CLCULO DE MATERIAIS POR METRO QUADRADO

OBS: Areia= Vol. Brita= Vol. Tinta= Litros Tijolo= Unid. Telha= Unid

TENS Q1 Q2 Q3 REA VOLUME

CHAPISCO 1 : 3 ( Cimento - Areia ) 2.5 0.0061 505.94


REBOCO 1:3 ( Cal Hidra - Areia ) 1.22 0.0243 505.94
Assent. Tijolo Furado 10x20x20 Esp = 10 2.18 2.18 0.015 267.67
Assent. Tijolo Furado 10x20x20 Esp = 20 6.19 6.19 0.0413 0
CONCRETO 15 ( Cim - Areia - B 1 ) 294 0.8872 0.836 5.23

Pintura Ltex 2 demos sem Massa 0.17 505.9


Pintura Esmalte Sinttico 2 demos 0.16 6
Massa Corrida 2 demos Unidade = Kg 0.7 252.95

Tijolo Furado Cermico 10x20x20 Esp = 10 25 267.7

Telha Romana 16 104.79

Eng Larcio Siqueira Email: ls_engecivil@yahoo.com.br


RIAIS POR METRO QUADRADO
ol. Tinta= Litros Tijolo= Unid. Telha= Unid

TOTAL Q1 TOTAL Q2 TOTAL Q3 SACO CIM. SACO CAL

1264.85 3.086234 25.297


0 617.2468 12.294342 30.86234
583.5206 583.5206 4.01505 11.670412 29.17603
0 0 0 0 0
1537.62 4.640056 4.37228 30.7524
67.719812 60.03837
86.003
0.96
177.065

6692.5 Emboo 1:2:8 , espessura 20 mm

1676.64 Composio Assent Alven Cim-Cal-A