Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Search... ??
HomeIntroductionComponentsusedinpipingClamp/HubConnectors:Piping tosearchtypeandhitenter
ConnectingSystem
FOLLOWUSONGOOGLE+
Clamp/HubConnectors:PipingConnecting
Piping engineering
System Follow +1
+ 671
0
1.IntroductiontoClamp/HubConnectors
Clamp/HubConnectorisatypeofconnectionsystemwhichconsistsofthreecomponents, SUBSCRIBEUPDATES.IT'SFREE!
Hub,sealring,clampalongwithbolting.Applicablepipingclasses,sizesaregenerally
Youremail:
consideredasdefinedbytheCLIENTspecifications.Fig.1showsthecomponentsofaclamp
connector. Enteremailaddress...
Subscribe
PipingLayoutDrawingsAbbreviationsand
Legends
May14,2015
http://www.pipingengineering.com/clamphubconnectorspipingconnectingsystem.html 1/9
3/29/2017 Clamp/HubConnectors:PipingConnectingSystem
NozzleOrientationDrawing
May15,2015
CentrifugalPumpPipingDesignLayout
May15,2015
Tankfarm:Types,DesignConsiderations,
PlotPlanArrangement,DykeEnclosurePart
1
May15,2015
7ExcelFunctionsYouMustKnow
toWorkSmarter
May15,2015
Pipingengineering
11,667likes
LikePage Share
Fig.1TypicalcomponentsofClampConnectors
1friendlikesthis
Thepurposeofthispostistoprovideguidelinesfordesign,materialandinspectionofclamp
connectors.ThiswillbeparticularlyhelpfultoTraineeandPipingEngineerstounderstandthe
minimumrequirementstobeconsideredforprocuringclampconnectors. Orreachmeonaj@pipingengineering.com
Thistopicissplitintothreesectionsaslistedbelow,tocaptureeachaspectindetail
Design Google+
Materials
Inspection
2.ReferencesusedforClamp/HubConnectors
http://www.pipingengineering.com/clamphubconnectorspipingconnectingsystem.html 2/9
3/29/2017 Clamp/HubConnectors:PipingConnectingSystem
ASMEB16.5 PipeFlangesandFlangedFittings
ASMEB31.3 ProcessPiping
ASMEB36.10 WeldedandSeamlessWroughtSteelPipe
ASMEB36.19 StainlessSteelPipe
ASME/BPVCSECVIIIDIV1&DIV2 RulesForConstructionofPressureVessels&AlternativeRules
ASME/BPVCSECIIPARTD MaterialProperties
NACEMR0175/ISO15156 PetroleumandnaturalgasindustriesMaterialsforuseinH2S
containingenvironmentsinoilandgas
Production
3.DescriptionofActivities
Thisdocumentgivesthestepwiseapproachforminimumrequirementstobecapturedwhile
procuringclampconnectors.
1.1Design
HubsshallbedesignedasperASMESecVIIIDiv.1Appendix24forinternalpressure
andclampsshallbedesignedasperASMESecVIIIDiv.2Part4forexternalloads.
Alternativelyhubscanbedesignedbasedonvendorsprovencalculationswettedbyreputed
thirdparty
OR
ThecompleteclampconnectorassemblyshallbedesignedasperASMESecVIIIDiv.2
Part5DesignbyAnalysis.
Thedesignoftheclampconnectordependsonthebelowinformation.Ifanyofthebelow
parametersarechanged,itisnecessarytorecheckiftheselectedclampconnectoris
suitableforthenewparameters.Asaminimumfollowingtobespecified.
Sizeoftheconnectingpipe.
Schedule/thicknessoftheadjoiningpipetowhichthehubshallbeweldedandvalveend
bore
http://www.pipingengineering.com/clamphubconnectorspipingconnectingsystem.html 3/9
3/29/2017 Clamp/HubConnectors:PipingConnectingSystem
PipeID/valvebore.
Designpressureanddesigntemperaturetowhichtheclampconnectorsshallbedesigned.
(Itshallbenotedthatspecialattentionshallbegiveniftheclampconnectorsshallbe
designedforlinedesignpressureandtemperatureorfullyratedclasscondition.Especially,
iftheclampconnectorsareusedasmatingconnectionwithhubendedvalves,thenthe
designpressureshallbethefullyratedclassconditionasvalvearedesignedtofullyrated
classcondition.Thehubshallbedesignedtosuitthefullyratedclasspressuretemperature
conditions).
Thematerialofthehub,sealring,clampsandbolting.
Oncetheaboveinformationisavailablethefollowingprocessshallbefollowedinselectingthe
clampconnectors.Manufacturershubselectiontable/stobereferred.
EXAMPLE1 EXAMPLE2
1. Determinenominalpipesize,schedule(orpipeOD/ID),Pipematerialandoperatingpressure/
temperature
8Sch.XXS,API5LX60@3705psi100 18Thk27mm,API5LX65@6250psi100deg.F
deg.F
2. Selectsuitablehub/clampsizenormallythiswouldmatchthenominalpipesize
8infor8Sch.XXS 18infor18Thk27mm
3. Selectsuitablesealringtomatchthepipeborenormallythiswouldbethesmallestsealringwithout
restrictingthepipeboreseealsoNote1.
Bore=174.64 Bore=403
Selectsize67tosuitboreof174.64 Selectsize160tosuitboreof403
8in678Sch.XXS 1816018Thk27mm
4. Selecthubmaterialgradecompatiblewithpipematerial
SelectA694F60 SelectA694F65
8in678Sch.XXSA694F60 18in16018Thk27mmA694F65
http://www.pipingengineering.com/clamphubconnectorspipingconnectingsystem.html 4/9
3/29/2017 Clamp/HubConnectors:PipingConnectingSystem
5. PreliminarysizingcompletecheckpressurecapacityNote2
8in67A694F60 18in160A694F65
Pmax@100is9949(acceptable) Pmax@100Fis5860(notacceptable)
6. CheckbendingcapacityNote3
7. IfacceptablesizingcompleteNote4
FinalConnectorsize:8in678XXSA694F60 Choosenextsizeofclamporlowersizeofthe
sealring.
FinalConnectorSize:20in16020Thk27mm
A694F65
8. Ifpressure/bendingisnotacceptablethenconsiderresizingconnectorusingasmallersealring,or
largerclamp(orboth).
Note1:Particularcareshallbetakenwhileselectingthesealringforpiggablelinesasawrong
selectionofsealringshallresultinrestrictingthepipebore.Thiswouldcreatehindranceswhile
carryingoutpiggingoperationsinthesepipes.
Note2:Theselectionofthesealringcompletesthepreliminaryselectionoftheclamp
connectors.Onceallthecomponentsareselected,itshallbecheckediftheselectedclamp
connectormaximumallowablepressureismorethanthedesignpressureandalsothebending
capacityoftheclampconnectorissufficient.Ifboth,designpressureandbendingcapacityof
theclampconnectorarewithinacceptablelimitsthen,theselectionoftheclampconnectorsis
complete.
Note3:Bendingstressasderivedfrompipingstressanalysisshallnotexceedallowable
bendingstressofclampconnector.
Note4:Iftheselectedclampconnectormaximumallowablepressureislessthanthedesign
pressure,thenthemaximumallowablepressureoftheclampconnectorcanbeincreasedby
eitherchoosingasmallersealringorlargerclamporboth.Again,checkifthenewselected
clampconnectormaximumallowablepressureismorethandesignpressure.
Otherpointstobeconsideredwhiledesigntheclampconnectorsare
http://www.pipingengineering.com/clamphubconnectorspipingconnectingsystem.html 5/9
3/29/2017 Clamp/HubConnectors:PipingConnectingSystem
Forstudboltdiameterinsizesabove2.5inASTMA193B7,mechanicalpropertiesofthe
boltmaterialconsideredinthedesigncalculationsshallbeasperthemechanicalproperties
ofthefinishedstudbolts.
Iftheboltsizeis1.5andabovethenbolttensionershallbeusedfortighteningthebolts
unlessotherwisementionedintheCLIENTspecification.Conicalwashersshallbeused
whileoperatingthebolttensionerasthiswillproviderequiredsurfacetomountthetensioning
tool.Conicalwashersshallbesuppliedbyhubvendor.
Clampsshallbeprovidedwithliftinglugsiftheweightisabove25kgsunlessotherwise
mentionedintheCLIENTspecification.
ValveVendorSupport
Iftheclampconnectorsareusedasmatinghubswithhubendedvalvesthenthehub
manufacturershallsupplyhubfabricationdrawingsalongwithalldetailstovalvevendorsfor
fabricationofhubs.Valveendswithhubandpipehubsuppliedbyhubvendorwhenassembled
shallformaleakproofjoint.Itisrecommendedtoinvitehubsupplierduringkickoffmeeting
withvalvevendortoagreethesealringsize.
1.2Materials
Thematerialofhub,sealring,clampsandboltingshallbeasperthepipingclass.
Allcarbonsteelhubsshallbesuppliedinnormalizedorquenchedandtemperedconditionor
asmentionedinCLIENTspecification.
CarboncontentandcarbonequivalentinthehubsshallbeasperASTMstandardoras
mentionedintheCLIENTspecification.
Allstainlesssteelmaterialshallbesuppliedinsolutionannealedconditionandnickelalloy
UNSN06625shallbesuppliedinannealedconditionunlessotherwisementionedinthe
CLIENTspecification.
Sealringshallbealwaysofseamlessconstruction.
Clampsshallbeofforgedconstruction,castmaterialisnotacceptable.
Iftheclampconnectorsarebeingusedissourservice,thenallthematerialsshallcomply
withlatestversionofNACEMR0175/ISO151516.
Clampsshallbepaintedasthepipingclass.
Paintingofhubfacebeyondsealringcontactareatobeinaccordancewithprojectcoating
http://www.pipingengineering.com/clamphubconnectorspipingconnectingsystem.html 6/9
3/29/2017 Clamp/HubConnectors:PipingConnectingSystem
specification.
ForclampconnectorsusedinAPI6Apressureclasses(1.eAPI2000,API3000,API5000,
API10000,API15000andAPI20000)themechanicalpropertiesofthematerialusedinthe
designcalculationforhubsandclampsshallbeasperAPI6ATable6.Thesame
informationshallalsobepassedontovendor,sothattheyshallusethesamevaluesintheir
designcalculations.
Whenweldoverlayisrequired,extentofoverlayinthesealringpocketshallbeextendedtill
thecontactsurfaceofthesealringonhubface.
ClampconnectorsshallbeinspectedasperapplicableASTMstandards.
Manufacturershalldemonstratematerialweldabilitybysupplyingtestingrings.Thenumber
andthesizeofthetestringsshallbeasadvisedbytheWeldingEngineerortheCLIENT
specification.
Aspertheconstructioncode,ifPWHTisrequiredafterweldingofhubswithpipe/fitting,then
itshallbeinformedtotheManufacturersthattheyshallperformPWHTsimulationasperthe
PWHTrequirementsoftheProject.
NDEexaminationoftheclampconnectorsshallbeinaccordancewithapplicable
manufacturingcode.
ClampconnectorswhichareusedinAPIpipingclasses,thetestingrequirementofthe
clampconnectorsshallbeasperthePSLrequirementsmentionedinAPI6A.
1.3Inspection
AppendixI
Typicalmaterialusedforhubs,sealrings,clampsandbolting
A193B7M/A1942HMfor
sourservice.
A320L7M/A1947Mfor
sourservice.
SharethisonWhatsApp
MOREREAD
http://www.pipingengineering.com/clamphubconnectorspipingconnectingsystem.html 8/9
3/29/2017 Clamp/HubConnectors:PipingConnectingSystem
LEAVEAREPLY
Youremailaddresswillnotbepublished.Requiredfieldsaremarked*
Name*
Email*
CheckheretoSubscribetonotificationsfornewposts
PostComment
ConfirmyouareNOTaspammer
copyrightPipingengineering2017AllRightsReserved.PrivacyPolicy|AboutUs
http://www.pipingengineering.com/clamphubconnectorspipingconnectingsystem.html 9/9