tube m3

14 Empty Weight Kg

15 Additional Internal Weight Kg

16 Piping,Platforms,Ladders Weight Kg

17 Insulation Weight Kg

18 Fire Proofing Weight Kg

19 Operating Liquid Weight Kg

20 Test Liquid Weight Kg

21 Erection Conditions Kg

22 Operating Conditions Kg

23 Test Conditions Kg

24 Cladding Weight Kg

25
26 LOAD AT BASE

27 Operatin
28 Maximum Vertical Saddle Load Kgf 154
29 Maximum Transverse Saddle Shear Load Kgf 88.
30 Maximum Longitudinal Saddle Shear Load Kgf 17
34 Maximum Wind Saddle Moment Kgf-m 18
35 Maximum Seismic Saddle Moment Kgf-m 71
36
37
38
39
40
41
42
43
44
45

Page 6 of 13
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

Page 7 of 13
ROCESSING FACILITY (GPF III)

DATA SHEET FOR GAS LIQUID EXCHANGER (EX-110-03)

Rev-A SHEET 3 OF 4
AND TESTING REQUIREMENTS
Impact Testing Yes, As Per Code
Special Heat Treatment As Per Code
Radiography Yes, 100 % (RT-1)
Pressure Test As Per Code
PWHT As Per Code
Dimensional Control As Per Code
Visual Inspection As Per Code

ISO 10474 - 3.1 B /


EN10204:2004 Type 3.1

ISO 10474 - 2.2 /


EN 10204:2004 Type 2.2

ED WEIGHT AND VOLUME


0.060 / 0.052
1316
N/A
N/A
25
N/A
78.3
115.7
1316
1395
1432
0

LOAD AT BASE

Operating Case Hydrotest Case


1542 877
88.5 20
177 12.5
180 195
713 NA

Page 8 of 13
Page 9 of 13
GAMBAT SOUTH GAS PROCESSING FACILITY (GPF I

Document Title: MECHANlCAL DATA SHEET FOR GAS LIQUID EXCHANG

Project: 15250 15250-ME-DAS-021 Rev-


1 SCHEMATIC DIAGRAM
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23 NOZZLE SCHEDULE

SIZE
24 SR . NO. NOZZLE NO. NOZZLE IDENTIFICATION QTY RATING FLANGE
(INCH)

25 1 N1 TS-Inlet 3 1 600 LWN RF


26 2 N2 TS Outlet 3 1 600 LWN RF
27 3 N3 SS Outlet 2 1 600 LWN RF
28 4 N4 SS Inlet 2 1 600 LWN RF
29 5 N5 Glycol injection 2 1 600 LWN RF
30
31 NOTES
32
33 1- Design, Fabrication & Installation Shall Confirm To Specifications For Pressure Vessel (15250-194-EN04-SP-001), Specification For Skid Mo
34 (15250-194-EN04-SP-007) In Addition To ASME Sec VIII Div.1 Requirements.
35 2- Internal And External Painting Shall Be As Per Specification For Painting, Coating & Wrapping (15250-194-EN04-SP-013)
36 3- All units are in MM unless mentioned otherwise
37
38 4- Welding shall comply with asme ix
39 5- All sharp edges shall be rounded up for r=3mm
40
41
42
43
44
45

Page 10 of 13
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70

Page 11 of 13
S PROCESSING FACILITY (GPF III)

CAL DATA SHEET FOR GAS LIQUID EXCHANGER (EX-110-03)

Rev-A SHEET 4 OF 4
SCHEMATIC DIAGRAM

NOZZLE SCHEDULE

REMARKS

long weld
long weld
long weld
long weld
long weld

NOTES

essel (15250-194-EN04-SP-001), Specification For Skid Mounted Equipment & Packages

Page 12 of 13
Page 13 of 13

Potrebbero piacerti anche