Sei sulla pagina 1di 1

GENERAL NOTES

THE GENERAL CONDITIONS APPLY TO ALL WORK UNDER THIS


SECTION OF THE SPECIFICATIONS.

ALL WORK SHALL COMPLY WITH THE PERTINENT PROVISION OF


THE PLUMBING CODE OF THE CONCERNED CITY, THE CODE OF
SANITATION OF THE PHIL., AND/OR NATIONAL PLUMBING CODE
OF THE PHILIPPINES.

THE DRAWINGS SHOW THE GENERAL ARRANGEMENT OF ALL


PIPING. HOWEVER, WHERE LOCAL AND/OR ACTUAL
CONDITIONS AT THE JOBSITE NECESSITATE A DEVIATION OR
RE-ARRANGEMENT, THE CONTRACTOR SHALL PREPARE AND
SUBMIT THE NEW ARRANGEMENT FOR THE ARCHITECT'S OR
ENGINEER APPROVAL.

SMALL SCALE DRAWINGS DO NOT POSSIBLY INDICATE ALL


OFFSETS, FITTINGS AND OTHER PARTS OF THE SYSTEM
REQUIRED. THE CONTRACTOR SHALL ARRANGE SUCH WORK
ACCORDINGLY, FURNISHING SUCH FITTINGS, TRAPS VALVE
AND ACCESSORIES AS MAY BE REQUIRED TO MEET SUCH
CONDITIONS.

A.MATERIAL SPECIFICATIONS

COLD WATER LINES - SHALL BE POLYPROPYLENE RANDOM


PIPE, PPR PIPE PN 16.

SEWER LINE - SHALL BE POLYVINYL CHLORIDE (PVC) PIPE,


SERIES 1000 II HIGH IMPACT.
H2O

VENT PIPE - SHALL BE POLYVINYL CHLORIDE (PVC) PIPE,


SERIES 600.

H2O
H2O GATE VALVE - 50MM & LARGER, SHALL BE RISING STEM IRON
BODY WITH BRONZE TRIM, FLANGED CONNECTION, MIN., OF 150
PSIG WORKING PRESSURE. 50MM & SMALLER, SHALL BE
NON-RISING STEM, ALL BRONZE, FEMALE THREADED, MIN. OF
150 PSI WORKING PRESSURE.

LEGENDS
1.0000

COLD WATER LINE


SEWER LINE
VENT LINE
WATER TANK
CLEAN OUT
LAVATORY
WATER CLOSET
FLOOR DRAIN
KITCHEN SINK
MANHOLE
GATE VALVE

DRAWN BY: PROJECT TITLE


PATRICIA H. AMOS
LARRY NICHOLAS B. EGAY
GROUND FLOOR PLUMBING LAYOUT CAMILLIA R. FIGUEROA OFFICE FLOOR PLAN

DATE SUBMITTED: SHEET NO: SCALE: REVISON NO:

1 of 2 1:100 1
SEPTEMBER 24, 2016

Potrebbero piacerti anche