ECBC Compliance Data Requirement Sheet

Architectural Data Requirement:

Section 4 Compliance Form with:

Drawings:

1. Floor wise Area Statement


2. Site Plan/Master Plan
3. Floor Plans
4. Roof Plan
5. All Side Elevations
6. Door-Window Schedule
7. Section Drawings
8. Faade Wall and Roof Sections with material description and K-Value Marking.

Calculations:

1. Window to Wall Ratio Calculation and Skylight to Roof Ration Calculation.


2. U Value Calculation for Wall and Roof
3. M Factor Calculation for Overhangs/Fins (if used).
4. Tradeoff method calculation (if opted).

Data Sheets:

1. Insulation proposed to be used in Wall and Roof with its K-Value


2. Proposed Window/Skylight Glass (Mentioning U Value, SHGC, VLT)
3. Proposed Roof Tile/Paint (Mentioning SRI Value)

HVAC Consultant:

Section 5 Compliance Form with:

Drawings:
ECBC Compliance Data Requirement Sheet

1. HVAC Layout showing air-conditioned area and non-air-conditioned area.


2. Summary on provision done as per NBC 2005 Part 8, Section 1 for natural
ventilation spaces.
3. Proposed HVAC system details (Mechanical Schedules) with mentioning star
rating and COP.

Calculations:

1. Air Side System and Hydronic System Balancing Report.

Data Sheets:

1. HVAC systems mentioning star rating or COP with IS standard.


2. Proposed ceiling fans star rating
3. Air circulator proposed in Air Conditioned room.
4. Door Closer
5. Piping Insulation (Mentioning the R value)
6. Duct Insulation (Mentioning the R value)
7. Pump used at cooling tower and closed circuit (Mentioning the efficiency and
VFD specs)
8. Photographs of shaded Condenser Unit.
9. Economizer data sheet.

Plumbing Consultant:

Section 6 Compliance Form with:

Drawings:

1. Plumbing layouts showing hot water supply (Solar/Electric/Fuel) to the


toilets.

Calculations:
ECBC Compliance Data Requirement Sheet

1. Hot water requirement in building and solar hot water provision (min 20%)
calculation.

Data Sheets:

1. Solar Water Heater with the information of its efficiency.


2. Electric equipment with the information of its efficiency.
3. Liquid/Gas fuel based equipment with the information of its efficiency.
4. Insulation used for piping mentioning the R value.
5. Swimming Pool Cover insulation mentioning the R value.

Electrical Consultant:

Section 7 Compliance Form with:

Drawings:

1. Lighting drawings, showing the provision of occupancy sensors in the


applicable spaces.
2. Lighting layout showing the location of lighting fixtures, mentioning the type
and wattage of the fixtures.
ECBC Compliance Data Requirement Sheet

Calculations:

1. Lighting Power Density Calculation for interior spaces and exterior spaces.

Data Sheets:

1. Exterior Lighting fixtures/Street Lights in the campus with its specification


(Time based or a photo sensed based).
2. Interior lighting fixture with its type and wattage details.
3. Display/Demonstrating/Exit Sign lighting fixture with its wattage details.
4. Exterior Ground Lighting Fixtures with the information of its luminous efficacy
(lm/W).
5. Master control devices for hotel buildings.
6. Task lighting fixtures.

Electrical Consultant:

Section 8 Compliance Form with:

Data Sheets:

1. Transformer details with the information of its type, capacity and losses at
50% and 100% loading.
2. Motors with the information of its class and efficiency.
3. Power Factor or APFC (Automatic Power Factor Controller) with the
specification.
4. Meter details having the provision to display the kVA, kWh, PF, current,
voltage, THD.
5. Power cable specifications (Max 1% losses).
ECBC Compliance Data Requirement Sheet