Lifing Beam Analysis

1. Weight of Precast Unit / Item

BJ Beton = 2500 kg/m3


Volume Beton = 0.85 m3
Rasio = 100 kg/m3

Berat Besi = 84.60 kg


Berat Beton = 2,115.00 kg
Berat Item = 2,199.60 kg

2. Formwork Adhesion

a) For Common Item Like faade Beam and Column


Formwork Adhesion (Fa) =qxa

a = 10.58 m2
qa = 10.58 kN
qa = 1,057.50 kg

b) Special Case Item like Double T Slabs, Ribbed element, Coffered Elements

Fa = 2,199.60 kg x 2
Fa = 4,399.20 kg

Fa Used = 1,057.50 kg

3. Dynamic Factor
When the movement of the precast unit is performed by lifting gear, dynamic forces that de
lifting gear used, appear. The lifting classes are described in DIN 15018.
Manually Count Volume

Common Concrete Unit

a = contact area between mould and concrete unit


q = formwork adhesion factor
q = 1 kN/m2 (for oiled steel mould)
q = 2 kN/m2 (for smooth timber/wood mould )
q = 3 kN/m2 (for rough timber/wood mould )

offered Elements

pick between a or b !!