Sei sulla pagina 1di 16

CUADRO 3.

5
CALCULO DE LA EVATRANSPIRACION POR EL METODO DE PENMAN - MONTEITH, USANDO EL PROGRAMA CROPWAT

PAIS : PERU ESTACION : JACAS CHICO


ALTURA : 3724 m.s.n.m.
LATTITUD 9.88 SUR LONGITUD : 76.5 OESTE
TEMPERATURA TEMPERATURA HUMEDAD VELOCIDAD HORAS DE RADIACION Eto
MES MAXIMA MINIMA RELATIVA DEL VIENTO SOL SOLAR
C C % (Km/d) Horas (MJ/m2/d) (mm/d)
ENERO 11.80 5.00 82.00 173.00 4.80 17.40 2.74
FEBRERO 11.60 5.10 82.00 173.00 4.50 17.00 2.67
MARZO 11.50 5.00 82.00 173.00 4.40 16.40 2.56
ABRIL 12.10 4.60 80.00 173.00 5.10 16.10 2.51
MAYO 12.20 4.00 79.00 173.00 5.50 15.20 2.35
JUNIO 11.80 2.80 77.00 173.00 5.90 14.90 2.25
JULIO 11.30 2.20 77.00 173.00 6.00 15.30 2.26
AGOSTO 11.90 2.70 77.00 173.00 6.10 16.90 2.53
SETIEMBRE 12.30 3.50 77.00 173.00 6.00 18.20 2.79
OCTUBRE 12.50 4.60 79.00 173.00 5.50 18.30 2.87
NOVIEMBRE 13.30 4.70 78.00 173.00 6.20 19.50 3.12
DICIEMBRE 12.40 4.50 79.00 173.00 5.70 18.80 2.96
Elaboracin Propia

MES Eto PRECIPITACION PRECIPITACION


TOTAL EFECTIVA
(mm/d) mm/mes mm/mes
ENERO 2.74 129.30 79.40
FEBRERO 2.67 159.50 103.60
MARZO 2.56 157.30 101.80
ABRIL 2.51 69.80 31.90
MAYO 2.35 35.50 11.30
JUNIO 2.25 13.80 0.00
JULIO 2.26 13.50 0.00
AGOSTO 2.53 17.90 0.70
SETIEMBRE 2.79 44.60 16.80
OCTUBRE 2.87 68.00 30.80
NOVIEMBRE 3.12 89.30 47.40
DICIEMBRE 2.96 120.00 72.00
Elaboracin Propia
CUADRO N 12.0
CEDULA DE CULTIVO CON PROYECTO
PROYECTO: INSTALACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO EN LAS LOCALIDADES DE COLPA CHURIN,
DISTRITO DE SAN FRANCISCO DE ASIS, PROVINCIA DE LAURICOCHA HUANUCO

MES
CULTIVO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO
AREA (ha)
PAPA 25 25 25 25 25 25 25

TRIGO 8 8 8 8 8 8 8

TRIGO 12 12 12 12 12 12 12

PAPA 10 10 10 10 10 10 10

MAIZ AMILACEO 8 8 8 8 8 8 8 8 8 8 8 8 8

HABA 12 12 12 12 12 12 12

CEBADA 8 8 8 8 8 8 8

CEBADA 25 25 25 25 25 25 25

HABA 10 10 10 10 10 10 10

PASTOS CULTIVADOS 18 18 18 18 18 18 18 18 18 18 18 18 18

Area Fsica 100


Area total cultivada 136 62 62 100 100 100 100 100 100 62 62 62 62
Indice Uso Tierra 1.36
Elaboracin Equipo Tcnico

Cultivo Base Cultivo Rotacin


Cuadro N 3.2
PROYECTO: INSTALACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO EN LAS LOCALIDADES DE COLPA CHURIN, DISTRITO DE SAN FRANCISCO DE ASIS, PROVINCIA DE
LAURICOCHA HUANUCO
COEFICIENTES DE USO CONSUNTIVO "Kc"
MESES
CULTIVOS
Tipo HAS ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE HAS

Papa/Trigo 25 1.04 0.85 0.50 0.20 0.40 0.65 0.91 1.18 1.05 0.30 0.70 0.85 8

Trigo/Papa 12 0.91 1.18 1.05 0.30 0.70 0.85 1.04 0.85 0.50 0.20 0.40 0.65 10

Maz Amilaceo 8 0.58 0.79 0.60 0.50 0.65 0.75 0.58 0.79 0.60 0.50 0.65 0.75 8

Haba/Cebada 12 1.00 0.79 0.76 0.20 0.40 0.65 0.91 1.18 1.12 0.36 0.67 0.93 8

Cebada/Haba 25 0.91 1.18 1.12 0.36 0.67 0.93 1.00 0.79 0.76 0.20 0.40 0.65 10

Pastos Cultivados 18 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 18

TOTAL (Has) 100 100 100 100 62 62 62 62 62 62 100 100 100 62


Kc (Ponderado) 0.90 0.92 0.80 0.51 0.70 0.84 1.00 1.00 0.91 0.37 0.58 0.74
Elaboracin Equipo Tcnico
Cuadro N 3.4
PROYECTO: INSTALACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO EN LAS LOCALIDADES DE COLPA CHURIN, DISTRITO
DE SAN FRANCISCO DE ASIS, PROVINCIA DE LAURICOCHA HUANUCO

DESCRIPCION MESES
ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
Demanda del Proyecto (m3/seg) 0.0000 0.0000 0.0000 0.0040 0.0229 0.0340 0.0405 0.0450 0.0356 0.0022 0.0070 0.0000
Has. de Cultivo 100.00 100.00 100.00 62.00 62.00 62.00 62.00 62.00 62.00 100.00 100.00 100.00
MODULO DE RIEGO(l/seg) 0.00 0.00 0.00 0.06 0.37 0.55 0.65 0.73 0.57 0.02 0.07 0.00
Elaboracin Equipo Tcnico

Caudal de Diseo = 45.03 Lt/seg = 45.00 Lt/seg


Modulo de Riego = 0.73 Lt/seg/Ha
CUADRO N 13.0
DEMANDA POR CULTIVO

CULTIVO: PAPA

Unidad de
Variable ene feb mar abr may jun jul ago sep oct nov dic
Medida
Evapotranspiracion Potencial mm/mes 84.94 74.76 79.36 75.30 72.85 67.50 70.06 78.43 83.70 88.97 93.60 91.76
Factor de cultivo - 1.04 0.85 0.50 0.30 0.70 0.85 1.04 0.85 0.50 0.30 0.70 0.85
Areas parciales del cultivo has 25.00 25.00 25.00 10.00 10.00 10.00 10.00 10.00 10.00 25.00 25.00 25.00
Factor K ponderado k, ponderado 0.90 0.92 0.80 0.51 0.70 0.84 1.00 1.00 0.91 0.37 0.58 0.74
Uso consuntivo mm/da 76.17 69.07 63.66 38.62 50.88 56.83 69.91 78.52 76.36 33.11 54.61 68.32
Precipitacin efectiva mm 79.40 103.60 101.80 31.90 11.30 0.00 0.00 0.70 16.80 30.80 47.40 72.00
Requerimiento de agua mm -3.23 -34.53 -38.14 6.72 39.58 56.83 69.91 77.82 59.56 2.31 7.21 -3.68
Requerimiento volumetrico neto de agua m3/ha -32.34 -345.29 -381.37 67.22 395.78 568.31 699.13 778.19 595.56 23.15 72.06 -36.76
Eficiencia de riego del proyecto - 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
Requerimiento volumetrico bruto de agua m3/ha -80.86 -863.23 -953.44 168.04 989.44 1420.77 1747.83 1945.46 1488.90 57.87 180.16 -91.89
N de horas de riego hrs 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
Modulo de riego lt/seg -0.03 -0.36 -0.36 0.06 0.37 0.55 0.65 0.73 0.57 0.02 0.07 -0.03
Area total de riego has 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Caudal disponible a la demanda lt/seg -0.75 -8.92 -8.90 0.65 3.69 5.48 6.53 7.26 5.74 0.54 1.74 -0.86

CULTIVO: TRIGO

Unidad de
Variable ene feb mar abr may jun jul ago sep oct nov dic
Medida
Evapotranspiracion Potencial mm/mes 84.94 74.76 79.36 75.30 72.85 67.50 70.06 78.43 83.70 88.97 93.60 91.76
Factor de cultivo - 0.91 1.18 1.05 0.20 0.40 0.65 0.91 1.18 1.05 0.20 0.40 0.65
Areas parciales del cultivo has 12.00 12.00 12.00 8.00 8.00 8.00 8.00 8.00 8.00 12.00 12.00 12.00
Factor K ponderado k, ponderado 0.90 0.92 0.80 0.51 0.70 0.84 1.00 1.00 0.91 0.37 0.58 0.74
Uso consuntivo mm/da 76.17 69.07 63.66 38.62 50.88 56.83 69.91 78.52 76.36 33.11 54.61 68.32
Precipitacin efectiva mm 79.40 103.60 101.80 31.90 11.30 0.00 0.00 0.70 16.80 30.80 47.40 72.00
Requerimiento de agua mm -3.23 -34.53 -38.14 6.72 39.58 56.83 69.91 77.82 59.56 2.31 7.21 -3.68
Requerimiento volumetrico neto de agua m3/ha -32.34 -345.29 -381.37 67.22 395.78 568.31 699.13 778.19 595.56 23.15 72.06 -36.76
Eficiencia de riego del proyecto - 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
Requerimiento volumetrico bruto de agua m3/ha -80.86 -863.23 -953.44 168.04 989.44 1420.77 1747.83 1945.46 1488.90 57.87 180.16 -91.89
N de horas de riego hrs 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
Modulo de riego lt/seg -0.03 -0.36 -0.36 0.06 0.37 0.55 0.65 0.73 0.57 0.02 0.07 -0.03
Area total de riego has 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Caudal disponible a la demanda lt/seg -0.36 -4.28 -4.27 0.52 2.96 4.39 5.22 5.81 4.60 0.26 0.83 -0.41

CULTIVO: CEBADA

Unidad de
Variable ene feb mar abr may jun jul ago sep oct nov dic
Medida
Evapotranspiracion Potencial mm/mes 84.94 74.76 79.36 75.30 72.85 67.50 70.06 78.43 83.70 88.97 93.60 91.76
Factor de cultivo - 0.91 1.18 1.12 0.20 0.40 0.65 0.91 1.18 1.12 0.20 0.40 0.65
Areas parciales del cultivo has 25.00 25.00 25.00 8.00 8.00 8.00 8.00 8.00 8.00 25.00 25.00 25.00
Factor K ponderado k, ponderado 0.90 0.92 0.80 0.51 0.70 0.84 1.00 1.00 0.91 0.37 0.58 0.74
Uso consuntivo mm/da 76.17 69.07 63.66 38.62 50.88 56.83 69.91 78.52 76.36 33.11 54.61 68.32
Precipitacin efectiva mm 79.40 103.60 101.80 31.90 11.30 0.00 0.00 0.70 16.80 30.80 47.40 72.00
Requerimiento de agua mm -3.23 -34.53 -38.14 6.72 39.58 56.83 69.91 77.82 59.56 2.31 7.21 -3.68
Requerimiento volumetrico neto de agua m3/ha -32.34 -345.29 -381.37 67.22 395.78 568.31 699.13 778.19 595.56 23.15 72.06 -36.76
Eficiencia de riego del proyecto - 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
Requerimiento volumetrico bruto de agua m3/ha -80.86 -863.23 -953.44 168.04 989.44 1420.77 1747.83 1945.46 1488.90 57.87 180.16 -91.89
N de horas de riego hrs 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
Modulo de riego lt/seg -0.03 -0.36 -0.36 0.06 0.37 0.55 0.65 0.73 0.57 0.02 0.07 -0.03
Area total de riego has 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Caudal disponible a la demanda lt/seg -0.75 -8.92 -8.90 0.52 2.96 4.39 5.22 5.81 4.60 0.54 1.74 -0.86

CULTIVO: HABA

Unidad de
Variable ene feb mar abr may jun jul ago sep oct nov dic
Medida
Evapotranspiracion Potencial mm/mes 84.94 74.76 79.36 75.30 72.85 67.50 70.06 78.43 83.70 88.97 93.60 91.76
Factor de cultivo - 1.00 0.79 0.76 0.36 0.67 0.93 1.00 0.79 0.76 0.36 0.67 0.93
Areas parciales del cultivo has 12.00 12.00 12.00 10.00 10.00 10.00 10.00 10.00 10.00 12.00 12.00 12.00
Factor K ponderado k, ponderado 0.90 0.92 0.80 0.51 0.70 0.84 1.00 1.00 0.91 0.37 0.58 0.74
Uso consuntivo mm/da 76.17 69.07 63.66 38.62 50.88 56.83 69.91 78.52 76.36 33.11 54.61 68.32
Precipitacin efectiva mm 79.40 103.60 101.80 31.90 11.30 0.00 0.00 0.70 16.80 30.80 47.40 72.00
Requerimiento de agua mm -3.23 -34.53 -38.14 6.72 39.58 56.83 69.91 77.82 59.56 2.31 7.21 -3.68
Requerimiento volumetrico neto de agua m3/ha -32.34 -345.29 -381.37 67.22 395.78 568.31 699.13 778.19 595.56 23.15 72.06 -36.76
Eficiencia de riego del proyecto - 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
Requerimiento volumetrico bruto de agua m3/ha -80.86 -863.23 -953.44 168.04 989.44 1420.77 1747.83 1945.46 1488.90 57.87 180.16 -91.89
N de horas de riego hrs 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
Modulo de riego lt/seg -0.03 -0.36 -0.36 0.06 0.37 0.55 0.65 0.73 0.57 0.02 0.07 -0.03
Area total de riego has 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Caudal disponible a la demanda lt/seg -0.36 -4.28 -4.27 0.65 3.69 5.48 6.53 7.26 5.74 0.26 0.83 -0.41
CULTIVO: MAIZ AMILACEO

Unidad de
Variable ene feb mar abr may jun jul ago sep oct nov dic
Medida
Evapotranspiracion Potencial mm/mes 84.94 74.76 79.36 75.30 72.85 67.50 70.06 78.43 83.70 88.97 93.60 91.76
Factor de cultivo - 0.58 0.79 0.60 0.50 0.65 0.75 0.58 0.79 0.60 0.50 0.65 0.75
Areas parciales del cultivo has 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
Factor K ponderado k, ponderado 0.90 0.92 0.80 0.51 0.70 0.84 1.00 1.00 0.91 0.37 0.58 0.74
Uso consuntivo mm/da 76.17 69.07 63.66 38.62 50.88 56.83 69.91 78.52 76.36 33.11 54.61 68.32
Precipitacin efectiva mm 79.40 103.60 101.80 31.90 11.30 0.00 0.00 0.70 16.80 30.80 47.40 72.00
Requerimiento de agua mm -3.23 -34.53 -38.14 6.72 39.58 56.83 69.91 77.82 59.56 2.31 7.21 -3.68
Requerimiento volumetrico neto de agua m3/ha -32.34 -345.29 -381.37 67.22 395.78 568.31 699.13 778.19 595.56 23.15 72.06 -36.76
Eficiencia de riego del proyecto - 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
Requerimiento volumetrico bruto de agua m3/ha -80.86 -863.23 -953.44 168.04 989.44 1420.77 1747.83 1945.46 1488.90 57.87 180.16 -91.89
N de horas de riego hrs 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
Modulo de riego lt/seg -0.03 -0.36 -0.36 0.06 0.37 0.55 0.65 0.73 0.57 0.02 0.07 -0.03
Area total de riego has 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Caudal disponible a la demanda lt/seg -0.24 -2.85 -2.85 0.52 2.96 4.39 5.22 5.81 4.60 0.17 0.56 -0.27

CULTIVO: PASTOS CULTIVADOS

Unidad de
Variable ene feb mar abr may jun jul ago sep oct nov dic
Medida
Evapotranspiracion Potencial mm/mes 84.94 74.76 79.36 75.30 72.85 67.50 70.06 78.43 83.70 88.97 93.60 91.76
Factor de cultivo - 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Areas parciales del cultivo has 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00
Factor K ponderado k, ponderado 0.90 0.92 0.80 0.51 0.70 0.84 1.00 1.00 0.91 0.37 0.58 0.74
Uso consuntivo mm/da 76.17 69.07 63.66 38.62 50.88 56.83 69.91 78.52 76.36 33.11 54.61 68.32
Precipitacin efectiva mm 79.40 103.60 101.80 31.90 11.30 0.00 0.00 0.70 16.80 30.80 47.40 72.00
Requerimiento de agua mm -3.23 -34.53 -38.14 6.72 39.58 56.83 69.91 77.82 59.56 2.31 7.21 -3.68
Requerimiento volumetrico neto de agua m3/ha -32.34 -345.29 -381.37 67.22 395.78 568.31 699.13 778.19 595.56 23.15 72.06 -36.76
Eficiencia de riego del proyecto - 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
Requerimiento volumetrico bruto de agua m3/ha -80.86 -863.23 -953.44 168.04 989.44 1420.77 1747.83 1945.46 1488.90 57.87 180.16 -91.89
N de horas de riego hrs 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
Modulo de riego lt/seg -0.03 -0.36 -0.36 0.06 0.37 0.55 0.65 0.73 0.57 0.02 0.07 -0.03
Area total de riego has 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Caudal disponible a la demanda lt/seg -0.54 -6.42 -6.41 1.17 6.65 9.87 11.75 13.07 10.34 0.39 1.25 -0.62

CUADRO N 13.1
DEMANDA TOTAL
Demanda total
MESES
(lt/seg)
ENERO 0.00
FEBRERO 0.00
MARZO 0.00
ABRIL 4.02
MAYO 22.90
JUNIO 33.98
JULIO 40.46
AGOSTO 45.03
SETIEMBRE 35.61
OCTUBRE 2.16
NOVIEMBRE 6.95
DICIEMBRE 0.00

Demanda total (l/seg)


50.00
45.03
45.00
40.46
Q (l/seg)

40.00
35.61
35.00
33.98

30.00

25.00 22.90
20.00

15.00

10.00 6.95
4.02
5.00 2.16
0.00
0.00 0.00 0.00 0.00

meses
Fuente: Elaboracin Propia
CUADRO N 14
BALANCE HIDRICO OFERTA - DEMANDA
SITUACION CON PROYECTO
MESES ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV.
N DE DIAS 31 28 31 30 31 30 31 31 30 31 30
DEMANDA TOTAL (M3) 0.00 0.00 0.00 10,418.50 61,345.13 88,087.50 108,365.31 120,618.75 92,311.80 5,786.58 18,015.60
OFERTA TOTAL (M3) 195,523.20 176,601.60 195,523.20 189,216.00 195,523.20 189,216.00 195,523.20 195,523.20 189,216.00 195,523.20 189,216.00
BALANCE OFERTA - DEMANDA (M3) 195,523.20 176,601.60 195,523.20 178,797.50 134,178.08 101,128.50 87,157.90 74,904.45 96,904.20 189,736.62 171,200.40

BALANCE HIDRICO OFERTA - DEMANDA


200,000.00 195,523.20 195,523.20 195,523.20 195,523.20 195,523.20 195,523.20 195,523
189,216.00 189,216.00 189,216.00 189,216.00
190,000.00

180,000.00 176,601.60

170,000.00

160,000.00

150,000.00

140,000.00

130,000.00
120,618.75
M3

120,000.00
108,365.31
110,000.00

100,000.00
92,311.80
88,087.50
90,000.00

80,000.00

70,000.00
61,345.13
60,000.00

50,000.00

40,000.00

30,000.00
18,015.60
20,000.00
10,418.50
10,000.00 5,786.58
DEMANDA
0.00

JUN. MESESJUL.
O FERTA 0.00 0.00 0.00 0.00
ENE. FEB. MAR. ABR. MAY. AGO. SET. OCT. NOV. DIC.
Fuente: Elaboracin Propia
CUADRO N 14
ANCE HIDRICO OFERTA - DEMANDA
SITUACION CON PROYECTO
DIC.
31
0.00
195,523.20
195,523.20

NCE HIDRICO OFERTA - DEMANDA


195,523.20 195,523.20 195,523.20 195,523.20 195,523.20
189,216.00 189,216.00 189,216.00

120,618.75

108,365.31

92,311.80
88,087.50

345.13

18,015.60

5,786.58

JUN. MESESJUL.
0.00
MAY. AGO. SET. OCT. NOV. DIC.

Potrebbero piacerti anche