FORM NO
MODIFICATION PROPOSAL FORM
PLANT: SECTION:
Date initiated ____________
Plant A Production
Plant B Mechanical
Plant C Ele Electrical
Power Services Instrument
Civil
Required Date for completion _____________
______________________________________________________________________________________
2 DESIGN DRAWINGS
Required Yes / No
3 AMENDMENT REQUIRED
____________________________________________________________________
4 ESTIMATION & SCHEDULING
5.1 Risk Level Acceptable Low Medium High Risk Accepted: Yes / No
7 EXECTUION
8 INSPECTION
9 COMMISSIONING
10 MONITORING
11 Completion Status
11.1 Operating instructions Yes / No Area Operating Manager Sign & Date
11.2 Maint. Instructions Yes / No Area Maintenance Manager Sign & Date
11.3 Process Flow Yes / No Area Operating Manager Sign & Date
1.2 HOW WILL THE MODIFICATION / ADDITION AFFECT THE DESIGN OF THE PLANT?
Design pressure Pipe Works.. Corrosion / Erosion
Design Temp Plant Layout Interlocks.
Mat. Of Construction Instrumentation Shutdown system
Reliefs Vents. Loads on Structures. Plant Equipments
Chemicals.
2.1 TO WHAT EXTENT IS THE ENVIRONMENT AFFECTED BY MODIFICATION / ADDITION ?
Working Conditions.. Brief Description if applicable...
Works Environment
Beyond Works Boundry
2.2 WHO NEEDS TO BE CONSULTED?
Divisions Experts.. Outside Authorities
List any consultation needed in summary of actions Section 9
NO..
10 ARE FURTHER HAZARD STUDIES REQUIRED?.
AN Standard 8 Asset Integrity & Process Safety Annex 4 The AkzoNobel Risk matrix
The Risk Matrix is a tool that defines risks according to different levels of acceptability and
required actions for an individual risk scenario. It is a combination of severity and frequency or
probability. For the five categories affected (people, environment, assets, security and reputation) an
identical matrix is used.
Medium
Severity People1 Environmental Assets
Reputation
damage2 damage Security
damage High
Euro
Severity rating
People safety
S1: FA: First Aid Treatment injury
S2: RI: reportable injury; Medical treatment Injury, Restricted Work Injury, or Lost Time Injury
not requiring in-patient hospital treatment.
S3: SI: Severe Injury; On-site injury to employees, contractors or members of the general
public, which leads to in-patient hospital treatment.
S4: F: Fatality One fatality, or several severe injuries on site, or one severe injury off-site
S5: One or more off-site fatalities, or several fatalities on site, or several severe injuries off-site.
Health
Environmental
Hazards are linked to the Loss of Containment categories (LoC) from our KPIs
S1: LoCA , S2: LoCB, S3: LoCC, S4: LoCD, S5: >LoCD
Assets (equipment/buildings)