Sei sulla pagina 1di 170

National Seminar on Rainwater Harvesting and Water Management 11-12 Nov.

2006, Nagpur

STATE OF THE ART LECTURE

1. Rain Water Harvesting, Conservation and Management Strategies


for Urban and Rural Sectors
* Dr. R. K. Sivanappan

1. Introduction Nabateans and other people of the Middle east.


Water is essential for all life and used in many While the early water harvesting techniques used
different ways, It is also a part of the larger natural materials, 20th century technology has made
ecosystem in which the reproduction of the bio it possible to use artificial means for increasing runoff
diversity depends. Fresh water scarcity is not limited from precipitation.
to the arid climate regions only, but in areas with Evenari and his colleagues of Israel have
good supply the access of safe water is becoming described water harvesting system in the Negve
critical problem. Lack of water is caused by low desert. The system involved clearing hill sides to
water storage capacity, low infiltration, larger inter smooth the soil and increase runoff and then building
annual and annual fluctuations of precipitation (due contour ditches to collect the water and carry it to
to monsoonic rains) and high evaporation demand. low lying fields where the water was used to irrigate
The term water harvesting was probably used crops. By the time of the Roman Empire, these runoff
first by Geddes of the University of Sydney. He farms had evolved into relatively sophisticated
defined as the collection and storage of any form of systems.
water either runoff or creek flow for irrigation use. The next significant development was the
Meyer’s of USDA, USA has defined it as the construction of roaded catchments as described by
practice of collecting water from an area treated to the public works Department of Western Australia
increase runoff from rainfall. Recently Currier ,USA in 1956. They are so called because the soil is graded
has defined it as the process of collecting natural into ditches. These ditches convey the collected
precipitation from prepared watershed for beneficial water to a storage reservoir. Lauritzan, USA has
use. Now a days water harvesting has become a done pioneering work in evaluating plastic and
general term for collecting and storing runoff water artificial rubber membranes for the construction of
or creek flow ,resulting from rain in soil profile and catchments and reservoirs during 1950’s. In
reservoirs both over surface /under surface. 1959,Mayer of water conservation laboratory, USA
Previously this was used for arid and semi arid areas, began to investigate materials that caused soil to
but recently their use has been extended to sub humid become hydrophobic or water repellent. Then
and humid regions too. In India water harvesting gradually expanded to include sprayable asphalt
means utilizing the erratic monsoon rain for raising compounds, plastic and metal films bounded to the
good crops in dry tracks and conserve the excess soil compaction and dispersion and asphalt fiber glass
runoff water for drinking and for recharging membranes. Early 1960, research programmes in
purposes. water harvesting were also initiated in Israel by Hillal
and at the University of Arizana by Gluff. Hillal’s
2. History of Rain Water Harvesting work related primarily to soil smoothing and runoff
Water harvesting like many techniques in use farming. Cluff has done a considerable amount of
today is not new. It is practiced as early as 4500 work on the use of soil sealing with sodium salt and
B.C. by the people of Ur and also latest by the on ground covered with plastic membranes.

* International Consultant in Water Resources & Irrigation,


No:14, Bharathi park, 4th Cross Road, Coimbatore 641 043

1
Water harvesting was practiced more than These rainwater are used for all labs, which require
1000 years back in South India, by way of pure and good quality of water. In the same way
construction of irrigation tank, ooranis, temple tanks, the rainwater falling on the terrace in all the building
farm ponds etc, but the research in India on this constructed subsequently are collected and stored
subject is of recent one. Work is taken up at in the underground masonry tanks Even the surface
ICRISAT, Hyderabad, Central arid Zone Research water flowing in the Nalla’s in the campus are also
Institute, Jodhpur, Central Research Institute for diverted by providing obstructions, to the open wells
dryland Agriculture (CRIDA), Hyderabad, State to recharge ground water.
Agricultural Universities and other dry land research Hence Rainwater harvesting is as old as
centers throughout India. civilization and practiced continuously in different
In Pakistan, in the mountainous and dry ways for different purposes in the world The only
province of Balukhistan, bunds are constructed thing is that it has not been done systematically in all
across the slopes to force the runoff to infiltrate. In places. Need has come to harvest the rainwater
China, with its vast population is actively promoting including roof water to solve the water problems
rain and stream water harvesting. One very old but everywhere not only in the arid but also in the humid
still common flood diversion technique is called region.
‘Warping’ (harvesting water as well as sediment).
When water harvesting technique are used 3. Need for Rain Water Harvesting
for runoff farming, the storage reservoir will be soil Water is a becoming a scarce commodity and
itself, but when the water is to be used for livestock, it is considered as a liquid gold in this part of the
supplementary irrigation or human consumption, a country (especially in Coimbatore, Erode, Salem
storage facility of some kind will have to be Districts of Tamil Nadu). The demand of water is
produced. In countries where land is abundant, water also increasing day by day not only for Agriculture,
harvesting involves; harvesting or reaping the entire but also for household and Industrial purposes. It is
rainwater, store it and utilize it for various purposes. estimated that water need for drinking and other
In India, it is not possible to use the land area only to municipal uses will be increased from 3.3 MHm to
harvest water and hence water harvesting means 7.00 MHm in 2020/25. Similarly the demand of water
use the rain water at the place where it falls to the for industries will be increased by 4 fold i.e. from
maximum and the excess water is collected and 3.0 MHm ti 12.00 MHm during this period At the
again reused in the same area. Therefore the same time more area should be brought under
meaning of water harvesting is different in different irrigation to feed the escalating population of the
area/ countries. The methods explained above are country, which also needs more water. But we are
used for both agriculture and to increase the ground not going to get one litre more water than we get at
water availability. present though the demand is alarming.
The water harvesting for household and for The perennial rivers are becoming dry and
recharging purposes are also in existence for long ground water table is depleting in most of the areas.
years in the world. During rainy days, the people in In Coimbatore, the depletion is about 30-50m in the
the villages used to collect the roof water in the last 30-40 years. Country is facing floods and drought
vessels and use the same for household purposes in the same year in many states. This is because, no
including drinking. In South East Asian countries concrete action was taken to conserve, harvest and
people used to collect the roof water ( thatched roof manage the rain water efficiently.
by providing gutters) by placing 4 big earthern drums The rainfall is abundant in the world and also
in 4 corners of their houses. They use this water for in India. But it is not evenly distributed in all places.
all household purposes and if it is exhausted only India being the monsoonic country, the rain falls only
they will go for well water. The main building of the for 3 to 4 months in a year with high intensity, which
Agricultural College at Coimbatore was constructed results more runoff and soil erosion. Total rain occurs
100 years ago and they have collected all the roof only in about 100 hours out of 8760 hours in a year.
water by pipes and stored in a big under ground It also erratic and fails once in 3 or 4 years. This is
masonry storage tanks by the sides of the building. very common in many parts of the country.

2
The availability of water in the world, in India hard rock in Tamil Nadu. Further the porosity of the
and in Tamil Nadu is given below with rainfall. rock is only about 3%. The natural recharge of
rainwater in this region is only about 8 -12%, which
Places Rainfall Population Availability of is very minimal. Therefore there is an urgent need
in mm Water/Person/Yr to take up the artificial recharge of the rain for which
M 3 /P/Year water harvesting and water conservation structures
World 840 6 Billion 700 are to be build up in large scale. The rainfall in coastal
area is more than 1200 mm (Chennai) still; drinking
India 1150 1.0 Billion 2200 water is a problem in almost every year. This is
Tamil Nadu 925 62.5 Million 750 because the entire rainwater is collected in masonry
drains (from houses, streets/roads etc) are taken to
If the availability of water is 1700 M3/p/y, the sea instead of taking into the ground water
there will be occasional water stress, and if it is less aquifers or in surface reservoirs by pumping if need
than 1000 M3/p/y, it is under water scarcity condition. be. The ground water available can be used during
Though India is not under water stress conditions summer and make the aquifer empty so that the
but Tamil Nadu state is already under water scarcity rainwater can be put into the aquifers during rainy
condition, but there is no need for panic since it is period by suitable water harvesting measures.
possible to manage this condition as in the case of All the above details indicate the need for
Israel where the availability is only about 450 M3/p/ water harvesting measures in urban and rural area
y, by means of water harvesting, water conservation for the use of Agriculture, drinking and other
and water management. purposes.
Water scarcity / stress is not limited to the
arid regions; only but also occurring in high rainfall 4. Methods of Water Harvesting in Rural and
areas also. Chirapunji gets more than 11,000mm of Urban Areas
average annual rainfall but face drinking water There are different / various system of water
problem before monsoon commences whereas in harvesting depending upon the source of water
Ralegoan Siddhi, in Maharastra there is no water supply and places as classified below.
scarcity problem though the annual average rainfall a) In situ Rainwater harvesting
is only about 450mm. Hence to mitigate water • Bunding and terracing.
problem / drought etc, there is an urgent need to • Vegetative / stone contour barriers.
follow our ancestral way of water harvesting and
• Contour trenching.
the latest technologies adopted in Soil and water
conservation measures on watershed basis including • Contour stone walls.
roof water harvesting etc which are described in • Contour farming.
detail below. • Micro catchments.
The Theme paper on Water vision 2050 of • Tie ridging methods
India, prepared by Indian Water Resources • Farm ponds.
Society(IWRS) has indicated that a storage of 60 b) Direct surface runoff harvesting
MHm is necessary to meet tbne demand of water • Roof water collection
for irrigation, drinking and other purposes. But the • Dug out ponds / storage tanks
present live storage of all reservoirs put together is
• Tankas
equivalent of about 17.5 MHm which is less than
10% of the annual flow in the rivers in the country. • Kundis
The projects under contruction (7.5 MHm) and those • Ooranis
contemplated (13 MHm) are added, it comes only • Temple tanks
37.50 MHm and hence we have to go a long way in • Diversion bunds
water harvesting to build up storage structures in • Water spreading
order to store about 60 MHm. c) Stream flow / runoff harvesting
More than 75% of the areas comes under • Nalla bunding

3
• Gully control structures municipalities / corporation without any difficulty to
• Check dams – Temporary some extent.
Permanent To sum up the following types of Water
• Silt detension tanks Harvesting System for different uses can be
• Percolation ponds implemented in different parts of the country.
d) Sub surface flow harvesting
• Sub surface dams No. Region Types of Water Use
• Diaphragm dams
e) Micro catchment’s / watershed 1 Arid Artificial catchments Drinking
• Inter terrace / inter plot water harvesting plains to capture rainfall
(tankas or kundis in
• Conservation bench terrace
Rajasthan)
f) Runoff inducement by surface treatment
• Roaded catchments Tanks or talabs in Drinking
• Use of cover materials – Aluminum foils, Rajasthan to capture and
Plastic sheet, bentonite, Rubber, etc surface runoff irrigation
• Using chemicals for water proofing, water
repellent etc. to get more run off water. Embankments / Irrigation
obstructions across water & also
A comprehensive watershed development on drainage / Nalla to for recharging
watershed basisincluding water harvesting structures capture surface runoff
are given in the figure 1.
2 Semi Tanks / Ponds/Eri to Irrigation
Arid capture surface runoff water and
5. Plan of Action for Rainwater Harvesting places and also chains of drinking water
As stated early, rainwater harvesting is as old tanks called cascade. through
as civilization and is practiced in many countries recharge of
including India from time immemorable. But ground water
government and people remember this only when
water is not available even for drinking purposes. 3. Flood Mud embankment Irrigation
There is no use of spending huge sum of money plains which may be water and
breached during the drinking water
when we notice the water scarcity for drinking,
floods. through
industry and agriculture. These activities / structure recharging
should be taken / constructed before the rainy season ground water
so that the rain water which goes as runoff outside
the sub watershed / city limits can be collected and 4 Hill and Diverted stream flows Irrigation
used directly or by recharging into the ground. Mountain Jammu, M.P., water
Government is undertaking the wasteland / region Maharastra
watershed development programs, but not done in a
comprehensive / integrated manner / holistic 6. Case Study In Water Harvesting
saturating the watershed in all water harvesting There are numerous case studies available in
measures. Hence there is a need to take up water harvesting both in Rural and Urban sectors.
watershed development programmes – mainly water In Rural areas it is Soil and Water conservation
harvesting measures in a scientific and systematic measures taken on watershed basis to conserve and
manner. augment ground water. In the urban sector, it is
The government of Tamil Nadu has laid mostly roof water harvesting for direct use and
condition that in any building construction, water recharging the ground water and also collecting of
harvesting work should be included and executed, surface runoff from pavements / roads and
but in practice, it is not perfect. The authorities recharging it into the ground through recharge pits
concerned should monitor the programme so that or using abandoned / existing wells. The following
the drinking water problem can be solved in all are the places where rain water / roof water

4
harvesting has been implemented in a successful the rain water harvesting to their Industry premises.
manner. If the above measures are implemented in
1. Rural areas Rural and Urban areas, the drought in rural areas
a. Ralegoan Siddhi in Maharastra state and drinking water problem in Urban and Rural
b. Lakshman Nagar and Varisai Nadu inTheni population can be solved to some extent. The people,
Dt., Tamil Nadu. NGO, and Government should joint together and
c. Alankulam Taluk in Tirunelveli Dt., Tamil Nadu. implement the rain water harvesting in a big way in
d. Aravari watershed in Alwar Dt., of Rajasthan. all places in the years to come to solve water scarcity
e. Maheshwaram watershed in Andhra Pradesh. problem in the country.
f. Kapilnalla watershed in Karnataka
7. Conclusions
2. Urban Sectors It is very important to make water everybody’s
Mostly the roof water harvesting measures are taken business. It means a role for everybody with respect
up. to water. Every household and community has to
a. India become involved in the provision of water and in
i. Tamil Nadu Agricultural University, Coimbatore, the protection of water resources. Make water the
all main buildings. subject of a people’s movement. It means the
ii. PRICOL, Periyanaickenpalayam (Industry empowerment of our Urban and Rural community,
Building), Coimbatore i.e., to manage their own affairs with the state playing
iii. TWAD Board / office and PWD office at a critical supportive role.
Chennai. Further involving people will give the people
iv. Numerous Apartment buildings in Chennai. greater ownership over the water project including
v. Sundaram and Clayton Ltd, Padi, Chennai – watershed development, Soil and Water
(Industry buildings) conservation and water harvesting will go a long
vi. TVS training schoool at Vanagaran, Chennai way towards reducing misuse of government funds.
vii. Rastrapathi Bhavan, Delhi. It will also develop the ownership (own water supply
viii. Center of science and environment building at systems), they will also take good care of them. In
Delhi. this way it is possible to solve water problems facing
ix. Institute of economic growth, New Delhi. the county in the 21st century.

b. Foreign Countries References


i. Thailand – Many houses including thatched • Ake Nilsson, Ground water dams for small-scale water
houses in villages. supply, IT publication, 1988.
ii. Japan – office complex. • Center for science and environment. A water-harvesting
manual, Delhi 2001.
iii. Germany – office buildings. • Center for Science and Environment – Making water
iv. Singapore – office buildings. everybody’s business, New Delhi, 2001.
• Chitale M.A., A blue revolution, Bhavans Book
Rules and regulations have been framed for University, Pune 2000.
Rain Water Harvesting in all corporation, • CII, Rainwter harvesting – A guide, New Delhi 2000.
municipalities and panchayat unions in Tamil Nadu. • Rajiv Gandhi, National Drinking water missions
The Gujarat government has issued a general Handbook on Rainwater harvesting, Government of India,
New Delhi, 1998.
resolution for the effort that no new construction • Sivanappan, R.K., Soil and Water Conservation and
would be allowed if it does not have provision for Water harvesting, Tamil Nadu Afforestation project,
roof top rainwater harvesting. This would be valid Chennai, 1999.
in all 143 municipalities and 6 urban development • Sivanappan, R.K. Water harvesting, ICCI, Coimbatore
authorities in the state. It is heartening to note that 2001.
Confederation of Indian Industries (CII) and • Stockholm water Symposium – ‘Water harvesting’
Stockholm, Aug 1998.
Federation of Indian Chambers of Commerce and
• Verma HN & Tiwan KN current status and Prospects of
Industries (FICCI) have taken action to implement Rain Water Harvesting, NIH, Roorkee, 1995.

5
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

2. Water Issues and Related Concerns


* Prof. (Mrs.) Vijaya Agarwal ** Prof. (Dr.) J. H. Agarwal

ABSTRACT
By 2025, world population will be 8 billion – water will become scarcer. Global
farming accounts for 70% of water use, while only 17% of farmland is irrigated and
it provides only 40% (estimated) of world’s food. Water application losses in irrigation
are quite high – almost 40 % of the total irrigation water is lost. Per capita irrigated
agricultural land is declining – main reason shortage of water. Water table is falling
steadily in intensive farming regions. People and ecosystems are under threat from
persistent chemicals like pesticides, fertilizers and heavy metals in waters. There are
no serious efforts to gain water by practices like rainwater harvesting, watersheds
and mini-ponds, reuse and recycling of waste water. It is said there is enough freshwater
in world – however, it is not always available in the right place or right form. The
problem is mainly of access, distribution, and optimum utilization.
The paper discusses related concerns and outlines what need to be done.
Key words : Fresh water, harvesting and conservation of water, water reuse, water
management in agro-ecosystems, electronics and IT based devices.

1.0 WHAT NEED TO BE DONE? – Some • Water conservation and higher efficiencies for
suggestions water-conveyance, water-application and
water-use. Scientific management of water by
1.1 Ground Water Recharge, Reuse, and making use of electronics and IT based aids
Efficient Systems like soil-moisture measurements.
• Watersheds, Check dams, Roof water • Participation of women in conservation of
harvesting (should be made compulsory and water.
mandatory), India uses around 15% of rain • Competent, knowledgeable and experienced
water while Israel almost 100% (see personnel to be involved in management of
Appendix). water related activities and balanced
• Efficient irrigation systems: Sprinkler, drip, distribution of water.
trickle (macro and micro irrigation). Drip
irrigation cuts water use by between 30% and 1.2 Water needs of plants
70% , increases crop yield by between 20% Agriculture accounts for 70% of fresh water
and 90%, compared with traditional irrigation. use. It requires as much as 2000 litres of water to
• Sequential water use : Reuse, recovery and grow 1 kg of rice. Water (with elements H + O) is
recycling of waste waters. a vital component for crop growth. Plants need
• Switching to less water-dependent crops. water for:

* Selection Grade Assistant Professor (Electrical Engineering), Department of Agricultural Structures and
Environmental Engineering, College of Agricultural Engineering, Jawaharlal Nehru Agricultural University,
Krishi Nagar, Adhartal P.O., Jabalpur 482 004, Email : vijaya_agarwal@gmail.com Phone : 0761 – 2681820
** Retired Director Instrumentation & Project Coordinator UNDP-GOI-MAEP, JNAU, G-83 Krishi Nagar,
Adhartal P.O., Jabalpur 482 004 Email : jhagarwal@sancharnet.in Phone : 0761 – 2680400

6
• Temperature regulation, web site: www.irrometer.com).
• Photosynthesis, • Tensiometric principle, indicates the amount of
• Transport of nutrients from soil to plant, and moisture available to plants.
• Transport of assimilates from plant parts to the • Direct display of moisture.
produce location. • Automatic control of irrigation systems.

1.3 Excess water harmful 4. Watermark Soil Moisture Sensor – 200SS


Excess water to crop is harmful. It causes/ (Irrometer Company, USA,
results in : web site : www.irrometer.com ).
• Spoilage of soil-health, salinity built up. • Solid state, electrical resistance type.
• Loss of nutrients due to excessive leaching. • Available with meter, electronic control unit.
• Contamination of surface and ground water. • Low cost.
• No proportionate increase in yield, and wastage
of water and energy. 5. Sentek Soil Moisture Probes – EnviroSCAN,
EnviroSMART, EasyAG and Diviner 2000
2.0 SOIL-MOISTURE MEASUREMENT (Sentek, Australia,
SYSTEMS web site : www.sentek.com.au ).
A variety of electronics and microprocessor- • Electrical capacitance principle, continuous
based devices for soil-moisture measurement are measurement of soil moisture over multiple
available for scientific water management in agro- depths in root-zone.
ecosystems. Some of the devices are based on • Easy installation, data download options for
electrical impedance, infrared thermometry and retrieving data in the field or remotely.
time-domain reflectometry. Salient features of five • Provides information on crop water use and
such devices are given below: water management in root-zone, facilitates
1. Gro-Point GP-ERS Moisture Sensor and decisions on how much and when to irrigate.
Irrigation Management System (ESI
Environment Sensors Inc., Canada, These devices should be used for scientific
web site : www.esica.com ). management of water in agro-ecosystems to make
• Soil moisture range: 5 – 50 % (volumetric) +/- efficient use of water and to minimize problems like
1%. water logging, salinity built up, non-point
• Rechargeable battery or mains operated. contamination (see Appendix , Fig. 2 (a), (b), (c)
• Available with hand-held display or with data and (d) for photographs of some soil-moisture
logger. devices).
• Intelligent Irrigation System, with a set of
sensors, computer, 3.0 IT ENABLED SUPPORT SYSTEMS
software and irrigation controller. FOR OPTIMUM UTILIZATION
Use of Crop Simulation Models, Weather
2. Moisture-Point, Multi-Probe Sensor MP-917 data and Knowledge Base(s):
(ESI Environment Sensors Inc., Canada, • To select appropriate crop and crop variety
web site: www.esica.com ). suitable to agro-climatic pattern, and switch to
• Soil moisture range : 0 – 50 % (volumetric) +/- less water-dependent crops.
1.5%. • To decide about the date of sowing, duration of
• A single probe gives moisture profile. crop.
• Rechargeable battery or mains operated. • To decide about the irrigation inputs to crop by
• LCD display or datalogger or RS-232 with monitoring soil-moisture and crop-water stress,
PC. to decide when and how much to irrigate, and
to optimize utilization of water by using
3. Irrometer-Tensiometer Probe (Irrometer efficient systems like sprinkler, drip and trickle
Company, USA, irrigation.

7
• To apply fertilizer to crops through irrigation Population Reports, Series M, No. 14.
water by computer-controlled fertigation Population Information Program, Johns Hopkins
techniques. School of Public Health, Baltimore, December
• To adopt controlled environment farming 1997.
wherever easily feasible: This provides • United States Department of Agriculture. ARS
monitoring and control of lighting, humidity, National Program # 201 on Water Quality and
temperature, CO2 level, irrigation, nutrients Management : Component I – Agricultural
supply, chemical treatments, etc. watershed management, Component II –
• To adopt a GIS coupled soil-water-balance Irrigation and drainage management,
computation system to calculate the available Component III – Water quality protection and
residual soil-moisture for its better utilization. management, 1998 – ongoing. <
www.nps.ars.usda.gov >
4.0 CONCLUDING REMARKS • Li, F., S. Cook, G. T. Geballe and W. R.
Water is a very valuable resource. There are Burch. Rainwater Harvesting Agriculture: An
no serious efforts to gain water by practices like integrated system for water management on
rainwater harvesting, watersheds and mini-ponds. rainfed land in China’s semiarid areas, AMBIO
Rainwater harvesting should be made mandatory. – Journal of Human Environment, Vol. 29, Issue
Sequential water use (reuse, recovery and recycling 8, December 2000, pp. 477-483.
of waste waters) should be planned wherever • Gleick, P. H. The World’s Water 2000 - 2001:
possible so that the load on fresh water can be The Biennial Report on Freshwater Resources.
reduced. Water’s presence in agro-ecosystems Island Press, Washington, DC, 2000.
should be treated on a holistic approach, and by • Rijsberman, F. and D. Molden. Balancing water
employing scientific management tools it should be uses: water for food and water for nature
judiciously used. For agriculture, an integrated (Thematic background paper), International
water management practice consisting of three main Conference on Freshwater, Bonn, Germany, 3-
components – rain water harvesting, water-saving 7 December 2001.
micro-irrigation, and highly efficient crop • Smajstrla, A.G., B.J. Boman, D.Z. Haman, F.T.
production – should be adopted. Conservation of Izuno, D.J. Pitts and F.S. Zazueta. Basic
water should be taken as a way of life and widely irrigation scheduling in Florida < http://
adopted. edis.ifas.ufl.edu/AE111 > Bulletin # 249,
Agricultural and Biological Engineering
SELECTED READING Department, Cooperative Extension Service,
• Goodchild, M.F., B.O. Parks and L.T. Steyaert Institute of Food and Agricultural Sciences,
(Eds.). Environmental Modelling with GIS. University of Florida, Gainesville, 2002.
Oxford University Press, New York, 1993. • Fahimi, F.R., L. Creel and R.M. De Souza.
• Berkhoff, J. A Strategy for Managing Water in Finding The Balance: Population and Water
the Middle East and North Africa. World Bank, Scarcity in the Middle East and North Africa.
Washington, DC, 1994. Population Reference Bureau, Washington, DC,
• Bian, F., Z. Sha and W. Hong. An integrated 2002.
GIS and knowledge-based decision support • Simonne, E. and G. Hochmuth. Irrigation
system in assisting farm-level agronomic scheduling as a means of applying the right
decision-making. J. Geogr. Syst., 1995, 3, pp. water amount and monitoring soil moisture for
49-67. vegetable crops grown in Florida in the BMP
• Soil-Moisture Systems. ESI – Canada < era. Document # HS909, Horticultural Sciences
www.esica.com > , Irrometer – USA Department, Cooperative Extension Service,
< www.irrometer.com > , Sentek – Australia < Institute of Food and Agricultural Sciences,
www.sentek.com.au > . University of Florida, Gainesville, 2003 < http:/
• Hinrichsen, D., B. Robey and U. D. /edis.ifas.ufl.edu/HS166 >
Upadhyay. Solutions for a Water-Short World. • Rijsberman, F. Sanitation and Water, In: Global

8
crises, global solutions (Ed. - B. Lomborg), 2. Soil-Moisture Probes :
Cambridge University Press, Cambridge, 2004,
670 p.
• IWMI. Beyond more crop per drop (Note
prepared by F. Rijsberman and D. Molden for
the 4 th World Water Forum, Mexico, 16-22
March 2006), International Water Management
Institute, Sri Lanka, Press release, 17 March
2006.

APPENDIX

1. Rainfall Facts : Percentage of Rainfall (a) Soil-Moisture Probe for moisture measurements in the
consumed to support direct and indirect human root zone of a crop (Sensors are mounted on a screwable
insert )
uses of water (Source: IWMI, Sri Lanka)
System / Uses % of Rainfall
Food – irrigation 2
Food – rainfed 4
Domestic & industry 1
In-stream ecology 8
Flood runoff 27
Permanent grazing 18
Grasslands 11
Forests & woodlands 17
Arid lands 5
All others 7
Total 100
(b) Tensiometer type soil-moisture probe.

(d) Soil-Moisture Probe working on impedance


principle.

[Note : Photographs of the probes from websites / product


(c) Sentek Soil-Moisture Probe working on literature. Disclaimer: No preference to any particular firm
capacitance principle. by the authors].

9
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

3. Rainwater Harvesting Techniques


* Dr. K. A. Patil ** G. K. Patil

ABSTRACT
Water is our most precious natural resource and something that most of us take for
granted. We are now increasingly becoming aware of the importance of water to our survival
and its limited supply. The human beings require water for various purposes. The most part
of the earth surface i.e. about 71 % is covered by water. Out of total volume of water
available on the surface of the earth 97 % is saline water, 2 % water is in the form of ice
and glaciers and only 1 % is fresh and potable water. India is well endowed nations in the
world in terms of average annual rainfall. It is unbelievable but it is true that Cherapunji
which gets 11000 mm annual rainfall still suffers from serious drinking water shortage.
Though India’s average annual rainfall is 1170 mm; in the deserts of western India it is as
low as about 100 mm. Hence, it is necessary to opt for rainwater harvesting measures for
fulfillment of water requirement.

INTRODUCTION harvesting can play important role for solving the


India is one of the developing countries. Due water problems.
to faster industrialization and urbanization and
increase in population water demand is increasing WHY RAINWATER HARVESTING?
day by day. Rainfall in India is highly irregular. Most Rainwater harvesting means the activity of
of it is concentrated during a few months of the year direct collection of rain water which can be
and maximum amount flows away resulting in poor recharged in to the ground water to prevent fall of
recharge of ground water. There is significant spatial ground water level or storing in surface or
imbalance in water resource available and water underground water tank. It is most suited in today’s
demand. Therefore, it is becoming necessary to context due to following reasons.
bring water from distant places increasing the cost 1. It is the most scientific and cost effective way
of conveyance. It is also a common observation that of recharging the ground water and reviving the
underground water table is depleting due to water table.
uncontrolled extraction of water. The state of 2. It offers advantage in water quality for both
Maharashtra covers an area of 307,713 square km irrigation and domestic use.
and supports a population of 82 million. Over half 3. It provides naturally soft water and contains
of this population is in rural area which faces almost no dissolved minerals or salts, arsenic
problems related to water. Conventional sources like and other heavy metals.
open well, bore well and piped water supplies have 4. It can be done at individual as well as in a
failed due to depleting water tables, poor water community level. This way we can be self
quality and high cost involved in operation and sufficient in terms of domestic water
maintenance. Every year a great amount of water requirements and not just dependent on the
is being lost that falls on terraces, all of which finds actions initiated by government or any other
its way to the storm water drains. Rain water local body.

* Lecturers in Civil Engineering Dept; Govt. College of Engineering, Aurangabad (M.S.) 431 005

10
Collecting rainwater as it falls from the sky 2. Utilization of Rainwater for Recharging Pit
seems immensely sensible in areas struggling to Where there is no well or bore well in the
cope with potable water needs. Rainwater is one of house, total rainwater falling on the open plot can
the purest sources of water available as it contains be recharged by making recharge pit. Water flowing
very low impurities. Rain water harvesting systems out of the plot can be directed to this pit. This pit
can be adopted where conventional water supply may get filled 10 to 15 times in one monsoon and
systems have failed to meet people’s needs. can recharge water up to 200 m3. This method is
effective in the area where permeability of soil is
COMPONENTS OF RAINWATER more. The capacity of the pit may be taken up to 10
HARVESTING STRUCTURE m3. The percolation of water through this pit of the
All rainwater harvesting structures will have three order of 200 m3 per annum is possible. The cost of
basic components: this structure may come about Rs 7000.
1. Catchment area i.e. the surface area utilized for
capturing the rainwater. 3. Utilization of Rainwater for Well Recharging
2. Collection device, like tanks or cisterns or Rainwater flowing in the farm is diverted to
percolation pits used for collecting or holding a water collecting tank of size 6 m x 6 m x 1.5 m
the water. near well and a small filter pit of size 1.5 m x 1.5 m
3. Conveyance system i.e. the system of pipes or x 0.6m is made at the bottom of large pit. Otherwise
percolation pits through which water is suitable pit may be excavated depending upon the
transported from the catchment area to the availability of space near well. Fig.2 shows details
collection device. regarding recharge of open well by runoff from farm.
Filter pit is filled with sand, pebbles larger than 20
METHODS OF RAINWATER HARVESTING mm and pebbles/boulders larger than 75mm pebbles
There are different ways by which rain water is filled in three equal layers and connected to the
harvesting is carried out. Some of the important well by 150 mm diameter PVC pipe and this pipe
methods are discussed one by one as discussed in projects 0.5 to 1.0 m inside the well. The capacity
coming paragraphs. of the water tank may be taken about 50 m3. The
percolation of water 400 to 1000 m3 per year is
1. Utilizing Rainwater for Dewas Roof Water possible through this structure.
Filter
Dewas is the name of the city located in 4. Utilizing of Rainwater for Bore well
Madhya Pradesh. This roof water filter is first Recharging
practiced at Dewas and hence the name Dewas roof Arrangement of bore well recharging is as
water filter. Fig.1 shows details of Dewar roof water shown in fig. 3. A six metre diameter collecting pit
filter. It can be made easily using sand pebbles of of 1.5 m depth is excavated around the bore well
different sizes. In this two caps are provided as T1 casing pipe. Another small pit of 1.5 m x 1.5 m x
and T2. Keep the cap T1 and T2 always closed. The 0.6 m depth is made at the bottom of large pit and
T2 is used for periodical back washing of filter and filled with filter media. A 75 mm diameter PVC pipe
cap T1 is used for backwash drainage. Small pebbles is connected to the bore well casing pipe after first
of size 6 mm are on entry side of rainwater. Use of layer of 75 mm pebbles. An inverted elbow is
medicine for water purification is made through cap connected to the pipe.
T2. Do not recharge rainwater for first two days in
rainy season. Keep the roof always clean, especially 5. Utilizing Roof Water to Recharge Trench
in rainy season so that quality of rain water falling The roof water collected can be recharged
on roof is not deteriorated. The cost of this roof through recharge trench. Water can be recharged
filter excluding connecting pipe is about Rs 800. throughout the year either by using used water or
For average condition in Maharashtra, from 100 rainwater. This recharge trench may get filled many
square metres roof area about 50 m3 of water can times as per availability of used or rain water. This
be percolated through this filter. method is effective in the area where permeability

11
of soil is more. The capacity of the trench may be second sand filter surrounding the slotted section of
taken up to 20 m3. The percolation of water through the well at the top prevents the remaining suspended
this pit of the order of 100 to 200 m3 per annum is material entering the well. Beyond this is a coir
possible. The cost of this structure may come about wrapping as a final protective filter before water
Rs 5000. enters the well. The rate gradually decreases due to
setting of slit at the top. Every year, after the rainy
6. Utilizing Surface Rainwater to Recharge Tube season about one meter of the sand at the filter bed
well has to be replaced. Every year the well is developed
Depleted aquifers are directly fed with surface with a compressor once immediately after the
rainwater by using a recharge tube well so that storage structures become empty because the water
recharge is fast and evaporation and transit losses level is shallow immediately after the monsoon and
are zero. development is effective.
A typical recharge tube well is designed as During pumping when the water is clear, it
follows : may be allowed on the filtered bed so that it takes
1. A borehole of 50 cm diameter is drilled to the down the slit accumulated in the filter bed into the
desired depth. well which is being developed. Through this method
2. A 20 cm diameter casing i.e. outer pipe of the the entire filter bed also gets cleared of the silt during
bore well is designed by providing slotted the time of infiltration.
perforated sections against aquifers.
3. The depth of the recharge tube well should be 7. Utilizing Roof Water to Collect into the Storage
about 30 metre below the water table in the area. Tanks
4. The annular space between the borehole and Rainwater from the roof surface is drained
the pipe is filled with good gravel and developed through gutters into storage tanks. To prevent
with a compressor till it gives clear water. To contamination and dust to flow into the storage tanks
stop the suspended solids from entering the there is a provision of a hand movable gutter
recharge tube well, a filter mechanism is connection which can be manually moved to divert
provided at the top. the water out. The rooftop is used as the collection
5. A pit of dimensions 6 m x 6 m x 6 m is dug with device. Guttering generally made of PVC is used to
the tube well at the center. transport the rainwater from the roof top to the
6. This pit is filled with small rounded boulders, storage tanks. Storage tanks may be either above or
stone chips and sand in layers with boulders at below the ground and should be properly covered.
the bottom and sand at the top. In apartments more than one storage tanks can be
7. The top one metre of the casing assembly in used and they can be interconnected through
this pit is filled with sand. The top of the casing connecting pipes. The storage tanks should have
pipe is provided with a cap which is about 600 provision of an adequate enclosure to minimize
mm below the sand bed to prevent suspended contamination from human, animal or other
material from entering the well. environmental contaminants. The end of the gutter,
8. In order to release the air present in the casing which connects the storage tank, should be attached
assembly during the percolation process of with a filter to prevent any contaminants to get into
floodwater, the air vent is provided through a the storage tank. It is also advisable to drain the
75 mm diameter pipe connected to the first flow to get rid of the dust and contaminants
recharging tube well within the top 600 mm from the roof top.
through a reducer tee of dimensions 200 mm x
75 mm. The air releasing pipe is then extended CASE STUDY OF RAIN WATER
to one of the banks where the vent is HARVESTING FOR BUILDING IN URBAN
constructed. AND VILLAGE AREA
Rain water harvesting system for annexure
When flood water filters through the sand, building of Govt. College of Engineering,
most of the suspended materials are filtered out. The Aurangabad is being considered for study purpose.

12
The Government Engineering College is located in III) Plumbing cost
Marathwada region of Maharashtra State. The a. PVC pipe 6" size total length 200 m @ Rs
average annual rainfall of Aurangabad town is 100/- per m = Rs.20000/-
around 700 mm/year. The population of the city is b. PVC pipe 4" size total length 120 m @Rs 85/-
more than 10 lakh. Presently the water is supplied per m = Rs 10200/-
to the town by Municipal Corporation, Aurangabad. c. Labour charges (Lump sum)
Considering the capacity of water treatment plant, = Rs 20000/-
the water is supplied to town on alternate day. d. PVC pipe accessories = Rs 10000/-
The institute needs water about 350 m3 per
day. In last few years it is observed that the ground IV) Tube Well 100 m deep and 2 H.P. pump
water level of the town is being depleted. It is = Rs.30000/-
essential to conserve the rainwater not only in the Total Expenditure = Rs142680 /-
city itself but also in areas surrounding to The total cost of rain water harvesting system
Aurangabad. No one can neglect the importance of project is Rs.142680/-
rainwater harvesting. According it is proposed to
collect roof water from at least ten hoses from each Rain water harvesting system for village
village. It is also proposed to collect rainwater from community
roof of Annex building of this institute. If this roof This system is designed for the village
top rain water harvesting scheme is implemented community situated in locality where there is
all civil engineering students from this institute will scarcity of water. The annual rainfall is 650 mm per
have a role model. These students will see the system year. The water is supplied by panchayat/local
and in future they will be motivated to implement authority alternate day. Incase of summer season
roof water harvesting system elsewhere. The the water is supplied by tankers. So it is proposed
tentative estimate is as given below. to conserve the rain water by allowing it to percolate
so as to meet underground water. It is proposed to
Estimate for rain water harvesting system for conserve rain water collected on top of every house
annex building and common rain water harvesting system is
Area of building : 2159.78 m2 designed for group of 10 houses having approximate
Perimeter of building : 335.45 m area of 70 m2 each
Average annual rainfall at Aurangabad : 700 mm
Coefficient of runoff : 0.8 Estimate for rain water harvesting system for
Quantity of water to be harvested per year : village community
1209.47 m3 Area of group of houses : 700 m2
Requirement of soak pit : 6 m x 6 m x 1.5 m (Two Perimeter: 340 m
numbers) Average annual rainfall: 650 mm
Coefficient of runoff: 0.8
I ) Cost of excavation : 2 x 54 m3 x Rs.60/- Quantity of water to be harvested per year: 364 m3
= Rs. 6480/- Requirement of soak pit: 3 m x 3 m x 2 m

II) Cost of material for filling of soak pit I) Cost of excavation : 18 m3 x Rs.60/-
a. 75 mm to 100 mm size aggregate = Rs. 1080/-
= Rs. 12000/-
b. 15 mm to 25 mm size aggregate II) Cost of material for filling of soak pit
= Rs. 12000/- a. 75 mm to 100 mm size aggregate
c. Sand = Rs. 8000/- = Rs. 2500/-
d. Protection wall with perforation b. 15 mm to 25 mm size aggregate
= Rs 8000/- = Rs. 2500/-
e. Labour cost for filling material ( Lump sum) c. Sand = Rs. 2000/-
= Rs. 6000/-

13
d. Protection wall with perforations failing on his roof, plot, and farm and recharges it
= Rs 2000/- under ground. Two cases of roof top water
e. Labour cost for filling material harvesting for urban and rural area have been
= Rs. 5000/- considered in the present study. Similarly for other
building roof top rain water harvesting can be
III) Plumbing cost implemented. In fact there is no village and
a. PVC pipe 4" size total length 200 m @Rs 85/- habitation in India that cannot meet its basic drinking
per m = Rs.17000/- and cooking needs through rainwater harvesting
b. Labour charges (Lump sum) techniques.
= Rs 8000/-
c. PVC pipe accessories = Rs 6000/- REFERENCES
Expenditure for one unit of ten houses 1. Gawai A.A. and Aswar D.S. (2006) “Towards
= Rs 46080/- Self reliance for Water Needs through Rain
Water Harvesting” Conference on ‘Engineering
CONCLUSION Technology for Efficient Rain Water Harvesting
Water is essential element of life. Everyone and Soil Conservation’, S.G.G.Nanded, 29-30
knows that, if we do not harness available sources May 2006.pp. 1-7
of water and use them judiciously with proper care 2. Kaushal Kishore (2004) “Rain Water
the problem of water scarcity is going to be serious. Harvesting”, Journal of Civil Engineering and
Irrespective of fast development in all fields of Construction Review, May 2004, pp.42-48
science there can be no substitute to water. Hence, Magar R.B. and Waghmare S.T. . (2006) “Rain
it is necessary to opt for various water harvesting Water Harvesting” Conference on ‘Engineering
measures. It is the responsibility of government Technology for Efficient Rain Water Harvesting
organization as well as individual to harvest each and Soil Conservation’, S.G.G.Nanded, 29-30
drop of water falling on earth surface. For this, it is May 2006.pp. 44-51
necessary that each person collect the raindrops

14
15
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

4. Harvested Rainwater for Drinking


*Dr. N. Balasubramanya

Abstract
It is clear from the World water quantity that out of total available water, only 0.3%
is available for human consumption. But today even this is getting polluted due to human
activities like mining, industrialization has created acute shortage of potable drinking water.
Rain water harvesting is one of the most ancient and easy methods that can be adopted at
urban and rural level efficiently.
The aim of this study is to investigate the possibility of using harvested rainwater as
a source of drinking water without causing any health risk. This can be achieved by adopting
suitable storage technique efficient and economical treatment methods.
Roof harvested rainwater samples were collected from five different places of
Bangalore during October 2005. The water samples were collected and stored in good
grade plastic containers and were subjected to periodical treatments (like chlorination,
solar disinfections and use of silver nitrate) and tests fro and use of silver nitrate and tests
for physical chemical and Biological parameters up to May 2006 as per IS 10500:1991.
All the above treatment methods suggested proved to be highly effective in reducing
the colonies fro an initial value of around 300 to zero.

Introduction increases due to increase in the population. Hence,


For centuries world has relied upon rainwater the most effective way to obtain fresh drinking water
harvesting to supply water. Rainwater harvesting is to harvest rainwater. Rainwater harvesting system
promotes self sufficiency and fosters an appreciation is inherently simple in form, and can often be
for water as a resource. It saves money, saves other assembled with readily available materials by
resources of water, reduces erosion and storm water owners, builders with a basic understanding of the
runoff and increases water quality. plumbing and construction skills.
Rainwater can provide clean, safe and reliable The present investigations was proposed with
water for drinking so long as the collection system a vision to overcome the scarcity of drinking water
is properly constructed and maintained and treated during the non – rainy seasons such that it gives
appropriately for its intended use. easy and economical solution that can be adopted
Rainwater harvesting means capturing rain both in urban and rural areas.
where it falls or capturing the runoff in a village or
town and taking all precautions to keep it unpolluted. Sample Collection and Storage
One third of world’s population will Rainwater samples were collected from five
experience severe water scarcity by the end of this different places of Bangalore during October 2005.
century. In rural areas, the water may not be fit for The samples were stored in good grade plastic cans.
drinking due to the polluted water bodies, due to The above samples were tested for physical,
contaminated ground water and also due to acute chemical and microbiological parameters. Table 1
water scarcity. In urban areas, water demand gives the experimental finding.

* Professor, Dept. of Civil Engineering, M.S.Ramaiah Institute of Technology, Bangalore – 54

16
Table 1 : Experimental Results of Physical, Chemical & Biological Parameters

Sample Date of Expt Turbidity pH Do Hardness Chloride Alkalinity Acidity


NTU mg/l of mg/l mg/l mg/l of mg/l of
CaCO3 CaCO3
1. Banashankari 14/08/05 4.6 7 7.8 56 13.96 86 06
2. MSRIT 17/01/06 6.3 8.4 7.7 22 16 30 08
3. Shivajinagar 21/11/05 8.3 8.11 8 58 13.2 40 06
4. Vijayanagar 18/01/06 11.9 7 7.7 58 21.3 46 12
5. Vidyaranyapura 12/12/05 7.3 8 8.1 46 12 18 14

A detailed study of Table 1 reveals that both sis hours. Such an exposure increases the
the physical& chemical parameters are very much temperature of water and also gives an extended
within the limits for drinking water standards dose of solar radiation killing the microbes.
specified by WHO (1984) and IS 10500:1991.
However, the colony counts were quite significant Chlorination
in all the five samples. Chlorination is one of the most reliable
Therefore, it was decided to emphasize more methods of disinfecting drinking water. In this
on the microbiological contaminations and suitable method the calculated amount of chlorine is added
treatment methods to make the rainwater fit for to one litre of water sample for a specified tune and
drinking. thereafter tested for the coliform counts.

Treatment methods and Results Silver Nitrate


All the five rain water samples were subjected Silver nitrate is very small doses of 0.05 to
to the following treatments. 0.1 mg/l helps in disinfecting the drinking water.
• Solar disinfection Silver nitrate in smaller doses does not impart any
• Chlorination taste, odour or produces any harmful effect on
• Using Silver nitrate human body.
• Combination of the above method.
Combination of the above methods
Solar Disinfection In order to investigate the effectiveness of the
Solar disinfection is a process where in treatment methods following combinations were
microbes are destroyed through temperature and tried.
ultra violet radiation provided by the fun. a) Chlorine + Solar disinfection
Water is filled either in a clean transparent or b) Silver nitrate + Solar disinfection.
painted (Black) bottle oxygenated by shaking,
followed by topping up. It is placed in the horizontal Tables 2,3 & 4 presents the details of coliform
portion on tope exposed to direct sunlight for about counts of the above specified treatments.
Table 2: Coliform Count (At room temperature)
Sample Date of Collection Date of experiment Coliform Count/100ml (Average of 3 tests)
Chlorination Silver Nitrate
1. Banashankari 20/10/05 17/05/06 0 0
2. MSRIT 25/10/05 17/05/06 0 0
3. Shivajinagar 25/10/05 17/05/06 0 0
4. Vijayanagar 25/10/05 17/05/06 0 0
5. Vidyaranyapura 28/10/05 17/05/06 0 0

17
Table 3 : Coliform Count (Solar disinfection using transparent bottle)

Sample Date of Date of Expt Coliform count / 100ml


Collection Transparent Bottle Chlorination Silver nitrate
(Average of 3 tests)
1. Banashankari 20/10/05 17/03/06 40 0 0
2. MSRIT 25/10/05 24/03/06 38 0 0
3. Shivajinagar 25/10/05 02/04/06 40 0 0
4. Vijayanagar 25/10/05 15/04/06 35 0 0
5. Vidyaranyapura 25/10/05 21/04/06 28 0 0

Table 4 : Coliform Count (Solar Disinfection using black painted bottle)

Sample Date of Date of Expt. Coliform Count / 100 ml (Average of 3 tests)


Collection Black Bottle Chlorination
1. Banashankari 20/10/05 17/03/06 2 0
2. MSRIT 25/10/05 24/03/06 2 0
3. Shivajinagar 25/10/05 02/04/06 3 0
4. Vijayanagar 25/10/05 15/04/06 2 0
5. Vidyaranyapura 28/10/05 21/04/06 0 0

Careful study of Table 2 depicts that Conclusions


chlorination and Silver nitrate in very small dosages Rainwater collection is easy and economical
are very effective even at room conditions, justifying both in rural and urban areas.
their selection. Rainwater harvested during Oct 2005, tested till
Detailed study of Table 3 indicates that solar May 2006 without much changes in physical
disinfection using a transparent bottle is not very properties like colour, odour & turbidity, inspite
effective in reducing the coliform counts. However, of the fact that they were from various sources
addition of chlorine and silver nitrate have proved and stored in normal food grade plastic
to be highly effective, further strengthening their containers.
selection as disinfectants. All the treatment methods suggested are highly
Finally from Table 4, it can be seen that solar effective in reducing the microbiological
disinfection using a black painted bottle has yielded contamination and also viable both at rural and
in a more effective disinfection, the coliform counts urban levels.
have very significant, reduced. The reason being Rainwater harvesting and its treatment is
that a black bottle or body absorbs more heat, which affordable by individuals and will be highly
enables in destroying the bacteria. In the present useful in drought prone areas.
investigations is was observed that the water
temperature in the bottles recorded a temperature Future
around 500 C. It is suggested that similar investigations are
It is also very interesting of disinfection to made on a number of samples collected from
note that the chlorination method has established different places, stored under different conditions.
its supremacy.

18
Acknowledgement Proe. 23rd WEDC Conf. Sep 1-5 1997, Durban
The author wishes to thank the management S.Africa.
of M.S.Ramaiah Institute of Technology, Bangalore 6. Sharma S.K. and Jain S.K, Proceedings of the
560054 for all the encouragements & inspiration International Conference on Management of
provided for the study. Also many thanks are due to Drinking water resources – central leather
Mr.Sunil Hegde, Mr.Anantha Padmanabha & Research Institute. Anna University & Tamil
Mr.Vinay Final Year B.E. Students for their help Nadu Water supply & Drainage, Board,
during the course of the experimental investigations. Chennai, 1997, pp129-138.
7. Wegelin M & Sommer B, Solar water
References : disinfections (SODIS) – Destines for world
1. Bell, F.A.Jr, D.L.Jerry, J.K.Smoth, and wide use. Water lines, Vol 16, No.3, IT
S.C.Lynch, Studies on home water treatment Publications, London 1998.
systems. Jr.Am water works Assoc. 75:104-107- 8. Winter bottom, Daniel “Rainwater Harvesting,
1984. An ancient technology – cisterns in
2. Davies C.M., and Evison L M “Sunlight & the reconsidered, Landscape Architecture”, April
survival of entropic bacteria in natural water .2000 pp 42-46.
Journal of applied Bacteriology 7, 265-274- 9. White G.C, Hand Book of chlorination &
1991. Alternative Disinfectants, Johns Wiley & Sons,
3. Drinking water standards, www.epa.gov/safe Inc, New York 1999.
water/md.html. 10. Wolfe R.L., 1990, “Ultraviolet Disinfection of
4. I.S. 10500:1991 “Drinking Water Standards”. Possible water” Env.Sci and Technology 24(6),
5. Jalbottt R “Rural water supply and Sanitation 768-773, 1990.
program in India – Goals, roles & innovation.

19
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

5. Rain Water Harvesting and Ground Water Recharge


*Madhaorao Bajirao Deshmukh

1.1 Water is an essential natural resource for By adopting water harvesting, an additional 160
sustaining life and environment. The available water BCM shall be available for use.
resources are under pressure due to increasing
demands and the time is not far when water, which 3.2 Ground water level in some areas are falling at
we have always thought to be available in abundance the rate of one meter per year and rising in some
and free gift of nature, will become a scarce other areas at the same rate.
commodity. Conservation and preservation of water You can capture and recharge 650000 liters of
resources is urgently required to be done. Water rainwater from a 100-sq. meters size rooftop and
management has always been practiced in our meet drinking and domestic water requirement of
communities since ancient times, but today this has family of four for 160 days.
to be done on priority basis. The number of wells and borewells for
irrigation in the country has increased five fold to
1.2 India’s population has recently crossed the one 175 lacks during past fifty years.
billion mark, with an ever-increasing population, our There are 25 to 30 lack wells and borewells for
country faces a serious threat to the management of drinking, domestic and industrial uses.
her water resources as the gap between demand and More than 80% of rural and 50% of urban, industrial
supply widens. and irrigation water requirement in the country are
met from ground water.
2.1 In our villages and cities, down the ages, people
have developed a wide array of techniques to harvest 3.3 Causes Of Fall In Ground Water Levels
rainwater, which are simple, efficient and cost • Over exploitation or excessive pumpage either
effective. There is a tendency to ignore these locally or over large areas to meet increasing water
traditional water-harvesting systems. We should demands.
draw upon the wisdom of our ancient life sustaining • Non-availability of other sources of water.
systems and through better management, conserve Therefore, sole dependence is on ground water.
our precious water resources. • Unreliability of municipal water supplies both
in terms of quantity and timings, driving people to
2.2 Harvesting of rainwater is of utmost important there own sources.
and the ministry of water resources is embarking on • Disuse of ancient means of water conservation
such programme. A judicious mix of ancient like village ponds, baolis, percolation tanks and
knowledge, modern technology, public and private therefore, higher pressure on ground water
investment and above all, people’s participation will development.
go a long way in reviving and strengthening water
harvesting practices through out the country. 3.4 Effects Of Over Exploitation Of Ground
Water Resources
3.1 Ground Water Resources: - Annually • Drastic fall in water levels in some area
replenishable resources are assessed as 432 billion • Drying up wells/ borewells
cubic meters (BCM) • Enhanced use of energy

*B.Sc., B.E. (Hon), AMICE (USA), Ex- Superintending Engineer, 54, Tatya Tope Nagar, Nagpur

20
• Deterioration in ground water quality • Benefiting in the water quality
• Ingress of sea water in coastal areas. • Arresting sea water ingress
• Assuring sustainability of the ground water
4.0 Method And Techniques Of Rain Water abstraction sources and consequently the village and
Harvesting town water supply system
• Roof – top rain water harvesting and its • Mitigating the effect of droughts and achieving
recharge to underground through existing wells and drought proofing
borewells or by constructing new wells, borewells, • Reviving the dying traditional water harvesting
shafts etc. structures and their rehabilitation as recharge
• Capturing and recharging city storm water run structures.
off through wells, shafts, storm water drains. • Effective use of lack of defunct wells and
• Harnessing run off in the catchment by tubwells as recharge structure
constructing structures such as gabions, check dams, • Up gradation of social and environmental status
bhandaras, percolation trenches, sub-surface dykes etc.
etc.
• Recharging treated and industrial affluent 7.0 Proposed Policy Measures For Rain Water
underground by using it for direct irrigation or Harvesting
through ponds, basins or wells etc. • Provides at least one roof-top rain water
harvesting structure for every 200sq. meters plot in
5.0 Objective Of Rain Water Harvesting urban areas.
• Restore supplies from the aquifers depleted due • Revive/ rehabilitation all village ponds
to over exploitation • Subject to technical feasibility, provides at least
• Improve supplies from aquifers lacking one check dam / KT weir / Sub- surface dyke in
adequate recharge. each streamlet with catchments of 1 to 3 sq. km.
• Store excess water for use at subsequent times. • Provide all drinking water wells with a recharge
• Improve physical and chemical quality of structure
ground water • Ban construction of irrigation wells / tubewells
• Reduced storm water run off and soil erosion within a distance of 200 m or less (depending on
• Prevent salinity ingress in coastal areas. scientific criteria) of the drinking water supply well.
• Increase hydrostatic pressure to prevent/ stop
land subsidence. 8.0 Success Stories Of MAHARASHTRA
• Recycle urban and industrial wastewater etc. • In Yaval taluka, Jalgaon District, Six
• Rehabilitate the existing traditional water percolation tanks, two recharge shafts and one
harvesting structure like village ponds, percolation injection well were constructed- A total of about 546
tanks, baolis, tanks, etc ha area benefited
• With minor scientific modifications and • In Amravati District, three percolation tanks
redesigning, convert the traditional water harvesting and ten cement plugs benefiting an area of 280 ha
structure into ground water recharge facilities. and 100 ha respectively have been constructed- rise
• Use the existing defunct wells and borewells in water level up to 10 meters recorded.
after cleaning and also the operational wells as • Experiments of catchments treatment carried
recharge structures. out at Adgaon and Palaswadi in Aurangabad,
Ralegaon Siddhi in Ahmednagar and Naigaon in
6.0 Benefits Of Rain Water Harvesting Pune by Shri Anna Hazare - effort have led to revival
• Rise in ground water levels in water of streamlets and enhanced availability of ground
• Increased availability of water from wells water in the water shed.
• Prevent decline in water levels
• Reduction in the use of energy for pumping 9.0 Proposed Strategy
water and consequently the costs. • Organize Mass Awareness Programmes
• Reduction in flood hazard and soil erosion involving district administration and NGOs to

21
educate in different sections of users and to make industrial houses to be invited to participate in the
the programme demand oriented. work and adopt towns and villages and provide
• Roof-Top rain water harvesting and its recharge financial support.
underground through more than two lack existing • Government organizations to act as facilitators
but defunct drinking water and irrigation wells, or and provide technical and financial support for
by constructing new wells, borewells, Shafts, creating the demonstration facilities etc.
spreading basins etc.
• Make roof-top rain water harvesting and 10.0 Future Action Plans
recharge mandatory in all urban dwellings. • Prepare national and state level water
• Capturing city storm water run- off and harvesting perspective plans.
recharging it through wells, shafts, spreading basins, • Develop plans and implement roof-top rain
storms and water drains etc. water harvesting measures using 1,00,000 wells
• Harnessing run off in catchments by (existing, defunct and or operative wells to be used
constructing structures such as gabions, check dams, in the first instance)
bhandaras, percolation trenches, bus-surface dykes • Provide rural drinking water wells with
etc. recharge facilities- cover 1,00,000 wells
• Impounding surface run from village • Harvest and recharge city storm water in 100
catchments and water shed(s) in village ponds and towns
percolation tanks. • Revive and rehabilitate 1, 000 dying village
• Rehabilitation all ancient rain water harvesting ponds.
structures. • Design and construct 200 percolation tanks,
• Invoke legal provision, if and when required, 5000 check dams/ bhandaras and 1,000 sub surface
to regulate indiscriminate boring of wells and to dykes.
make the installation of recharge facilities mandatory • Recycle secondary treated urban waste water
• Constitute water user Association (WUA) or through aquifers at five centers.
village Beneficiary Groups (VBG) NGOs to • Identify potential aquifers in drought prone
organize the constitution of these bodies. The WUA/ areas and declare these apart as “Ground Water
VBG and NGOs to be associated with the project Sanctuaries”
right from the concept to completion stages.
• For expanding further scope of work, the Ref: - CENTRAL GROUND WATER BOARD-
MINISTRY OF WATER RESOURCES.

22
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

6. Rain Water Harvesting Tanks for Supplementing Minor Irrigation


Tanks during Drought
* Mohd. Mahboob Hussain

Introduction : development etc. Rainwater harvesting is usually


India’s total land area is 3287263 Sqkm. The classified into two types (i) harvesting for
cultivated land is 55.7% i.e., 183.09 million hectors. agriculture (irrigation) needs and (ii) harvesting for
Average annual rainfall is 117 Cm; average monsoon domestic and other needs. For irrigation needs the
rainfall is 55 Cm. The occupation of about 70% of rainwater can be harvested during rainy season by
people in India is agriculture. The population of constructing any of the following structures.
India is fed on the food production of the country. 1. Major storage reservoir
Main source of water in this country is rainfall 2. Medium storage reservoir
during monsoon season. The rainfall mainly 3. Minor storage tanks
confined in the months from June to September. But 4. Watershed development Structures, like
it is not regular and erratic with respect to both time Check dams, percolation tanks, Sunken gully pits
and place. Now a days drought and floods are the etc.,
sever hazards in different parts of our country. The Looking in to the rainfall trends in past forty
requirement of agricultural produce is expected to years it is felt that rain water above 75% P.L. should
rise steeply by 2025.Hence India must concentrate be stored for beneficial use during droughts / low
on increasing area under irrigation and improving rainfall year. In this paper it is proposed to construct
the productivity of both land and water to meet the Rain Water Harvesting Tanks for the beneficial use
needs of the population. The demand of water of water for supplementing minor irrigation tanks
increasing due to several factors such as increase in during drought years. Rain Water Harvesting is
population growth, which has led to a situation in being promoted extensively in India, particularly
which water has become a scarce resource. Hence in the Southern States.
it is very essential to harvest rainwater during rainy
season. Rainwater harvesting is the intentional Need for Rain Water Harvesting Tanks :
collection of rain water from a surface and its Since rivers occasionally swells, hence some
subsequent storage in order to supply water during countries have built oversized capacity reservoirs
the time of demand. Rain water harvesting is to store surplus water which will other wise be
essential in view of the fact that rainfall, which is a wasted in to sea. For example, Egypt had built
source of fresh water, occurs in very short spells Oswan Dam to store water about five times the yield
and runs off as a waste unless arrangements are available in Nile River. During droughts they are
made for its storing. successfully irrigating lands so that the country is
Main source of irrigation development are not vulnerable by famine. In most of the areas of
dams and canals. Other option are water harvesting semi-arid region yearly rainfall is below the normal
structure such as for ground water development, for continuous two to three years followed by a
surface minor irrigation systems, watershed normal rainfall year. The year wise monsoon rainfall

* Deputy Executive Engineer, Medium Irrigation, I & C.A.D.Department, Govt. of A.P., Hyderabad

23
for some of the rain-gauge stations of Ranga Reddy natural resource. Hence all water over and above
District in Andhra Pradesh are shown in annexure- 75% dependable yield is wasted in to sea. Since
I and graph enclosed showing rainfall variation for rainfall is a natural phenomenon, we do not know
last 40 years indicates that lot of water above 75% when and in which year rainfall will be above 75%
P.L .is wasted. More over from rainfall graphs it P.L., hence it is the need of the hour to harvest Rain
can be seen that there are number of years when water above 75% P.L. also and to utilize during the
there is rainfall more than 75 % P.L followed by a drought / low rainfall year. It is proposed to construct
low rainfall year. From graph of Monsoon rainfall Rain Water Harvesting Tanks without any canal
versus year for Medchal R.G.S, the following system with a sluice to letdown water in the down
conclusions are drawn. stream for existing minor irrigation tanks.
For one R.G.S (i.e., TANDUR) the year wise
(i) In the year 1967 there is excess rainfall over total yield available for one of the subgroup having
75% P.L. followed by a normal rainfall year 20 Sq.Miles for 40 years have been calculated. The
1968 and a low rainfall year in 1969. yield available @ 75 % PL also has been calculated
(ii) In the year 1971 the rainfall is much higher using strange’s table which works out to 255.64
than 75% P.L. followed by low rainfall year Mcft. The surplus yield available after deducting
of 1972. the yield @ 75 % PL from the total yield is also
(iii) In the year 1974 the rainfall is much higher calculated year wise. Statement showing the above
than 75% P.L. followed by low rainfall year values year wise are presented in annexure- II
of 1975. enclosed. From the statement it is observed that for
(iv) In the year 1976 the rainfall is much higher 30 years there is surplus yield available. The
than 75% P.L. followed by low rainfall year maximum surplus yield is 801.20 MCft. The
of 1977. average of surplus yield for 30 years is 267.495
(v) In the year 1978 the rainfall is much higher Mcft, but where as the 75% dependable yield is
than 75% P.L. followed by low rainfall year 255.64 Mcft. The average of surplus yield is slightly
of 1979. higher than the yield available at 75% dependability.
(vi) In the year 1983 there is flood followed by a Since every year the surplus yield may not be
normal rainfall year of 1984 and a low rainfall available so much, hence it is proposed to utilize at
year of 1985. least 50% of the yield available at 75%
(vii) In the year 1990 the rainfall is much higher dependability duly constructing Rain Water
than 75% P.L. followed by low rainfall year Harvesting Tanks. In the statement minus values
of 1991. indicates that the yield available is below the 75%
(viii) In the year 1996 the rainfall is much higher PL yield for ten years out of 40 years. Hence there
than 75% P.L. followed by low rainfall year is scope for storing this surplus yield in the proposed
of 1997. Rain Water Harvesting Tanks.
(ix) In the year 2000 the rainfall is much higher More over sometimes heavy rainfall occurs
than 75% P.L. followed by low rainfall year in one single month followed by a dry spell of 20 to
of 2001. 30 days. In such case also this excess water due to
heavy rainfall can be stored in Rain Water
From the above it can be stated that the water Harvesting Tanks and released for existing minor
above 75% P.L. can be stored in the proposed Rain irrigation tanks during dry spell so that crops can
Water Harvesting Tanks and used in the low rainfall be grown successfully.
years. Presently any irrigation project is design to The World Banks has published a report
utilize water out of the available 75% dependable “India’s Water Economy: Bracing for a turbulent
yield. Water has to be harvested, preserved and future”. In this report it is highlighted that India’s
utilized for beneficial used, as it is becoming a scarce storage capacity of 200m3 per person is too little, as

24
compared to over 5000 m3 per person in U.S.A. through natural stream with minimum conveyance
and Australia, and 1000 m3 per person in Mexico losses. The Rain Water Harvesting Tanks should
and China. It is also highlighted that the need for essentially have a sluice and a surplus weir to
storages in India will be even more in the post dispose off flood water. The sluice can be used to
climate change scenario. In India the poverty in let down water to the down stream existing minor
irrigated districts is one third of that in unirrigated irrigation tanks. The design procedure of minor
districts. Hence the proposed Rain Water Harvesting irrigation tank can be adopted for design of Rain
Tanks will increase storage capacity per person in Water Harvesting Tanks. The capacity of each Rain
India. Water Harvesting Tank can be fixed based on the
number of tanks to be taken up as Rain Water
Methodology for Proposing Rain Water Harvesting Tanks duly utilizing at least 50 % of the
Harvesting Tanks : utilization of that of minor irrigation tank designed
In a sub-group of a given sub-basin of a river for 75 % dependable water. Eg: - In a given sub-
basin there may be few minor irrigation tanks, check group if the 75% dependable water is 100 M.cft.
dams and percolation tanks which together may and the existing utilization is 80 M.cft. under
utilize 75 % dependable yield. Whenever there is existing minor irrigation tanks. Rain Water
high rainfall above 75% P.L. in the catchment, the Harvesting Tanks should be design to hold 40 M.cft.
water go waste down stream and ultimately joins of water, which is 50% of present utilization. To
sea. We may not be able to know how much surplus store 40 M.cft. of water, now propose 4 tanks of
water (above 75% P.L.) a sub-group catchment each 10 M.cft. live capacity in the upper reaches of
yields. Hence it is proposed to utilize at least 50 % streams so that this water can be utilized during
of the water utilization of that of existing tanks droughts / low rainfall year.
designed to utilize 75 % dependable water, so that
if there is failure of monsoon next year we can make Plan of operation for Rain Water Harvesting
use of this water for irrigation and avoid drought. Tanks :
The following sketch shows probable locations of Once these Rain Water Harvesting Tanks are
Rain Water Harvesting Tanks in a given sub-group. constructed, the sluices should be kept open so that
The Rain Water Harvesting Tanks should be located when it rains the water will flow down to the existing
in the initial reaches of streams, so that the stored minor irrigation tanks to fill them up to their full
water can be utilized for filling the minor irrigation tank level in the monsoon. When the minor irrigation
tanks when there is scanty rainfall and hence crops tanks are filled up the sluices of Rain Water
can be grown successfully. Harvesting Tanks should be closed so that water
can be stored in these Rain Water Harvesting Tanks.
Then depending up on the number of fillings
required ( as per design ) again water can be released
to lower existing minor irrigation tanks for their full
utilization as per hydrological clearance given . Now
close the sluices of Rain Water Harvesting Tanks
and store water up to full tank level. If there are
heavy rains again the surplus water will
automatically flow down through surplus weir. Next
year when monsoon are late, some quantity of water
from these Rain Water Harvesting Tank can be
Design of Rain Water Harvesting Tanks : released through sluices to the existing minor
Select the site of Rain Water Harvesting Tanks irrigation tanks so that farmers can take up land
such that it can feed the minor irrigation tank preparation and sowing can be done in time. Even

25
if the monsoon fails the remaining water also can be (9) There will be soil conservation in the upper
released to down stream tanks so that the crops can reaches of the catchment because of
be grown successfully. In a year when total rainfall construction of Rain Water Harvesting Tanks.
is less than normal, these Rain Water Harvesting (10) There is a need to workout surplus yields for
Tanks can be kept empty. every year for each Rain Gage Stations and
prepare model for storing water in Rain Water
Conclusions : Harvesting Tanks to utilize surplus water
(1) The concept of Rain Water Harvesting Tank optimally.
is to store water during excess rainfall year (11) As water is becoming scarce natural resource,
(above 75% P.L.) and to utilize during drought the cost of construction of Rain Water
/scanty rain fall year. Harvesting tanks should not come into way.
(2) Since Rain Water Harvesting Tanks are (12) There is a need to formulate a coherent policy
designed to store surplus water over and or strategy towards strengthening extension
above 75% P.L yield, there will not be any and technical support for Rain Water
effect on existing minor irrigation system. Harvesting Tanks for crop production.
(3) Success rate of existing minor irrigation tanks
can be ensured by regulation of water from References :
Rain Water Harvesting Tanks, thus utilizing (1) “Innovative participatory technologies for
water optimally. water shed development in drought prone
(4) Generally minor irrigation tanks are designed areas of India” by Sri. T. Hanmanth Rao,
for 150% irrigation intensity. Because of Consultant of united nation.
proposed Rain Water Harvesting Tanks in (2) “Hand book for planning water shed
upstream by storing surplus water, the management works”, Government of India,
intensity of irrigation can be increased to Ministry of water resources, CWC,
200% by supplying water for Rabi crops by December, 2000.
virtue of which food production can be (3) Paper on “Irrigation development in India”
enhanced. by Sri. Uddhao Wankede published in
(5) These Rain Water Harvesting Tank can serve proceedings of National Seminar on “
as percolation tank in upper reaches of Irrigation development India” held from 9-
catchments to improve ground water table, 10 October 2004 hosted by the Institution of
as there will be some dead storage below sill Engineers (India), Nagpur local Center.
level of sluice of that tank. (4) Irrigation manual by Illys.
(6) Because of construction of Rain Water (5) “Rain water harvesting – a case study in a
Harvesting Tanks the loss due to flood collage campus in Mysore”, by Sri. M. R.
damages can be minimized. YADUPATHI PUTTY & Sri. P.RAJE URS,
(7) Wastage of heavy surplus water in to sea can Dept. of civil engineering, National Institute
be minimized. of Engineering, Mysore published in
(8) Rain Water Harvesting Tanks also will be very Hydrology Journal of Indian Association of
much useful for flora and fauna for Hydrologist volume 28, November 3-4,
maintaining ecology of that area. September – December 2005.

26
ANNEXURE - I
Monsoon Rainfall ( in mm ) of different Rain guage stations of R.R. District in A.P
S.No Year Medchal Tandur Himayat Sagar
1 1960 N/A N/A 551.2
2 1961 N/A 909.1 571.2
3 1962 N/A 1063.6 856
4 1963 759.9 942.8 751.8
5 1964 710.3 751.5 710.8
6 1965 671.9 663.6 796
7 1966 468.2 493.1 689.4
8 1967 804.2 670.2 865.4
9 1968 663.4 652.3 440.9
10 1969 600.9 684.4 452.4
11 1970 754.9 992.9 842
12 1971 797.7 459.3 497.6
13 1972 547.8 454 221.7
14 1973 957.6 1097 633.5
15 1974 784.4 850 614.4
16 1975 566.7 1116.5 1689.6
17 1976 720.1 725.1 906.8
18 1977 584.1 480.8 568.5
19 1978 783.3 1216.6 1009.7
20 1979 440.3 585.2 564.6
21 1980 845.2 650.5 577.6
22 1981 1102.8 711.9 660.1
23 1982 862.8 665.9 564.6
24 1983 1858.5 1036.6 793.2
25 1984 673.7 651.6 595.6
26 1985 563.1 822.6 550.9
27 1986 445.9 645 586
28 1987 604.8 853.8 795.5
29 1988 933.4 961.1 741.4
30 1989 845.3 864.4 711.5
31 1990 760.4 1173 721.6
32 1991 624.8 767.4 393.4
33 1992 645.8 795.8 611.9
34 1993 767.5 697.2 479.8
35 1994 787.2 479.8 598.7
36 1995 899.9 790.8 1077
37 1996 775.8 758.6 803.7
38 1997 533.6 648.3 514.4
39 1998 988.6 1342.1 983.5
40 1999 701.3 670.7 540.8
41 2000 791.3 861.9 N/A
42 2001 589.6 N/A N/A N/A –
43 2002 629.4 N/A N/A Not Available.

27
Annexure- II
Statement showing the surplus yield beyond 75% dependability

No. Year Monsoon Yield per Total Yeild Yeild Surplus % of Surplus
Rainfall Sq.miles from Available Yeild Yeild beyond
in mm in MCft subgroup @ 75% PL 75 % PL
C.A ( 20 Sqm)
1 1961 909.1 27.25 545 255.64 289.36 113.19
2 1962 1063.6 38.566 771.32 255.64 515.68 201.72
3 1963 942.8 29.53 590.6 255.64 334.96 131.03
4 1964 751.5 17.742 354.84 255.64 99.2 38.8
5 1965 663.6 13.317 266.34 255.64 10.7 4.19
6 1966 493.1 6.479 129.58 255.64 -126.06 -49.31
7 1967 670.2 13.628 272.56 255.64 16.92 6.62
8 1968 652.3 12.783 255.66 255.64 0.02 0.01
9 1969 684.4 14.297 285.94 255.64 30.3 11.85
10 1970 992.9 33.148 662.96 255.64 407.32 159.33
11 1971 459.3 5.417 108.34 255.64 -147.3 -57.62
12 1972 454 5.255 105.1 255.64 -150.54 -58.89
13 1973 1097 41.248 824.96 255.64 569.32 222.7
14 1974 850 23.447 468.94 255.64 213.3 83.44
15 1975 1116.5 42.841 856.82 255.64 601.18 235.17
16 1976 725.1 16.322 326.44 255.64 70.8 27.7
17 1977 480.8 6.079 121.58 255.64 -134.06 -52.44
18 1978 1216.6 51.618 1032.36 255.64 776.72 303.83
19 1979 585.2 9.872 197.44 255.64 -58.2 -22.77
20 1980 650.5 12.698 253.96 255.64 -1.68 -0.66
21 1981 711.9 15.647 312.94 255.64 57.3 22.41
22 1982 665.9 13.426 268.52 255.64 12.88 5.04
23 1983 1036.6 36.404 728.08 255.64 472.44 184.81
24 1984 651.6 12.75 255 255.64 -0.64 -0.25
25 1985 822.6 21.767 435.34 255.64 179.7 70.29
26 1986 645 12.437 248.74 255.64 -6.9 -2.7
27 1987 853.8 23.691 473.82 255.64 218.18 85.35
28 1988 961.1 30.863 617.26 255.64 361.62 141.46
29 1989 864.4 24.37 487.4 255.64 231.76 90.66
30 1990 1173 47.745 954.9 255.64 699.26 273.53
31 1991 767.4 18.627 372.54 255.64 116.9 45.73
32 1992 795.8 20.213 404.26 255.64 148.62 58.14
33 1993 697.2 27.448 548.96 255.64 293.32 114.74
34 1994 479.8 6.048 120.96 255.64 -134.68 -52.68
35 1995 790.8 19.926 398.52 255.64 142.88 55.89
36 1996 758.6 18.139 362.78 255.64 107.14 41.91
37 1997 648.3 12.593 251.86 255.64 -3.78 -1.48
38 1998 1342.1 52.838 1056.76 255.64 801.12 313.38
39 1999 670.7 13.652 273.04 255.64 17.4 6.81
40 2000 861.9 24.21 484.2 255.64 228.56 89.41

28
29
30
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

7. Rain Water Harvesting and Recharging Ground Water


*R. K. Parghane *S. P. Kulkarni **A.W. Dhawale

INTRODUCTION : WATER AVAILABILITY :


Water is the most important resource of the India receives precipitation (including
entire society as a whole, since no life is possible snowfall & rain) of around 4,000 billion cubic
without water. As water, being a limited resource, metres (BCM), only 1,869 BCM is accessible water,
its efficient use is basic to the survival of the ever of which India uses barely a third. Nearly 1,179
increasing population of the world. In India, the BCM of water drains in to the sea. Region, whose
ground water is mainly used for drinking and yearly renewable freshwater availability is below
agricultural purposes. About 85% of drinking water 1,700 m3/ person is called as the water stress region.
is available through dug well, bore well, filter point And the region whose yearly availability falls below
and tube well etc. The per-capital availability of 1,000 m3 / person is termed as water scarcity region.
water at national level has reduced from about 5,177 But national figure of annual average per capita
m3 in the year 1951 to present level of 1,869 m3. water availability is 2,464m3. It shows that the
In view of this, water management is very critical country is not in the water stress range so far.
for the growth and development of any economy, However in some regions per capita availability is
more so in a large country like India which is as low as 411m3. (Kanyakumari, Pennar, Kutchh,
endowed with many large rivers, lakes and wells Kathiawar, Krishna basin, etc. )
that need to be conserved, better managed, recharged The run-off which is about 215 MHM needs
and channellised for meeting the ever growing to be arrested by making proper planning on micro
requirement of agriculture, industrial and urban level as well macro level. Microlevel means water
growth. Moreover exploitation of ground water has conservation schemes of the state governments
been taken up by millions of individual farmers which is to be implemented in every village. But on
mostly in regions where surface water is either macro level, a large chunk of water must be arrested
scarce or absent to meet their dire water needs. by programme like national river – linking.
Although this has lead to local depletion or decline Availability and utilization of water in India is
of ground water levels causing serious concern about shown in table No.1 & Fig. No.1.
rainwater harvesting & the need to recharge ground
water. The quantum of ground water so far harnessed Table No. 1
is one third of the replenishable ground water of No. Item Quantity
431 km3 a year. In the comprehensive strategy (Cu.Kms.)
needed for the conservation and development of 1. Annual precipitation volume
water resources, several factors are to be kept in (including snowfall) 4,000
view. These include the availability of water, its 2. Average annual potential flow
quality, location, distribution and variation in its in rivers 1,869
occurrence, climatic conditions, nature of the soil, 3. Per Capita Water availability
competing demands & Socio-economic conditions. (1997) 1,967
In dealing with each of these, every effort must be 4. Estimated utilizable water resources 1,122
made to make the best use of water for the survival i) Surface water resources 690
of human life, animal and plant life. ii) Ground water resources 432

*Lect.in Civil Engg., Govt. Polytechnic, Nanded **Lect.in Civil Engg., Govt. Polytechnic, Washim

31
The average annual precipitation is
400 million Hectare Metre (MHM)

Evaporates Percolates Run - off


70 MHM 115 MHM 215 MHM

Moist soils Enters into the ground water table


65 MHM 50 MHM

Fig. 1 : Details of precipitation water

RAINWATER HARVESTING AND ITS have been depicted in the Fig.No.2, Fig.No.3, Fig.
TECHNIQUES : No.4.
Rain is the ultimate source of fresh water
with the ground area around houses and buildings
being cemented, rain water which run–off from
terraces and roofs was draining into low-lying areas
and percolating into the soil and causing floods else
where.
Rainwater Harvesting is a system by which,
rainwater that collects on the roofs and the area
around buildings is directed into open wells, bore
wells, tube wells through a filter tank or in to a
percolation chamber, built specifically to serve the
purpose. The rain water can be stored in tanks and
can be recharged in to the ground to improve ground
water storage. Fig. No. 2 Roof Top Rainwater Harvesting
The storage of rainwater on surface is a
traditional technique and the structures used were
underground tanks, ponds, check dams, percolation
wells, weirs etc. Recharge to ground water is a new
concept of rainwater harvesting.
There are following three techniques of rainwater
harvesting.
a) Storing rain water for direct use.
b) Recharging ground water aquifers, from roof
top run off.
c) Recharging ground water aquifers with runoff
from ground area.
Fig. No. 3 Recharging of Bore well
The techniques of rainwater harvesting

32
Fig. No. 4 Recharging of Open well

WHY RAINWATER HARVESTING ? Following table shows how much roof


To meet our water demand, we entirely water can be harvested by considering 80%
depend upon rivers, lakes & ground water. However efficiency and according to roof top surface areas.
the rain is the ultimate source that feeds all these Roof top Area (Sq.m)
sources. The rainfall is highly seasonal and occurs Considering hypothetical case following
over a short rainy season with a very large dry calculations shows as to how much rain water can
period. As a result, there is a progressive decrease be harvested.
in the ground water level. Hence, it should be  Consider a building with a flat terrier area =
admitted that rain water harvesting is essential 125 Sq.m.
because.  Average annual gainful in the area is say 1000
i) Surface water is inadequate to meet our demand mm (40 inch)
and we have to mostly depend on ground water.  Suppose, there is no loss of water from the
ii) Due to rapid urbanization population growth terrace floor, then in one year, there will be
and industrialization, improved sanitation, rainwater on the terrace floor to a height of
living standard, infiltration of rain water into 1000mm.
the sub-soil has decreased drastically and  Height of rainfall = 1000 mm, Volume of
recharging of ground water has diminished. rainfall = 125 x 1000= 1,25,000 litres
iii) Over exploitation of ground water results in to-  Assuming that only 80% water harvested.
i) Ground water depletion. Volume of water harvested = 1,00,000 litres.
ii) Drying up of wells / bore wells.  A family of four needs 87,600 litres of water
iii) Enhance use of energy. per year. (@ 60 litres / person)
iv) Ingress of sea water in coastal area.
It is now alarming to seriously consider ARTIFICIAL GROUND WATER
about conserving water by harvesting and managing RECHARGE :
this natural resource by artificially recharging the Optimum development and sound
system. management practices are vital to the sustained use
of ground water. Ground water recharge may be
HOW MUCH RAIN WATER CAN BE increased by conservation measures and artificial
HARVESTED FROM ROOF TOP ? recharge procedures. Artificial recharge to ground
The estimation of water available from top water is a process by which the ground water
of roof (flat terrace) is worked out by multiplying reservoir is augmented at a rate exceeding that
the roof area with normal rainfall data for monsoon obtaining under natural conditions of replenishment.
period. Total quantity of rain water available from In general any man-made system or facility that adds
roof top to be used for harvesting is about 70% to water to an aquifer is an artificial recharge system.
90%, due to losses like evaporation, absorption, Artificial recharge of ground water is,
leakages etc. therefore, preferred and encouraged in the present

33
Roof Rain Fall (mm.)
top
Area 100 200 300 400 500 600 800 1000
(Sq.m) Harvested Water from Roof Top (Cum) @ 80%
20 1.6 3.2 4.8 6.4 8.0 9.6 12.8 16.0
30 2.4 4.8 7.2 9.6 12.0 14.4 19.2 24.0
40 3.2 6.4 9.6 12.8 16.0 19.2 25.6 32.0
50 4.0 8.0 12.0 16.0 20.0 24.0 32.0 40.0
60 4.8 9.6 14.4 19.2 24.0 28.8 38.4 48.0
70 5.6 11.2 16.8 22.4 28.0 33.6 44.8 56.0
80 6.4 12.8 19.2 25.60 32.0 38.4 51.2 64.0
90 7.2 14.4 21.6 28.80 36.0 43.2 57.6 72.0
100 8.0 16 24.0 32.0 40.0 48.0 64.0 80.0
150 12.0 24 36.0 48.0 60.0 72.0 96.0 120.0
200 16.0 32 48.0 64.0 80.0 96.0 128.0 160.0
250 20.0 40 60.0 80.0 100.0 120.0 160.0 200.0
300 24.0 48 72.0 96.0 120.0 144.00 192.0 240.0
400 32.0 64 96.0 128.0 160.0 192.0 256.0 288.0
500 40.0 80 120.0 160.0 200.0 240.0 320.0 400.0
1000 80 160 240 320 400 480 640.0 800.0
2000 160 320 480 640 800 960 1280.0 1600.0

days, so as to augment the natural available During wet season, the W.T. rose by, 6-4.8
underground yield for management of water supply = 1.2 m., Since 2m lowering of W.T. equals 2M.m3
systems. Artificial recharging techniques is under of water, 1.2 m rise will equal to 1.2 M. m3 of
intensive research and is being increasingly used in recharge.
France, Israel, U.K. Germany etc.
Ex.- Estimation of DIVERSION OF RUN OFF IN TO EXISTING
i) The specific yield of the aquifer and SURFACE BODIES
ii) The volume of Recharge during the wet season. Construction activity in and around the city/
Soln - town is resulting in the drying up of water bodies
Consider, the area of aquifer is 4 km2. and also reclamation of these tanks for conversion
Water pummeled out in lowering W.T. i.e. in to plots for houses has impacted urban hydrology
Volume of water drained by 6.8-4.8 = 2m is 2 M.m3 as under.
Total Volume of aquifer drained in lowering W.T. 1. Over consumption of water increases water
by 2 m demand.
= Area x 2m 2. More dependence on ground water use.
= 4x106x2m3 = 8M.m3 3. Increase in run off, decline in well yields and
fall in water levels.
Specific yield of aquifer S.Y. 4. Reduction in open soil surface area.
Specific yield, S.Y.= Volume of water drained x 100
Reduction in infiltration and deterioration of
Total volume of aquifer drained water quality.
=
2Mm3 x 100 = 25%
8Mm3

34
RECHARGING OF UNDERGROUND the permeability of the spread area and on the depth
STORAGE : of water stored, and is generally less, say of the order
In order to store the surplus surface water of 1.5m/day, though rates as high as 22m/day have
the artificial surface reservoirs are constructed by been possible.
building dams, in the summer, artificial underground
reservoirs are now-a-days developed by artificial 2. Recharge-well Methods :
recharge for storing water underground. This method consists in injecting the water
The development of such a reservoirs may be in to bore holes called recharge wells. Depending
advantageous as compared to the development of a upon the favorable condition of surface, the water
dam reservoir, because of the following reasons. is fed in to recharge wells by gravity or for increasing
i) Much pure water can be obtained from an the recharge rate, it may be pumped under pressure.
underground reservoir source. The recharge wells used are just like ordinary
ii) No space is required for building such a production wells. In fact the ordinary wells are
reservoir. many a times could directly used for recharge during
iii) The cost of building such a reservoir by the off season, when the water is not required in
recharging the aquifers may be considerably use. With this method high recharge rates can be
less than the cost of the surface reservoirs. obtained. This method is widely used in Israel.
Moreover in an underground reservoir, the Moreover, this method may help in injecting water
aquifer in which the water is stored shall itself in to the aquifers and also where it is most needed.
act as a distribution system for carrying the To avoid clogging of the well screens, the water
water from one place to another, and as such, used for recharging well should be free from
the necessity of constructing pipe lines or suspended impurities.
canals (as is required in a surface reservoir)
is completely eliminated. 3. Induced Infiltration Method :
iv) The water lost in evaporation from an This method is sometimes used for recharge
underground reservoir is much less than the is that of the induced infiltration which is
water lost from a surface reservoir. accomplished by increasing the water table gradient
v) The raising of the water table by artificial from a source of recharge. In this method, Renney
recharge may help in building pressure type wells are constructed near the river banks. The
barriers to prevent sea water intrusion in the percolating water is collected in the well through
coastal areas. radial collectors and is then discharged in to a lower
level aquifer ‘B’ for storage as Shown in fig. No.5.
METHODS OF RECHARGING : This types of well construction is very common in
The below mentioned methods are being France and is sometimes referred to as French
generally adopted for ground water recharging. system of tapping underground water.
1. Spreading Method. In addition to the above mentioned
2. Recharge-well Method. methods, the recharge to ground water is
3. Induced Infiltration Method. accomplished by using some of the structures are
a) Pits : The pits have been constructed about 3
1. Spreading Methods : metres deep & 1 to 2 metres wide filled with
This method consists in spreading the water boulders, gravel and coarse sand such types
over the surfaces of permeable open land and pits, of ponds are constructed for recharging
from where it directly infiltrates to rather shallow shallow aquifer.
aquifers. In this method, the water is temporarily
stored in shallow ditches or is spread over an open b) Trenches : Trenches are constructed
area by constructing low earth dykes (called subjected to the availability of permeable
percolation bunds). The stored water, slowly and stream at shallow depth. These trenches are
steadily, percolates downward so as to join the back filled with filter materials. The trenches
nearby aquifers. The recharging rate depends upon may be 0.5 to 1 metre wide, 1 to 1.5 meter

35
increasing the available usable water by developing
artificial rain technology. It is also of vital
importance to conserve water by practicing
economy and avoiding its wastage.
However ground water exploitation is
inevitable especially urban areas. To curtail its
reduction, a strategy to implement the groundwater
recharge, in a major way needs to be launched with
concerted efforts by various Non-Governmental and
Governmental agencies and the public at large, to
increase the water table and make the groundwater
resource, a reliable and sustainable source for
supplementing water supply needs. It is about
building our relationship with water and the
environment. Harvest rain. Learn the prestigious
value of each rain drop.

REFERENCES :
1. Dr. S.V.Dahasahasra, Dr. Y.B.Katpatal &
Dr.M.M.Mahajan, “National River –
Fig. No.5 Induced infiltration method of Linking” Journal of CE & CR, May – 2004,
recharge PP.26 – 34.
2. Eye Opener, “Rainwater Harvesting &
Recharging Ground Water” enROUTE, JUL-
deep and 10 to 20 meters long depending on DEC. 2005, Vol IX, PP. 16-17.
the availability of water. 3. Kaushal Kishore, “Rainwater Harvesting”,
CE & CR Journal, May 2004, PP.42-48.
c) Dug wells : Existing dug wells may be 4. Dr. Pranab Kumar Ghosh, “Rain Water
utilized as recharge structure and water should Harvesting – A Ray of Hope” Orissa Review,
be allowed to pass through filter media before August 2004, pp. 38-40.
storage. 5. Dr. Gauhar Mahmood & Sharshikant
Chaudhary “A Comprehensive Water
CONCLUSION - Management Plan – A Case Study of
The proper conservation, maintenance and Lakewood city, Harayana” Journal of Indian
careful use of water resources, along with Water Works Association, July – Sept. 2004,
developing additional storages may considerably pp. 219-228.
reduce the chance of water famines for further Santosh Kumar Garg, “Hydrology and Water
generations to come. In addition to these measures, Resources Engineering” Khanna Publication.
it is necessary to find out means and ways for

36
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

8. Artificial Recharge of Aquifers in Urban Setup


*Mrs. Grace Selvarani

Introduction The basic purpose of artificial recharge of


To meet the growing water supply demand, we ground water is to restore supplies from aquifers
are depending maximum on surface water, which is depleted due to excessive ground water
stored in the form of lakes and reservoirs. development.
Availability and storage of water in reservoirs and
lakes depends ultimately on yearly rainfall. If 1. Basic Requirements for Artificial Recharge
rainfall is inadequate or if there is draughts for Projects
successive years, surface water bodies get consumed The basic requirements for recharging the
and in such a case, we have no alternative than using ground water reservoir are:
the ground water. Therefore we must guard against a) Source Water Availability
the depletion or spoiling of our most valuable Before undertaking any artificial recharge
ground water storage. Natural conservation and project, it is a basic prerequisite to ascertain the
efficient use of this natural storage and at the same availability of source water for the purpose of
time making arrangements for additional recharge recharging the ground water reservoir. Availability
of ground water aquifer by one way or other, to of non-committed surplus monsoon runoff in space
replenish the used ground water becomes our and time can be assessed by analysing the monsoon
responsibility. We should make maximum use of rainfall pattern, its frequency, number of rainy days
the easily available normally wasted, local and maximum rainfall in a day and its variation in
renewable source of water that is rainwater. The space and time.
effective way to store rainwater is by allowing it to
percolate into ground by enriching ground water b) Identification of Area
storage. The artificial recharge projects are site specific
The artificial recharge to ground water aims at and even the replication of the techniques from
augmentation of ground water reservoir by similar areas are to be based on the local hydro-
modifying the natural movement of surface water geological and hydrological environments. The first
utilizing suitable civil construction techniques. step in planning the project is to demarcate the area
Artificial recharge techniques normally address to of recharge. The artificial recharge of ground water
following issues – is normally taken in following areas:
(i) To enhance the sustainable yield in areas where 1. Areas where ground water levels are declining
over-development has depleted the aquifer on regular basis.
(ii) Conservation and storage of excess surface 2. Areas where substantial amount of aquifer has
water for future requirements, since these already been de-saturated.
requirements often changes within a season or a 3. Areas where availability of ground water is
period. inadequate in lean months.
(iii) To improve the quality of existing ground water 4. Areas where salinity ingress is taking place.
through dilution.
(iv) To remove bacteriological and other impurities 2. Scientific Inputs
from sewage and waste water so that water is In order to plan the artificial recharge schemes
suitable for re-use. following studies are needed.

* Lecturer in Applied Mechanical Dept., M.H. Saboo & Siddik Polytechnic, Byculla, Mumbai - 8

37
Hydro meteorological Studies
Hydro meteorological Studies are undertaken
to decipher the rainfall pattern, evaporation losses
and climatological features. These can bring out
the extent of evaporation losses in post monsoon
period which would be helpful in designing the
storages of particular capacity with a view to have
minimum evaporation losses. The data on rainfall
intensity, number of rain-days, etc. help in deciding
the capacity and design of the artificial recharge
structures.
Hydrological Studies
For determining the source water availability
for artificial recharge, hydrological investigations Figure (1) Elements of RWH system
are required to be carried out in the Watershed/Sub-
basin/basin where the artificial recharge schemes
are envisaged. Hydrological studies are undertaken
to work out surplus monsoon run off which can be
harnessed as source water for artificial recharge.
Soil Infiltration Studies
In case of artificial recharge through water
spreading methods, soil and land use conditions
which control the rate of infiltration and downward
percolation of the water applied on the surface of
the soil assume special importance. These two
phenomena are closely related since infiltration
cannot continue unimpeded unless percolation Figure (2) Components of Rooftop RWH system
removes infiltrated water from the surface soil.
Hydro geological Studies. ‘In situ’ precipitation will be available almost at
A detailed hydro geological study providing every location but may or may not be adequate to
information on regional hydro geological rock units, cause artificial recharge but the runoff going
their ground water potential and general pattern of unutilised outside the watershed/ basin can be
ground water flow and chemical quality of water in stored/ transmitted through simple recharge
different aquifers are necessary so as to know structures at appropriate locations. Various kinds
precisely the promising hydro geological units for of recharge structures are possible which can ensure
recharge and correctly decide on the location and that rain water percolates into the ground instead of
type of structures to be constructed in field. draining away from the surface. While some
structures promote the percolation of water through
Geophysical Studies soil strata at shallow depth (e.g. recharge trenches,
The main purpose of applying geophysical permeable pavements) others conduct water to
methods for the selection of appropriate site for greater depths from where it joins the ground water.
artificial recharge studies is mostly to help and (e.g. recharge wells). At many places, existing
assess the unknown sub-surface hydro geological features like wells, pits, and tanks can be modified
conditions economically, adequately and and be used as recharge structures, eliminating the
unambiguously. Mostly it is employed to narrow need to construct any structures afresh.
down the target zone, pinpoint the probable site for A few commonly used artificial recharging
artificial recharge structure and its proper design. methods are explained here. Innumerable
Concept : innovations and combinations of these methods are
possible.

38
a. Direct surface techniques This is the most common method for artificial
Flooding recharge. In this method, water is impounded in
Basins or percolation tanks series of basins or percolation tank. The size of basin
Stream augmentation may depend upon the topography of area, a flatter
Ditch and furrow system area will have large basin. The most effective depth
. of water in basin is 1.25 m because lesser or greater
b. Direct sub surface techniques depths resulted in reduced rate of infiltration. This
Dug well/Bore well recharge method is applicable in alluvial area as well as hard
Recharge pits /Recharge well rock formation. The efficiency and feasibility of this
Percolation pit (Soak away) method is more in hard rock formation where the
Recharge trenches rocks are highly fractured and weathered.
Modified injection well
Aquifer storage and recovery 3. Stream Augmentation
Seepage from natural streams or rivers is
c. Indirect Techniques one of the most important sources of recharge of
Induced recharge from surface water source the ground water reservoir. When total water supply
. available in a stream / river exceeds the rate of
d. Recharging Techniques to arrest sea water infiltration, the excess is lost as run off. This run
intrusion off can be arrested through check bunds or widening
the steam beds thus larger area is available to spread
I DIRECT METHODS the river water increasing the infiltration. The site
selected for check dam should have sufficient
A. SURFACE SPREADING METHODS thickness of permeable bed or weathered formation
1. Flooding to facilitate recharge of stored water within short
This method is suitable for relatively flat span of time. The water stored in these structures is
topography. The water is spread as a thin sheet. It mostly confined to stream course and height is
requires a system of distribution channel for the normally less than 2 m. To harness maximum run
supply of water for flooding. Higher rate of vertical off, a series of such check dam may be constructed.
infiltration is obtained on areas with undisturbed
vegetation and sandy soil covering. 4. Ditch & Furrow system
In areas with irregular topography ditches or
2. Basin & Percolation Tanks furrow provide maximum water contact area for
recharge. This technique consists of a system of
shallow flat bottomed and closely spaced ditches /
furrow which are used to carry water from source
like stream /canals and provide more percolation
opportunity. This technique required less soil
preparation and is less sensitive to silting. Generally
three pattern of Ditch & furrow system is adopted
(i) lateral (ii) dendritic & (iii) contour. In area of
low-transmissibility the density of ditch & furrow
will be high.

B. SUB-SURFACE METHODS

Figure (3) Generalized cross-section of artificial (1) Artificial recharging of aquifers through
recharge of groundwater using a surface bore well/dug well
spreading technique. Figure (4) shows typical systems of
recharging wells directly from rooftop runoff.

39
Rainwater collected on the rooftop of the building Settlement tank :
being diverted by drainpipes to a settlement or Settlement tanks are used to remove silt and
filtration tank, from which it flows into a recharge other floating impurities from rainwater. A
well (bore well or dug well). If a bore well is used settlement tank is like an ordinary storage container
for recharging, then the casing of the bore well having provisions for inflow (bring water from the
should be preferably be slotted or perforated pipe, catchment), out flow (carrying water to the recharge
so that more surface area will be available for the well) and over flow. A settlement tank can have an
water to percolate unpaved bottom surface to allow standing water to
percolate into the soil.
Apart from removing silt from the water, the
de-silting tank acts like a buffer is the system. In
case of excess rainfall, the rate of recharge,
especially of bore wells may not match the rate of
rainfall. In such situations, the de-silting chamber
holds the excess amount of water till it is soaked up
the recharge structure.

Design Parameters :
Providing the following elements in the system
can ensure the quality of water entering the
recharging wells.
1. Filter mesh at entrance point of roof top drains.
2. Settlement Chamber.
3. Filter bed.
Figure (4) Artificial recharging of aquifers through
bore well/dug well Design parameters for settlement tank:
For designing the optimum capacity of the tank
following aspects have to be considered.
Developing a bore well would increase its 1. Size of the catchments
recharging capacity. Developing is a process where 2. Intensity of rainfall.
water or air is forced in to the well under pressure 3. Rate of recharge.
to loosen the soil strata surrounding the bore to make Since the de-silting tank also acts as a buffer
it more permeable. tank, it is designed such that, it can retain certain
If a dug well is used for recharging the well amount of rainfall, since the rate of recharge may
lining should have openings, (weep holes) at regular not be comparable with the rate of runoff. The
intervals to allow seepage of water through the sides. capacity of the tank should be enough to retain the
Dug well should be covered to prevent mosquito runoff occurring from conditions of peak rainfall
breeding and entry of leaves and debris. The bottom intensity. In Mumbai, peak hourly rainfall is 90 mm.
of recharge-dug wells should be de-silted annually (Based on 25 year frequency). The rate of recharge
to maintain intake capacity. It is preferred that the in comparison to runoff is critical factor. However,
dug well or bore well used for recharging shall be since accurate recharge rates are not available
shallower than the water table. This ensures that without detailed hydro geological studies, the rates
the water recharged through the well has a sufficient have been assumed. The capacity of recharge tank
thickness of soil medium through which it has to is designed to retain runoff from at least 15 minutes
pass before it joins the ground water. Any old well, rainfall of peak intensity say 25 mm/hr.
which has become dysfunctional, can be used for
recharging, since the depth of such well is above Suppose the following data is available,
water level. Area of rooftop catchment (A) = 100 m2
Peak rainfall is 15 min (r) = 25 mm=0.025 m.

40
Runoff coefficient, (C ) = 0.85
Then capacity of the de-silting tank =A x r x C =100
x 0.025 X 0.85 = 2.215 m3 (2125 lit).

(2) Recharge pits : (Recharge well)

Figure (7) Percolation pit in section

A soak away is a bored hole of up to 30 cm


diameter in the ground to a depth of 3 to 10 m. The
soak away can be drilled with a manual auger unless
Figure (5) Recharge pit Plan and section hard rock is found at a shallow depth. The borehole
A recharge pit is a pit 1.5 m to 3 m wide and 2 can be left unlined if a stable soil formation like
m to 3 m deep. The excavated pit is lined with a clay is present. In such a case, the soak away can be
brick/stone wall with (weep holes) at regular filled up with a filter media like brickbats or pebbles.
intervals. The top area of the pit can be covered In unstable formations like sand, the soak away
with a perforated cover to allow entry of rain water should be lined with PVC or M.S. pipe to prevent
runoff. collapse of the vertical sides. The pipe may be
slotted or perforated to promote percolation through
(3) Percolation pit (soak away) : sides.

(4) Recharge trenches :

Figure (6) Percolation pit (photograph)


Figure (8) Recharge trench in section

41
Recharging through recharge trenches, (5) Modified injection well
recharge pits and soak away is simpler compared to Injection techniques use wells to accomplish
recharge through wells. Fewer precautions have to artificial recharge. Injection wells usually place
be taken to maintain the quality of the rainfall runoff. water directly into a deep, confined aquifer where
For these types of structures, there is no restriction surface spreading would usually not work. Injection
on the type of catchments from which water is to be wells also require maintenance to remove particles,
harvested, (i.e.) both paved and unpaved catchments microbial growth, and chemical precipitates (solid
can be tapped. substances).Hence, modified injection wells are
A recharge trench is simply a continuous preferred.
trench excavated in the ground and refilled with
porous media like pebbles, boulders or brickbats. A
recharge trench can be 0.5 m to 1m wide and1m to
1.5m deep. The length of the recharge trench is
decided as per the amount of runoff expected. The
recharge trench should be periodically cleaned off
the accumulated debris to maintain the intake
capacity.
In terms of recharge rates, recharge trenches
are relatively less effective since the soil strata at
depth of about 1.5 m is less permeable. To enhance
the recharge rate, percolation pits can be provided
at the bottom of the trench.

Design of a recharge trench :


The methodology of design of a recharge
trench is similar to that for designing a settlement
tank. The difference is that water holding capacity
of recharge trench is less than the gross volume
because it is filled with porous materials. A factor
of loose density (voids ratio) of the media has to be
applied to the equation. Using the same method as
used for design of settlement tank:
Area of rooftop catchment (A) =100 m2
Peak rainfall is 15 min. (r) = 25 mm (0.025 m)
Runoff coefficient (C) = 0.85
Voids ratio D = 0.5 (assumed)
Required capacity of recharge tank
= (A x r x C)/D Figure (9) Modified injection well
= (100 x 0.025 x 0.85) / 0.5
= 4.25 m3 (4250 liters) In this method water is not pumped into the
The voids ratio of the filter material varies aquifer but allowed to percolate through a filter bed,
with the kind of material used, but for the commonly which comprises sand and gravel. A modified
used materials like brickbats, pebbles and gravel, a injection well is generally a borehole, 500 mm
void ratio of 0.5 may be assumed. diameter, which is drilled to the desired depth
In designing the recharge trench, the length depending upon the geological conditions,
of the trench is an important factor. Once the preferably 2 to 3 m below the water table in the
required capacity is calculated as illustrated above, area. Inside this hole a slotted casing pipe of 200
length can be calculated by considering a fixed depth mm diameter is inserted. The annular space between
and width.

42
the borehole and the pipe is filled with gravel and its path through the aquifer material before it is
developed with a compressor till it gives clear water. discharged from the pumping well.
To stop the suspended solids from entering the
recharge tube well, a filter mechanism is provided D. RECHARGING TECHNIQUES TO
at top. ARREST SEA WATER INTRUSION
The situation of over-extraction of ground
(6) Aquifer Storage and Recovery water in coastal aquifers cause problem of seawater
intrusion. The method that is used to control sea
water intrusion is to use recharge well barriers
through a line of injection tube wells driven parallel
to the coast. This mechanism establishes a pressure
ridge which pushes the saline front seawards.

SPECIAL PRECAUTIONS
Whether the harvested water is used for direct
usage or for recharging ground water, it is of utmost
importance to ensure that the rainwater collected is
free of any pollutants that might be added to
rainwater from the atmosphere or the catchment.
Figure (10) Generalized cross-section of aquifer While polluted water directly used for consumption
Storage and Recovery would have an immediate impact on health, polluted
water recharged into the ground would cause long
Aquifer storage and recovery is a special type term problems of aquifer pollution. Damage done
of artificial recharge of groundwater that uses dual- to aquifers by recharging polluted water is
purpose wells for both injecting water into the irreversible.
aquifer and recovering (withdrawing) it later. Most of the precautions to ensure rainwater
Although the intent of artificial recharge generally quality have been summarized below.
is to increase groundwater storage for later use, (1) At the catchment level
incidental activities such as excess irrigation, storm 8 Keeping the catchment clean
water disposal, canal leakage, and leaking water 8 Using gratings to trap debris at the catchment
pipes may also result in artificial recharge. Artificial itself
recharge and aquifer storage and recovery are 8 Paving the catchment with ceramic tiles stone
valuable water management tools that effectively tile or other such non erosive materials
help to offset increased demands for water.
(2) At the conduit level.
II INDIRECT METHODS 8 Provision for first flush to drain off from initial
C. INDUCED RECHARGE spell of rain
It is an indirect method of artificial recharge
involving pumping from aquifer hydraulically (3) Before recharging.
connected with surface water such as perennial 8 Allowing for sedimentation of water
streams, unlined canal or lakes. The heavy pumping 8 Filtering the water
lowers the ground water level and cone of
depression is created. Lowering of water levels In establishments like industries it is very
induces the surface water to replenish the ground necessary to ensure that the catchments surfaces are
water. This method is effective where stream bed is free of chemical wastes, fuels, lubricants etc.While
connected to aquifer by sandy formation. physical and biological impurities in water can be
The greatest advantage of this method is that easily removed by de-sedimentation and filtration,
under favourable hydro geological situations the it is very difficult to remove chemical impurities.
quality of surface water generally improves due to

43
SCALE OF WATER HARVESTING: To control the total amount of runoff received
Most methods described here are applicable at by a large-scale system, the catchment can be
a singular building or establishment level. However, subdivided into smaller parts. A locality-level water
the same principles can be applied for implementing harvesting system illustrated in figure shows how
water harvesting at a larger scale, say, a residential the runoff from individual houses can be dealt with
colony or an institutional cluster. To an extent, the at the building-level itself, while remaining runoff
nature of structures and design parameters remain from the storm water drain (which drains water from
the same; the physical scale and number of roads and open areas) can be harvested by
structures may increase corresponding to the size constructing recharge structures in common areas
of catchment.

Figure (11) Tapping storm water drains in a community level system

References:
1. ‘A Water Harvesting Manual’ Published by Centre for Science and
Environment
2. ‘Guide on Artificial Recharge to Ground Water’ Published by Central Ground
Water Board, Ministry of Water Resources
3. web site www.rainwaterharvesting.org
4. www.waterencyclopedia.com
5. http://www.aboutrainwaterharvesting.com/rwh_methods.htm

44
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

9. The Scope of Rainwater Harvesting in Urban Areas


*Sandip. H. Deshmukh **Prof. R. B. Magar

Abstract :
A project is being undertaken for the feasibilty study of RainWater Harvesting for
the buildings in the premises of Fr.Agnel Technical Education Complex, Vashi. The
research is being carried out as a part of one of the objectives of Agnel Seva
Ashram, ‘Save Electricity & WaterAbhiyan’ (SEWA ). In a city like Mumbai, where
the ground surface is heavily concretised, the main way to harvest rainwater is to
tap the water falling on the terraces of buildings. Thus, in residential or commercial
buildings, the pipes on terraces should be connected not to the BMC drains but to
a recharge well or recharge pit. This process is termed ‘recharging’ the groundwater.
The same bore well or tube well then can be used for pumping out the groundwater.
Key words : Aquifer, Recharging, Catchments Area, Average annual rainfall.

1. INTRODUCTION an area of more than 1,000 square metres to install


The rapid development in science and a rainwater harvesting system that will tap the
technology in the world has brought the countries terrace water and make it flow to a bore well.
closer to each other and the world has become a The BMC will henceforth supply such buildings
global village. ‘Vasudeiva Kutumbakam’ (The world only 90 liters/person/day for drinking, cooking, where
the one family) is the need of the day. The integrated as they are expected to derive another 45 liters/
world is the new concept which Acharya Vinobaji person/day from rain water for flushing of toilets
Bhave had given in his slogan of ‘Jay Jagat’ long and other not potable uses.While many builders have
back in the same context. only recently and grudgingly started implementing
However as we see our country progressing in BMC’ s directive, it will come as a surprise to many
the global market there is increase in the suicides that the costs of doing it are not that high.
of Indian farmers every year. Today, it is the
responsibility of engineers in all the disciplines to 2. THE PRINCIPLE OF RAINWATER
come together to provide them with possible HARVESTING
alternatives to cope up with the problems of Rainwater falling on the ground is absorbed
environmental imbalances and scarcity of proper by the earth and it constitutes the groundwater. This
knowledge to adjust with the weather uncertainties. water is stored amidst the loose soil and hard rocks
On the other side, there are urban cities which beneath the earth’s surface just as sponge stores
are over-flooded with the population and finding the water. Just as the water can be sucked out of a
difficulties like inadequate supply of municipal water. sponge, so can groundwater be sucked out from
Even though Bombay Municipal Corporation is in beneath the earth through bore wells. All this can
denial of a water crisis, since October 2002 it has happen only if the rainwater is allowed to touch the
made it mandatory for all new constructions covering loose earth. Extreme urbanisation in a city like

*Asst.Professor **Sr.Lecturer
Fr. Agnel Technical Education Complex, Sector 9A, Vashi, Navi Mumbai 400703.
E-mail: sandiphk@rediffmail.com, rbm59@rediffmail.com

45
Mumbai has meant that at least three-fourths of the This will consolidate our methodology & validate the
city’s surface area has been developed, that is, procedure. The simple formula to find the water
covered in hard concrete by way of buildings and harvesting potential is given below in Fig.1.
roads.
The BMC’s extensive drainage system in the
form of big nullahs and small arterial gutters is 3.1 RWH for Indian Woman Scientists
designed to ensure that rainwater does not Association
accumulate on the roads and buildings. It is another The site of the construction is located at
matter that nullahs and gutters get choked with Plot.No.20, Sector 10A of Vashi, Navi Mumbai. In
garbage and silt and many areas of Mumbai still this site both the methods of rainwater harvesting
experience flooding. But even this flooded water i.e. storage and recharge is proposed. The site falls
cannot seep in through the hard concrete. Which is in a deccan trap terrain with top layer covered with
primarily why one needs to devise techniques that clay.
can make the rainwater seep into the earth. It is also
necessary to ensure that only reasonably pure 3.1.1 Recharging underground aquifers
rainwater goes into the ground, or else there is a The roof water from the top through the rain
grave risk of contamination of groundwater. The water pipes can be collected by series of chambers
different techniques to make rainwater seep into the with interconnected pipes and diverted to the
ground, which otherwise would not happen recharge well. The evaluation of rainwater
naturally, is known as ‘rainwater harvesting’. harvesting potential is done by the method shown
In a city like Mumbai, where the ground the Fig.1.
surface is heavily concretised, the main way to The collection chambers are designed to be of
harvest rainwater is to tap the rainwater falling on 0.5 m x 0.5m x 0.5m in size and the interconnecting
the terraces of buildings. The idea is to prevent this pipes are of 6 inches in diameter.
water from running off in BMC’s drains and divert The recharge well is of 2m x 1.5m x2m in size,
it to bore wells or storage tanks. Thus, in residential and the recharge bore of 20m depth. This recharge
or commercial buildings, the pipes on terraces well can be filled with filtering materials consisting
should be connected not to the BMC drains but to a of layer of pebbles and sand each of 0.3m in
bore well. This process is also termed as ‘recharging’ thickness. In the recharge well a recharge bore well
the groundwater. The same bore well is then used of 6 inch diameter of 50m depth should be drilled
for pumping out the groundwater for use. using air compressor.
A slotted casing pipe of 1m length should be
3. THE PROJECTS DONE ON RWH IN provided inside the recharged well. This slotted pipe
MUMBAI will be wrapped with coir rope to prevent the entry
Let us have a short survey on the projects on of fine silt into the recharge bore well. The cost for
RWH done in the past in Mumbai & near by area. recharge well including collection chambers and
interconnecting pipes is Rs.30, 000.

Fig.1 : Evaluating Roof Top Rainwater Harvesting Potential

46
Fig. 2 : Design & Estimate of Recharge Well

3.1.2 Trench cum percolation pit : The surface be used for recharge purpose by constructing two
runoff from the drive way, lawn and the part of the percolation chambers of 0.5m x 0.5x 0.5m in size
roof water normally flows to the road would be with a recharge bore of 10m depth of 6 inch
harvested by constructing a collection trench diameter. The collection chamber can be provided
measuring 2.5m length,0.5m width and 0.75 m with pebbles for filtering purpose. Two numbers of
depth. This will be covered with a metal grill for trench cum percolation pits will be constructed in
easy vehicular movement. The runoff collected will two gates and the total cost will be Rs 40,000.

47
Fig. 3 : Trench cum Percolation Pit

3.1.3 Storage tank system: The rainwater can be 3.2 RWH proposal for Anoopam Mission
stored in a sub surface concrete tank below ground Centre, Kharghar :
level and will be used for flushing purpose. This Another case study was observed to be carried
sump can be either in addition to the existing tanks out for Anoopam Mission Centre, Kharghar, and
or if the drinking water is stored in separate tank, Navi Mumbai.
the rainwater can be directly routed to existing The options for RWH proposed a) Storage of
storage tanks through filtration chamber.As per our Rainwater b) Recharging Underground Aquifers
observation the association has routed the complete The Average Annual Rainfall in the region is 2250
roof water to the existing storage tank of capacity mm with Runoff coefficient 0.85 (as per CSE).
50,000 litres through a filtration chamber of size Catchment’s Area & Potential Rainwater
1m x 1m x 1m.The first flush device is a diversion Quantity :
valve of 3 inch size. The initial rooftop rainwater Consider the Terrace (Roof top) Area as the
with silt is flushed out to the sew age drain. minimum catchment’s area available: 656 Sq.m.
Then the filtered water from the filtering tank Quantity of Water available =656sq.m x 2.250x0.85
is connected to the storage tank. The cost of =1254.6m3 =12, 54, 600 Litres/4moths
constructing the storage tank along with first flush, Assuming 50 days of the rainy days per year
filtering tank & interconnecting pipes is 72,000/- the Harvestable Water per day =25,092L/day

Fig. 4 : Design of Storage Tank Design

48
Water Requirements /day (Min): buildings, Ekta Woods of Ekta Shelters Builder at
50 Residents @ 135 L/ h /day =6,750L Borivli (East), having three wings of eight floors
60 Day staff or Personnel @ 45L/h/day =2,700L each and four flats on each floor, the rainwater
1000 Visitors @15L/h/day =15,000L harvesting system was in the final stage of
Total Flushing Requirements = 11,100L /day construction. A casual enquiry with the site-
Garden Requirements = 680 Sqm @ 4L/sq.m supervisor revealed that its total cost was about Rs
= 2,720 L /day 300,000. When you average it out across the
Total Water Requirements =27,170 L /day collective 96 flats in the three wings it worked out
to just Rs 3,100 per flat which is just 0.17 per cent
The harvested rainwater can be used for of the average cost of a flat of Rs. 18,00,000.
flushing and gardening purposes. The rain water
from the terrace is to be routed to an underground 4. THE PROJECT ON RWH AT
Rainwater Storage Tank though a silt trap & 2 Fr. A. T. E. COMPLEX :
filtering tanks each of 1mx 1mx1m size with a A project is being undertaken for the feasibility
facility for bypass or overflow into Cidco Storm study of Rainwater Harvesting for the buildings in
Water Drain or Nallah. The terrace and filter media the premises of Fr. Agnel Technical Education
needs to be cleaned before letting water into tank Complex, Vashi. The research is being carried out
and mesh filter should be provides at the rainwater as a part of the one of the objectives of Agnel Seva
pipe inlet. No fertilizers or pesticides should be Ashram (ASA) as to ‘Save Electricity & Water
allowed to enter the system. Thus with the above Abhiyan’(SEWA).
data a suitable size of the tank can be arrived.
4.1 Factors Influencing RWH potential:
3.3 RWH in Urban Housing Societies There are various factors which are influencing
3.3.1 Potential and estimate of installing RWH potential. Rainwater harvesting is catching
rainwater harvesting in a 12-year old building in rainwater, when and where it falls for the use. It
Kandivli : can be done in two ways, either by diverting it into
In the Coronet Co-op. Housing Society, tanks, ponds etc or as ground water by injecting into
Lokhandwala Township, Kandivli there are two the soil aquifers.
wings of seven floors each and four flats on each
floor. That means the total flats are 56 with the area The choice of the system depends on
of terrace equal to 360 sq. m. • Geography of area, topographical features of
Assuming the average yearly rainfall in the site etc.
Bombay of 2 metre high per sq. m. • Ecological and climate conditions
The harvestable rainwater volume: 360 sq.m x • Rainfall available at the site
2m x 0.85 = 612 (cu. m.) = 612,000 litres • The rainfall Pattern
One-time estimated cost of installing a • Site characteristics like type of catchments,
rainwater harvesting system is evaluated as shown runoff coefficient of site
below:
For 50-250ft deep bore well : Rs 45,000 to Rs 4.2 Benefits Projects on RWH:
60,000 1. It is an attempt to make a standby arrangement
Settlement tank and filtration tank: Rs 15,000 or emergency supply services for the water needs
to 30,000 adjacent to bore well of the complex.
Piping work: Rs 15,000 to Rs 20,000 2. Rain water harvesting replenishes the ground
============================================== water table and enables the dug wells and bore wells
Total cost : Rs 75,000 to Rs 1, 10,000 to yield in a sustained manner.
(Average cost per flat = Rs 1350/- to 1965/-) 3. If ground water is brackish, harvesting will
============================================== reduce the salinity of water. Flooding of low lying
3.2.2 RWH for Ekta Woods : In the month of areas and roads can be avoided to a large extent,
February 2006 it was observed that a new group of since rain water that is not harvested both within

49
the house as well as out side is responsible for Plan B : To dig a trench of 3m deep and 1m wide
flooding. along the inside portion of the compound wall and
4. Rain water harvesting can be used for irrigation fill it with HDPE (High Density Poly Ethylene)
purpose. Film and clay along the length of the wall of the
5. It promotes conjunctive use of river, rain campus as shown in the fig 6. This will not allow
ground, and sea and sewage water. the saline sea water to drip into the soil of
6. It prevents unsustainable exploitation of the Fr.A.T.E.C.campus. Then using the bore wells of
aquifer. 15m to 18m deep we will pump out the existing
7. It ensures efficiency, economy and equity in the saline water from the soil creating the voids which
water use through co-operative management of can be recharged with the rainwater. Using the
water sheds and command area. recharge well technique we will fill the underground
aquifers with the rainwater collected from the roof
4.3 The various plans of RWH : tops as shown in Fig 7. Then we can take two
• Plan A : The first option is to utilize the three additional bore wells to retrieve this stored water
existing water tanks of fire fighting system of during non monsoon season. The care should be
capacity 1,52,400 liters (50800*3) to fill the taken that we pump less quantity of water than what
rainwater collected from the roof top. We can route we will recharge. We are also trying to construct
the rainwater pipes of the BalBhavan & Boy’s hostel open well instead of bore well if it is feasible.
Building to these tanks through proper
interconnected pipes, Devas filters and filtration
chambers.
These two buildings have got rain water
harvesting potential per year of 16,25,630 liters. The
yearly flushing requirement for the two building per
year is 71,35,750 liters (considering 85litres
consumption per day per capita excluding drinking
water requirement).
There is one more tank of capacity 1,020,50
liters which can be used for drinking purpose. There
is a provision to divert the BMC water supply to
this tank with a flow control valve to fill the other
three tanks if these tanks remain empty.
One of the water pumps would be pumping
the water from these three interconnected tanks
supplying water to the buildings of Boy’s hostel &
BalBhavan for flushing.

Fig. 5 : Routing rainwater to the storage tanks Fig.6 Compound Wall of HDPE Film

50
• Plan C : The third plan is most assured way of • Plan D : In this plan we are planning to mount
getting the rain water collected from the roof tops. loft tanks wherever necessary in staff quarters. The
This includes collecting the water from the rooftops rainwater pipes can be routed to these tanks fitted
into underground tanks or open wells designed in the houses. These tanks can be interconnected in
according to rooftop area and the average annual such a way that, once the tank on the upper floor is
rain fall. full, water starts filling the tank on the adjacent
This plan has limitations of high initial lower floor. These tanks can be used only to store
investment cost of constructing tanks of Rs.1000/- water for flushing purpose.
per m 3 and regular maintenance of the filters.
However this is the most ensured way of getting 5. PILOT STUDY FOR DIFERENT PLANS
the rainwater during the no monsoon season. With
proper filtration system incorporated we can even 5.1 PLAN A:
use rainwater stored in these tanks for drinking Total Catchments area of = 530 + 320 = 850 m2
purpose. Boy’s Hostel and BalBhavan

Average annual rainfall = 2.25 m


in Navi-Mumbai
Total quantity of Harvestable Water = 850 X 2.25
= 1912.5m3

Considering 15% losses = 1912.5 X 0.85


= 1625.625 m3
(For four months)
Total quantity of water available = 16, 25,625 L
(By considering 50 Rainy days)
Quantity of harvestable water = 32,512.5 L /
Day.
Assuming the requirement of 85L /capita/day
The total requirement of water for = 230X85x365
Fig.7 Recharging bore well with
= 19,550L/day = 19.55 m3 /Day =136.85m3/Week
Wall of HDPE Film
both the buildings.

Fig. 8 : Rainwater Harvesting


for Bal Bhavan Building

51
As mentioned earlier, we have decided to Then the total volume of 450m3 rain water can be
route the rainwater pipes of the BalBhavan & Boy’s harvested by the method of under ground storage
hostel buildings to the existing three tanks of fire water tank.
fighting system of capacity 50,800L each through This will be sufficient for 450/37.5=12 days
proper interconnected pipes, filters and filtration of non monsoon season saving the equivalent cost
chambers. The total size of water that can be stored of Rs.4,950/- per Year.
will be 1,52,400L i.e.152.4 m3.This will be quite
sufficient for weekly storage of rainwater 136.85m3
during rainy season. Also after the monsoon this
water will be sufficient for 152.4/19.55 = 8 days
during summer season.

Fig. 9 Rainwater Harvesting Fig.10 Rainwater Harvesting of Fr. Agnel Degree


for Boys Hostel Building &Diploma Buildings

5.2 PLAN C:
Total catchments area = 2500 sq. m. 5.3 PLAN B :
Average annual rainfall = 2.25 m We are trying to implement this plan by first
in Navi-Mumbai doing hydro geological investigation and estimating
Total quantity of Harvestable = 2500 x 2.25 the rough estimate of construction of gravel pack
= 5,625 m3 ring well cum bore well. This is necessary to be
Water carried out in order to identify points or locations
Considering 15% losses = 5625 x 0.85 for ground water development. As per the quotation
= 4,781.25 m3
Total quantity of water available = 47, 81,250 L
(For four months)
(By considering 50 Rainy days)

Quantity of Harvestable water = 95,625 L / Day

available per day


Assuming the requirement of 15L /capita/day
The total requirement of water = 2500 x 15 =
37,500L/day = 37.5m3 /Day
If we design and construct two tanks of size
15m length X 5m Width X 3m depth having the
total Area = 225m3 Fig.11 A open tank constructed with HDPE film

52
from one of the consultants the assessment cost will the trench. The rate of excavation depends on the
be Rs 7,500/- strata below the ground.
After this assessment we will be able to
conclude whether we can take open well or not. Also 5.4 OBSERVATION TABLES
the estimate for one gravel pack ring well cum bore After carrying out the pilot study we have made
well given including all taxes is 1,53,210/-. For a observation Table 1, comparing the water
protection against the saline water to enter inside harvesting potential of each building with the annual
the soil of the complex, HDPE film of gauge 500 water requirement .This also facilitate cost benefit
micron can be used as imperious film in the trench analysis of the project. Also Table 2 shows the rough
that we are going to excavate .The cost of the film estimate of the particulars of Plan A which very soon
is around Rs.50 per m2. We have to calculate the we have decided to implement.
film area required and the quantity of excavation of

NO. PARTICULAR ITEM UNIT RATE / UNIT TOTAL QNTY. TOTAL COST
I PVC PIPES
1 DIA.100mm m 155 28.22 4374.1
2 DIA.120mm m 165 56.6 9339
3 DIA.140mm m 175 29.92 5236
4 DIA.150mm m 180 15.9 2862
5 DIA.160mm m 185 18.5 34225
II DEVAS FILTER - 600 7 4200
III ELBOWS 45° ANGLE - 100 7 700
IV
1 EXACUVATION m3 150 17.89 2683.5
2 P.C.C. m3 15000 1.19 1785
3 BRICK WORK m3 1400 7.45 10430
TOTAL RATE : 55,469.10/-

53
Fig.12 Fr. Agnel Technical Education Complex, Vashi

6. FURTHER STUDIES IN PROGRESS


We have decided to first implement Plan A which involves designing the interconnecting pipes with
DEVAS filters. The rain pipes will be connected to main pipeline through these filters that are costing
approximately Rs. 600/- each. The following figure shows the DEVAS filters which can be manufactured
easily from PVC pipes and sands of various sizes. The crucial factor is soil assessment and determination in
what way we can recharge and retrieve the rainwater. This will be the area of our further research.

Fig.13 : Manufacturing of Devas Filters for Water Purification

54
7. CONCLUSION and FUTURE SCOPE and flats, complexes since it makes us more self
As per our Vedic scriptures the Great Saint sufficient and less dependent on government for our
Parashara says requirements of fresh water. Let us make a sincere
|| Annam Hi Dhanya Sanjatam, Dhanyanm Krishya attempt to harvest rainwater falling on both rooftop
Vina Na Ch || as well as the open area all around our homes to
Tasmad Sarvam Parityajya, Krushim Yatnen prevent any further deterioration of ground water
Karayet ||1|| source.
|| Vrustimula Krushi Sarva, Vrushti Mulam Ch
Jeevanam || 8. REFERENCES
Tasmadadau Prayatnen,Vrushti dhnyanam • Anil Agarwal, Available from: http://
Samacharet ||2|| www.rainwaterharvesting.org Accessed: 2006-07-
“Which means we get food from grains.Without 23
doing farming we can not get grains. Therefore • Sunita Narain & Rahul Ranade (2003). A Water
leaving every thing aside we should do harvesting. Harvesting Manual, Centre For Science And
As the root of agriculture is in the rains, life is Environment, New Delhi
dependent on rains. Therefore we should very • M. Jacob, (2005), ‘Technical Report for rainwater
meticulously study the rains” harvesting’, Navi Mumbai
• Gopal Chandorkar (2005). Parjanya Mapan va
Thus in the direction of his guidance we march Purva Anuman, Proceedings of Traditional Wisdom
forward to get more and more knowledge about rain in Water Management, pp. 96-101, A National
harvesting and water management. We should feel Conference at Nasik, October 2005, The Indian
proud of harvesting rainwater in our own houses Council for Water & Culture, Aurangabad

“WATER SCARCITY DIVIDE PEOPLE…..


….. RAINWATER HARVESTING UNITES THEM”.

55
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

10. Measures for Water Conservation and


Improvement in Water Quality
*R. S. Goel **V. B. Patel

ABSTRACT
Safe water supply and environmental sanitation are vital for protecting the
environment, improving health and alleviating poverty. According to the World Bank
estimates, water pollution accounts for about 60% of the major annual environmental
costs in India. Availability of water in India is under tremendous stress due to growing
population, rapid urbanization, increase in per-capita consumption, industrial growth
and other demands for maintaining ecology. It is to be stressed that non-development
of water storage projects is not a viable or available option; due to the large temporal
variations in river flows in Indian monsoonic climate. Integrated water management
is most vital for poverty reduction, environmental sustenance and sustainable
economic development in India because water has the potential for both disease
causation and prevention. This article highlights the challenges in supplying the
qualitative water for the bulging requirements of water for various uses in our highly
populated country and suggests measures to overcome the serious crisis. The article
would help the policy planners, municipal agencies and professional societies to
properly focus and channelise their energy for integrated water resources development
and management.

Keywords- water quality, water management, wastewater, reuse, recycle,

INTRODUCTION become a serious problem. Safe water supply and


It is estimated that 80% of all diseases and over environmental sanitation are vital for protecting the
1/3 rd of deaths are caused by consumption of environment, improving health and alleviating
contaminated water and on an average as much as poverty. Unless facilities for the treatment of
1/10th of each person’s productive time is sacrificed domestic sewage and industrial effluents are manifold
to water related diseases. India supports 1/6th of the increased, the increasing pollution load due to
world’s population on 1/50th of world’s land with urbanization will further deteriorate the quality of
meager 1/25th of the world’s water resources. Due water bodies. Preserving the quality and the
to the indiscriminate discharge of untreated sewage availability of the freshwater resources is the most
and industrial effluents into natural water bodies, the pressing of the many environmental challenges on
quality of surface water as well as ground water is the national horizon. It is imperative that conservation,
deteriorating in India. Deteriorating water quality has recycle, reuse of precious water and proper

*Former Vice-President, Indian Water Resources Society, Former Convenor of Programmes, Water Management
Forum, Convenor, Coordination Committee, Water Related National Professional Societies, Chief Engineer,
Narmada Tapi Basin Organisation, Central Water commission, Sector 10 A, Gandhinagar (Gujrat) – 382043
E-mail - goelrscwc@yahoo.com
**Vice-President, Indian Water Resources Society, Former Chairman, Central Water Commission, Former Chairman,
Board of Governors, Water Management Forum, Co-chairman, Coordination Committee, Water Related National
Professional Societies, 128, Manekbaug Society, Ambawadi,Ahmedabad–38 00 52 E-mail - vbpatel@multimantech.com

56
treatment of waste are given serious attention for terms, but also the cost that other communities have
sustainability of built environment for our highly to incur in terms of opportunity lost by not using the
populated country. water. The measure for water conservation should
include metering of supplies as a matter of policy
CONCENTRATED WATER NEEDS DUE TO and increase in tariff rate on a sliding scale. Use of
RAPID URBANIZATION treated effluents, in place of filtered water for
During last 50 years the share of urban horticulture and large gardens, and fitting of waste-
population in the country has increased from 14% to not taps on public stand-posts to avoid wastage of
33%. During the last fifty years the population of water should be encouraged.
India has grown two and half times, but Urban India
has grown by nearly five times. India’s population WASTEWATER GENERATION
has already crossed 1 billion mark and it has been Between years 2000 and 2050 freshwater
assessed that the urban population may reach 50% withdrawals by urban areas will rise from an
of the total population by the middle of this century, estimated minimum of about 15 BCM to a projected
as against about 33% at present. Already there is maximum of about 60 BCM. About 80 percent will
acute shortage of drinking water supply in cities like be returned as polluted wastewater to nearby surface
Bangalore, Delhi, Mumbai, Hyderabad and Chennai water bodies. This will result in massive pollution of
and water is being transmitted long distance to cater fresh surface water resources. A large part of the
to the needs. Between years 2000 and 2050 sewage in most of the municipalities is still flowing
freshwater withdrawals by urban areas will rise into the aquatic environment without any treatment,
from an estimated minimum of about 15 BCM to a thereby increasing the oxygen demand in shrinking
projected maximum of about 60 BCM. Options like water bodies and increasing the bacterial load of
watershed management, rainwater harvesting, water, the main cause of water borne diseases.
groundwater exploitations, which create spatially Discharge of untreated domestic waste water is
distributed resources, are unable to meet these predominant source of pollution of aquatic resources
concentrated demands. Supply of safe drinking water in India. Urban centers contribute more than 25%
to such a large urban population besides meeting the of the sewage generation in the country. The smaller
commercial, industrial, cattle and recreational towns and rural areas do not contribute significant
purposes is proving a Herculean task and calls for amounts of sewage due to low per capita water
creating concentrated sources of water to meet the supply. Waste water generated in these areas
concentrated demands. normally percolates in the soil or evaporates. Owing
to the indiscriminate discharge of untreated sewage
WATER CONSERVATION and industrial effluents into natural water bodies, the
Water Conservation has three broad quality of surface water as well as ground water is
connotations; maximum storage of rainwater, deteriorating. A result of this is that the principal
economical and optimal use including prevention of drinking water supply sources of cities and towns
wastage/ leakage and multiple use – Reuse and are becoming polluted of which is increasing
Recycling. In urban water supply almost 30 to 40% considerably the cost of water treatment.
of the water is wasted through the distribution Even in the mega cities namely Mumbai,
system. In Industrial sector also, there is a scope of Calcutta, Delhi and Chennai; wherein about two third
economy in use of water. Public awareness should of the total wastewater of 23 metro cities is
be generated through a massive campaign of generated, the waste management is highly
communication through all available media and by unsatisfactory despite the huge infrastructure and
the utility management itself setting an example for paraphernalia due to many socio-political and
conservation. All urban dwellers should be made managerial problems. Of the wastewater generated
aware of the source from which water is being in Class I cities, 12 metropolitan cities accounted for
brought to the city and from which additional water about 65 percent. Mumbai and Delhi generated more
will have to be brought in the future. They should wastewater than that generated in all the Class II
be aware of the costs involved, not only in financial cities together. About 80% of about 20% collected

57
wastewater in these cities was receiving primary or especially during lean season for various diverse uses
primary and secondary treatment. Further, out of the has greatly diminished the dry flows in streams. To
wastewater generated in Class II cities, only 5% reverse this situation, moderation of floods and
was being collected and only 2% was receiving some increasing the dry season flows is imperative. The
kind of treatment. Almost all the wastewater was increasing discharge of domestic and industrial
being disposed in the rivers and agricultural lands, wastes has also led to the contamination of ground
affecting surface and ground water; creating highly water, making it unfit for human consumption at
alarming situation. many places. In some regions, over-exploitation of
The major water polluting industries are leather, ground water has led to salinity ingress and severe
sugar, distilleries, paper and pulp, chemicals, iron and depletion of ground water accentuated by low
steel, and metal plating. A large part of industrial recharge capabilities. For small scale sector, a
water pollution is caused by small-scale units. The scheme titled Common Effluent Treatment Plant
integration of proper water supply, recycling and (CETP) has not been uniformity successful as
reuse of water, roof water harvesting and adequate different units within the same complex release
sanitation facilities in all cities and bigger towns is different types of effluents which cannot be treated
absolutely vital for revival and maintaining the through a single technology. More important, pooling
integrity and purity of rivers eco-system. In the 8th of resources for this common cause has not found
five-year plan 24 highly polluted stretches in rivers favour with small scale & cottage industry.
of 16 states were identified and Ganga Action Plan
Phase I & II were launched which were later on Waste Water Generation from Different types
integrated into National River Conservation Plan. of Industries and Possible Reuse
Focus of the River Action Plans has been on sewage
with very little success with regard to the other two Industry Average Volume of Possible
forms of water pollution viz., industrial pollution and Wasteland per Unit Percent
agricultural run off. of Product Reuse
Thermal Power 155 kl./hr/MW 98
SURFACE WATER POLLUTION Plant
About 75% of domestic water supplies from Pulp & Paper 250 kl./tonne 50
urban areas come back as return flow, deteriorated Iron and steel 150 kl./1000 lit/tonne 40
in quality due to organic, chemical and bacterial
Pharmaceutical 4.5 kl./tonne 40
pollution. Even though, drains and rivers have been
functioning as waste disposal channels from time Distillery 15 lit/lit of alcohol 25
immemorial; but the pollution load in earlier times Textile 250 lit/kg cloth 15
was within the self-purification capacity of these Tannery 34 lit/kg of raw hides 12
streams. Due to the bulk of discharge of effluents
with very heavy doses of impurities of the modern The main challenge lies in devising instruments,
day world which are mostly untreated, the pollution which make it attractive for corporate sector to
load is now manifold and beyond the self-purification conserve and recycle water by adopting less water
capacity of the rivers. Analysis of water quality data intensive processes and encourage material recovery.
for 1997 reveals that Gujarat tops in chemical The direct regulation of the “Command and control
pollution, followed by Maharashtra, Andhra Pradesh, Type” has not worked due to weaknesses in
Tamilnadu , Uttar Pradesh and Punjab. The worst enforcement coupled with low level of penalty.
affected states in terms of presence of coliform Under regulation of this kind, perceived benefit from
bacteria in water, are Uttar Pradesh, Gujrat, conservation must be more than the cost of
Tamilnadu and Assam. In terms of BOD values compliance.
Kerala is at the bottom and Maharashtra at the top
(most polluted). GROUND WATER POLLUTION
Many of the modern water pollutants are non- Regulation and conservation of ground water
biodegradable. Greater abstraction of water, present technical and administrative difficulties

58
because precise delineation of aquifers is difficult so that it is fit for use like fresh water, and
and monitoring and control of extraction by large regeneration refers to replenishment of a water
numbers of individually owned wells is not feasible. source in a natural manner. Recycling and re-use
Accordingly, depending upon the characteristics of has been demonstrated to be cost-effective in a large
the pollutants and application of water, the pollutants number of cases, with periods of return of
may migrate to the saturated zone along with recharge investments ranging from a few months to less than
water, thereby affecting ground water quality. The five years. Thus it makes sense to practice
reasons for ground water pollution mainly related to recycling/re-use for economic reasons, besides doing
the faulty agricultural practices, industrial pollution, so to meet moral or legal liability associated with
municipal pollution, mine pollution and natural disposal of wastewater.
pollutants present in the ground water itself. Central
Ground Water Board (CGWB) is monitoring the EFFECTIVE RECYCLE AND REUSE OF
quality of ground water at 16,000 hydrograph stations WATER
in the country. In urban water supply, 30 to 40 % of the
municipal water is wasted through the distribution
ECOLOGICAL IMBALANCES DUE TO system. In Industrial sector too, there is a scope of
DETERGENTS economy in use of water. As per estimates by
The health risk posed by phosphate rich Bureau of Industrial Costs and Prices, 10 to 30%
detergents is not yet recognized in India despite a saving in water consumption in industries is possible
worldwide awareness and ban in several countries by recycling, modifications in processing, evaporation
in Europe and America. Detergents contain many control etc. Apart from ensuring leakage control,
ingredients which could be a threat to the environment water conservation strategy in industries should
and human health. A common ingredient, sodium include introduction of appropriate technology to
tri-polyphosphate (STTP) softens the water thus ensure efficient use of cooling and process water
helping to remove dirt from clothes and to keep the and necessary pollution control mechanisms and
dirt off during the washing cycle. Phosphorus, part maximum recycling and reuse. Treatment of
of STPP is an essential nutrient for the growth of wastewater in stabilization ponds is an effective and
aquatic plants and as such adds to the cultural low-cost method of pathogen removal, and is,
eutrophication, a process in which the excess therefore, suitable for schemes for wastewater reuse,
nutrients result in algae bloom, kill fish and increase particularly for irrigation of crops. Similarly,
pathogenic organism, causing loss in aesthetic and duckweed ponds are quite effective in treating
recreational values of water. Strict regulations be municipal wastewater and at the same time the
made requiring that not more than 5% phosphorus harvested duckweed is a good fish and chicken feed.
in detergents. As such, there is a need to develop appropriate and
cost effective technologies, for treatment and reuse
WASTE WATER TREATMENT of municipal wastewater, suitable to Urban Local
Care is necessary that treated wastewater Bodies for their adoption. Possible health risks to
does not contain toxic matter beyond a threshold. agricultural workers should, however, be assessed
Otherwise, it may enter the food chain, both aquatic thoroughly and monitored regularly. Treated
and terrestrial. Besides, wastewater can damage wastewater should conform to pollution control
fertility of soil and quality of ground water if its standards for adopting reuse practice.
constituents are not kept within the prescribed limit There are various options for recycling and
For the most economic disposal of wastewater from reuse of grey water (bathroom and kitchen wash)
various sources, recycling, re-use, renovation and and black water (sewage). However, the grey water
regeneration (summed up by the term “4-R and black water from large residential complexes
Concept”) must be practiced with utmost keenness. like Cooperative Housing Societies, multistoried
Recycling refers to repeating the same use; re-use buildings and industrial effluents from large industries
is done by using effluent for other purposes; can be recycled and reused for various purposes
renovation refers to treatment to the (tertiary) level other than drinking. The grey water may be put into

59
various types of treatment such as grease trap, the scope of the polluter pays principle we can
anaerobic filter etc and the filtered water may be let consider of such subsidies such as originating from
into wet land, polishing ponds etc. and can be reused funds created on the basis of pollution related charges
for gardening and horticulture etc. The black water (e.g. acidification funds).
may also be put into various types of treatment such
as screen, grit removal primary, secondary and RENTING OF WATER
tertiary treatment etc. and the treated waste water Above economic instruments provide incentives
can be let into wet land for irrigation or for ground to economic actors inducing them to behave in an
water recharge. The municipal wastewater and environmentally responsible manner. Their merits
industrial effluent may be treated up-to tertiary level include: effectiveness, efficiency, flexibility and
and used for various purposes other than drinking incentives for eco-innovation. Under the scope of
by various industries and cities. For example, in the polluter pays principle we can consider of such
Chennai the Chennai Metro Board is providing 30mld subsidies as originating from funds created on the
treated municipal wastewater to Ennore Thermal basis of pollution related charges (e.g. acidification
Power Plant for recycle and reuse for cooling & funds). Another important thing about pricing of
other purposes. Likewise in Mumbai, many of the water may be costing it according to its end use.
industrial houses are using the recycled industrial Farmers and low income industries may not be
effluent for purposes such as air-conditioning, cooling charged at the rate of charges fixed for high yielding
etc. In Pondicherry Ashram, the wastewater from industries.
housing complexes and community’s toilets are
recycled and reused for horticulture purposes and MARKETING BOTTLED WATER
irrigation. State Governments may create Urban Considerably more satisfaction and benefit can
Development Fund for Urban Infrastructure be obtained from the present water supply system,
development and the same can also be used for if managed efficiently. Costly systems are
setting up of pilot projects for waste reuse, recycling constructed, but for want of proper operation and
and resource recovery. maintenance, the benefits are not received by the
people who have to incur considerable private costs
INCENTIVES AND LEGAL ASPECTS and have to resort to alternate means or
Suitable fiscal concessions and subsidies may supplementary sources. Fast catching up practice
be considered by the Central and State Governments of selling mineral water bottles at rates even more
to the industries, commercial establishments and any than milk and more than 1000 times than the tap
other agencies which adopt/practice waste reuse, water in India is paradoxical. While half of our
recycling and resource recovery. Similarly, in case population is unable to afford even the absolute
the Urban Local Bodies on their own would like to minimum needs to quench their thirst. Only water
take the initiative and set up waste reuse, recycling supply utilities should be allowed to bottle and market
and resource recovery schemes in their respective the bottled water to generate much-needed funds
areas, similar fiscal concessions and subsidies may for modernization and proper maintenance of existing
also be made available to them. It may be made infrastructure.
mandatory in phases that large industries and
commercial establishments must meet a sizeable PROTECTION OF NATURAL WATER
percentage of their non-potable water requirements RESOURCES
from the reclaimed water. Similarly, for irrigating Responsibility should be fixed on various civic
crops, horticulture, watering public lawns/gardens, and industrial authorities to treat the wastewater
flushing of sewers, fire-fighting etc. reclaimed water before disposing it in conveyance drains or natural
should only be used. Economic instruments may streams. Water quality should be monitored regularly
provide incentives to economic actors inducting them at every out-fall drain. State wise river basin
to behave in an environmentally responsible manner. conservation plan should be formulated for different
Their merits include: effectiveness, efficiency, basins. The pathogenic, toxic and biological and
flexibility and incentives for eco-innovation. Under physico-chemical effects of various types of water

60
pollution in different scenario and regions should be Large storage projects are essentially required for
scientifically analysed, collated, understood and diverting surplus water from flood prone areas to
suitable action plans should be framed. deficit areas. Indira Gandhi Nahar Project has been
a boon for large tracts of Rajasthan in alleviating
QUESTIONABLE USE OF WATER AS A droughts.
CARRIER OF WASTES
The traditional way of removing wastes from SOCIO-ECONOMIC & ECOLOGICAL
industries, and homes has been to dilute them in water ASPECTS OF FLOODS
and then carry this wastewater over long distances Over 40 million hectares of the area of the
to extract most of the waste in the sludge, leaving country experiences periodic floods. The average
polluted water as effluent. Such traditional and highly area affected by floods annually in India is about 7.5
unscientific method of using water carriers of wastes m. ha of which crop area affected is about 3.5 m.ha.
need to be closely examined. There are many better Floods have claimed on an average 1,529 human
alternatives to treat the waste at its origin, without lives and 94,000 cattle ever year. Apart from loss of
using so much water. Use of low flushing and dry life and domestic property, the devastating effects
toilets as well as use of ‘grey water’ drained from of floods, sense of insecurity and fear in the minds
showers, kitchens and laundries to flush the toilets, of people living in the flood plains is enormous. The
should be targeted for adoption in at least in all new after effects of floods like the agony of survivors,
construction of commercial institutions and planned spread of epidemics, non availability of essential
colonies in all class I and II cities. commodities and medicines and loss of their dwellings
make floods most feared natural disaster being faced
MINIMUM FLOW REQUIREMENT by human kind. Large-scale damages to forests,
Quality of river waters is deteriorating with crops & precious plants and deaths of aquatic and
large number of municipal and industrial effluents wildlife, migratory and native birds in various National
being discharged untreated into rivers. Return flows Parks, Delta region, low altitude hilly areas and
from irrigated areas pollute river water with residual alluvial flood plains of Assam, Arunachal, Uttrakhand,
fertilizers, pesticides and herbicides. Necessity for U.P., Bihar, Orissa, West Bengal, have always been
maintaining minimum flow therefore, arise out of the the matter of serious concern. River Valley Projects
need to maintain water quality, river regime, such as Bhakra, Ramganga, Hirakud, Pong etc. have
maintenance of river eco-system or other public proved highly successful in moderating the
necessities. magnitudes as well as frequencies of floods.

SOCIO-ECONOMIC & ECOLOGICAL ACCELERATED WATER STORAGE


ASPECTS OF DROUGHTS DEVELOPMENT
It is estimated that around 263 million people Water demands forecasts show that Rajasthan,
live in drought prone area of about 108 m. ha., which Maharashtra, Gujarat, Haryana, Karnataka and
works out to 1/3rd of the total Indian geographical Tamilnadu could face heavy water supply shortfalls.
area. Thus, more than 26% of total population of The water shortages would be far more serious in
the country face the consequences of recurring the water short basins like the Cauvery, Pennar,
droughts, on a wide spectrum of social concerns. Sabarmati, Mahi, and Krishna etc. To meet the
During the drought years there is a marked tendency bulging water requirements, it would be necessary
of intensive exploitation of ground water, resulting in to ensure substantial augmentation of water supplies;
abnormal lowering of ground water table thus requiring sufficient raising of water storage
accentuating the distress. Grave adverse impacts capacities, thus necessitating completion of new large
are borne by flora, fauna and domestic cattle and water storage projects.
the very life itself fights against nature for its survival. Supreme Court Majority Judgement for
Droughts accentuate problems in cities in the form Narmada Projects has also highlighted that against
of mushrooming of slums and pressure on the existing the utilisable storage 690 cu. km. of surface water
civil amenities thereby adversely affecting urban life. resources out of 1869 cu. km.; so far storage capacity

61
of all dams in India is only 174 cu. km., which is societies can act as multi-disciplinary fora for national
incidently less than the capacity of Kariba Dam in and regional debates, analysis and framing of action
Zambia/Zimbabwe with capacity of 180.6 cu. km. plans on water related matters by utilizing their
and only 12 cu. km. more than the Aswan High Dam infrastructure, professional expertise, library,
of Egypt. The impact on environment should be seen publication and documentation services. These
in relation to the project as a whole. Water of poor societies can serve as rich sources in generating
quality leads to ill health, whereas water in insufficient technically sound options with well-defined limitations
quantity claims large chunks of time spent in & assumptions in Indian peculiar situations for taking
augmenting the supply; otherwise, the significant time informed decisions. The services of professional
could be spent on more remunerative tasks. We must Societies like Indian Water Resources Society, The
realize the basic fact that the medium and small Institution of Engineers (India), Indian National
water projects as well as water harvesting schemes Science Academy, Indian Water Works Association,
cannot substitute the need of large water storages Indian Association of Hydrologists, Indian Society
but can at best complement the larger projects. This, of Hydraulics, Water Management Forum,
too, depends upon the hydrological, geological, Association of Hydrologists of India & Indian
topographical and regional limitations. The Buildings Congress having vast network, good spread
controversy of the large versus small dams is and pool of expertise may be channelised in debating,
irrelevant. Sustainable management of water dissemination and creating balanced scientific public
resources with due respect to ecological, economic awareness.
and ethical sustainability blended with technical
feasibility requires a holistic and integrated approach WORKING GROUP ON WATER RELATED
involving engineering, socio-economic and ECOLOGICAL MATTERS
environmental aspects. Expansion of storage Considering the seriousness and deteriorating
capacity by completing on-going projects and state of affairs concerning quality and quantity of
construction of new projects is imperative to enhance available water particularly for urban use, alarming
water availability. water pollution levels and challenges in managing
water related ecological concerns, a Working Group
ROLE OF COMMUNITIES AND on Water Related Ecological Matters for X Five Year
PROFESSIONAL SOCIETIES Plan was formed vide Planning Commission’s O.M.
It is essential that environmental aspects and No. M-12018/1/2000-E&F dated 8th January, 2001
the process of planning and operation of water under the Chairmanship of Secretary (Water
resources projects be fairly understood by the experts Resources). The Group consisted of the
of different disciplines. Participation of people is a representatives of the Planning Commission,
must in the management of water. People have to Confederation of Indian Industries and the Ministries
be made an integral part of the water management of Environment and Forests, Agriculture &
system. The community is to be made not only water Cooperation, Urban Development & Poverty
conscious, but also to be integrated to participate in Alleviation, Industrial Development, Rural
the planning and management of such projects and Development, Department of Ocean Development
pollution prevention programmes. It is unfortunate as well as Chairman, Central Water Commission;
that a smear campaign has been launched during Chairman, Central Ground Water Board; Chairman,
last two decades against hydropower and water Central Pollution Control Board and Member (River
resources projects by exaggerating the likely or Management), CWC. The first author of this article
assumed adverse environmental impacts and by was inducted as Member Secretary for the Group.
suppressing their need and tremendous benefits. Working Group in its Report has suggested that the
Knowledge about the changes required in following measures may yield significant benefits
cropping patterns and agronomic practices also must from the overcoming crisis in the field of water related
be communicated to farmers to sensitise them about ecological arena :
the constraints of water supply and motivate them Strict measures to ensure proper treatment of
to use it carefully and efficiently. Professional waste water

62
Strict enforcing of responsibility on users for as 1/10 th of each person’s productive time is
waste treatment before discharging into water bodies sacrificed to water related diseases. Deteriorating
Local bodies should be responsibile for water quality has become a serious problem. We
maintaining CETPs would have to maintain a balance between the thrust
Economic Instruments as incentives and areas of development (infrastructure and consumer
subsidies to induce users accountability to curb goods), which are said to improve the quality of life,
increasing water demands and to encourage and the social aspects like bare necessities of life in
recycling and reuse of water the areas of water, food, fiber, power, education,
Suitable cess collected on marketing of water health, housing and nutrition. Preserving the quality
bottles be exclusively reserved for modernization of and the availability of the freshwater resources is
public water supply systems. the most pressing of the many environmental
Water sensitive urban planning challenges on the national horizon. Social tensions,
Wide spread use of water saving fixtures political instability and street fights are already on
Strategy based on agro-climatic regional the horizon; due to stoppage and slowing down the
planning construction of almost all major dams; ignoring the
Integrated planning and management of river bulging demands of water and power for municipal
basins uses in metro cities, by few environmental activists
Declaration of water resources projects as and novelists; without professional analysis. It is to
green projects in respect of environmental clearance be stressed that non-development of water storage
Equitable distribution of water projects is not a viable or available option; due to the
Use of appropriate technology in water supply large temporal variations in river flows in Indian
and sanitation sectors monsoonic climate. Conservation, recycle, reuse of
Scientific public awareness and curbing precious water and proper treatment of waste water
environmental pseudoism. must be given serious attention for sustainability of
Encouraging professional societies for built environment for our highly populated country.
feedback, documentation and proper dissemination In such peculiar conditions, the initiative for
Research and development activities in the area interlinking of rivers in India so as to meet the bulging
of water quality management demands of water for various uses even for water
Impose restriction in water abstraction and starved states is highly commendable and timely.
ensuring discharge of only treated sewage/ trade
effluent on land, rivers and other water bodies with Note - The views in the article may not belong to
a view to mitigating crisis of water quality; the Authors’ Organisations.
To maintain minimum discharge for sustenance
of aquatic life forms in riverine system; REFERENCES
Encourage rain-water harvesting, roof top • Central Water Commission, 2000 ‘River Valley
harvesting for indigenous consumption Projects and Environment-Concerns and Management’,
To utilize self assimilation capacities to minimize Publication No. 61/2000, New Delhi.
cost of effluent treatment; • Goel R.S.(Editor), 1993, ‘Environmental Impacts of
Encourage ground water recharging with strict Water Resources Development’, M/S Tata McGraw Hill
monitoring of the water quality Publishing Company, New Delhi.
To create public awareness on water • Goel R.S.(Editor), 2000, ‘Environment Impacts
conservation and economical water usage. Assessment of Water Resources Projects’, M/s Oxford
& IBH Publishing Co. Pvt. Ltd., ISBN-81-204-1422-5, New
Delhi.
CONCLUSION
• Goel R.S. (Editor), 2000, ‘Environmental
India supports 1/6th of the world’s population
Management in Hydropower and River Valley Projects’,
on 1/50th of world’s land with meager 1/25th of the
ISBN-81-204-1423-3, M/S Oxford & IBH Publishing Ltd.,
world’s water resources. Further, 80% of all diseases New Delhi.
and over 1/3rd of deaths are caused by consumption • Goel R. S. and Srivastava R.N.(Editors), 2000,
of contaminated water and on an average as much

63
‘Hydropower and River Valley Development’, M/s Oxford • Indian Water Resources Society, 1999, ‘Theme Paper
& IBH Publishing Co. Ltd., New Delhi. on Water Vision 2050’, New Delhi.
• Goel R.S., 2002, ‘Management of Water Supply and • Indian Water Resources Society, 2002, ‘Theme Paper
Wastewater for Sustenance of Indian Urban on Integrated Water Resources Development and
Infrastructure’, VIII Annual Convention and Seminar on Management’, New Delhi.
Urban Infrastructure Development, Vigyan Bhavan, New • Ministry of Water Resources, 1999, ‘Report of the
Delhi, 14-16, June 2002. National Commission for Integrated Water Resources
• Goel R.S., 2002, ‘Integrated Water Management for Development’, New Delhi.
Sustenance of Indian Urban Environment’, International • Ministry of Water Resources, 2001, ‘Report of the
Conference on Water & Wastewater: Perspectives of Working Group on Water Related Ecological Matters for
Developing Countries, 11-13th Dec, 2002, New Delhi. Xth Five Year Plan’, New Delhi.
• Goel R.S. and Shete D.T., 2005, ‘Water Quality • Prasad Kamta and Goel R.S.(Editors), 2000,
Management in Urban Centres- an Overview in Indian ‘Environmental Management in Hydro Electric Projects’,
Context’, XI Annual Convention and Seminar on Water ISBN-81-7022-870-0, M/s Concept Publishing Company,
Management in Urban Centres, Vigyan Bhavan, New New Delhi.
Delhi, 21-23, July 2005. • Supreme Court Judgement, 2000, ‘Narmada Bahao
• Goel R.S., 2000, ‘The Unquiet Narmada - The Andolan Vs. Union of India’, AIR, SCC, 2000.
Antagonism Against River Valley Projects Is Unjustified’, • Water Management Forum, 2002, ‘Theme Paper on
The Economic Times, New Delhi, 31st December 2000. Inter-Basin Transfers of Water – Challenges and
• Goel R.S., 2001, ‘River Valley Projects, Dams are Opportunities’, New Delhi.
Beneficial’, The Times of India, , 11th May 2001, New Delhi

64
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

11. Rainwater Harvesting and Water Management


Dr. S. G. Kirloskar

Abstract
The water crisis has taken considerable space in our lives. The problem of
water shortage has become a national and universal theme of discussion. The
water crisis has become alarming to such an extent that unless every citizen starts
acting towards saving and preserving the rainwater, the survival of present and
future generations would be in jeopardy. Thanks to the environmentally aware
masses for sowing the seeds of rainwater harvesting in the society.
In this paper, some of the methods of rainwater harvesting, particularly
feasible in urban areas, actually implemented elsewhere are discussed.

Introduction to the problem. The ecological balance has been


India is facing a huge water crisis today. There collapsed owing to irregular rains, environmental
is an enormous unmet demand for water. Even as deterioration, and uncontrolled pollution.
clean water sources are being viciously attacked by The exclusive reliance on river and groundwater
pollution and over exploitation, hardly any river or is already leading to a number of problems.
groundwater aquifer near a city escapes the perils
of pollution today. While agricultural lands go thirsty, Heavy extraction of water from rivers : The
many thousands of villages find it difficult to get clean rivers are so heavily exploited that there is no water
drinking water. The dispute over tap waters heard left during the summer season. Agencies involved in
in the history in olden days and in the villages in water resource development are not bothered to
present times has been transferred to urban areas implement the legislation for the minimum river flows.
too. The issue of water-crisis is more acute than the
petrol for which largely the human beings are Construction of large dams and neglect of small
responsible. water harvesting structure :
There has been growing reliance on the use of Because of this, the numbers of displaced
surface and groundwater, while the earlier reliance populations will steadily increase, while forests will
on rain water and flood water has been declined, submerge and availability of land for resettlement
even though rain water and flood water are available will go down continuously.
in much greater abundance than river water or
groundwater. It is reported that the money pumped Dependence on the state : There are financial
in for rural drinking water supply and methods used and human problems with state sponsored water
were unsustainable. Corruption, lack of people’s supply. The state subsidises water. People squander
interests in maintaining government schemes, land it. The state soon runs out of money for new projects
degradation leading to heavy runoff, heavy to meet the burgeoning demand and for maintaining
groundwater exploitation leading to lowering of projects already built. The state becomes responsible
groundwater tables, neglect of traditional water for water supply. Demand will grow in future
harvesting system and growing pollution are all added because of population growth, increased urbanization,

Professor of Environmental Engineering and Principal of Rizvi College of Engg., Bandra (W), Mumbai 50

65
industrialization. Increased water pollution has further lid to avoid contamination.
reduced the availability of clean water which means
greater stress on remaining sources of ground and
surface water.
To get the reliever, people started boring the
tube wells only to lower the depth of water table
from 50 feet to 100-200 feet. The water crisis has
become alarming to such an extent that everyone
has to be educated to start saving and preserving
the rainwater. The concept of storing the rainwater
and elevating the level of water table, popularly
known as ‘water harvesting’ has already taken its
roots.
In the villages, the rainwater harvesting is being
practiced by building small bunds, by digging small
trenches around the wells. However in urban areas Fig. 1.1
specific methods have to be applied for rainwater
harvesting. Some of the methods are listed Bleaching powder is applied to prevent
(1) water from roof or terrace can be allowed to contamination and maintain the quality of stored
permeate near the bore or well or in the house water. Airtight covers on storage tank protect the
premises if bore or well is not available water from sunlight and contamination. Initial
(2) water from roof or terrace can be taken investment cost of the structure is little high.
(i) to well or bore through pipe or Operating cost consists of cleaning expenses once
(ii) to an underground tank of sufficient capacity can in a year and periodic expenses of bleaching powder
be built to receive the water through pipe. which would cost around only Rs. 1000/- per year.
Considering the life span of the structure of 20 years
The methods of water harvesting are described and the relief it brings, this method is the most
below. reliable.
(1) Permeating the water from the roofs into
premises of the house (2) A soak-pit can also be created at the outlet
Construction of underground structures of point of the house premises
20,000 l capacity to harvest water from rooftops for As shown in fig. 1.2, a soak-pit of 8’ depth and
domestic consumption , manual withdrawal of water, 5’ length can be prepared containing brickbats,
to use runoff water as recharge in shallow wells. stones, boulders etc. The water starts filling up the
The capacity depends upon the no. of people in the trench of the soak-pit. It is estimated that a small
houses with average consumption of 7 l per capita soak-pit gives 25000 liters of water in the monsoon
per day. season.
Many houses will not have bore wells or wells.
One can utilize the open space available at any corner
of the plot for the permeation of water. A trench of
9-10’ depth and 6-8’ length can be prepared
depending up on the availability of the space.
As shown in fig. 1.1, the boulders of 2-3’ dia. are
placed up to 300 mm at the bottom of the trench.
The sand layer of 1.5-1.75 m is placed over the
boulders. The water from the roof and terrace should
be diverted into the trench. The bricks have to be
laid on the boundary of the trench to avoid falling of Fig. 1.2
earth in the trench. Trench is covered with a grilled

66
Fig. 1.3

(3) Diverting water from roof and terrace to bore A trench of 2’x 8’ (depth) is prepared at a corner
or well through a pipe with pitching of stones on one side and a lining of
The roof would be cleaned initially. Water PVC sheet. The trench is filled up with the earth for
collected from the roof is taken to the bore through rest of the year. In monsoon, the trench is filled up
pipe of 4.5" dia. As shown in Fig. 1.3, following with water before it starts spreading around. Water
material is required. is raised with this technique.
(i) pipe of 6" dia., and 4’ length (ii) two reducers
(iii) 4 mesh screen (iv) T pipe, 2 in number and T (5) Open air rainwater harvesting
cap (v) 4.5" dia. and 4.5’ length In this a number of materials are used to capture
rainfall directly from the skies.
The assembly of pipe filter can be fabricated. (i) Polythene sheets (3m x 3m size) spread across
One end of this pipe is connected to the outlet end in open air devoid of trees to collect direct rainfall.
of the pipe from the roof. The other end of the pipe Water thus collected is cleaner than the roof runoff.
filter through a casing is directed towards the bore. The polythene sheet is mounted on 4 poles and a
The first rain water is allowed to drain. The system hole is made centrally for collection of water. This
can be started operating from the second monsoon. technique is an ad-hoc one, which is installed prior
The graded sand beds incorporated in the pipe act to rain. Lot of water goes waste in heavy rains.
as filter. Thus there is three- stage filtration. Collection rate is 85-100 l/hr on an average rainfall
day. This method is expensive and weak for wind
(4) The earthen bunds are placed at certain resistance.
places in the farms and thus water is temporarily (ii) Galvanised sheet : A galvanized sheet of 2 m X
stored 1 m is spread in the open air. The sheet is tied from
Water is seeped through the soil. The earthen the two corners in the shape of a boat. The sheet is
bund is constructed about 2-3 feet above the ground mounted on 4 or 6 poles in the open air. This method
with pitching done from inner side, as shown in Fig. is costly and faces rusting problem. The water
1.4. The bund is constructed necessarily on the sloping collected is limited sufficient for about 2 days for a
ground. family of 7-8 members on average rainy day.
(iii) Akshaydhara System:
(a) First stage involves segregating the small
volume of sanitary toilet waste and subjecting it to
anaerobic bio-digestion and then discharging the liquid
effluent into the city sewer system. This step involves
only minor modification of the already existing civil
work as the drains toilet and non-toilet wastewaters
are already separated in buildings as part of the
normal building construction practice.
(b) The second stage involves construction of
percolation wells in the housing societies for soil-
Fig. 1.4 aquifer treatment of the segregated non-sanitary

67
wastewater and storm runoff water, to rejuvenate sewer system will help reduce expenditure on
the shallow ground water system. This would result collection / disposal of wet biodegradable waste as
in reduction of wastewater to be discharged into the recyclable waste is more hygienic and
city sewer system. environmentally sustainable. The biogas generated
(c) The third stage consists of providing separate can be used for street lighting. This system is useful
plumbing and pumping / recycling system for non- in urban environment because of reduction of the
potable water. This would gradually ease the load of cost of centralized sewage collection, reduction in
high quality public drinking water supply system. high quality water supply thus ensuring resource
(d) In the fourth stage, the existing wastewater sustainability and involvement of the residents in
treatment system can be augmented through maintaining hygienic conditions in city. Fig. 1.5 shows
construction of infiltration basins and soil-aquifer “Akshaydhara” concept for total water management.
treatment of the organic rich liquid waste collected
at the centralized sewage collection point. Facilitating urban water harvesting
(e) In the last stage, the domestic sewerage system Following pints need to be undertaken:
can be linked to city garbage collection system, • All water bodies in urban areas should be
wherein segregated recyclable waste is collected by controlled by one single water authority.
the dry waste collection network and the wet • All building plans must provide for rainwater
biodegradable kitchen waste is disposed off in the harvesting structures before applications are
community bioreactor, the output of which being accepted.
liquid can be let out either into the city sewer system • There should be a ban on permitting rainwater
or utilized locally for horticulture. With the to be mixed with sewer or septic tanks.
commissioning of bioreactors for kitchen waste, the • A central rainwater harvesting fund can be set

Fig. 1.5

68
up by the union water resources ministry offering Conclusion
funds on loan-cum-grant basis for the promotion of The scarcity of water has gained global
rainwater harvesting. attention. The developing countries due to lack of
• Rainwater harvesting should be viewed by the expertise, funds, national policies, public awareness
society as a means of provision of water and can not do much about this complicated problem.
prevention of flooding of low-lying urban areas. The efforts are being taken by the NGOs and other
• One of the most effective means of encouraging organizations from the micro level. The municipal
household and community participation is through offices, town planners of the urban sectors are
financial instruments such as water tariffs and changing their outlook positively towards meeting
property tax assessments. water scarcity of the future generations. That is a
• Water conservation may be included in the useful step!
curriculum of the school
• The Central Govt. should take up and declare References
the rain water harvesting as the national program. (1) NGOs from Sangli (Maharashtra) , Ref. No. 0233-
• Annual national and state awards should be 2322412
announced on recognition of outstanding work in (2) “Making water everybody’s business, Practice and
water conservation. Policy of water harvesting” Edited by Anil Agarwal, Sunita
Narain and Indira Khurana CSE publication.

69
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

12. Water Harvesting : Limitations in Implementation

*Y. Arunakar Reddy

Abstract
Since water harvesting depends on natural rainfall, it is no more reliable than the
weather. Without adequate storage facilities the system will fail in draught years. In locations
with less average annual rainfall, water harvesting will probably never be economically
feasible. Lack of rainfall data in many areas makes it very difficult to properly design a
water harvesting system.
Poorly designed and managed water harvesting systems can cause soil erosion, soil
instability, and local flooding. All catchments require a certain amount of maintenance to
keep them performing properly which may include occasional patches, weed control, cleaning
trash from screens, seal coats, or complete reshaping.
A water harvesting system must withstand weathering and some foot traffic. Some
may require fences. Contamination of the water must be constantly considered. Discolored
or contaminated water will require treatment before it can be used for human consumption.
To day no one water harvesting method or material has proven suitable for all areas,
soils, and climatic conditions. Another problem is the variability in the quality of some
materials, even though they may meet existing manufacturing specifications. This has been
particularly true for artificial rubber sheeting, since some batches have proven very effective
and durable, whereas others, with the same specification, have failed in a short time.
Design of water harvesting system has received less attention than methods or
treatments for increasing runoff from the soil surface. Most design procedures are limited
in application because of constraints mentioned in the above paragraphs.
This paper reviews all the above constraints in implementation of water harvesting
system with examples.

Introduction Ancient History


The origin of the term “water harvesting” is Although the term “water harvesting” is
not known, but it was probably first used by Geddes relatively new, the practice is ancient. Shanan,
of the University of Sidney. He defined water Evenari, and Tadmor excavated runoff farms that
harvesting as “the collection and storage of any farm were used over 3,000 yrs ago for several centuries
waters, either runoff or creek flow, for irrigation in what is now the Negev Desert of Israel. This area
use.” Several modifications of the definition have was intensively cultivated by an irrigation system
broadened the term to mean “the process of which collected the meager rainfall by clearing large
collecting natural precipitation from prepared hillside areas of rocks, smoothing the soil, and
watersheds for beneficial use”. concentrating the runoff by a system of contour

*Associate Professor in Civil Engineering, Swami Ramananda Tirtha Institute of Science & Technology,
Nalgonda, Andhra Pradesh. E-mail:arunakar_reddy2001@yahoo.com

70
ditches. The runoff water was used to irrigate a much served as the basis for installing numerous butyl
smaller lower-lying area. By the time of the Roman rubber catchments and storage bags, including over
occupation these runoff farms had evolved into 300 installations in Hawaii and other pacific islands.
relatively sophisticated systems covering about In 1958 and 1959 two ancient farm systems in
300,000 ha (740,000 acres) of the Negev Highlands. Israel were restored to study the hydrology of the
After the Arab conquest, the ancient desert desert catchments and the water harvesting
agriculture in this area slowly disintegrated. techniques of the ancient farmers.
There is evidence that less complicated systems In the 1960’s Myers and Cluff in the United
were used about 700 to 900 yrs ago by the Indians States and Hillel in Israel initiated research programs
of the southwestern United States, particularly in to devise methods of waterproofing the soil surface
the four corners of Arizona, Utah, Colorado, and and using soil as the supporting structure. Myer’s
New Mexico. group developed methods using sprayable asphalt
compounds, plastic and metal films bonded to the
Recent Development soil, soil compaction and dispersion, and field-
Collection and storage of runoff from roofs of fabricated asphalt fiberglass membranes. Cluff
houses is a more recent practice that is still used in concentrated on using sodium salts to seal the soil
some regions of the world. Some of the first and on gravel-covered plastic membranes. Hillel
catchments build specifically to collect water were investigated several soil treatments, like crude oil
roof – like structures built in Australia in the early and water repellants, but worked primarily on soil
1930’s using galvanized sheet iron on a wooden smoothing and crusting.
frame. Sheet metal was also used for other
catchments built in Australia at about the same time, Present Status and Potential
but the metal sections were placed directly on the Research on ways to increase runoff by soil
soil surface and anchored with spikes. treatments is presently confined to a few U.S.
The development of the most widely used type researchers. Although both Israeli and Australian
of catchment was reported by the Public Works researchers are investigating the use of fuel oils and
Department of Western Australia in 1956. These asphalt on a small scale, their major emphasis is
catchments were called “roaded catchments” runoff farming and roaded catchments, respectively.
because the soil was graded into a series of parallel As yet water harvesting is not accepted as a
roadways or gently sloping ridges that drained into competitive method of providing water supplies,
the ditches separating them. These ditches carried although over 3,000 water harvesting systems have
the collected water to a storage reservoir by way of been installed around the world. Most catchments
a collection ditch which ran perpendicular to the are the roaded catchments type and are used in
roadways. Several thousand acres of these Western Australia where private farms have supplied
catchments have been installed in the relatively the capital for installation. In the U.S. catchments
uniform topography of Western Australia where soils have been built almost exclusively on public lands
often contain significant clay layers which are by government agencies or research organizations.
exposed and compacted and provide a rather low Despite the rather slow acceptance of water
infiltrating surface. Most of these catchments have harvesting to provide water supplies, its potential
been used to provide farm water supplies, although for providing economical water is still tremendous.
some are used for municipal water supplies. When water harvesting techniques are used,
In the United States water harvesting began available water supplies can be based on
during the 1940’s and early 1950’s when several precipitation rather than stream flow or ground
small sheet steel and concrete catchments were built water. This is true for both arid and humid areas.
to provide drinking water for livestock and wildlife. Hawaii and Jamaica are two areas using water
Of considerably more impact was the pioneering harvesting techniques developed by researchers in
work of Lauritzen in the 1950’s in which plastic and arid parts of the world. For example, a 0.6-ha
artificial rubber membranes were evaluated for catchment in Manchester, Jamaica, provides more
constructing catchments and reservoirs. This work than 245,000 1/day of water during a year of average

71
rainfall. outcrops, highways, airports, and parking lots.
Water harvesting will never be used in some Chiarella and beck described a highway catchment
areas because other water sources are more system in Arizona, used for livestock drinking water
economical, or because the annual precipitation is that has been used for over 16 yrs with no observed
very low. However, water harvesting can often mean detrimental effect to livestock. According to Evans,
the difference between life and death, thus making Woolhiser, and Rauzi, the interstate highway system
its economic aspects of minor importance. in Wyoming would provide 2 ha/km of catchment.
Assuming a 90% catchment efficiency, the water
Methods of Harvesting supply from a 250-mm rainfall zone would be almost
A wide variety of methods and materials have 4,700,000 1/km.
been used to increase precipitation runoff into For land where rock outcrops or highways are
storage facilities. Some materials, like concrete and not available, sometimes a water supply can be
sheet metal, can be used in almost any situation. developed by simple land alteration treatments
However, the most economical system for a which increase the runoff from the soil surface. Land
particular site can be determined by evaluating clearing is probably the least expensive treatment,
several factors, like soil type and depth, accessibility but the increase in runoff is often negligible, unless
to equipment, climatic variables, vegetation, labour storms are of high intensity of long duration.
and material costs, and availability of treatment Because small precipitation events do not usually
products. Whatever treatment or method is used, produce sufficient runoff, rather large catchment and
some maintenance will be required to insure storage facilities must be constructed to insure an
optimum performance. adequate water supply to carry over between the
For discussion, the methods used to increase large runoff events.
runoff can be divided into four general categories: Another simple treatment is constructing
vegetation management, land alteration, chemical contour ditches to collect runoff from hillsides
treatments, and soil covers. before it reaches natural channels or infiltrates into
the soil. This was practiced by ancient people who
Vegetation Management : A summary of studies once lived in what is now Mesa Verde National
conducted throughout the world indicates that runoff Monument in southwestern Colorado.
can be increased by vegetation management from The “roaded catchments” discussed previously
areas with precipitation in excess of 280 mm are a more elaborate method of land alteration. It
annually. However, the conversion efficiency for has been estimated that over 2,500 of this type of
producing extra water increases as rainfall increases, catchment have been built in Western Australia.
at least up to 860 mm/yr; therefore, conversions at Soil erosion is a potential problem with all of
lower rainfall values may not be economical. the land elaborate methods. Hollick suggests that
Potential water yield increases depend upon the maximum nonerosive slopes should be used to
percent of total precipitation occurring as snowfall, increase runoff. However, he indicated that no
the type, depth, and slope of the watershed soil, and universal method exists for predicting the maximum
the varieties of vegetation with their associated nonerosive slope, thus each site must be field
evapotranspiration rates, which can be managed evaluated.
considering all other constraints. Besides increasing
water yield, vegetation management on watersheds Chemical and Physical Soil Treatments : Treating
can improve wildlife habitat, forage production, and soil surfaces with materials to prevent water from
recreation activity. soaking into the soil is an intriguing approach to
building efficient and low-cost catchments. Runoff
Land Alteration : Often the simplest and least from bare soil can often be increased by dispersing
expensive method of water harvesting is to construct its aggregated particles with sodium salts to reduce
walls or ditches to collect runoff from existing permeability. Hillel et al. in Israel, and Myers in
natural or manmade catchments like large rock Arizona, were able to increase runoff by treating
outcrops, highways catchments like large rock cleared and smoothed sandy-loam and clay-loam

72
soils with sodium carbonate. Both found that on the soil and the oil used. Rawitz and Hillel found
treatment effectiveness was lost in about 1 yr and that retreatment each 2 years improved runoff yield
erosion was excessive. The same treatment has been above initial treatment values.
very successful for sealing earthen stock tanks on Soil Covers. – Soil covers are treatments that
some soils where erosion is no problem. can generally be applied to a wide range of soil types,
High-rate applications of sodium chloride have since they only use the soil as a supporting structure
proven considerably more successful on a and do not depend on its properties to provide water
Whitehouse loam soil in the Tucson area. Here the repellency.
soil was cleared and smoothed and 11,000 kg/ha of Asphalt pavements for water harvesting were
granulated salt was mixed into the upper 5 cm of constructed by spraying asphalt compounds on
soil. The soil was later compacted after a couple of nonswelling soils. Another, more durable type of
small rains. Over 50% runoff has been obtained asphalt catchment was made by placing a layer of
during the 3 yrs of records, with no deterioration or fiberglass or polypropylene matting on the surface
salt movement noted. and spraying it with asphalt. A seal coat of asphalt
A silicone water repellant treatment on loamy and a protective cover of special paint produced a
sand in Arizona produced 90% runoff during the very durable and efficient catchment. The matting
first year, but runoff gradually decreased to 60% serves as a reinforcing fabric, and the asphalt as a
after 4 yrs. water-proofing agent. The paint extends the period
Care must be used in designing silicone - and between maintenance retreatments by protecting the
salt – treated catchments since increased runoff can asphalt from sunlight, and reduces runoff water
cause excessive erosion. Silicone treatments provide discoloration. This type of catchment can be
no apparent stability, and stabilizing effects of salt installed over almost any soil and requires only
treatments have been limited to certain sandy loam minimum surface preparation.
soils. Thin plastic films have been used as ground
A paraffin wax treatment on a sandy loam soil covers, but they were easily destroyed by wind and
has produced 90% runoff on test plots for over 2 deteriorated rapidly under exposure to solar
years with no visual signs of deterioration. The radiation. Cluff developed a unique method of
molten paraffin penetrates the soil up to 25 mm and utilizing plastic’s relatively low cost and high water-
tends to stabilize the soil particles as it solidifies. proofing characteristics. He developed equipment
However, a 0.2-ha field catchment treated with to install plastic film and cover it with a layer of
paraffin was no longer water repellant or stable after small gravel. The gravel protects the plastic against
freezing and thawing with a light snow cover. both wind and weathering damage; however, the
Although laboratory tests in a freeze-thaw chamber gravel also reduces the runoff efficiency by retaining
confirmed the loss of effectiveness for this soil, two part of the water which is then lost to evaporation.
other operational catchments on sandy soils in These catchments are useful where gravel is
Arizona have survived a winter of freezing and available and a large portion of the annual rainfall
thawing with no apparent damage. The lower end occurs as storms larger than 2.5 mm. A more recent
of one catchment did erode somewhat when the fine catchment treatment developed by Cluff is
soil was disturbed during construction. Laboratory constructed by spraying soil with a tack of asphalt,
tests indicated that hot summer temperatures may followed immediately by a 4-mail layer of
regenerate the wax treatments after freeze-thaw polyethylene plastic. After the plastic is coated with
damage on some soils. These tests also indicated an additional asphalt layer, rock chips are added as
that wax treatments were not effective on certain a top cover. This catchment can be applied to a wide
soils under any climatic conditions; therefore, more range of soil types and yields about 95% of the
effectively treated with wax. rainfall runoff. A similar catchment using standard
Several researchers have reported using fuel roofing paper and procedures, but applied to the soil
oil to reduce infiltration. All of the studies indicated surface, has remained in good condition after 6 yrs
that initially the oil did reduce infiltration, but and yields about 80% runoff.
completely deteriorated within to 3 yrs, depending Artificial rubber sheeting has probably been

73
most widely used as a ground cover treatment. release to the crop may be necessary if precipitation
Several rubber catchments have been used for over uniformity and/or variability do not meet the crop
20 yrs in the United States, and over 300 additional requirements.
rubber catchments or storage units have been Storage requirements should be balanced
installed in Hawaii and other Pacific islands during against the quantity of precipitation for the area and
the past 15 yrs. When correctly installed and the reliability of receiving this precipitation. Storage
maintained, good rubber sheeting is an efficient requirements can be readily estimated by
catchment material that provides high quality water. considering the purpose for which the water will be
Problems encountered with its use have been used and the use period. The precipitation quantity
attributed to improper installation, lack of and dependability generally are often more’ difficult
maintenance, poor quality material, or animal and to determine due to inadequate precipitation records.
damage. Artificial rubber catchments have the Seepage Control. Dedrick reviewed the three
advantage of being rather easily transportable and means of storing harvested water – excavated pits
simply installed once the site has been prepared. or ponds, tanks, and bags – and various methods of
Corrugated sheet metal, one of the first controlling seepage losses. Excavated pits or small
catchment materials used for collecting ponds are easily constructed in relatively flat areas,
precipitation, has been used continually through the but usually a water barrier must be used to minimize
years, although high costs have restricted its use. seepage losses. The type of material used may
Some early sheet metal catchments were built above depend on the pit site. Dedrick presented a list of
ground on a roof-like framework. Many catchments characteristics that should be considered when
failed when the framework deteriorated or collapsed selecting a barrier for seepage control: (a) degree of
under heavy snow loads. Sheet metal catchments seepage control expected; (b) resistance to
built on the ground have proven very durable and deterioration by soil microorganisms, atmospheric
essentially maintenance free. Their runoff efficiency elements, wind, and sub grade movement: (c)
is perhaps the highest of any catchment material, resistance to mechanical puncture and vermin attack;
and they have often produced runoff from dew. If (d) toxicity; (e) installation ease; (f) transportability
protected from corrosion, sheet metal can be used to use site; (g) maintenance requirements; and (h)
on almost any soil type and can provide an economics.
economical source of high quality water under Lining materials that have been used, with
present economic conditions. varying degrees of success, can be categorized as
Use of concrete as a catchment material has (a) earth linings and chemical treatments –
been limited, mainly because of its high cost. compacted earth, bentonite, chemical additives, and
Concrete catchments require more maintenance and chemical sealants; (b) membrane and film –
have lower runoff efficiency (60 to 80%) then prefabricated asphaltic plank, hot applied asphaltic
several other catchment materials. However, when membrane, reinforced asphaltic membrane, plastic
properly constructed and maintained, concrete film, and synthetic rubber; (c) hard surface linings
catchments are very durable and will provide years – Portland cement concrete, shotcrete, soil-cement,
of service. brick, and stones. The underlined materials have
been the most successfully used in the field and are
Storage of Harvested Water discussed further.
Where water supplies are limited and water use Sodium bentonite, fine-textured colloidal clay,
rates exceed the supply rate, a means of storing has been used to reduce seepage in coarse-textured
harvested water becomes an essential part of the soils. A good sealing bentonite must have a sufficient
water harvesting systems. The storage generally amount of exchangeable sodium to disperse the soil
means confinement in either excavated pits or ponds, particles. Application rates generally range from 5
or tanks. One exception to this type of storage is to 15 kg/m. Laboratory analysis, like that of
direct storage in the soil profile associated with Dirmeyer is recommended as a guide in classifying
runoff farming. Even with runoff farming, the bentonite to be used and in determining
conventionally storing water for later controlled application rate.

74
Sodium salts have been the most successful thicknesses and can be either fabric-supported or
chemical additives used to control seepage. Sodium nonsupport. For most excavated pits, 0.08 cm, nylon-
carbonate has been most effective considering supported liners are adequate. Reservoir side slopes
treatment costs and ability to reduce seepage. The should be not steeper than 1:2. Information regarding
Soil Conservation Service recommends sodium field installations, recommendations for use, and
carbonate application rates of 0.5 to 1.0 kg/m while physical property requirements are discussed in
Reginato et al. presented an equation for calculating several publications.
the amount of use. Retreatment may be required Vertical-walled tanks have advantages
every 2 to 3 yrs. unattainable with excavated pits including: the ratio
Reinforced asphaltic membrane liners consist of water volume stored to water surface area is
of a substrate matting of fiberglass or polypropylene maximum when the walls are vertical; evaporative
generally made watertight by using asphalt – either control devices, like floating covers, can be used
emulsion or cutback. Linings are fabricated in the more effectively and efficiently; and maintenance
field and shaped like the excavated pit. They can be requirements are generally low and repair is easy.
used as an exposed liner if properly protected from One main disadvantage of vertical-walled tanks is
mechanical damage. Pit side slopes should not be initial cost; however, on an amortized basis the
steeper than 1:2 (vertical: horizontal). Plant growth yearly cost may be lower than some low-initial-cost
under the liners should be eliminated by using soil storage systems. Materials successfully used in
sterilants. constructing tank walls include Portland cement
Plastic films of polyvinyl chloride (PVC), concrete; plastered concrete and metal. The bottom
Polyethylene (PE), and chlorinated polyethylene of the tanks has been made watertight by using
(CPE) have been successful only when buried. puddle clay, bentonite, sodium salts, concrete, metal,
Thickness of buried plastic film should be 0.02 to and flexible membranes.
0.03cm depending on the sub grade soil. Side slope Storage bags constructed of butyl-coated nylon
should not exceed 1:3. The earthen pit should be have been placed in excavated pits or basins. These
over-excavated to accommodate the cover material. storage systems are completely closed and both
The sub grade should be cleared of all sharp objects, seepage and evaporation losses are controlled. Their
and if too coarse, a fine-textured cushion should be main disadvantages are susceptibility to mechanical
laid in the pit before installing the film. damage, vandalism, and vermin attack.
Recommended cover thickness varies from 15 to Evaporation Control. — Cooley has discussed
30 cm with the layer next to the film not coarser evaporation suppression method. Many methods
than silty sand. Plastic-lined, rock-filled, excavated have been investigated and can be categorized by
pits can be used and are a variation of the standard, energy-reducing treatments (energy involved in the
buried, plastic-lined pond. The main difference is evaporative process) like (a) changing the water
that the pond is completely filled with rock rather color, (b) using wind barriers, (c) shading the water
than just covered with to protect the plastic. Freedom surface, and (d) floating reflective covers. Of the
from vandalism and reduction of evaporation losses four energy-reducing categories, floating covers
(as much as 90%) are advantages of rock-filled pits have been most widely researched and certain
over open storage systems. materials seem most promising for use in water
Butyl rubber and ethylene propylene diene harvesting storage facilities. These include covers
monomer (EPDM) are synthetic rubber membranes of continuous paraffin wax, polystyrene rafts, and
used as water barriers for harvesting water. All formed rubber.
synthetic rubber membranes can be used as exposed The paraffin wax, like that used for canning,
linings, but they must be adequately protected melts at 128 to 130 F and forms a continuous cover
against mechanical damage and damage due to during summer months. The wax can either be
vandalism and burrowing animals. Synthetic rubber placed on the surface as blocks which will later be
membranes are resistant to weathering processes that melted by the sun to form a wax layer or melted
cause failure in other membrane and film materials. with a heater and sprayed or poured on the water.
Rubber membranes are fabricated in numerous Polystyrene rafts are constructed of 1.2 X 1.02 cm

75
sheets of expanded polystyrene, 25mm thick, coated Vegetation management methods have been
with emulsified asphalt and covered with a layer of applied to larger areas than the other water
chips. They are then coupled together using a clamp harvesting techniques. Annual precipitation in
made of PVC pipe. An outer frame of 32 – mm excess of 280 mm is generally required to assure
diameter PVC pipes is used as a bumper for the rafts. successful vegetation management results, and
Continuous covers of low-density, closed-cell potential for increasing runoff yield increases as
synthetic rubber sheeting, available as 1.2-m wide annual precipitation increases. Land alteration
roll stock, have been fabricated for use on water methods are especially attractive where impervious
storage tanks. Covers have been fabricated from 5- areas already exist (highways, airports, rock
and 6-mm thick material. outcrops, etc.), and only collection and storage
All three covers – continuous paraffin wax, facilities are required. Land alteration techniques
polystyrene rafts, and foamed rubber – reduce are also economically feasible in areas where labor
evaporation by 85% to 95%. The cost of water saved costs are low and soil conditions are suitable.
in high evaporation areas compares favorably with Chemical and physical soil treatments, like salts,
alternate water sources. Wind damage to floating silicones, and waxes, have been applied successfully
covers can be a disadvantage. Joining the to certain soils, but more research is required to
polystyrene rafts together helps to minimize the wind delineate the conditions under which each can be
problem, as does maintaining an adequate freeboard used. Soil covers are not generally restricted by soil
with the foamed rubber. The wax covers have and climatic conditions; however, initial cost of the
withstood winds up to 22 m/sec on a small tank with system will generally be higher than for the other
only 25 mm freeboard. methods discussed. Regardless of the material or
method used, erosion protection, routine
Summary maintenance, and protection of the catchment and
Water harvesting is an ancient art used by storage should be considered.
farmers in the Negev Desert of Israel over 3,000 yrs Water collected from the catchments can be
ago where they cleared hillsides to increase rainfall- stored in the soil itself (as in runoff farming) or in
runoff and directed the water to cultivated fields in excavated pits or ponds, bags, or tanks. Sophisticated
the valleys. This practice was then essentially computer models and practical experience have been
abandoned until the early 1930’s, except for used to provide design standards for constructing
collecting rainfall from rooftops in some areas. and optimum sizing of catchment areas and storage
Although revival of water harvesting techniques facilities.
began in the early 1930’s, most activity in both Water harvesting systems may provide the only
construction and research did not begin until the late source of water in some areas and can provide a
1950’s. even this research effort and the development low energy input, economical water source in many
of new materials have not yet produced widespread others. The water obtained from water harvesting
use of water harvesting methods to provide water system can be used to increase the productivity of
supplies, although there is still a potential for rangelands of proper management practices are
economically collecting water in many areas of the followed. Although it is very useful in many areas,
world. water harvesting depends on natural precipitation
The particular water harvesting method used and is, therefore, limited to areas where precipitation
to collect precipitation depends on several factors, is sufficient and variability is not excessive.
including soil type and depth, vegetative cover,
surface roughness and slope, climatic factors, land, References
labour, and material costs, water use rate and • American Society of Agricultural Engineers,
distribution, water quality desired, and availability “Installation of Flexible Membrane Linings,
of materials. All of the commonly used methods fall “Agricultural Engineers Yearbook, ASAE
into one of four categories — vegetation Recommendation: ASAE R340, American Society
management, land alteration, chemical or physical of Agricultural Engineers, St. Joseph, Mich., 1974.
soil treatments, or soil covers. • Baker, James W., “Polypropylene Fiber Mat

76
and Asphalt Used for Oxidation Pond Linear, “Water • Cluff, C. B., “Low-Cost Evaporation Control
and Wastes Engineering, Vol.7 No. 11, 1970, F-17- to Save Precious Stock Water, “Arizona Farmer –
21. Ranchman, Vol. 51, No. 7, July 1972.
• Burdass, W.J., “Water Harvesting for Livestock • Cluff, C. B., “Plastic Reinforced Asphalt
in Western Australia, “Proceedings of the Membranes for Precipitation Harvesting and
Water Harvesting Symposium, U.S. Department of Seepage Control, “Proceedings of the 11th National
Agriculture, Agricultural Research Service, Western Agricultural Plastics Conference, San Antonio, Tex.,
Region, ARS W-22, Feb., 1975. 1973.
• Burgy, R.H., and Papazifiriou, Z.G. “Effects of • Cluff, C.B., and Dutt, G. R., “Using Salt to
Vegetation Management on Slope Stability, Increase Irrigation Water, “Progressive
“presented at the January 25, 1971, Water Resources Agricultural in Arizona, Vol. 18, No. 3, 1966.
Center Advisory Council Meeting, held at Los • Dedrick, A. R., “ Rain trap Performance on the
Angeles, Calif. Fishlake National Forest, “ Journal Range
• “Catchment Areas for Livestock Water,” Soil Management, Vol. 26, No. 1, 1973.
Conservation Service, Wyoming Engineering • Frasier, G. W., ed., “Concluding Remarks,
Standard, 701-WY, REev. Jan., 1968. “Proceedings of the Water Harvesting Symposium,
• Chiarella, J.V., and Beck, W.H., “Water U.S Department of Agricultural, Agricultural
Harvesting Catchments on Indian Lands in the Research Service, Western Region, ARS W-22, Feb.,
Southwest,” Proceedings of the Water Harvesting 1975.
Symposium, U.S. Department of Agriculture, • Frasier, Gary W., Myers, Lloyd E., and Griggs,
Agricultural Research Service, Western Region, John R., “Installation of Asphalt – Fiberglass Linings
ARS W-22, Feb., 1975. for Reservoirs and Catchments, “WCL Report 8,
• Cluff, C. B., “Water Harvesting Plan for U.S. Department of Agricultural, U.S. Water
Livestock of Home,” Progressive Agriculture in Conservation Laboratory, 1970.
Arizona, Vol. 19, No. 3, 1967.

77
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

13. Roof Top Rainwater Harvesting for Artificial Recharge to


Ground Water : An Urgent Need of Present Century
* P. K. Singh **Bhaskar Singh **B. K. Tewary

Abstract :
The water has been harvested in India since antiquity. Evidence of this tradition
can be found in ancient texts, inscriptions, local traditions and archaeological remains.
The Puranas, Mahabharata, Ramayana and various Vedic. Buddhist and Jain texts
contain several references to canals. tanks, embankments and wells.
Overexploitation of groundwater resources is increasingly being recognized as a
major problem. Despite being one of the wettest countries of the world, India’s growing
water shortage has reached alarming proportions. Over the last few centuries, a
range of techniques to harvest every possible form of water has been developed.
Technically speaking, water harvesting means capturing the rain where it falls, or
capturing the run-off in one’s own village or town. So, the need of roof top rain water
harvesting has become an urgent demand of the present century.
The amount of water harvested depends on the frequency and intensity of rainfall,
catchments characteristics, water demands and how much runoff occurs & how quickly
or how easy it is for the water to infiltrate through the subsoil and percolate down to
recharge the aquifers. Moreover, in urban areas, adequate space for surface storage
is not available and water levels are deep enough to accommodate additional rain
water to recharge the aquifers, so the roof top rain water harvesting is ideal solution
to solve the water supply problems.
The present paper focuses in brief about the components of the roof top rain
water harvesting structure, types of recharge structures and the benefits of the system.

1.0 Introduction : water from the deepest portions of the earth.


Rapid industrial development, urbanization and Thus, the knowledge on the several traditional
increase in agricultural production have led to water harvesting processes, storage facilities,
freshwater abstraction in many parts of the country practices and their significance to the present day
as well as of the world. As the recharging of the situations has become necessary in the present
groundwater is not adequate, there is a rapid century. It is estimated1 that 8 billion people (globally)
decrease in groundwater level in several parts of are to be fed by the end of the first quarter of the
the world. In view of increasing demand of water 21st century. This effort requires utilization of all
for various purposes like agricultural, domestic and water resources intelligently. For this, there is a need
industrial etc., as well as unpredictable monsoon to collect, conserve and use critical water resources
rainfall, a greater emphasis is being laid now-a-days judiciously.
for re-use of waste water. It has become an urgent In this context, roof top rainwater harvesting
need of this century. Advancement in pumping can become popular technique to improve the
technology is extensively used in extracting ground recharge regionally and globally. Moreover, in Urban

* Scientists **Research Intern, Geo-environment Division, Environmental Management Group


Central Mining Research Institute, Barwa Road, Dhanbad, Dhanbad- 826001 (Jharkhand)

78
Areas, adequate space for surface storage is not c) Abandoned Dugwells
available and water levels are deep enough to d) Hand Pumps
accommodate additional rain water to recharge the e) Recharge Wells
aquifers, so roof top rain water harvesting is ideal f) Recharge Shafts
solution to solve the water supply problems. g) Lateral Shafts With Borewells

2.0 Urgency of the Process: a) Storage Tanks :


A comparison of water levels from 1960 to 2001 for harvesting the roof top rain water, the
shows that water levels in major part of country are storage tanks may be used.
steadily declining because of over-exploitation. these tanks may be constructed on the surface
During 1960, in Delhi, the ground water level was as well as under ground by utilizing local material.
by and large within 4 to 5 meters and even in some the size of tank depends upon availability of
parts water logged conditions existed. During 1960- runoff & water demand.
2001, water levels have declined by 2- 6 m. in most after proper chlorination, the stored water may
part of the alluvial areas. Decline of 8-20 m. has be used for drinking purpose.
been recorded in south-west district and in south
district the decline has been 8-30 m. Areas b) Recharge Pits
registering significant decline fall mainly in south and recharge pits are constructed for recharging
south-west districts and have been identified as the shallow aquifers.
priority areas for taking up artificial recharge to these are constructed 1 to 2 m. wide and 2 to 3
ground water by roof top rain water harvesting. m. deep which are back filled with boulders, gravels
Thus, though the concept of roof top rainwater & coarse sand.
harvesting is an age old one, but systematic collection the size of filter material is generally taken as
and recharging to ground water is of recent times. below:
As surface water sources fail to meet the rising coarse sand : 1.5 - 2 mm
demands of water supply in urban areas, ground gravels : 5 - 10 mm
water reserves are being tapped and over-exploited boulders : 5 - 20 cm
resulting into decline in ground water levels and the filter material should be filled in graded
deterioration of ground water quality. This precarious form. boulders at the bottom, gravels in between
situation needs to be rectified by immediately & coarse sand at the top so that the silt content that
recharging the depleted aquifers. will come with runoff will be deposited on
the top of the coarse sand layer and can easily be
3.0 Typical Roof Top Rainwater Harvesting removed.
Structure: if clay layer encountered at shallow depth, it
A typical roof top rainwater harvesting system should be punctured with auger hole and that auger
comprises of: hole should be refilled with fine gravel of 3 to 6 mm
a) roof catchments size.
b) gutters
c) down pipes c) Trenches
d) rain water/storm water drains these are constructed when the permeable
e) filter chamber strata is available at shallow depths.
f) ground water recharge structures like pit, trench may be 0.5 to 1 m. wide, 1 to 1.5 m.
trench, tube well or combination of above structures. deep and 10 to 20 m. long depending upon
availability of water.
4.0 Methods of Groundwater Recharge: these are back filled with filter materials. in
For Rainwater Harvesting System following case of clay layer encountered at shallow
structures are required: depth,
a) Recharge Pits the number of auger holes may be constructed
b) Recharge Trenches & back filled with fine gravels.

79
d) Abandoned Dug wells 30 m. long depending upon availability of water with
existing abandoned dug wells may be utilised one or more bore wells may be constructed. the
as recharge structure after cleaning and desilting lateral trench is back filled with boulders, gravels &
the same. coarse sand.
for removing the silt contents, the runoff water
should pass either through a desilting chamber 5.0 Benefits of Rooftop Rainwater Harvesting
or filter chamber. Structure
a) An ideal solution of water problem in areas
e) Abandoned Hand pumps having inadequate water resources.
the existing abandoned hand pumps may be b) The ground water level will rise.
used for recharging the shallow / deep aquifers, c) Mitigates the effects of drought.
if the availability of water is limited. d) Reduces the runoff which chokes the storm
water should pass through filter media before water drains.
diverting it into hand pumps. e) Reduces flooding of roads.
f) Quality of water improves.
f) recharge wells g) Soil erosion will be reduced.
recharge wells of 100 to 300 mm. diameter .
are generally constructed for recharging the 6.0 Design Criteria of Recharge Structures
deeper aquifers and roof top rain water is diverted Recharge structures should be designed based
to recharge well for recharge to ground water. The on availability of space, availability of runoff, depth
runoff water may be passed through filter media to to water table & lithology of the area.
avoid choking of recharge wells.
Assessment Of Runoff
g) Vertical Recharge shafts The runoff should be assessed accurately for
For recharging the shallow aquifers which are designing the recharge structure and may be
located below clayey surface at a depth of about 10 assessed by following formula.
to 15 m, recharge shafts of 0.5 to 3 m. diameter and Runoff = Catchment area * Runoff
10 to 15 m. deep are constructed depending upon Coefficient * Rainfall
availability of runoff. these are back filled with
boulders, gravels & coarse sand. For lesser diameter Runoff Coefficients
shafts, the reverse / direct rotary rigs are used and Runoff coefficient plays an important role in
larger diameter shafts may be dug manually. In upper assessing the runoff availability and it depends upon
portion of 1 or 2 m depth, the brick masonry work is catchment characteristics. General values are
carried out for the stability of the structure. tabulated below which may be utilised for assessing
the runoff availability.
h) Shaft with Recharge well
If the aquifer is available at greater depth say Type of catchment Runoff coefficient
20 or 30 m, in that case a shallow shaft of 2 to 5 m
diameter and 5 to 6 m deep may be constructed Roof top 0.75 - 0.95
depending upon availability of runoff. inside the shaft, Paved area 0.50 - 0.85
a recharge well of 100 to 300 mm diameter is Bare ground 0.10 - 0.20
constructed for recharging the available water to
deeper aquifer. at the bottom of the shaft a filter Green area 0.05 - 0.10
media is provided to avoid choking of the recharge
well. Design Considerations
Three most important components, which
i) Lateral trench with bore wells need to be evaluated for designing the rainwater
For recharging the upper as well as deeper harvesting structure, are:
aquifers, lateral trench of 1.5 to 3 m. wide & 10 to 1. Hydrogeology of the area including nature and

80
extent of aquifer, soil cover, topography, depth to or green belts and general built up pattern of the
water levels and chemical quality of ground water area.
2. Area contributing for runoff i.e. how much area 3. Hydrometeorological characters viz. rainfall
and land use pattern, whether industrial, residential duration, general pattern and intensity of rainfall.

Schematic sketch of Rain Water Harvesting in Rural Areas

81
Roof Top Rain Water Harvesting Structure

8.0 Conclusions : References :


Thus, water has been harvested in India since a) Nagrajan R. : Water ; Conservation, Use and
antiquity. Evidence of this tradition can be found in Management for Semi-arid Region: Capital
ancient texts, inscriptions, local traditions and Publishing Company;2006.
archaeological remains. The Puranas, Mahabharata, b) Athavale, R.N. Water harvesting and
Ramayana and various Vedic. Buddhist and Jain sustainable supply in India, Centre for
texts contain several references to canals. tanks, Environmental Education and Rawat Publications;
embankments and wells. 2003
Overexploitation of groundwater resources is c) Natarajan, P.M., & Kallolikar S. Rain Water
increasingly being recognized as a major problem. Harvesting New Approaches For Sustainable
Despite being one of the wettest countries of the Water Resources Development, Sarma Sanitorium
world, India’s growing water shortage has reached Press; 2004
alarming proportions. Over the last few centuries, a d) http://www.rainwaterharvesting.org/urban/
range of techniques to harvest every possible form Howtoharvest.htm
of water has been developed. Technically speaking, e) h t t p : / / a k a s h - g a n g a - r w h . c o m / RW H /
water harvesting means capturing the rain where it WaterHarvesting.html
falls, or capturing the run-off in one’s own village or f) http://www.gdrc.org/uem/water/rainwater/
town. Thus, the role of Institution of Engineers introduction.html
(India), Nagpur Local Centre is worthy in this Todd, D.K. (1980). Groundwater Hydrology.
direction. Second edition., John Wiley & Sons, New York.

82
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

14. Roof Top Rain Water Harvest- A Long Lasting Solution to


Drive away the Need of Water Tankers
*Mrs. Charu Bhavsar **Pradeep Bhalge

Abstract
Water has been harvested in India since antiquity. Roof top water harvesting
techniques are not new for Indians. Numerous documentary and filed evidences about
the water harvesting techniques used by the ancestors exist in India. For general,
Maharashtra receives a good amount of annual rainfall. But the Government has to
supply drinking water by the water tankers to numerous villages and wadies. Many of
the wadies or tandas are situated in remote places. In such cases drinking water cannot
be supplied to the thirsty people by tankers or by any other means. The water supplied
by the Tankers may not be either pure or sufficient. There is a need to think; ‘Is it
necessary to supply the drinking water by Tankers?’ The answer is ‘not in all the
cases’. Roof top rainwater is the best solution to solve all the problems discussed above.
This paper will illustrate the drinking water needs, computation of the quantity of the
annual rain water from the roof top, methods and type of storages in practice, care to
be taken to maintain the purity of the rain water harvested, and the merits and demerits.

Introduction ponds and tanks in southern India. In Tamil Nadu,


India receives good amount of rainfall. But the ancient people stored rainwater in public placed
the rainfall is highly erratic in nature. It is not evenly separately one for drinking purposes and another
distributed over the entire area and over the period. for bathing and other domestic purposes. They also
India have distinct rainy season. In most part of the formed percolation tanks or ponds, for the purpose
country the annual rainy days varies from 10 to 45. of recharging irrigation or domestic wells. They
As soon as the rains are over, water scarcity starts. periodically clean the waterways so as to get clean
The ancestors realize that, harvesting the water in water throughout the year. These are instances in
rainy season will be use full in rest period of the the history that people constructed crude rubble
year. They have developed varies techniques to bunds across river courses either for diversion of
harvest the water because they knew that without water or for augmenting the ground water.
harvesting the water life is difficult to survive. There Unfortunately under the British governance
are evidences that, during Harappan period, there system the wisdom of the raindrop was lost. The
was very good system of water management as technological interventions, which got water into
could be seen in the latest excavation at Dholavira our taps, relied on large-scale water impoundments
in Kachch. The people use to manage water in the upper reaches of rivers and pushed the wisdom
resources considering it as part of the nature, which of the raindrop into the background. Today the need
is essential for their survival. This could be seen of the hour is to go back to the wisdom of ancestors,
from the rainwater harvesting structures in the low rediscover their concepts and adapt them into our
rainfall areas of Rajasthan, harvesting springs in lives.
hilly areas and mountainous region and percolation

*Indian Council for water and culture; Aurangabad.


**A.E.II, Water Resources Department, Government of Maharashtra.

83
Traditional rainwater harvesting Kunds of Thar Desert :
Traditional rainwater harvesting, which is still In the sandier tracts, the villagers of the Thar
prevalent in rural areas, was done in surface storage Desert had evolved an ingenious system of rainwater
bodies like lakes, ponds, irrigation tanks, temple harvesting known as kund or kundis. Kund, the local
tanks etc. In urban areas, due to shrinking of open name given to a covered underground tank, was
spaces, rainwater will have to necessarily be developed primarily for tackling drinking water
harvested as ground water, Hence harvesting in such problems. Usually constructed with local materials
places will depend very much on the nature of the or cement, kund were more prevalent in the western
soil viz., clayey, sandy etc. The below listed are the arid regions of Rajasthan, and in areas where the
various kinds of traditional rainwater harvesting limited groundwater available is moderate to highly
methods. saline. Under such conditions, kund provides
convenient, clean and Sweetwater for drinking. The
kund consists of a saucer-shaped catchments area
with a gentle slope towards the centre where a tank
is situated. A wire mesh to prevent the entry of
floating debris, birds and reptiles, usually guard the
openings or inlets for water to go into the tank. The
top is usually covered with a lid from where water
can be drawn out with a bucket. Kund are by and
large circular in shape, with little variation between
the depth and diameter which ranges from 3-4.5 m.
Lime plaster or cement is typically used for the
construction of the tank, since stone as a building
KUND OF RAJASTHAN material is not always available and is relatively
more expensive. Either of these materials can be
used to plaster the horizontal and vertical soil
surfaces, although cement ensures a longer life span.
The success of a kund depends on the selection of
the site, particularly its catchments characteristics.
An adequately large catchments area has to be
selected or artificially prepared to produce adequate
runoff to meet the storage requirements of the kund.

Bamboo Method :
In Meghalaya, an ingenious system of tapping
of stream and spring water by using bamboo pipes
to irrigate plantations is widely prevalent. About
18-20 liters of water entering the bamboo pipe
system per minute gets transported over several
hundred meters. The tribal farmers of Khasi and
Jaintia hills use the 200-year-old system. The
bamboo drip irrigation system is normally used to
irrigate the betel leaf or black pepper crops. Bamboo
pipes are used to divert perennial springs on the
hilltops to the lower reaches by gravity. The channel
sections, made of bamboo, divert and convey water
to the plot site where it is distributed without leakage
into branches, again made and laid out with different
BAMBU DRIP IN MEGHALAYA forms of bamboo pipes. Manipulating the intake

84
pipe positions also controls the flow of water into But taking the mouthwash under a running tap will
the lateral pipes. Reduced channel sections and require more than 15 to 20 liters of water. A bucket
diversion units are used at the last stage of water of 15 to 20 liters was sufficient to take bath before
application. The last channel section enables the the advent of tap water, but now a day’s taking bath
water to be dropped at the rate of 20-80 drops per under the water tap consumes 50 to 100 liters of
minute near the roots of the plant. water. In this way, habits of wasteful use of water
are increased in these days. With the advent of the
Roof top rainwater harvesting and rainwater electric pumps the rate of withdrawal of water from
harvesting techniques is not new the well is increased tremendously, resulting in to
The concept of roof top rainwater harvesting depletion of ground water level. Every year the
and rainwater harvesting techniques is not new. rains replenish the ground water. But due to
Many of us feel that this tool is devised by the exploitation of more water than the replenish one;
modern society as a tool to drought proofing. This peoples do not get water even for drinking in
is not so. Our ancestors had been doing it according summer days. The wells and bore wells runs dry as
to the means available then. At large, no of places soon as the rainy season is over. In such situations
in India, this art and science has been practiced. tankers are supplying water. The local leaders put
The most beautiful rainwater-harvesting scheme lot of pressure on the government officials to supply
could be witnessed at Deogiri fort. Water from the water tankers. It is observed that nobody worries
adjacent hillock was transported through an inverted about the purity of the water supplied by the tankers.
siphon of twin pipes and the mot around the hilltop Drinking the impure water leads to water born
fort was filled. A moat around the hill top fort is disease. It is said that 80% of the human disease
another wonder. Transportation of water though are due to impure water. The whole family has to
inverted siphon was a unique feature. The temples suffer when any member of their family becomes
were used as roof top rainwater harvesting devices. ill. Especially incase of a family whose livelihoods
The noteworthy example is of Minakshi temple in is depend upon the labor work, if an adult get ill,
Madurai. If seen carefully it is seen that beautiful survival of his family comes in danger. All the
arrangement of collection of roof top rainwater problems as said above can be minimized if every
scheme is made here. The harvested water is stored family gets sufficient amount of pure water for
in a tank. With the advent of tap water, rainwater drinking. A time is now came to think that is it
harvesting has lost its importance. As our State is necessary to use heavy cost water supply schemes
in a situation where efficient management of water everywhere? Is it necessary to supply water by
resources has become a necessity, rainwater tankers? This can be achieved by adopting roof top
harvesting has come to limelight again. We have to rain water system. By adoption of the Roof top
resort to long-term measures in harvesting the rainwater harvesting techniques, there will not be
rainwater due to the growing demand. It is hence any need to supply water by tankers. Let us see that
emphasized that rainwater harvesting should how where and when this technique is useful.
become an integral part of every home, society,
village, city and country. Human water needs : Let us understand our daily
per head water requirement.
Back to the tradition Daily water need Maximum Minimum
In the previous days peoples were bringing in liters in liters
water from the community well. The water was Latrine and 25 05
drawing from the well with the help of rope and washing mouth
bucket. Thus there was a limitation of drawing the Bath 25 10
water and indirectly there was restriction on the Washing cloths 25 10
water use. The methods of domestic utilization were Food preparation 10 05
developed to support the minimum use of water. and drinking
For example water for mouthwash was taken in a Other purpose 10 05
pot. The capacity of such pot was around one liter. Total 95 35

85
The minimum water need is 35 liters per day Thus it is seen that the cost of the under
per person. Thus 175 liters water per day will be ground storage tank i.e. 20000/-will be recovered
sufficient for a family of five persons. Suppose the within five years.
roof top area of the house is 30 sqm; and the average Construction of Kund and such type of under
annual rainfall is 700 mm. Then the roof top ground storage tanks are practiced in Rajasthan and
rainwater potential is 21000 liters. If a under ground Gujarat. With these techniques they have solved the
tank of size 3m x 3m x 2.5m is constructed. The water problems. They built a water storage tank
storage capacity of the tank will be 22500 liters. under the main Hall of the house. The storage
This much water will be sufficient to them for 128 capacity is ranging from 20000 to 40000 liters. In
days. That is more than 4 months of the dry summer summer days when the wells become dry they use
days. The construction cost of the tank will be the stored water. The rainwater harvesting system
around Rs.20000/-. With nominal maintenance the is found in the house of general publics as well as
tank will serve for more than 40 to 50 years. Thus in the minister’s house also. It will be interested to
this is a long lasting solution. The annual cost of note that an under ground tank was in use in the
the tank will be around Rs.2000/- house at Porabandar, where Mahatma Gandhi was
born.
Comparison of tankers expenditure with the construction cost of water storage tank

Harvesting Water at Home

86
The rainwater that is harvested is pure with drained. 3 to 4 down water pipes seem sufficient
virtually no impurities and is suitable for all purposes. for 30 to 40 square meter roof areas.
After filtration the harvested rainwater can be put
to all uses including drinking and cooking purposes. Filtration
The area on which the rainwater falls is the Before the water enters the down water pipes
catchments area. The annual rainwater harvesting Filtration arrangements is must. This can be archived
potential of rooftop can be calculated by multiplying with following simple methods.
the area and the amount of rainfall that is received • Put a piece of sponge placed at the inlet of the
annually. down water pipe.
In rural areas, the roof top harvested rainwater • A PVC bucket with gravel, sand & charcoal is
can be stored or used for recharge of ground water. a good filter before rainwater is stored
This approach requires connecting the outlets pipe • A PVC drum with sponge at the inlet & outlet
from rooftop to divert the water in to a storage tank is also a filter
or divert it to either existing well/tube wells/bore • A small two chamber inspection/ filter tank can
wells or specially designed wells/ structures. also be devised
Following table shows the availability of rainwater • A Devas type filter is found to be useful. It is
through Roof Top Rain Water Harvesting. easy to construct, maintain, and have low cost.

Size of down water pipe The rainwater dissolves the impurities that are
The collection system directs the rainwater present on the surface as it flows over the roof area
falling over the rooftop, into the filtration system. 75 into the collection system. Therefore it is advisable
to 90 mm diameter PVC pipes resistant to UV rays to keep the catchments area free of any chemical or
appear to be the best bet as down water pipes. Of other harmful impurities. At times, it is also advised
course, this depends upon the roof area to be that the run-off of the first few minutes of the rain

Water yield available in liters from the annual rainfall, roof top area
Annual Rainfall in mm ..................

(m²) Harvested Roof Top Water in liters

87
be allowed to flow out. This washes away most of to the one third area of the roof top and the depth of
the impurities that may be possibly present on the the tank equal to three times the average annual
surfaces. rainfall in meter or three meter whichever is less.”
For example there are three rooms in a house of
Storage size 3m x 3m. The total roof area will be 3no x3m x
The harvested rain shall be stored in a storage 3m i.e. 27 square meter. Let the house is lies in the
tank. The tank can be built with locally available average annual rainfall of 700 mm (0.7meter). Then
materials and traditional construction techniques. for storing the harvested roof top water construct a
The storage tank can be constructed underground, under ground tank having the bottom area equal to
above ground or partially above ground as shown one third the roof area i.e. 27/3=9 square meter.
in the following figures. Use the ground water till Keep the depth of the tank equal to 3 times the
it is available. Use the water stored in the tanks in average annual rainfall i.e. 0.7m x 3=2.1 meter. Thus
dry months. the storage capacity of the tank will be 3 x3 x 2.1
Depending on the amount of rainwater that needs =18.9 cubic meter i.e. 18900 liters. And this much
to be harvested and the proposed end use of the water will be sufficient for three most dry summer
harvested rainwaters, an appropriate storage or month to a family of five members. And if used very
recharge system is designed. The simple thumb rule precisely for drinking and cooking purpose then this
for that is “build a storage tank of bottom area equal much water will be sufficient for more than six

88
months. It is interesting to note that in Bikaner area • Rooftops of houses serve as excellent and
of Rajasthan the people prefer to give harvested economical form of collection centers for rainwater.
rain water to an ill person than the tap water. Thus If properly diverted and used for artificial recharge
they have very much faith on the purity of the it will augment the ground water table to a sufficient
harvested and stored rainwater. Since 1986, in 450 extent. The roof is connected to the well through a
school of Rajasthan under ground storage tank are filtering arrangement by PVC pipe. A valve system
constructed. The total storage capacity of these can be incorporated to flush the initial part of the
tanks is about 27 million liters. The students and the rainwater to get rid of impurities collected on the
staff have drunk the water since its inception and roof. Rainwater also can be collected and stored in
there have been no complain from their teacher or large sumps to consume directly after necessary
parents that they have fallen ill from drinking the chlorination.
water. • Bathing and washing water can be routed to
the open ground nearby to percolate down to retain
Maintenance the soil moisture. The gray water can also be treated
Water harvesting systems require occasional by some water treatment methods like Soil Aquifer
maintenance, but this can be easily accomplished. Treatment System (SAT) and further the pretreated
Debris and leaves should be filtered before storing water.
the water by placing screens over gutters. Debris • The ground level near the gate should be raised
screens over gutters should be cleaned periodically to retain as much water as possible inside the
and storage tanks should be drained and cleaned compound. Alternatively, it is recommended to
regularly. Water kept in tanks should be covered to construct a sloping gutter across the gates and direct
minimize algae growth and eliminate the potential the rushing water towards percolation pit. For
for any mosquito breeding. multistoried building, it is better to direct this water
to a recharge well.
Ground water recharge-Simple Methods • The storm drains inside the premises should
The water in the premises can be harvested to have boundary wall to ensure that the rain water
recharge the ground water. The recharging will instead of rushing into the drains and going as waste,
certainly help to increase the ground water storage. stagnates over the ground for sometime and seeps
The design and the location of these recharge into the soil.
systems is site specific and needs to be evolved as • Wherever there is a slope, it is recommended
per the requirements. to construct a dwarf wall to a height if 1 ft, to avoid
When the rainwater falls on the ground, some of it run-off as well as to retain the rain water and allow
seeps into the soil but the surplus adversely flows for slow percolation.
out as a stream or as run-off. The top soil however, • The run-off water generated in monsoons
can hold only a fraction of water that falls on it and within an area can be well utilized for ground water
the rest gradually percolates down, depending on recharging by diverting it into suitably designed
the type of the soil and joins the aquifers that are recharge structures in public parks, splay grounds,
groundwater-bearing formation Artificial recharge stadiums, airports, stations, temple tanks, etc.
is a process of augmenting the underground water • Storm water drains should be designed in such
table by artificial infiltration of rain water and a way that two separate segments are made so as to
surface run-off. accommodate water coming from houses and from
roads. The segments on the sides of the roads should
Techniques of Rain water Harvesting. be covered with perforated slabs and should have
• to make more water to percolate down the soil, percolation pits of depth 20 to 50 ft., depending on
percolation pits are made, when there is a paved the soil condition, at regular intervals.
pathway and are covered with perforated concrete • Due to severe depletion of ground water table,
slabs wherever necessary. Whenever the depth of many open wells, bore wells and hand pumps are
clay soil is more, recharge through percolation pits getting dried. Instead of discarding these wells, they
with bore is preferable. can be converted into useful recharge wells. Roof

89
water and run-off water can be diverted into these the water sources get polluted due to entry of
wells after filling the wells with pebbles and river floodwater in to them, and other reasons. In such
sand. There should be an effective arrangement for conditions harvested rainwater will be the only
desalting before diverting the water into these wells. source of pure water.
• It is advisable to have numerous percolation • Combination of roof top rainwater harvesting
pits in agriculture lands for gradual percolation and and rain water harvesting is a long lasting
recharging of aquifer. Construction of small bunds sustainable solution for the drinking water crises,
on slope areas slows down the run-off water and and to keep the tankers away.
helps easy percolation. Run-off water can be
diverted into a large well through a Baby well and Demerits
filtering tank to avoid silt depositing in the well. Roof top rain water harvesting system can not
• In open grounds, the topsoil is removed and supply water if there is no rain fall over the
filled with river sand. As the river sand is loosely catchments or the water is not stored in the storage
packed, it allows water to percolate down quickly. tank, in the preceding rainy season.

Merits References
• It is a low cost long lasting solution supplying Books
pure water. 1. Pani Sarvansathi, Pradeep Bhalge
• If it is made compulsory to adopt the roof top 2. Aaj bhee khare hai talab, Anupam Misra
rain water harvesting then there will be no need to 3. Bharatiya Jal Sanskriti Sawarup Ani Vyapti,
supply water by tankers. This will save huge amount Dr. R.S.Morawanchikar
of money. This on other wise can be spent on the 4. Param vaibhavacha tappa ala, Prof.
development works. This will also save the diesel R.M.Pandav
indirectly foreign currency.
• The rainwater harvesting system is very useful Papers and Articles
in the remote places and in arid zone. 1. Glimpses of Water History of India, Dr. D.M.
• It is also useful in high rainfall and well as More
low rainfall zones. 2. Few Glimpses of Indian water Culture, Dr. R.
• This can be a best solution in the areas having S. Morawancikar
saline ground water or water containing fluorides. 3. Sankalan Pauspanyache, Pradeep Bhalge
• It is also useful in case of flood situations as

90
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

15. Additional Ground Water Storage Potential for Artificial Recharge


in Phreatic Aquifers of Yavatmal District, Maharashtra, India
*Pandith Madhnure **Sunil Kumar Jain

ABSTRACT
Yavatmal district is mainly underlained by varied geological formations consisting of
Penganga Group, Gondwana Group, Deccan Traps and Quaternary sediments. Post monsoon
depth to water level and lithological logs of exploratory wells in shallow aquifers down to
20 m depth have been studied and analysed in detailed. The average tahsil wise depth to
water level varies from 6 to 9 m m bgl and the available porous space for artificial recharge
in unsaturated zone in phreatic aquifers varies from 0.4 to 6 m. The potential of ground
water storage by recharging the phreatic unsaturated zone is estimated to be 951.6 MCM.
The drinking needs of 1,44,200 people during the 4 months of summer season can be met or
additional 1,29,500 hectors of land can be brought under assured irrigation from this
augmented ground water resources. The undue withdrawal of ground water from the deeper
aquifers containing excessive fluoride causing fluorosis can be checked in the area.
KEY WORDS: Shallow aquifer, Storage potential, Depth to water level Yavatmal, Artificial
recharges potential.

1. INTRODUCTION 79009’ E Longitude (Maharashtra State Gazetteer,


Ground water is basically a renewable 1974) and covers an area of 13584 km2, which is
resource, but the volume of water actually stored 4.41% of the Maharashtra state (Socio Economic
may vary greatly from place to place depending on Review, 2003-04). It is one of the economically
physiography, climate, hydrogeology and rate of backward district of Vidarbha regions of the state.
ground water withdrawal used for various purposes. As per the 2001 census the district has got a
The ground water development has to be optimised population of 24,58,271 with a density of 181/ km2
considering the demand and supply factors. Under (Census of India, 2001). Location of the area is given
utilization of available resources is not desirable as in Fig 1.
it deprives the economic development of the human
beings. On the other hand overexploitation of 3. HYDRO-GEOLOGICAL SETUP
ground water leads to depletions of water resources
and scarcity in future. Available ground water 3.1 Physiography and Climate
resources and potential for its augmentation needs Physiographically the area is mostly
to be assessed scientifically and understood undulatory dissected plateau with isolated hills
holistically for planning the water resources excluding the eastern part of the district, which is
management. This study has been done for Yavatmal plain. The district is well drained by the rivers
district on scientific lines as follows. Penganga, Wardha and their tributaries namely Pus,
Bembla, Aran, Arunavati, Waghadi, Khuni,
2. LOCATION Vaidharbha and Nirguda.
The Yavatmal district lies between 19026’ The climate of the district is characterized
N to 20042’ N Latitude and between 77018’ E to by hot summer and general dryness except during

* Scientist “B”, **Scientist “D” 2Central Ground Water Board, Central Region, Civil lines, Nagpur –440001
For correspondence (email: Pandith_m@rediffmail.com or sunilkumar_jain@ rediffmail.com)

91
the SW monsoon. The normal annual rainfall varies dug wells for the year 2005 (CGWB, 2006). The
from about 850 to 1150 mm and it increases from depth to water level in the phreatic aquifers varies
NW to SE direction in the district. The temperature between to 1.80 mbgl to 16.80 mbgl during the pre
varies from minimum of 15.1 0C in winter and monsoon season and between 0.30 m bgl to 15.15
maximum of 41.80C in summer. mbgl during the post monsoon season in the district.
The tahsil wise average depth to water level in the
3.2 Geology area during post monsoon season of the year 2005
Archaean rocks from the basement and are varies from 6 m bgl to 9 mbgl with an average of
covered by Penganga and Vindhyan group of rocks. 6.96 m bgl. Deep water levels are observed in Wani,
The Gondwana group of rocks overlays these rocks. Kelapur and Ghatanji tahsils. Hydrogeological map
Deccan trap is spread all over the area. Finally the of the district along with depth to water level
action of atmosphere eroded the Deccan traps in (November, 2005) is given in Fig 1.
parts, exposing the other older formations at surface.
The thickness of these formations therefore varies 4. GROUND WATER RESOURCES
from place to place and thus hydrogeology of the The CGWB and GSDA estimated the
area is influenced accordingly (Deshmukh, 1994). ground water resources of the district based on
The contact between Penganga Group of Ground Water Estimation (GEC) Methodology
rocks and Deccan traps is marked by unconformity. 1997. The net annual available ground water
The contact between Gondwana and Deccan trap is resources are 1278.34 MCM and the ground water
mostly undulatory. The eastern part of the district draft is 314.35 MCM. Overall the stage of ground
is traversed by numerous faults; therefore rocks of water development is 24.6 % in the district (GSDA
different groups are met at different altitude in the & CGWB, 2005). The tahsil wise ground water
area owing to differential subsidence or upheaval resources of the district are given in Table 2.
events. The lithological geometry of the phreatic Ground water development scenario varies
aquifers is generated exclusively based on the in the district, while eastern part consisting of Wani,
exploratory drilling at 51 wells is given in Table 1 Maregaon, Kelapur, Ghatanji and Jhari Jamni tahsils
and plotted in Fig 2. are the least developed tashils from ground water
resources point of view having less than 15% of
3.3 Hydrogeology the development. The Ralegaon, Yavatmal,
The Deccan traps are the predominant water Babulgaon, Kalamb and Arni are the next developed
bearing formations with variations in hydro tahsils with the stage of development between 15
geological properties over horizontal and vertical to 25%. There is better ground water development
space. It is followed by Gondwana formations in Darwah, Ner, Digras, Pusad and Umarkhed tashils
having sandstone and shales sequence. The where the stage of ground water development is 25
Penganga and Quaternary alluvium aquifers are to 40%. Maximum development of ground water is
spread in limited areas but have significant role 45% and is observed in Mahagaon tahsil. As per
wherever they are found. Archaean aquifers are the GEC norms all the tahsils and 64 watersheds
limited and have less significance in the area. falls in safe category.

3.3.1 Phreatic Aquifers: Phreatic aquifers are most 5. SCOPE OF GROUND WATER
productive and occur at shallow depth, which are AUGMENTATION THROUGH ARTIFICIAL
developed by dug wells up to 20 m depth. Ground RECHARGE
water occurs in the weathered zone, fractures in The ground water development scenario of
Archaean rocks, Penganga formations, Vindhyan the district is favorable for further ground water
formation and Gondwana formations and weathered development in years to come. However, as the
zone, fractures and vesicular part in the basaltic development of ground water resources proceeds
formations. with increasing ground water withdrawal, the
A comprehensive depiction of depth to depletion of water table will accelerate resulting into
water level is made by using the data of the 317 drying or deepening of existing wells. There are

92
many pockets in the district where water levels have tahsil) to 6 m (Kelapur tahsil) with an average of
deepened and also certain areas lack adequate 3.16 m. It is found that only some percentage of
natural replenishment. Therefore, artificial recharge total thickness of the unsaturated zone is porous and
measures would be required simultaneously so as the remaining is non porous for ground water
to augment the ground water resources of the area. storage. The percentage varies from 7% (Digras &
There is a need for assessing the scope and extent Arni tahsil) to 67% (Kelapur tahsil) with an average
of artificial recharge potential available at present of 48%. The area having maximum thickness of
in the area so as to make a comprehensive porous strata in unsaturated zone is most potential
management plans for the district. The artificial for ground water recharge through artificial
recharge potential has been assessed accordingly measures.
on the scientific pattern and methodology in this The artificial recharge is targeted to raise
study. the depth to water level up to 3 m bgl so as to avoid
the danger of water logging. The column 7 of Table
6. IDENTIFICATION OF POTENTIAL AREAS 3 is worked out by subtracting column 5 from
FOR ARTIFICIAL RECHARGE (PHREATIC column 4 of Table 3 or the actual top impervious
AQUIFER) layer or 3 m whichever is more.
The base map of Yavatmal district on 1:
250,000 scale is prepared by demarcating district, 7. STORAGE POTENTIAL OF
tahsils boundary and major drainage. The UNSATURATED PHREATIC AQUIFERS
lithological logs of the phreatic aquifers down to The volume of water for recharging the
the depth of 20 meters below ground level (m bgl) unsaturated (dry) zone of phreatic aquifers is
are compiled and plotted on the base map (Fig. 2), estimated by multiplying the tahsilwise area with
as the area is developed by dug wells up to 20 m the available unsaturated thickness and the average
depth. Data of 51 exploratory wells drilled by specific yield of the particular strata. Thus, the total
CGWB is specifically analyzed in detail for the storage potential of phreatic unsaturated aquifer
phreatic part although their depth ranges from 17 varies from 9.04 MCM in Digras & Arni tahsils to
m bgl to 470 m bgl. This is superimposed on the 142.56 MCM in Wani tahsil. The total potential of
base map so as to account for storage potential of ground water resources augmented through artificial
different strata more precisely. The aquifer geometry recharge is estimated in the district is 951.61 MCM.
is also reflected from this data source. The depth to The tahsilwise details of estimated sub surface
water level data of post monsoon season for the year storage potential of phreatic aquifers through
2005 is used to assess the unsaturated space artificial recharge to ground water are given Table
availability in phreatic zone. These are 4.
superimposed and transferred on the base map to
generate a comprehensive map (Fig. 2). 8. GROUND WATER AVAILABILITY VIS A
Based on the above-mentioned information, VIS AUGMENTATION POTENTIAL
the tahsilwise potential for artificial recharge to The ground water resources of the district
ground water is worked out. The summarized results are 1278.34 MCM and possibility of further ground
of lithology, depths to water levels are given in water augmentation is 951.61 MCM or the actual
Table 3. non-commuted surplus runoff. Thus, the overall
ground water resources can be made available is
The disposition of impervious layers below 2230 MCM (Table 4) depending up on the available
the ground water surface has decisive role to surplus water. However, there are variations in the
facilitate or to retard the recharge from rainfall or tahsilwise scenario of ground water availability and
storage tanks. A perusal of the Table 3 indicates that augmentation potential.
the depth of impervious formation varies from 0.
75 m bgl (Darwah tahsil) to 5.6 m bgl (Digras & RECOMMENDATIONS
Arni tahsil).The unsaturated thickness of porous The additional storage potential of the
zone availability varies from 0.4 m (Digras and Arni phreatic aquifers may be harnessed appropriately

93
considering the drinking water scarcity and irrigation suggestions and encouragement while preparing the
needs of the area. It will generate many fold benefits paper. Sincere thanks are due to S/Sh. Bhushan
to ameliorate the suffering of underprivileged regions Lamsoge, Binoy Ranjan, D.N.Mandal, B.N.Warke,
and economic upliftment of the local populations. S.K.Bhatnagar, scientists, CGWB, CR who have
The recommendations follow. collected the valuable data from the district.
1. Efforts may be made to utilise the maximum
volume of water from the available potential of REFERENCES
951.6 MCM or the actual non-commuted surplus 1. Census of India (2001): District census,
runoff, which will cater the drinking needs of rural Yavatmal (Un published).
people even during the 4 summer months. 2. CGWB (2006): Report on Groundwater
2. The existing rural ground water supply management studies in parts of Yavatmal district,
schemes will be strengthened by ground water Maharashtra. Un published Central Ground Water
augmentation measures. Board, Ministry of Water Resources, Government
3. Alternately, the additional irrigation of India report for A.A.P.; 2005-06.
potential can be generated from 951.61 MCM to 3. Deshmukh A.B. (1994): Ground water
the extent of 1,29,500 hectors considering the crop resources and development potential of Yavatmal
requirement of 0.65 m prevailing in the area. Both district, Maharashtra. Central Ground Water Board,
these requirement may also be managed by suitable Ministry of Water Resources, Government of India,
appropriation of the augmented resources. report no 629/DIS. p. 62.
4. Stress on ground water withdrawals from 4. GSDA and CGWB (2005): Dynamic
deeper aquifers will be reduced which shall be used ground water resources of Maharashtra as on March
in exigency and emergency for the future water 2004. Groundwater Surveys and Development
needs. Agency, Govt of Maharashtra and Central Ground
5. Parts of the district is affected by high Water Board, Ministry of Water Resources,
fluoride concentration in ground water resources Government of India, p.332.
and therefore the utilization of water from phreatic 5. GSI (2001): District resource map of
aquifers will minimize the fluorosis in the endemic Yavatmal district, Maharashtra. Geological Survey
areas as deeper aquifers are discharging fluoride rich of India.
ground waters. 6. Maharashtra State Gazetteers (1974):
6. Appropriate recharge schemes best suited Gazetteers of India, Maharashtra state, Yeotmal
in the area may be identified on the basis of local district, Second Edition (Revised), p. 872.
and site-specific surveys and terrain conditions. 7. Socio Economic Review and District
Statistical Abstract (2003-04): Yavatmal District,
ACKNOWLEDGEMENTS Maharashtra.
The authors thank Shri Dinesh Prakash, Subramanian P.R. (1998): Ground water exploration
Regional Director CGWB; CR, Nagpur for in Maharashtra State and Union Territory of Dadra
providing necessary guidelines and valuable and Nagar Haveli. Central Ground Water Board,
suggestions in carrying out the studies. Auther Ministry of Water Resources, Government of India.
expresses their sincere thanks to Shri P.K.Parchure, p. 294.
Sc “D” for his constructive comments valuable

94
Fig. 1

Fig. 2

95
Table 1: Lithology of shallow aquifers based on the results of exploratory drilling in Yavatmal district

96
contd....
Table 1: Lithology of shallow aquifers based on the results of exploratory drilling in Yavatmal district

97
TS=Tope Soil, C=Clay, VB=Vesicular Basalt, WVB= Weathered Vesicular Basalt, FVB= Fractured Vesicular Basalt,
WFVB= Weathered Fractured Vesicular Basalt, MB= Massive Basalt, WMB= Weathered Massive Basalt,
FMB=Fractured Massive Basalt, WFMB= Weathered Fractured Massive Basalt, SS=Sandstone, SHS= Shale &
Sandstone
Table 2: Ground water resources of the district as on March 2005 (After GEC-97)

98
Table 3: Summarized results of the lithology, depth to water level of the phreatic aquifers in the area

99
Table 4: Estimated sub surface storage potential of phreatic aquifer through
Artificial Recharge to ground water in Yavatmal district, Maharashtra (Post monsoon season 2005).

100
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

16. Appropriate Technique of Rainwater Management to Enhance Soil


Moisture and Higher Productivity of Rainfed Bt Cotton
*Jagvir Singh *D. Blaise *M.R.K. Rao *B. M. Khadi *N.R. Tandulkar

ABSTRACT
In Central part of India, 70 % of arable land is rainfed without assured irrigation and
cotton occupy major area of 60 lakh ha under rainfed in 2005. Rainfed cotton production
per unit ha is very low as compared to irrigated cotton. Higher production can be achieved
if soil moisture conservation technique is to be adopted during growing season of Bt cotton.
Sowing of Bt and non Bt cotton hybrids was done on flat system. Two different land
configuration systems viz. ridges and furrow and flat bed system were compared in rainfed
Bt hybrids at different fertilizer levels in Vertisols. Significant higher yield of seed cotton
was received by adopting ridges and furrow method over flat bed system. An additional
yield of 550 to 600 Kg/ha was obtained by utilizing run-off rain water in cotton field.
Biomass accumulation and number of bolls in Bt hybrids by moisture conservation technique
was higher compared to flat bed system in medium deep soil. The technique of soil moisture
conservation through ridges and furrow was found superior over flat bed system in terms of
increasing in moisture content by 4-5% and NUE during peak boll development stage when
rainfall is scanty. Foliar application of Zn and B (@ 0.5%) improved fibre quality of Bt
hybrids marginally. Higher dose of fertilizer was found non significant. Higher yield was
observed in medium spacing (90x45cm) as compared to recommended spacing (90x60cm)
adopted in medium deep soils.

INTRODUCTION period as increase productivity of rainfed agro eco-


Bt cotton is available in India only in the form regions (Venkateswarlu, 1981). Inspite of water
of hirsutum hybrids and now occupying an area of harvesting on watershed, an appropriate technique
33% to the total area of cotton while in Maharashtra to conserve soil moisture through management of
it is about 80% area in Bt cotton. Production in the run-off water during scanty rainfall and active
rainfed land is a very difficult task due to uncertainty growth period of cotton has been successfully
and uneven distribution of rainfall. Hybrid cotton is developed for conventional hybrids at CICR,
a long duration crop requires more water and Nagpur. The efforts have been made for
nutrients as compared to soybean or sorghum. It also maximization of transgenic Bt cotton production
has capacity to tolerant excess water conditions for through run-off water management during scanty
4-5 days or dry conditions for 20 to 25 days. Higher rainfall under rainfed conditions.
production of cotton can be achieved at assured
rainfall of 650 to 700 mm with proper distribution MATERIAL AND METHODS
of rainfall during growing season. Rain water Field trials on Bt cotton was laid out at Central
harvesting through tanks, ponds and reservoirs, Institute for Cotton Research, farm, Nagpur during
though an age old practice but use of harvested rain 2001-06, to achieve higher production through run-
water for supplementary irrigation in the stress off water management by making a ridges and

*Central Institute for Cotton Research, Nagpur – 440 010

101
furrows when rainfall recedes during September off water and enhance soil moisture. Thus run-off
month. Two field trials on Mahyco Bt cotton viz. water was saved by above mentioned technique. It
MECH 184, 162 & 12 with different fertilizers levels enhanced the soil moisture and nutrient utilization
75, 100 & 125% RDF and different spacing in cotton. Rainfall of 80 mm received in the middle
(90x60cm, 90x45cm in medium deep soil and of October had beneficial effects in conservation of
90x60cm & 60x60cm in shallow soil) were soil moisture through ridges and furrows system.
evaluated for two years during 2001-03. Second field
experiment on bunny Bts viz. NCS 913 and NCS Soil conditions effect on yield and yield
138 with non Bt bunny was conducted in medium attributing characters :
deep soil with different fertilizers levels coupled Biomass accumulation at maturity stage (110
with flat bed and ridges & furrows systems. Sowing DAS) in Bt cotton was significantly lower than
of cotton was done in the last week of June on flat conventional hybrids. Higher Harvest index (%) was
bed system. Fertilizer dose of NPK 90:45:45(F1), observed in Bt cotton because Bt cotton had higher
100:60:80(F2) and 150: 80:100 (F3) to all hybrids bolls as compared to leaves. Higher seed cotton yield
were given as per recommended practices. Only one and number of bolls in Bt was recorded in medium
spray of sucking pests was given to all hybrids and deep soil as compared to shallow soil. No yield
2 sprays of insecticides for controlling bollworms difference was observed in shallow soil by applying
were given in non Bt only. Cotton was picked thrice higher dose of fertilizer (125% RDF) while in
in Bt and twice in non-Bt. Rainfall distribution and medium deep soil, higher dose of fertilizer gave
temperature data during the crop season from 25 higher yield as compared to RDF but no significant
June to 31 December is presented in table 1. increase in yield was recorded due to higher dose of
fertilizer. Hence, the recommended dose of fertilizer
RESULTS AND DISSCUTION to hybrid cotton Bt or conventional hybrid was
Effect of rainfall distribution on growth of sufficient for getting optimum seed cotton yield.
cotton : Fibre quality of Bt cotton was also improved when
Rainfall data for the year 2002 and 2005 was Bt was grown in medium deep soils.
interpreted in the paper where soil moisture content
of surface soil was measured at 80, 95 and 110 days Spacing effect on yield and conservation of soil
after sowing (DAS). Total rainfall during the crop moisture :
season was 1018, 651 and 1012 mm in 2003, 2004 In shallow soils medium spacing (90x45 cm
and 2005, respectively. In 2002, there was a good or 60x60 cm) for hybrid cotton was found superior
distribution (32 rainy days) of rainfall of 661 mm over higher spacing viz. 90x60 cm or 90x75 cm.
during active growth period upto first fortnight of sowing of cotton rows across the slope was also a
September and there after very few amount of good to protect soil erosion and run-off rainwater.
rainfall was received. Ridges and furrows ware made At maturity stage there was higher soil moisture by
on third September, 2002 which has saved run-off 3-4% in lower spacing as compared to higher
rain-water of first week of September. After second spacing in shallow soils resulted in higher nutrient
week of September there was a scanty rainfall of 30 utilization by cotton and higher seed cotton yield.
mm. In 2005, precipitation during the active growth In spacing trial with Bt hybrids viz. NCS 138 and
period of cotton i.e. from 25 June to 15 August was NCS 913, data indicated that higher seed cotton yield
673 mm and for the period from 16 August to 30 of 25q/ha in Bt cotton was obtained at medium
September, it was 370 mm. Rainfall distribution was spacing (90cm x 45cm) as compared to 21q/ha in
uneven at initial growth period of cotton. Ridges lower spacing (90cm x 30cm) and 22.5q/ha in
and furrows were made across the slope on 22 recommended spacing (90cm x 60cm), it might be
August, 2005 when rainfall recedes. In the first due to protection of soil erosion and run-off rain
fortnight of September, there was heavy rainfall of water. Additional yield in medium spacing system
280 mm resulting in large proportion of run-off may also be attributed by more plant population per
water. If ridges and furrows made before the rainfall unit area.
of September it could have been better to save run-

102
Effect of soil moisture conservation technique: CONCLUSION
Significant higher yield of seed cotton was Therefore, to make this technique a viable and
obtained at ridges & furrows system over flat bed successful one in rainfed Agro-ecoregions, ridges
system. Both the Bt hybrids gave an additional yield and furrows are to be made across the slope and
of about 600 kg by utilizing run-off water through when rainfall recedes and demand of water is more
land configuration as ridges & furrows system over for development of bolls in cotton. The maximum
flat bed system. Higher seed cotton was recorded in conservation of run-off of scanty rainwater and its
both the Bt hybrids as compared to non-Bt Bunny. prudent utilization practice is worth for
No significant difference in yield was observed due maximization of cotton production under rainfed
to higher dose of fertilizers. However, the increase condition.
in yield by 20-25% at ridges and furrows system
was noticed at higher dose of fertilizer. REFERENCE :
Venkateshwarlu J. (1981). Maximization of crop
production in dry lands. J. Soil Cons. 9: 124-40.

Table 1 : Rainfall (mm) distribution pattern during crop season

Period Rainfall No. of rainy days Max Temp. (Mean)


Year-2002
25 Jun to 15 Sept 661 32 330 C
(Jun-3, Jul-3, Aug-19, Sept-7) (June- 36, Jul -34, Aug- 30, Sept- 32)
16 Sept to 30 Sept 7 2 320 C
1 Oct to 15 Oct 13 1 340C
Year-2005
25 Jun to 15 Sept 437 33 340C
(Jun-38, Jul-30, Aug-31,Sept-31)
16 Sept to 30 Sept 315 16 320C
1 Oct to 15 Oct - - 320C

Table-2 : Effect of fertilizer levels at different run-off water management


on Seed cotton yield (q/ha)

Hybrids Seed cotton yield F1:90:45:45 F2-100:60:80


Flat Bed Ridge & Flat Bed Ridge & Flat Bed Ridge &
furrows furrows furrows
Bt NCS 138 17.28 22.06 15.95 21.62 16.6 23.31
Bt NCS 913 15.99 21.72 15.91 20.55 16.06 20.88
Non Bt (Bunny) 9.34 12.06 9.03 12.08 9.65 12

103
Table -3 Surface soil moisture content of different DAS in 2002
Growth Shallow soil Medium soil
period Flat bed Ridg.& Furr. Flat bed Ridg.& Furr.
At 100% RDF treatment
80 DAS 20 24.5 22 27
95 DAS 16 20 20 24.5
110 DAS 10.5 12.5 11 13.5
At 125% RDF
80 DAS 20 24 22 26
95 DAS 15 18.5 19.5 24
110 DAS 9.5 12 10.5 11.5
Ridg.& furr.-Ridges & Furrows

NCS 138 NCS 913 Bunny non-Bt

30
26.52

24 .69 24.3 24.42


25 24.94
22.88
2 1. 8 6 2 1. 9 6
2 1. 5 2
Seed cotton yield (q/ha)

20.8
20

14 . 9 6
15 14 . 0 8 13 . 9 5 13 . 7 1
12 . 4 3

10

0
90x30 90x45 90x60 100:60:80 150:80:100
Spacing x Fertilizer

Fig 2: Effect of Spacing and Fertilizers on Bt cotton yield

104
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

17. Rain Water Harvesting – An ultimate need in 21st Century


Er. L. K.Bisoyi

Introduction : The collection system; and


Rainwater harvesting (RWH) refers to The utilization system.
collection of rain falling on earth surfaces for
beneficial uses before it drains away as run-off. The Factors : The following factors are to be taken into
concept of RWH has a long history. Evidences consideration for RWH practices
indicate domestic RWH having been used in the Location and topography of the area – Whether
Middle East for about 3000 years and in other parts plane or hilly area, rain fed, desert, steep slope,
of Asia for at least 2000 years. Collection and drought prone, flood prone, rural and urban area.
storages of rainwater in earthen tanks for domestic Rain fall pattern – Whether rain fall is
and agricultural uses is very common in India since distributed uniformly through out the year or
historical times. The traditional knowledge and intermittent.
practice of RWH has largely been abandoned in Intensity of rain fall- It varies from 100mm in
many parts of India after the implementation of dam western Rajsthan to 11,000 mm in Cherapunji
and irrigation projects However, since the early 90s, (Meghalaya).
there has been a renewed interest in RWH projects Soil Characteristics- Whether the soil is
in India and elsewhere. Rainwater harvesting can permeable or impermeable to facilitate recharge of
be done at individual household level and at aquifers.
community level in both urban as well as rural areas. Catchments area – Whether barren land, Forest
At household level, harvesting can be done through area, Agricultural land, Ice caps and desert area.
roof catchments, and at community level through
ground catchments. Depending on the quantity, Water Resources at a Glance (India) : Out of
location and the intended use, harvested rainwater, 100% water what we have.
it can be utilized immediately or after storage. Other 97% as sea water, such a huge water source is
than as a water supply, RWH can be practiced with of no use to us unless we treat it with highly
the objectives of flood control and soil erosion expensive methods like Reverse osmosis or
control. The total water resources, comprising evaporation etc… However water which we get by
surface water (1953 bcm) and ground water (423 such techniques is not affordable by every
bcm) are not uniformly distributed, in the sense, individual.
roughly 67 percent of the resources are reported to 2% water is in the form of ice and glaciers and
be available in the Indo-Gangetic alluvial basins is also not of any immediate use to us.
covering 33 percent of the geographical area of the 1% water is in the form of rivers, lakes, ground
country as against 33 percent of the potential in the water etc. Which is the only source, readily available
hard rock regions occupying 67 per cent of the to whole world to satisfy their needs.
geographical area. This is represented in Fig-1. Now lets narrow
down our focus to our country. Out of 1% available
Components of RWH System : potable water source globally, only 4% is available
A RWH system has three components in India. As compared to the world population, 17%
The catchments; population live in India. Because of this situation there

*FIE (India), ME (PH) (Committee Member, Env. Engg. divisionI.E (India), Orisssa state centre Bhubaneswar)
Address : Plot no-759, Jayadev Vihar, Bhubaneswar (Orissa)

105
is a tremendous crisis on our Water demand and supply arrangements.
Water resources
Available water in BCM Losses in BCM Unutilized water that can be harnessed in BCM
From all natural – Evaporation – 700 Remaining available water ………………1100
Sources — 4000 Flow on ground – 700 Out of which
Flow to sea – 1500 Ground water recharge – 430
Present utilizable surface water – 370
Unutilized water that can be harness – 300
Per - capita availability of land/water in India :
Year 1950 2000 2050 (prob.) —
Availability of land – ha/capita 0.28 0.1 0.07 —
Year 1947 1998 2005 2025 (prob.)
Availability water in Cum/yr. capita 6 2.2 1.6 0.5
Projected water consumption :In BCM
Irrigation Domestic Manufacturing Power Total
1997-98 560 30 30 9 629
2020 BAU 640 56 57 28 781
2020 BCS 602 51 57 27 737
(Source – Water resources division, planning commission Govt. of India)

Harvesting potential(India) :
Potential of Water Harvesting to meet India’s Drinking Water Needs
Assumptions
Population: 1050 million
Average annual rainfall: 1,100mm
Land area for which land-use records are available: 304 million hectares
Average household water requirement nationwide: 100 litres/day/person
Annual water Water collection efficiency Land requirement % of India’s land
requirements (% of rainfall collected)
38,325 billion litres 100% 3.50 million hectares 1.15%
38,325 billion litres 50% 7.00 million hectares 2.30%

Issues : A number of issues may affect the widespread adoption of RWH systems in India. Such as:
Economics and Technology – Research and design needs to improve the cost-effectiveness of RWH, like:
Economically optimizing the size of system components
Minimizing the quantity or quality of materials needed to create any given volume of water storage.
Developing new designs for tanks, guttering and catchments
Developing measuring instruments to assist RWH system management
Establishing the environmental and economic benefits of reducing extraction of domestic water from
distant point sources.
Water Quality and Health : the impact of RWH on health such as :
The likely causes of low RW quality (physical, chemical, biological) and assessing its impact on health

106
Actual RW quality as a function of user Strategies
behaviors, system design and environmental Rainwater harvesting
conditions Comprehensive water policy reform and
Devising new techniques for reducing turbidity demand management
and pathogens, and improving the taste Secure water rights
Understanding the links between RWH and the User management of irrigation systems.
prevalence of disease vectors like mosquitoes and Reformed price incentives
identifying cost-effective and sustainable vector Appropriate technology
control measures. Environment protection
Water Policies, Regulations and Attitudes that Tradable water rights
affect taking-up of RWH projects on wider scales, International co-operation
including:
Current policies, priorities, rules and concerns Need and Advantages of RWH : The need and
of key stakeholders advantages of RWH are as enumerated below
RWH popularization and dissemination
techniques. Choice between Storage and Artificial
The optimal role of RWH alongside other water Recharge of Rain Water (Fig. 2, 3 & 4) The
supplies in different regions of the country. decision whether to store or recharge water depends
on the rainfall pattern of a particular region. For
Challenges / Strategies in 21st Century – example, in places like Kerala and Mizoram, rain
Challenges and Strategies for water in 21st falls throughout the year, barring a few dry periods.
century are as given below. In such places, one can depend on a small domestic-
Challenges sized water tank for storing rainwater, since the
Ground water depletion period between two spells of rain is short. On the
Water quality deterioration other hand, in dry areas like Delhi, Rajasthan and
Low water use efficiency Gujarat, the total annual rainfall occurs only during 3
Expensive new water sources to 4 months of monsoon. The water collected during
Resource degradation the monsoon has to be stored throughout the year;
Water and health which means that huge volumes of storage
Massive subsidies and distorted incentives containers would have to be provided. In Delhi, it is
Development of new water sources

107
more feasible to use rainwater to recharge ground that is collected on the rooftop of the building
water aquifers than for storage. Hand pumps – The existing hand pump may
be used for recharging the shallow / deep aquifers,
Rainwater Harvesting Practices(Fig.5-10) : if the availability of water is limited.
There are two main practices of rainwater Recharge wells – recharges wells are generally
harvesting: constructed for recharging the deeper aquifer and
Storage rainwater on surface for future use. It water is passed through filter media to avoid choking
is a traditional practice and structures used are under of recharge wells.
ground tanks, ponds, check dams, weirs etc. Recharge shafts – for recharging the shallow
Recharges of ground water: is a new concepts aquifers, which are, located below clayey surface.
of rain water harvesting and the structures generally Lateral shafts with bore wells- for recharging
used are: the upper as well as lengths. Deeper aquifers lateral
Pits – recharge pits are constructed for shafts of 1.5 to 2-mt width and 10 to 30mt.
recharging the shallow aquifers. Spreading techniques- when permeable strata
Trenches – These are constructed when the start from top then this technique is used. Water is
permeable strata is available at shallow depths. spread in streams/nalas by making check dams,
Dug wells – drainpipes to a filtration tank, from cement plugs, gabion structures or a percolation
which it flows in to the dug well, divert rainwater pond may be constructed.

108
Is there Water Shortage ?
Every village in India can meet its own water needs: Land area needed per village in different states of
India to capture enough rainwater to meet drinking and cooking water needs

Note : Calculation based on the assumption that average village population in different meteorological
sub-divisions is the same as that of the state.
Source : India Meterological Department for normal rainfall data and based on Census of India data for
1981, 1991 & 2001

International Initiatives :
In U.S. RWH practice in individual and small groups of Texas University through 3 cascade ponds to
support aquatic life for biology laboratory fed by harvested rain water.
In Mexico due to artificial recharge of aquifer 50% reduction cost of pumping of ground water achieved.
In South Africa in 25 million hector one non-native weed consumed almost 7% more of country’s run

109
off and it was replaced by indigenous plants to save and industries. The recycled water must be used for
water remarkably. all usages including agricultural needs, except for
With active participation of NGO’s, World Bank drinking. This will reduce the per capital requirement
and Denmark Govt. a special type of grass planted of water to nearly 25% of the present consumption
in Denmark in slopes which reduced 70% rainwater and enable larger number of population to get
run off and even strong roots of these grass adequate potable water and for sanitation.
penetrated hard rock and improved infiltration. Community managed in situ water harvesting
interventions on watershed basis can better the
Major initiatives(India) : quality of life of people be ensuring access to safe
Recommending schemes which will ensure drinking water and increased productivity of natural
availability of minimum 25 kiloliters of water per year resources. Unless some crucial measures are not
for each citizen in the country. taken in time then by 2025 India will be highly water
Water harvesting must be made mandatory for stressed.. In view of this Rain water-harvesting
the buildings. Necessary legal provisions may be system is the only alternative, which can provide
made in this regard. good quality of water. Harvested rainwater if
Appropriate legal provisions for making recharged in to the ground then problem of depletion
recycling of water mandatory in all buildings of under ground water can be sorted out very easily.
particularly larger hotels and industries where large It has become very necessary to form certain
amount of water is consumed are to be taken out. regulations and laws for the effective utilization of
Since sustainability of the drinking water available water source as well rain water harvesting
source is of paramount importance for smooth systems implementations so that our coming future
functioning of rural water supply, 25 per cent out of will be secured at least on Water front. Financial
20 per cent of the allocation under Accelerated Rural incentives also can be devised to over come the
Water Supply Programme (ARWSP) has been constraints.
earmarked exclusively for water harvesting schemes
to make implementation of such schemes mandatory. Selected Reading
Similarly, 25 percent out of the allocation under • Agarawal, A etall – State Indias environment – Centre
Prime Minister’s Gramodaya Yojana has also been for science and Environment New Delhi. 2001 edition
• Agarawal, A etall – Making water every body business
earmarked for funding schemes under submission – Practice and policy or water harvesting - do -
on sustainability. • Bisoyi L.K. – Rain water harvesting and Artificial
MP’s are to be requested to utilize Local Area recharge – An innovative approach for crisis management
Development Fund in their respective constituencies and sustainable development – An experiences of New
to take up water harvesting scheme. Delhi- 21st National convention of Env. Engineers, 11-12
Nov. 2005, Bhubaneswar, Orissa.
Besides feasibility studies alone with • Concepts and practices for rain water harvesting –
consultancy services for preparation of pilot projects CPCB-MOEF-10/2001, New Delhi.
on rainwater harvestings in select states have already • Kalam A.P.J- Integrated water mission - do –
been taken. • Kulkarni M.K. – Rain water harvesting – Definite tool
Further, preparation of user friendly atlas type to win over water scarcity – Integrated water and waste
water management for sustainable urban development –
of document on traditional water harvesting Modern trends I.E(India), Pune Local Centre – 10-11
structures in various parts of the country has been March-06.
initiated for popularizing the concept of water • Nimbal F. – Rain water harvesting – Yojana – 6/05
harvesting amongst all concerned including the New Delhi
community. • Rain water harvesting – Need of the Millennium-
I.E.(India), Tamil Nadu State Center. Jointly with HUDCO
and Anna University- 12/2000.
Conclusion : Rain harvesting is emerging as a viable • Sahoo. N. – Water harvesting in water sheds. – Vigyan
long term strategy to tackle the increase pressure on Diganta – 12/05, Bhubaneswar.
fresh water resources of our country. In addition to • Yadupatty M.R. etall- Rain water harvesting – A case
water harvesting, water recycling is essential for study of in a College campus at Myosore – Hydrology
journal, quarterly – IAH – ISSN-0971-569X-vol-28- no-
large consumers such as hotels, public Institutions 3-4 Sept.2005.

110
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

18. Traditional Rainwater Harvesting Systems – Our Field Experiences


DHAN Foundation

SYNOPSIS
Traditional rainwater harvesting systems comprise mainly tanks, ponds and Ooranis
(drinking water ponds). Considering the erratic rainfall obtaining in our country, they have
been constructed by our ancestors over the past centuries, to capture the monsoon rains
and store them for later use when required. During the past few decades they are getting
degraded and even extinct due to various reasons, which has resulted in alarming water
scarcity, over exploitation of ground water and environmental hazards. DHAN Foundation’s
study, approach and efforts made to renovate these small scale water bodies with community
participation are described. The achievements and experiences of these efforts are explained,
with particular reference to the role of these renovated water bodies in augmenting storage
capacity, stabilizing tankfed & rainfed agriculture, increasing crop production and most
importantly improving the groundwater potential through recharge. In conclusion,
formulation of a massive programme of tank renovation & its implementation with some
priority criteria, and only through the user groups is recommended.

INTRODUCTION turns into flood inundating vast tracts of land and


Rainwater harvesting is undertaken mainly to damages life and property. When the rainfall is
capture the run off from the seasonal rains and store scanty, part of it gets lost by interception by tree
it for use in times of need. The storage is made on canopy, evaporation and run off leaving very little
the ground surface or underground, depending upon of it for storage and future use. Although water is
the topography of the land, the types of surface and renewable, it is a finite commodity. Therefore
sub surface soils and the underground geological rainwater harvesting and storage becomes
formations. Storage cisterns, check dams, farm imperative in either case, for effective use by people,
ponds, percolation ponds, Ooranis (drinking water livestock and nature.
ponds), irrigation tanks and reservoirs comprise the While in the urban areas rainwater harvesting
surface storage systems, Rain water stored in the is practiced for drinking, domestic, gardening, and
soil profile upto its field capacity, sub surface dams ground water recharge purposes, in rural areas it is
constructed in deep sandy beds across rivers and undertaken more extensively for irrigation, dryland
streams, sumps, dug wells, filter point wells, tube agriculture, horticulture, ground water recharge,
wells and aquifers constitute the underground domestic, livestock, inland fisheries, duck rearing
storage systems. The source of supply for all these and for multifarious other similar purposes. Each
storages is the rainfall which is highly variable. form of storage has its specific merits and uses,
The rainwater which is not harvested and although from the efficiency point of view,
stored, mostly runs off the land surface and gets underground storage is the best as evaporation and
wasted without proper use. Where the rains are other losses are eliminated.
intense and continuous over some days, the run off

18, Pillaiyar Koil Street, S.S.Colony, Madurai – 625010, Tamilnadu

111
Table 1 : Merits, demerits & uses of different forms of rainwater harvesting and storage

DHAN FOUNDATION’S APPROACH TO resources as a means to increase productivity of tank


RAINWATER HARVESTING IN RURAL fed and rainfed agriculture. These rainwater
AREAS harvesting structures of one form or the other, benefit
DHAN Foundation is a grassroots development predominantly the large number of livestock, small
organisation working mainly in rural areas with a and marginal farmers and the rural folk who have
focus on water resources development and their local no access to large and medium reservoirs. The
management. More specifically, it has been organisation comprises highly motivated, well
concentrating on the restoration of small scale water qualified and/or experienced professionals, who live
resources like minor irrigation tanks and watershed in and work from the villages, with a deep concern
development, and the revival of local initiatives like for poverty alleviation through developmental
the maintenance and management of the water activities, and build people to become self reliant.

112
STUDY successive governments failed or did not care
In order to gain a good understanding of the enough to study and revive the old methods of water
traditional rainwater harvesting systems like tanks harvesting, which would have once again made the
and ponds DHAN Foundation first took up detailed rural communities self reliant with regard to
study of the location, design and construction irrigation and drinking water. Inspite of the large
features, the water management practices and the number of large and small dams constructed across
maintenance of the systems. It found that those rain many rivers in the country, irrigation facilities are
water harvesting structures were ideally located, still woefully inadequate and people continue to
ingenious but simple in design, constructed with depend upon erratic rainfall conditions. In a country
locally available materials and maintained by the where many regions are arid, semi arid or prone to
local communities. However due to various reasons, monsoon floods, this dependence has proved costly.
the foremost among them being the decline of Where the rainfall is unseasonal, in excess or
community management, these rainwater harvesting inadequate, the price paid is heavy in terms of
structures have been steadily getting dilapidated and destroyed crops, mounting debts and uprooted
in some cases even extinct. The government taking human lives. The most cost effective way by which
control of the water bodies during the colonial rule the water resources can hence forth be developed,
has triggered the decline of community management at least in Tamilnadu and the adjacent peninsular
of them. Massive groundwater programmes like the states, is by rehabilitating the thousands of
construction of dug wells and tube wells, traditional irrigation tanks which are centuries old
aggressively promoted by government organisations and which are still functioning well where the local
and banking institutions with inducements in the community is cohesive and enlightened, instead of
form of liberal loans and subsidies, technological investing in new structures and systems. Further
innovations like electrical pumpsets, provision of there are no more hydrologically appropriate sites
subsidised and in many cases free supply of available for forming new tank systems. After the
electricity to agriculturists for lifting water from the detailed study and analysis of the reasons for the
wells - all these had contributed to the neglect of decline of the small scale water resources, DHAN
the tanks. Foundation has ventured to restore these tanks to
This neglect has set in motion, other intrusions their original design standard and performance
like encroachments, weed infestation and efficiency; and more importantly, to undertake the
sedimentation of feeder channels and tank beds, programme by organising the concerned people,
erosion of earthen embankments of tanks, loss of enlisting their active participation, building their
sluice shutters, leaky sluices and damaged surplus capacity and making them contribute a part of the
weirs, all of which have further compounded the cost of restoration and thus become stakeholders and
degradation process of the water bodies. Instead of then facilitating them to implement the rehabilitation
repairing or restoring the water resources through works. These processes would ensure proper timely
community action, the people began looking upto maintenance and management of the water resources
the government to undertake the works. The and make them sustainable over the years, so that
government’s attention was focussed more on the future generations would continue to enjoy the
construction of massive dams and large scale benefits derived. History confirms that a community
irrigation facilities across the country, terming them is the best protector of its own resources.
as the new temples of modern India. It perhaps felt
that these small scale water bodies are too small to ACHIEVEMENTS
provide any spectacular benefit and too scattered to During the past thirteen years DHAN
have an effective impact on the people, to initiate Foundation has undertaken rehabilitation works of
any activity for their restoration. For a country which more than 750 minor irrigation tanks and Ooranis
at the time of independence was in a hurry to catch with people’s participation, in the five districts of
up with the rest of the world and where millions of Madurai, Ramanathapuram, Theni, Tiruvallur and
people had to be literally hauled up above the poverty Kancheepuram in Tamil Nadu; in two districts of
line, this was considered to be the way out. But Chittoor and Nalgonda in Andhra Pradesh and in

113
Tumkur district of Karnataka. Besides, it has also and federations to provide credibility to them. DHAN
undertaken sixty tankbased watershed development organised several exposure visits to the people to
works with people’s participation and contribution other areas where the tank rehabilitation works were
in Madurai, Ramanathapuram, Virudhunagar, undertaken, for them to see and share the experience
Tuticorin and Chittoor districts. Twenty five of their counterparts in those areas. Several training
community wells were also constructed in Madurai, programmes were conducted to the members of the
Ramanathapuram and Tiruvallur districts. The funds Associations, Executive Councils and Federations,
to carry out these works came mainly from the on leadership, organising people, construction
District Rural Development Agencies (DRDA), technology, improved water management and crop
Drought Prone Area Programme (DPAP), National production techniques, accounting procedures and
Bank for Agriculture and Rural Development the like, to build their capacity, motivation and
(NABARD) and Sir Ratan Tata Trust (SRTT) while confidence. All these efforts paid dividends to
the International funding agencies like the Ford DHAN workers who could build a good rapport with
Foundation and NOVIB, met the overhead charges the villagers and instill confidence in them. During
of DHAN Foundation. While the funding agencies the initial years, with DHAN workers living in the
came forward with 100 percent of the cost of works villages and the nearest small towns, it took about
as grant, DHAN Foundation availed only 75 percent six to nine months to form one association. Presentily
of the works cost, and successfully mobilised the with the experience gained over the years it takes
remaining 25 percent from the beneficiaries, right only a month or two to do this. The process adopted
from the initiation of this programme in early 1992. to form WUAs has also been refined and improved
We are happy to find that since 1997, the government so that the farmers’ federations themselves organize
also has changed their financing policy from 100 new WUAs and undertake the activities that DHAN
percent grant to 75 percent and insists on 25 percent has been carrying out, in order to upscale the
people’s contribution and full participation in many programme in a big way in the future. It is this effort
of their development programmes. that makes people committed to their roles and
DHAN Foundation organised about 950 water responsibilities which we believe would result in
users (WUAs) and watershed development sustained community management of the water
associations with 60,000 members in order to enable resources.
them to carry out the development works mentioned
above and to manage them thereafter. It also EXPERIENCES
organised tank farmers’ federations at the Panchayat DHAN Foundation itself gained considerable
Union and district levels to guide and assist the experience in these thirteen years of its involvement
WUAs in their work, ensure the quality of work, in small scale water resources development. In its
mobilise funds towards people’s contribution and pilot (first) phase of three years, the focus of work
liaise with funding agencies for speedy disbursement was on rehabilitation of tank irrigation systems,
of funds. While the members of the general bodies wherein the emphasis was on restoring the tank
of the various associations were the actual water structures like tank storage capacity, bunds, sluice
users, in the selection of office bearers of the outlets, and surplus weirs to their original design
Executive Councils of these associations DHAN standard. This effort has resulted in greater
Foundation focussed their attention and assisted the acquisition and increased storage of rain water over
members to make the right choice with great care. It longer periods. Additional storage capacity ranged
was these people’s organisation which did the from 100 to 200 percent. In the second phase of three
planning, implementation, quality control and years, the emphasis was on regeneration of farmers’
systematic accounting of the works, DHAN management in addition to rehabilitation. This effort
Foundation providing only the required technical resulted in communities’ participation with active
and managerial support to them. DHAN also held involvement, reduced wastage and equitable
several discussions at the tank and village levels to distribution of water among the users. This was made
motivate the people and organise them, assisted them possible by the users regulating the water use
in drafting byelaws and registering the associations through their local management. During the third

114
phase, tankfed agriculture was the focus beside This has been a boon to the small and marginal land
rehabilitation and farmers’ management. This effort holders who could not have their own individual
resulted in provision of appropriate inputs at the right wells to practice conjunctive use.
time, improved water management and increased All these water conservation measures are
crop production ranging from 30 to 100%. And in introduced either on the initiative or with the consent
the fourth phase sustainability of the rehabilitated of the users of the water resource and in accordance
tank systems in given importance by organising with their priorities. When the people get involved
Micro Finance Groups & facilitating them to intensely in every activity of tank rehabilitation
periodically maintain and manage those traditional planning, decision making and implementation, they
small scale water resources. This has resulted in take good care to prevent wastage, preserve the
greater cohesion among the user groups and their stored water, and distribute it equitably among
concern to maintain and manage the tank systems themselves. They maintain the structures themselves
with their own initiative and ensure the sustainability with their own funds mobilised for the purpose. In
and thus become self reliant. times of disaster like a tank bund getting breached
Similarly, from taking up isolated tanks for due to unprecedented rains, the people themselves
renovation, the planning and implementation was undertake breach closing and bund strengthening
made taking a cascade of tanks as a unit, so as to work collectively, when every able bodied villager
capture and store the entire run off flowing down joins in the team work. This attitudinal change
the micro watershed. The feeder channel cleaning occurs mainly through each member of the WUA
and restructuring (removal of wild growth of finding strength and confidence in unity. This is the
vegetation and desilting) and removal of most important and gratifying experience that has
encroachments formed an important component of happened.
tank rehabilitation. This work was found to be the
most cost effective component for augmenting tank TANKS AS RECHARGE STRUCTURES
storage, next to provision of plug and rod shutters Although the primary use of tanks is irrigation,
to sluice outlets for preventing leakage and they contribute as much as 40 percent of their storage
conserving the harvested rain water. The philosophy to augment groundwater resources through recharge.
has been “a drop saved is equal to a drop added to According to a study report by the National
storage”. Another component of work added to tank Geophysical Research Institute (ICAR), Hyderabad,
renovation was the provision of silt traps on the front measurements carried out in about 20 river basins
side of sluice opening to prevent the choking up the well distributed over the various climatic and
vent way (pipe or barrel). Tree planting on the geomorphic zones in India, 5 to 10 percent of the
foreshore of tank bed in the belt of land bound by seasonal rainfall is contributed as annual recharge
the FTL contour of the tank upto the government in the peninsular hard rock regions, whereas in
boundary has been introduced, to provide additional alluvial areas, about 15 to 20 percent of the rainfall
income to the people through usufructs and to contributes to groundwater. The Central Ground
minimise silt accretion into the tank waterspread. Water Board in its manual on “Groundwater
Incidentally tree planting also serves to identify the resources of India (1995)” accounted nearly 30 to
encroachments if any and to remove them promptly. 40 percent of applied irrigation water as seepage
Yet another innovation made is provision of dead return from irrigated fields and field channels.
storage within the tank bed to hold water in a selected Irrigated fields also contribute to augmentation of
pocket to facilitate aquaculture, to serve the drinking groundwater resources. The average infiltration rate
water needs of livestock and/ or to provide life from paddy fields is reported to be generally higher
irrigation to withering crops in times of water than that from tanks. The paddy field infiltration
scarcity. The community wells sunk in the tank ratio (that is, the ratio between the water infiltrated
complex get much of their recharge from the tank underground to water applied) varied between 55
itself and from the water applied for the crops raised and 88 percent. Paddy fields can be used as ground
in the tank command and provide supplemental or water recharge basins by harvesting the rainfall
life irrigation to the crops after the tank gets emptied. effectively. Water spreading as a recharge method

115
is practiced on an increasing scale all over the world OTHER BENEFITS
in areas where the aquifer is shallow. Our experience In quite a few tanks renovated in the rural areas
of the effectiveness of rehabilitated irrigation tanks of Madurai district, inland fish culture has been
& Ooranis as groundwater recharge structures in introduced in tank water which fetches the water
Theni and Ramanathapuram districts is that there is users a sizable income ranging from ten to fifty
a perceptible rise in the water table ranging from 4 thousand rupees a year per tank, depending upon
to 6 metres (m). Before restoration of the tanks, the the period of tank storage and the efforts taken by
water table in the wells was between 30 to 45 m the local people to raise fish. Usufructs from trees
below ground level. After the desilting of the feeder planted on the tank bunds and in tank beds have
channel & tank bed, the tanks filled up in the next generated additional income upto Rs 75000/- over
rains and within a few weeks the water table in 169 a six year period to the water user group.
dug wells situated close to Silamalai tank in Theni In some tanks and Ooranis desilted under the
district rose by 5 to 6 m. In the wells situated in the tank rehabilitation programme, the excavated tank
zone of influence of Kurinjiappagoundan tank in silt was applied to their agricultural lands, thereby
Theni district, the water table in twenty out of fifty improving the texture and fertility status of the soils.
wells rose by five metres from 40 to 35 m below
ground level, while in the remaining thirty wells the CONCLUSIONS
rise ranged from 2 to 4 metres. In the next year, the The Institute of Remote Sensing (IRS) Anna
water table rose still further, with many dried wells University has prepared micro watershed maps
getting rejuvenated and providing adequate water Panchayat Union wise, delineating therein the
supply for irrigated crops. The area under well revenue village boundaries; and identifying
irrigation in this region has expanded by 50 to 100 favourable areas for ground water recharge using
percent and ground water became a dependable remote sensing and GIS. We therefore suggest that
source of supply. A new well 22 m deep excavated the tanks situated in such favourable tracts may be
downstream of a renovated tank has 9 m depth of taken up for rehabilitation on a priority basis, so
storage & provides drinking water for the entire that the people of those regions will get the benefits
village of Silamalai. In most of the wells under the of tankfed agriculture and groundwater recharge as
renovated tanks, people no more resort to deepening well and also augment the storage of the existing
of the wells, which they were doing earlier, as they wells in the concerned tank commands.
have adequate supply. We also strongly recommend that a ten year
Similarly in Ramanathapuram district after the plan for the period from 2006 to 2016 be prepared
reclamation of Ooranis, the water stored in them is to rehabilitate all the existing tanks and ooranis;
available for drinking purposes almost round the initiate tankbased watershed programme in all the
year as against hardly 3 to 4 months’ availability districts of Tamilnadu to include farm ponds,
earlier, as the storage capacity is increased three to drainage line treatment and tree planting on a
four times by deepening the Ooranis. Besides, the massive scale. We believe that this effort will
quality of water in the surrounding wells has also strengthen people’s participation and provide lasting
improved as confirmed by tests carried out in water benefits to the rural communities through tankfed
testing laboratory as well as by the local villagers. agriculture and groundwater recharge.
Above all, the womenfolk are saved from the All existing encroachments in the water bodies
drudgery of fetching water from distant places and may be summarily evicted and future encroachments
the time spent for the purpose. Since the Oorani be strictly prohibited in order to preserve these gifts
reclamation works also have been carried out with of our forefathers and can be passed on to our future
people’s contribution of 25 to 30 percent and their generations to go along Nature’s path. Here it will
participation, the beneficiaries take good care to be appropriate to conclude this paper with a
preserve them from pollution and use the Oorani quotation from Gandhiji. “The greatness of a nation
water without wastage. and its moral progress can be judged by the way
people treat the environment”.

116
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

19. Importance of Rain Water Harvesting in Current Senario


*S. R. Asati **Abhijit Deshpande

Abstract
In the last few decades, rapid growth in urbanization and industrialization trends,
and dependence on ground water for domestic and agricultural purposes by rural community
altogether have resulted in to exploitation of ground water without much focus on its recharge.
Thus there is urgent need to search suitable methods to replenish the cause. In this context
rainwater harvesting has been the crucial factor for sustaining the fast depleting surface
and sub surface water resources. Rainwater harvesting is the traditional technique has
been in use in hilly areas such as Forts and desert areas such as Rajasthan to conserve the
water in the dry periods. Ground water is the main source and being exploited since the
days of Mahabharata. The current paper focuses on the per capita water availability, critical
ground water deficit problems in India and the various water harvesting techniques suitable
for the Indian conditions. Each and every belt now faces the problem of depletion of ground
water. This is the time to collect the people so as to solve the problem collectively, traditionally,
economically, qualitatively so as to fulfill the minimum demand for the long time. Government
policies and economic incentives have also determined how and how much of India’s water
can be used.

Introduction is stored in inland water bodies both natural (lakes


The unequal distribution of water resources and ponds) and man-made (tanks and reservoirs).
over the time and geographic area and its constant India receives a total precipitation of 4000 cu.km of
exploitation, especially the ground water resources fresh water in the form of rain and snowfall out of
has arisen the severe ground water problems mainly which only1869 cu.km is available as annual surface
due to its large dependence on ground water by the runoff and only an estimated 1122 cu.km can be
rapid growth in urban, rural and industrial exploited due to topographic constraints and
establishments. This has resulted in decrease in distribution effects.
ground water levels without much focus on its Groundwater represents one of the most
recharge and has thus necessitated the development important water sources in India and accounts for
of water harvesting systems. Government policies over 400 cu.km of the annual utilizable resource in
and economic incentives have also determined how the country. Due to the highly variable nature of the
and how much of India’s water can be used. The climate, groundwater has become a popular
following discusses some of the major alternative for irrigation and domestic water use
characteristics of water in India: where it comes across India. Reliance on groundwater resources is
from, where it goes and how it is currently being particularly strong where dry season surface water
managed. levels are low or where wet season flows are too
A portion of the total precipitation of the total disruptive to be easily tapped. In addition to being
water is absorbed by the soil and is stored in accessible, groundwater quality is generally
underground aquifers. A much smaller percentage excellent in most areas and presents a relatively safe

*Lecturer-Selection Grade **Lecturer


Deptt. of Civil Engg., MIET, Gondia- 441 614 (M.S)

117
source of drinking water for Indians in rural and urban per year (World Bank, 1999). According to the World
centers. Bank, demand for industrial, energy production and
The presence and availability of groundwater other uses will rise from 67 billion m3 to 228 billion
varies greatly with changes in topography, Demand from the domestic sector has remained low
subsurface geology and the prevailing climate in the and accounts for only 5% of the annual freshwater
region. In some areas, groundwater exists in deep withdrawals in India (World Resources Institute,
aquifers while in others the water is stored near the 2000). Domestic water use will increase as the
surface. The location of the aquifer also affects its population continues to grow and access to water is
recharge rate and its susceptibility to pollution and improved. Recent data from the World Bank
overuse. indicates that demand over the next twenty years
will double from 25 billion m3 to 52 billion m3. Only
Water Harvesting Systems 85% of the urban and 79% of the rural population
Water harvesting structures have been designed has access to safe drinking water and fewer still have
to help capture and store rainwater during the access to adequate sanitation facilities (World
monsoon season and serve as a source of drinking Resources Institute, 2000). The central government
and irrigation water during the rest of the year. In made a commitment to improve access to water in
India, tanks, ponds and reservoirs cover a total of 5 rural and urban areas in the National Water Policy
million hectares, the majority of which lies in the adopted in 1987. The original goal of providing
southern portion of the country (MOWR, 2001). water to 100% of all citizens of India by 1991 had
Although they do not make a significant contribution to be revised and now stands at 90% access to urban
to the total freshwater water resource in India, water and 85% access to rural areas, respectively. Drinking
harvesting systems do have a strong impact in terms water and sanitation nevertheless remain high
of drinking water and irrigation provision on a local priorities on the government agenda.
scale.
Many of the water harvesting structures used Groundwater Depletion : facts and figures
in India are based on ancient models, mainly due to Following findings focuses on the critical
the potential of these systems to supply freshwater scenario of ground water depletion :
adequate to all areas and sectors and therefore highly As per the findings in 1955 the availability of
adapted to the prevailing climatic and hydrologic fresh water in India was 5277 cum while in 2001 it
conditions of the area. However, since colonial has depleted to 1820 cum.
times, these systems have been increasingly
abandoned and neglected in favor of large dam and Out of 650 BCM around 231 BCM water is
canal irrigation projects. So far, these ‘modern’ pumped from ground water.
structures have been successful in providing water
to portions of rural and urban India, yet high Around 575 liters of ground water per capita
economic, social and environmental costs have per day is in demand, of which only 46 liters is used
reduced their overall benefit. As a result, for domestic and industrial purposes while the rest
development and civil society organizations have is consumed for irrigation.
been advocating the return to local water harvesting
systems for domestic and irrigation purposes. As The ground water is depleting at the rate of 2
awareness and public opinion continue to grow, to 3 mts.per year.
water-harvesting systems will become increasingly
more important source of water in India. Finally Meherana in Gujarat and Coimbatore
In the past several decades, industrial in Tamil Nadu have lost their entire ground water
production has increased in India owing to an resources.
increasingly open economy and greater emphasis
on industrial development and international trade. The state wise ground water deficit (cu.km/
Water consumption for this sector has consequently year) in India is depicted in following Table
risen and will continue growing at a rate of 4.2%

118
dropped 25-30 m. in a decade. The major utilization
State Deficit (cu.km/ year)
is for agriculture in Tamil Nadu, which has caused
Rajasthan 32.6 the water table to drop close to 30 meters in a decade.
Maharashtra 22.0 • While it is estimated that Delhi will run out of
Gujarat 16.0 groundwater by 2015 at current rates. In Ludhiana
district of Punjab, the water table is dropping nearly
Haryana 14.2
1 m annually; water tables are dropping by under
Karnataka 12.7 one to several meters per year in much of northern
Punjab 4.0 India’s Punjab, Haryana and Uttar Pradesh.
Other 2.8 • The position of most of the villages in India is
Total 104.3 more pathetic where the major dependence of water
supply for the domestic and irrigation purposes is
the dependence on ground water
Forth-coming Problems
• India’s irrigation water came from less than 30
• In the Indus basin as a whole, groundwater
% groundwater in 1951 but over 40 % in 1980.
pumping is estimated to exceed recharge by 50%.
• India’s potential surface water resource = 700-
• India is one of the leading countries in total
800 cu.km / year.
irrigated area and the third-largest grain producer,
• India’s potential utilizable ground-water
the number of shallow tube wells used to draw
resource = 350 cu.km / year.
groundwater was 3000 in 1960, and 6 million in
• India’s rainfall = 110 cm / year. Ave. surface
1990.
flow = 1800 cu.km / year. Inflow from neighboring
• Water Constraints on Irrigation : The eventual
countries accounts for 200-cu.km / year of this 1800.
lack of water for irrigation could cut India’s grain
Storage capacity (mid-1970s) = 160 cu.km. India’s
production by 25%. 25% of India’s grain harvest
water utilization = 250 cu.km / year (1974). 100
could be in jeopardy.
cu.km of this was from storage; 150 from rivers and
• Pumped underground water is double the rate
streams. Irrigation accounted for 240-cu.km / year
of aquifer recharge from rainfall.
of this utilization. (95 cu.km were used in 1951)
Estimated surface water utilization in 2000 = 500
Following are the critical ground water deficit
cu.km / year, including 420 cu.km / year for
problems observed in various states of India
irrigation.
The ground water availability and the projected
• Of 1.33 million km2 of land being cropped,
deficit in India are shown in Fig.-1. It can be seen
240,000 km2 are irrigated, but only 50% of this has
from the figure that since 1951 the per capita water
an assured supply of water. 90,000 dug wells, 30,000
availability has rapidly decreased almost three times
shallow tube wells, and 9500 deep wells have been
in fifty years in the year 2001, while the future
installed in the past 15 years. The limited water
projected availability is expected to be 1140 cu.m
supply encourages inadequate leaching of land and
which is almost twice less than observed in 2001.
a resultant increase in soil salinity. Indian per-capita
However, this would much depend on increase/
water supplies fell by roughly half during 1955-90.
decrease in pumping and our earnestness to
• Sugarcane growers in the state of Maharashtra
implement the water harvesting methods.
take 50% of available irrigation water supplies, even
Presented below are the ground water deficit
though they occupy only 10% of cropped land.
problems observed in the various states of India: -
• Water shortages plagued 17,000 villages in the
• India’s use of ground water in 1973-74 was
northern Indian state of Uttar- Pradesh in the 1960s.
120-130 cu.km / year (80% for irrigation).
By 1985 that figure had risen to 70,000. Similarly,
• 65% of Haryana in India sits over salty
in Madhya-Pradesh, more than 36,400 villages
groundwater.
lacked sufficient water in 1980; in 1985 the number
• In southern India, groundwater levels are
totaled more than 64,500. In the western state of
falling 2.5-3 m/ years and between 1946-86; the
Gujarat, the number of villages short of water tripled
water table in parts of Karnataka dropped 40 m while
between 1979 and 1986, from 3,840 to 12,250 and
in the state of Tamil Nadu, ground-water levels have
119
over-pumping by irrigators caused saltwater to invade Following are the structures generally used for
the aquifer. the rainwater harvesting
1. Recharge Pits: Recharge pits are constructed
Why Rain Water Harvesting for recharging the shallow aquifers. These are
Unavailability and inadequacy of surface water constructed 1 – 2 m. wide and 2 - -3 m. deep which
and to meet our demands, we have to depend on are backfilled with boulders, gravels and coarse
ground water. sand.
Due to rapid urbanization and concrete 2. Recharge Trench: These are constructed when
covering over the land the infiltration of rainwater the permeable strata are available at shallow depths.
into the sub-soil has decreased drastically and Trench may be 0.5 to 1 m. wide, 1 to 1.5 m. deep
recharging of ground water has diminished. and 10 to 20 m long depending upon the availability
Over-exploitation of ground water resource has of water. These are backfilled with filter materials.
resulted in decline in water levels. 3. Open wells: Existing open wells may be
To avoid the situation of temporary floods or utilized as recharge structures and water should pass
stagnation of water in urban areas even for a short through filter media before putting it into open well.
duration of rainfall. 4. Hand Pumps: The existing hand pumps may
To enhance availability of ground water at a be used for recharging the shallow / deep aquifers,
specific place and time. if the availability of water is limited. Water should
To arrest saline water intrusion. pass through filter before diverting it into hand
Improvement of the water quality, conservation pumps.
and augmentation of the ground water aquifers. 5. Recharge Wells: Recharge wells of 100 to 300
Sustaining the moisture content in the subsoil mm. Diameter are generally constructed for
so as to minimize the cracks during dry periods. recharging the deeper aquifers and water is passed
To improve the vegetation cover. through filter media to avoid choking of recharge
To raise the water levels in dug wells and bore wells.
wells that are drying up. 6. Recharge Shafts: For recharging the shallow
Different methods of Roof Top Rain water aquifers, which are located below clayey surface,
Harvesting. recharge shafts of 0.5 to 3 m. diameter and 10 to 15
m. deep are constructed and back filled with
There are two main techniques of rainwater boulders, gravels and coarse sand.
harvesting 7. Lateral shafts with bore wells: For recharging
a) Storage of rainwater on surface for future use. the upper as well as deeper aquifers lateral shafts of
b) Recharge to ground water. 1.5 to 2 m. wide and 10 to 30 m. long depending

Rain Water Harvesting Techniques

Different methods of Roof Top Rain water Harvesting

Bore wells
Hand
Deserted Open Wells Pumps
Recharge wells
shafts
Recharge Recharge Recharge
pits trenches wells

120
upon availability of water with one or two bore wells • The structures required for rainwater harvesting
are constructed. The lateral shaft is back filled with are simple and economical. Also suit in any
boulders, gravels and coarse sand. environment.
8. Deserted wells: Recharge water is guided • Rainwater harvesting provides a water supply
through a canvas pipe of 100 mm diameter to the buffer for use in times of emergency or breakdown
bottom of well or below the water level to avoid of the public water supply system.
scouring.
References
Ideal Conditions for Rain Water Harvesting and • Artificial Recharge in India, A Publication of National
Artificial Recharge to Ground Water Geophysical Research Institute, Hyderabad.
• Most suitable for the urban areas where • Asati S.R., “A case study on Rooftop rainwater
adequate space for surface storage is not available. Harvesting,” Proceedings in National Conference and
• Water level is deep enough (greater than 8m.) sustainable Development, L.A.D. and Smt.R.P.College for
an adequate surface storage is available. women, Nagpur dated 16-17 Dec.2005.
• Permeable strata is available at shallow / • Asati S.R., and Sharma N.S.”Roof top Rainwater
Harvesting: A case study,”proceedings in 38th Annual
moderate depth.
Convention of I.W.W.A. hold at Jaipur (Rajasthan), 06-
• Where adequate quantity of surface water is
08 Jan2006.
available for recharge to ground water.
• Ashtankar T, Kelkar P and Nanoti M, ., “Rainwater
• Where there is possibility of intrusion of saline Harvesting in Urban Areas- A Review ,” proceedings in
water especially in coastal areas. 38th Annual Convention of I.W.W.A. hold at Jaipur
• Where the evaporation rate is very high from (Rajasthan), 06-08 Jan2006.
surface water bodies. • C.G.W.B., Manual on Artificial Recharge of Ground
• Where the ground water quality is bad. water, March 1994, Technical Series M.No-3.
• Dainik Bhaskar-News Paper, 28th June 2004.
Conclusion and suggestions • Development of Monomolecular Film to Act as
The current paper discusses the ground water Evaporation Retardant and Prevent Water from
availability, deficit and its future prediction for India. Evaporating from large Water Bodies Economically”,
Also, importance and various harvesting techniques Project No. ID/17/95 sponsored by Ministry of Water
have been discussed. Thus in the current scenario Resources, Govt. of India.
of severe water crises implementation of rain water • Husiman L. & Olsthoorn T.N., “Artificial Groundwater
harvesting technique can be helpful in solving Recharge”, Pitman Advanced Publishing Program.
following problems : • IWWA proceeding of 33rd Annual Convention Theme,
• An ideal solution to water problems in areas “Water for New Millennium”.
• Mahajan G., “Ground Water Recharge”, Ashish
having inadequate water resources.
Publishing House, New Delhi.
• Pingle S.S. “Water Harvesting- The Need of the Hour,”
The ground water level will rise.
Proceedings in National Conference and sustainable
• Mitigates the effects of drought and achieves Development, L.A.D. and Smt.R.P.College for women,
drought proofing. Nagpur dated 16-17 Dec.2005.
• Rainwater harvesting can reduce storm • National Drinking Water Mission, “Water Harvesting
drainage load and flooding in city streets. System Reference manual”.
• Flooding of roads is reduced. • Rainwater Harvesting, A Publication of national
• Rainwater is bacteriologically pure, free from Institute of Hydrology, Roorkee
organic matter and soft in nature, so can be utilized • Todd D. K., “Ground Water Hydrology”, John Wiley
for drinking purposes. & sons
• Soil erosion will be reduced. • Trivedi S.H and Bhavnani H. V., “Artificial Ground
• Saving of energy per well for lifting of ground Water Recharge through Roof top Rainwater Harvesting:
water – a one-meter rise in water level saves about A case study,” proceedings in 38th Annual Convention of
0.4 kwh of electricity. I.W.W.A. hold at Jaipur (Rajasthan), 06-08 Jan2006.

121
122
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

20. Rain Water Harvesting : A Viable Solution To Conserve Water


*Rishab Mahajan **Prof. Shakti Kumar ***Dr. R. K. KhitoIiya

Abstract :
The problem of water shortage in arid and semi-arid regions is one due to low rainfall
and uneven distribution through out the season, which makes rain fed agriculture a risky
enterprise. Rain water harvesting for dry-land agriculture is a traditional water management
technology to ease future water scarcity in many arid and semi-arid regions of world. The
paper discusses the use of water harvesting as an effective tool for water management. The
various forms of water harvesting have been elucidated. The common goal of all forms is to
secure water supply for annual crops, pastures, trees and animals in dry areas without tapping
groundwater or river-water sources. As the appropriate choice of technique depends on the
amount of rainfall and its distribution, land topography, soil type and soil depth and local
socio-economic factors, these systems tend to be very site specific. The water harvesting methods
applied strongly depend on local conditions and include such widely differing practices as
bunding, pitting, micro catchments water harvesting, flood water and ground water harvesting.

Introduction 1. Basic Concept


Rain water harvesting is defined as the 1.1 General concept
collection of runoff and its use for the irrigation of Water harvesting is applied in arid and semi-
crops, pastures and trees, and for livestock arid regions where rainfall is either not sufficient to
consumption. As long as mankind has inhabited sustain good crop and pasture growth or where, due
semi-arid areas and cultivated agricultural crops, it to the erratic nature of precipitation, the risk of crop
has practiced some kind of water harvesting. Based failure is very high. Water harvesting can
on “natural water harvesting” the use, of the significantly increase plant production in drought
waters of ephemeral streams was already the basis prone areas by concentrating the rainfall/runoff in
of livelihood in the arid and semi-arid areas many parts of the total area. The intermittent character of
thousands of years ago, allowing the establishment rainfall and runoff and the ephemerality of
of cities in the desert .The European expansion, floodwater flow requires some kind of storage. There
especially the technological development since might be some kind of interim storage in tanks,
1850, lead to a steady increase in area under cisterns or reservoirs or soil itself serves as a
“classical” irrigation techniques with preference to reservoir for a certain period of time.
large schemes. The classical sources of irrigation Water harvesting is based on the utilization of
water are often at the break of overuse and therefore surface runoff; therefore it requires runoff producing
untapped sources of (irrigation) water have to be and runoff receiving areas. In most cases, with the
sought for increasing agricultural productivity and exception of floodwater harvesting from far away
providing sustained economic base. Water catchments, water harvesting utilizes the rainfall
harvesting for dry-land agriculture is a traditional from the same location or region. It do not include
water management technology to ease future water its conveyance over long distances or its use after
scarcity in many arid and semi-arid regions of world. enriching the groundwater reservoir. Water

*Pre-final Year **Professor ***Professor & Head, Post Graduate Environmental Engineering Department
Deptt. of Civil Engineering, Punjab Engineering College, Chandigarh – 160 012

123
harvesting projects are generally local and small scale 2.1 Roof top water harvesting
projects. Rain “harvested” from the roofs of buildings
including greenhouses is, in many locations, a very
1.2 Necessities valuable resource being used mainly for drinking
The main goals of water harvesting are: and domestic purposes. Fig. 2 shows a typical roof
1. Restoring the productivity of land which suffers top harvesting system.
from inadequate rainfall.
2. Increasing yields of rain fed farming The various types of roof top rain water
3. Minimizing the risk in drought prone areas harvesting are as follows :
4. Combating desertification by tree cultivation 2.1.1 Component System
5. Supplying drinking water for animals. This system enables custom building from
separate components giving great flexibility
2 Techniques of Rain Water Harvesting enabling the system to be adapted for many
The various rain water harvesting techniques situations regardless of location of storage tank
can be broadly classified into following six realative to building.
categories.
1. Rooftop water harvesting 2.1.2 Module System
2. Water harvesting for animal consumption This type of system differs in that they do not
3. Inter-row water harvesting replenish the storage tank with main water. Instead
4. Microcatchment water harvesting there is an integral main water cistern which the
5. Medium-sized catchment water harvesting pump draws from when there is insufficient water
6. Large catchment water harvesting. in storage tank.

2.1.3 Hybrid System


Hybrid system comprises a module unit with
an additional submersible pump located in
underground storage tank.

2.2 Water harvesting for animal consumption


Ancient dwellers harvested rain water for
human and animal consumption by redirecting the
water running down hill slopes into cisterns.
Presently, this tradition is still practiced in many
Fig. 1 : Annual precipitation ranges for different forms regions, but where the means are available, surfaces
of water harvesting in summer rainfall areas used for rainwater collection are usually either
physically compacted, chemically treated or covered
to increase runoff volume:
(i) Clay soils are well suited for compaction. The
surfaces are shaped, smoothened and then
compacted e.g. by tractor and rubber-tired rollers.
(ii) Sodium salts, wax, latexes, asphalt, bitumen,
fiberglass and silicones can be used as sealants on
soils which do not swell with moisture (Frasier
1994). Plots treated with sun-melted granulated
paraffin-wax yielded about 90 percent of the rainfall
as runoff, compared to 30 percent from untreated
plots.
(iii) Concrete, plastic sheeting, butyl rubber and
Fig. 2 : Roof top rain water harvesting metal foil can also be used to cover the soil for

124
rainwater harvesting. Gravel may protect the “Matuta” (East Africa). The ridges of about 0.40 m
underlying membrane against radiation and wind height are built 2 to 20 m apart, depending on slope,
damage. soil surface treatment, general CCR and type of crop
The runoff water is collected in lined or unlined to be grown. The catchment area should be weeded
pits down the slope of the catchment area (Fig. 2), and compacted; the crops are either grown in the
furrow, along the upper side of the bund or on top
of the bund. On sloping land, this system is
recommended only for areas with a known regular
rainfall pattern; very high rainfall intensities may
cause breakages of the bunds. Crops cultivated in
row water harvesting systems are maize, beans,
millet, rice or (in the USA) grapes and olives (Pacey
and Cullis 1986, Finkel and Finkel 1986, Tobby
1994). The preparation of the land for inter-row
water harvesting can be fully mechanized.

Fig 3. Rainwater harvesting system 2.4 Microcatchment systems


for animal consumption Microcatchment water harvesting (MC-WH)
is a method of collecting surface runoff from a small
2.3 Inter-row water harvesting catchment area and storing it in the root zone of an
Inter-row water harvesting is applied either on adjacent infiltration basin. This infiltration basin
flat land or on gentle slopes of up to 5 % having soil may be planted with a single tree, bush or with
at least 1 m deep. The annual rainfall should not be annual crop.
less than 200 mm/year. On flat terrain (0-1 % Fig 4. Illustrates a microcatchment system. The
inclination) bunds are constructed, compacted and, water collected from different parts of the catchment
under higher-input conditions, treated with area in stored as shown in the figure.
chemicals to increase runoff. The aridity of the
location determines the catchment to cropping ratio
(CCR), which varies from 1:1 to 5:1 (Fig. 3).
On sloping land (1 - 20% inclination) these
systems are called “contour ridges” (USA) or

Fig 5 : Negarin type Microcathment system

The system shown in the Fig was given by Ben-


Ashler [1] and has the following parameters.
1. Catchment Area = 3 - 250 sq. m
2. Cropping Area= 1 - 10 sq. m
3. Catchment: Cropping Ratio = 3: 1 -25:1
Fig. 4. Various forms of flat-land inter-row water
4. Precipitation =150- 600 mm/a
harvesting increasing CCR/aridity of location.
5. Slope = 1 - 20%

125
2.5 Medium-sized catchment water harvesting 2.5.2 Floodwater diversion
Water harvesting from medium-sized Floodwater diversion means forcing the wadi
catchments (1,000 m2 - 200 ha) is also known as water to leave its natural course and conveying it to
“water harvesting from long slopes”, as “macro- nearby areas suitable for arable cropping.
catchment water harvesting” or as “harvesting from Floodwater diversion techniques were already
external catchment systems”. applied several thousand years ago.
The various characteristics of this type of
system are
1. A CCR of 10:1 to 100:1; the catchment being
located outside the arable areas.
2. The predominance of turbulent runoff and
channel flow of the catchment water in comparison
with sheet or rill flow of micro catchments.
3. The partial area contribution phenomenon
which is not relevant for micro catchments.
4. The catchment area may have an inclination
of 5 to 50 %; the cropping area is either terraced or
located in flat terrain.
Fig. 6 shows a hillside conduit type system
which is adopted in areas having a precipitation of
100-600 m. Fig. 7 : Flood Diversion Technique

3. PARAMETERS FOR IDENTIFICATION


OF SUITABLE RAIN AREAS.
The selection of suitable areas and techniques
for rain water harvesting is of utmost importance to
derive the maximum benefits from the scheme.

Fig 6. Hill Type Conduit System The most important parameters to be


considered in identifying areas suitable for rain and
floodwater harvesting are as follows:
2.5 Large catchment water harvesting
Large catchment water harvesting comprises 3.1 Rainfall
systems with catchments being many square The knowledge of rainfall characteristics
kilometers in size, from which runoff water flows (intensity and distribution) for a given area is one
through a major wadi (bed of an ephemeral stream), of the pre-requisites for designing a water harvesting
necessitating more complex structures of dams and system. The availability of rainfall data series in
distribution networks. space and time and rainfall distribution are important
Two types are mainly distinguished: for rainfall-runoff process and also for determination
1. Floodwater harvesting within the stream bed. of available soil moisture. A threshold rainfall events
2. Floodwater diversion. (e.g. of 5 mm/event) is used in many rainfall runoff
models as a start value for runoff to occur. The
2.5.1 Floodwater harvesting within the stream intensity of rainfall is a good indicator of which
bed rainfall is likely to produce runoff. Useful rainfall
Floodwater harvesting within the stream bed” factors for the design of a rain- or floodwater
means blocking the water flow to inundate the valley harvesting system include:
bottom of the entire flood plain, to force the water (1) Number of days in which the rain exceeds the
to infiltrate and use the wetted area for crop threshold rainfall of the catchment, on a weekly or
production or pasture improvement. monthly basis.

126
(2) Probability and occurrence (in years) for the rainfall within a particular project area. The rain
mean monthly rainfall. falling on a particular catchment area can be
(3) Probability and reoccurrence for the minimum effective (as direct runoff) or ineffective (as
and maximum monthly rainfall. evaporation, deep percolation). The quantity of
(4) Frequency distribution of storms of different rainfall which produces runoff is a good indicator
specific intensities. of the suitability of the area for water harvesting.

3.2 Land use or vegetation cover 3.5 Socio-economic & infrastructure


Vegetation is an infiltration rates which conditions
consequently decrease the volume of runoff. The socio-economic conditions of a region
Vegetation density can be characterized by the size being considered for any water harvesting scheme
of the area covered under vegetation. There is a high are very important for planning, designing and
degree of congruence between density of vegetation implementation. The chances for success are much
and suitability of the soil to be used for cropping. greater if resource users and community groups are
involved from early planning stage onwards. The
3.3 Topography and terrain profile farming systems of the community, the financial
The land form along with slope gradient and capabilities of the average farmer, the cultural
relief intensity is other parameters to determine the behaviour together with religious belief of the
type of water harvesting. The terrain analysis can people, attitude of farmers towards the introduction
be used for determination of the length of slope, a of new farming methods, the farmers knowledge
parameter regarded of very high importance for the about irrigated agriculture, land tenure and property
suitability of an area for macro-catchments water rights and the role of women and minorities in the
harvesting. With a given inclination, the runoff communities are crucial issues.
volume increases with the length of slope. The slope
length can be used to determine the suitability for 3.6 Environmental and ecological impacts
macro or micro- or mixed water harvesting systems Dry area ecosystems are generally fragile and
decision making. have a limited capacity to adjust to change [3]. If
the use of natural resources (land and water), is
3.4 Soil type & soil depth suddenly changed by water harvesting, the
The suitability of a certain area either as environmental consequences are often far greater
catchments or as cropping area in water harvesting than foreseen. Consideration should be given to the
depend strongly on its soils characteristics viz. possible effect on natural wetlands as on other water
(1) Surface structure; which influence the rainfall- users, both in terms of water quality and quantity.
runoff process New water harvesting systems may intercept runoff
(2) The infiltration and percolation rate; which at the upstream part of the catchment, thus depriving
determine water movement into the soil and within potential down stream users of their share of the
the soil matrix, and resources. Water harvesting technology should be
(3) The soil depth incl. soil texture; which seen as one component of a regional water
determines the quantity of water which can be stored management improvement project. Components of
in the soil. such integrated plans should be the improvement of
agronomic practices, including the use of good plant
e) Hydrology and water resources material, plant protection measures and soil fertility
The hydrological processes relevant to water management.
harvesting practices are those involved in the
production, flow and storage other important 4. Conclusions
parameter that affects the surface runoff. Various Substantial amounts of rainfall in semi-arid
studies have shown that an increase in the vegetation areas are lost (e.g. by evaporation from soil
density results in a corresponding increase in surfaces), which could be utilized for agricultural
interception losses, retention and of runoff from production. This could be achieved through water

127
harvesting. Rainwater Harvesting have the potential applicable in particular environmental and geo-
to increase the productivity of arable and grazing physical conditions depends on kind of crop to be
land by increasing the yields and by reducing the grown and prevalent socio-economic and cultural
risk of crop failure. They also facilitate re- or factors.
afforestation, fruit tree planting or agroforestry. With
regard to tree establishment, rainwater and References
floodwater harvesting can contribute to the fight 1. Ben-Asher, J. (1988). A Review of Water
against desertification. Most of these techniques are Harvesting in Israel. World Bank Working Paper 2.
relatively cheap and can therefore be a viable WorldBank Sub-Saharan Water Harvesting Study,
alternative where irrigation water from other sources p. 47-69.
is not readily available or too costly. Unlike pumping 2. Boers, T. M. and Ben-Asher, J. (1982). A
water, water harvesting saves energy and review of rainwater harvesting. Agric. Water
maintenance costs. Using harvested rainwater helps Management.
in decreasing the use of other valuable water sources 3. Oweis, T., A. Hachum, and J. Kijne. 1999.
like groundwater. Remote sensing and Geographical Water harvesting and supplementary irrigation for
Information Systems can help in the determination improved water use efficiency in dry areas.
of areas suitable for water harvesting. The decision 4. Prinz, D., S. Wolfer.1999. Traditional
making process concerning the best method techniques of Water Management.

128
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

21. Technology to Effectively Utilize Rain and River Water through


Advanced Ground Water Recharging Technique without Interlinking
of Rivers
*Chetan Hari Sharma

Abstract
The technology to effectively utilize rain and river water through advanced ground
water recharging technique is a system which club together nearly every engineering aspect
related to it and utilizes them in the best possible way to serve the humanity.
It channelizes the floodwater and the water, which would otherwise mix with the sea,
as a ground water reserve, so that it can be made available, to the whole country during
non-monsoon months. As the pure water free from all impurities is stored under-ground
therefore a very huge percentage of water, which would have been evaporated if it had been
stored on the surface, can be saved.
In addition to all these capabilities the technology proves to be the gods blessing by
generating electricity, through pollution free hydroelectric power plant in between the journey
of this harnessed water from the surface location to under-ground aquifers, extracting all
the additional energy which the water initially possess due to its potential head.

1. INTRODUCTION necessary so as to obtain from this servant, as many


Water is an excellent resource of nature, and it benefits as possible, with minimum expenditure.
can be made to serve various functions. Properly Hence, the proposed proposal in this paper had been
planned use of water may nourish our farms and invented by me considering all the aspects of the
forests, may run our turbines for generation of hydro- behavior of water resource and present engineering
electric power, may help in preparing modern capabilities which ensures that the proposal is the
medicines for cure of various ailments and diseases, best one, and any other possible alternative will not
may help in beautifying our surroundings and be better then the proposed one.
environments, etc. Besides, fulfilling the basic The purpose of the plan to effectively utilize
necessities of life, properly harnessed and developed rain and river water through advanced ground water
water can enable us to lead an effluent and a recharging technique is to :
luxurious life. It is in fact, an amazing fluid and can [a] Reduce the extent of annual flooding at the
lead to an overall prosperity of a nation and that of flood prone areas, mainly of the Ganga and
the entire community as a whole. But, if not properly Brahmaputra Basin.
harnessed or planned, the same useful servant may [b] Solve the ground water related problems, such
become wild or an enemy in the form of severe as ground water depletion, pollution and quality
storms, floods, hurricanes, etc bringing disasters, deterioration, through rechargement of large amount
devastations and catastrophes. of pure water, which would otherwise get wasted.
Proper planning is, therefore, absolutely [c] Boost agricultural productivity, as ground

Krishna Mandir, Cement Road, Sadar, Gandhi Chowk, Nagpur - 440 001 India
Email: chetan hari Sharma@indiatimes.com

129
water irrigation’s contribution to agricultural the sea due to the floods, thus, the remaining available
productivity is some 45% higher then that made by water is only 1100 BCM out of this ground water
the surface irrigation in India. recharge accounts for 430 BCM per year and the
[d] Prevent seawater intrusion in the costal area present utilized surface water is 370 BCM the
aquifers, which is mostly caused because of ground balance unutilized water which can be harnessed is
water over exploitation. 300 BCM.
[e] Provide water for drought prone areas, and the A large part of the precipitation on the country
regions where ground water level is depleting due is received in the Himalayan Catchments of the
to over exploitation. Ganga- Brahmaputra- Meghna (GBM) basis. The
[f] Generate additional hydroelectric power, distribution of precipitation over the India is
approximately 50% more then the present country’s predominately governed by the monsoon as a result
hydroelectric power capacity. of which the north eastern water of the country
[g] Harness maximum possible amount of 1500 receives substantially large precipitation in
BCM of floodwater, 700 BCM of water which comparison with the north western, western and
presently gets evaporated and 300 BCM of balance southern parts for example, the eastern part of GBM
water, which presently remains unutilized. basin Cherrapunji receives an annual precipitation
of about 11,000mm while Ajmer just outside the
2. PRESENT HYDROLOGICAL SCENARIO western boundary of the GBM basin may receive
The rapid growth in the demand of fresh water only 200 mm of annual rainfall.
driven by growth in the global population and of
the economies has lead to this natural resources 3. INDIA’S GROUND WATER SOCIO-
becoming scarce in many parts of the world. As a ECOLOGY
result, the ratio between the number of the people The groundwater socio-ecology of India has
and the available water resource is worsening day been at the heart of their agrarian boom; and this
by day. By 2020, the global population is projected socio-ecology is under siege. Much concern about
to touch 7.9 billion, which is 50 percent longer than the problems of groundwater depletion, pollution
that in 1990. Because of this rapid growing and quality deterioration is fueled by worries about
population the world may see more then six fold their environmental consequences. These are indeed
increase in the number of people living in the serious; however, equally serious are their
condition of water stress from 470 million today to consequences for the sustenance of agrarian
3 billion in 2025. economies and millions of rural livelihoods that are
In the global picture, India is identified as a precariously dependent upon groundwater irrigation.
country where water scarcity is expected to grow India, Pakistan, Bangladesh and China account for
considerably in the coming decades further drought the bulk of the world’s groundwater use in
conditions resulting from climatic variability cause agriculture. Indeed, while much public investment
considerable human suffering in many parts of the has been devoted to the creation of surface irrigation,
country in the form of scarcity of water for both the reality of India is that the bulk of its agrarian
satisfaction of domestic needs and for crop growth in recent decades has been energized by a
protection. rapid rise in groundwater irrigation through small
Unlike the precipitation patterns in the pumps and wells financed mostly through private
temperate regions of the world, precipitation in India farmer investments. A new analysis of Indian
is characterized by acute variation in both space and agriculture suggests that based on an Indian data set
time. In our country 80 percent of the annual run off offering the tentative macro-level test, groundwater
is limited to brief monsoon period generally less than irrigation may contribute more to Indian agricultural
100 days. In total, country receives about 4000 BCM growth than even surface irrigation development.
of water as precipitation annually out of which 700 The model results support the hypothesis that
BCM are lost in evaporation and another 700 BCM groundwater irrigation contributes nearly 50 % more
are lost during the flow on the ground. Also, the to rural wealth creation than surface irrigation; for
large part of the water namely 1500 BCM flows into a 1,000 ha increase in the area under groundwater

130
irrigation increases a district’s average agricultural development has tended to be more ‘democratic’; it
productivity by Rs 23/ha, whereas adding 1,000 ha has responded more to people’s needs and demand
to surface water irrigated area increases it only by rather than to hydrological opportunity; it is linked
Rs 16/ha. Table below provides an alternative mode more to population density than to the occurrence
of comparing Agricultural Productivity and Ground of the resource. Finally, groundwater has proven
Water Irrigation in India. In the ‘average’ district more amenable to poverty targeting than have large
with 102,730 ha under groundwater and 79,230 ha surface irrigation systems; governments can design
under surface irrigation, Rs 2,363/ha of the average pump subsidies or build public tube wells, but not
productivity, of Rs 10,460 is contributed by large canal systems, exclusively for the poorer
groundwater irrigation, while only Rs 1,258 is segments. That’s why groundwater economy of India
explained by surface irrigation. is the backbone of its increasingly productive
agriculture and rural livelihood systems.
Table -1 : Throughout India, however, regions that have
Comparison of Agricultural Productivity and sustainable groundwater balances are shrinking day
Ground Water Irrigation in India by day. Three problems dominate groundwater use:
depletion due to overdraft; water logging and
salinization due mostly to inadequate drainage and
insufficient conjunctive use; and pollution due to
agricultural, industrial and other human activity.
Groundwater depletion has major environmental
consequences; but it has important economic
consequences too. Declining water tables raise the
energy and capital costs of accessing groundwater
All in all, the analysis of Indian data explores to prohibitive levels; in such regions, like North
that in the recent decades, of the agricultural Gujarat, entire agrarian economies face serious
productivity of a ‘representative’ (or typical) hectare, threat of extinction from the decline of groundwater
the portion contributed by groundwater irrigation is socio-ecologies. Water quality and health problems
very nearly twice that contributed by surface - such as very high fluoride and arsenic contents -
irrigation. It also shows that groundwater have similarly immiserizing social impacts in India.

131
Unlike India countries like the US and Australia, the to effectively utilized rain and river water through
presence of a small number of large users and low advanced ground water recharging technique, which
population density creates uniquely favorable emanates to bring a permanent solution to the
conditions for some institutional approaches to negative impacts or drought and floods. Such a
work; but these break down in India, with its high desire must be considered without question, worthy
population density and multitude of tiny users. For of applause because satisfaction of domestic water
instance, a stringent groundwater law that is needs should be considered as a human right and be
enforced in Australia would come unstuck in India given the top priority.
because of prohibitive enforcement costs. Europe
has a high population density; but it is much more 4. ABOUT MY TECHNOLOGY
comfortable than India in its overall water balance. My proposal envisages the withdrawal of
Moreover, ground water is a little Importance in flowing water through the river with the help of river
south East Asia, which has abundant surface water. intake structure. It is necessary to construct such
Therefore, it is obligatory that like surface river intakes because when water is withdrawn
water, the groundwater resource too needs to be through a conduit, from a river independently, and
planned and managed for maximum basin-level as such the entrance of the conduit is not an integral
efficiency. part of the dam or any other related structure than
an intake structure is used for safe withdrawal of
4. FLOOD AND DROUGHT SITUATION water from the river over a predetermined range of
The vast variation both in space and time in pool levels and thus to protect the conduit from being
the availability of water in different region of the damaged, trash, debris, waves, etc. The most suitable
country has created what is normally referred to as intake structures for this technology are: -
food drought flood syndrome with some area [a] Wet intake tower
suffering from flood damages and other facing acute [b] Dry intake tower
water shortage, flood and drought affects vast area However, the dry intake towers are useful and
of country transcending state boundaries. As per beneficial in the sense that water can be withdrawn
record after independence 70 droughts occurred in from any selected level of the river by opening the
country. Land over 80% of our country goes under port at that level. Since, the rain is uniformly
drought if there is a short fall of 5% rain in monsoon. distributed over the entire basin therefore the run
Jodhpur, Banner, Charu district of Rajasthan is off goes on increasing while making its way towards
drought hited for 31 out of 38 years. Floods normally sea. Hence, these river intakes can be installed at
affects, 8 major rivers valleys spread over 40 million such spacing that the withdrawal of water through
hectare of area in the entire country affecting nearly these intake maintains the desired level of flow
260 million people, similarly the drought affect 86 throughout the river.
million people who are spread in 14 states covering The water coming out from the conduit is send
a total 116 districts. This flood comes from the 1500 to the water purification plant to improve the quality
BCM of water every year flowing during the of the water, in such plants water is passed through
monsoon season. If we have to prevent the damage number of treatments so that the water coming out
due to the flood and reduce the severity of drought, of the plant when consumed for domestic purposes
we have to harness this 1500 BCM of water and it would not result in any health hazard. The quality
distribute it to the drought-affected areas. If we of water can be defined and estimated by studying its
succeed in doing this, we will save Rs. 150 billion 1. PHYSICAL CHARACTERISTICS : Turbidity,
per annum which is spend on drought relief and colour, taste, odour and specific conductivity of
Rs.300 billion per annum which is spend on flood water.
relief by our country. The question that arises is how 2. CHEMICAL CHARACTERISTICS : Total
to harness the floodwater? And how to regulate the solids and suspended solids PH value of water,
out flow of floodwater so that it does not go into sea hardness of water, sodium content of water.
and it is converted as useful water for the mankind. 3. BACTERIAL AND MICROSCOPIC
The answer is, through the project for technology CHARACTERISTICS : Aerobic bacteria, faultative

132
bacteria, plankton (algae), protozoa, etc. The reservoir is further connected to the
It is necessary to purify water because through waterways, which acts as a passage through which
this technology I had planned to preserve this water the water is carried from the storage reservoir to the
in the ground water aquifer’s, so that whenever and powerhouse where electricity is generated, utilizing
wherever required this water can be extracted with the power of water. The water has two_forms of
the help of pumps for domestic and other uses. Also, energy while flowing through the penstock, kinetic
in the process of natural ground water recharging, and potential. The kinetic depends upon the mass
the water while percolating below the ground surface of water flowing and its velocity, while the forms of
passes through the voids of the rocks, and join water energy while flowing through the penstock, kinetic
table, which makes it automatically purified along and potential. The kinetic depends upon the mass
its passage. But, in this artificial recharging of water flowing and its velocity, while the potential
technique water is directly passed to the underground energy exists as a result of difference in the water
location. Hence it most be purified first. level between the two points, which is known as
Depending upon the capacity of water “head” the hydraulic turbine convent kinetic and
purification plants water may be supplied to a single potential energies possessed by the water into
plant from the number of river intake structure via, mechanical power. The hydraulic turbine is thus a
conduit pipe or water may be supplied to the plant prime mover which when coupled to a generator
from a single river intake structure. The water produces electric power.
released from the purification plant is impounded Since, in this technology our aim is to prevent floods
by a reservoir having a dam constructed over it. The and deliver maximum possible mass of water
construction of such reservoir may hand out in many underground to enhance the ground water level,
ways. therefore there is no limitation, in the amount of
[a] Store a portion of the flood flows in such a water to be used. Hence, we are provided with the
way as to play down the flood peaks at the areas to ample mass of water with us, which can produce
be protected downstream. very high kinetic energy. Also since we have to
[b] To prevent difficulties to carry out the transmit water under ground therefore high heads
operation, during high flows. can be attained resulting in tremendous amount of
[c] Fulfill the demand of hydroelectric power plant. power generation.
[d] Direct water supply to the city, etc.

FIG : MODIFIED HYDRO ELECTRIC POWER PLANT

133
As such, it is a matter of concern that 59 years to huge distribution network and the large area of
after independence, more than fifty percent of all land which would be utilized in constructing such
rural house hold in India do not have electricity and canals is saved. Therefore through my technology
use kerosene for lighting. Even for those rural areas, of artificial ground water storage the following
which are electrified, there is a tremendous shortage benefits can be obtained.
of power supply. Thus it is not uncommon for those [a] The present ground water decline rate is as high
areas to have 10-15 hours of black outs every day. as 1.5 meters per year in some parts, has not only
There is a short fall of about 20,000 MW of destroyed many wells but also resulted increased
electricity in the country and we require about cost from water pumping, this problem can be
1,40,000 MW of additional capacity by 2010. This rectified only through my technique.
project will give a major contribution to overcome [b] Since, in India some 60% of total agricultural
such energy crisis; it will be helpful to meet out water comes from the ground water, which accounts
energy demands, by a 40-45% contribution in of over half of total irrigated area, increase in the
national power grids through, hydroelectric water table can give new boost to agricultural
generation by 35,000-40,000 MW. growth.
The water coming out from the draft tube of [c] This type of ground water management
the hydroelectric power plant is discharged to the requires no or sometimes very minor modification
artificial underground reservoirs. Such reservoirs are in the aquifer to distribute the water to the drought
created because of varying amount of valid spaces affected regions such as Rajasthan and Gujarat
in the bedrocks where ground water accumulates. which are under havoc and misery.
The rocks below the earth’s surface is the bedrock [d] The water lost in evaporation from an
consisting of many types of rocks, such as sand underground reservoir of this technology is much
stones, granite, and limestone. Bed rocks can also less than the water lost from a surface reservoir.
become broken and fractured, creating spaces that [e] My technology will prove to be more amenable
can be fill with water. And some bedrock, such as to poverty targeting than have large surface irrigation
limestone, is dissolved by water, which results in system, since government can design pump subsidies
large cavities that fill with water. or build public tube wells but not large canal system
In many places, considering vertical cross- exclusively for the poorer segments.
section of the earth the rock is laid down in layers [f] The ground water development as tented to be
especially in areas of sedimentary rocks. Some layers more democratic; it can respond more to people’s
have rocks that are more porous than others, and needs and demand rather than hydrological
here water moves more freely in the horizontal opportunity; it is linked more to population density
manner through the earth deep, in the bedrock there than to occurrence of the resource.
are rock layers made of dense material such as [g] More than 65% of India’s total ground water
granite or materials that water has a hard time is affected by excessive fluoride content, resulting
penetration, such as clay. These layers may be in fluorine related diseases, excess fluoride in
underneath the porous rock layers and thus, act as a drinking water also causes bone related problems
confining layer to retard the vertical movement of and ground water of West Bengal has high arsenic
water. Since, it is more difficult for the water to go content, this has become a major water quality and
any deeper it tends to pool in the porous layers and health issue effecting huge areas of population,
flow in more horizontal direction across the aquifer through this technology such problems can be solved
towards regions having there aquifer with low water by keeping the concentration of fluoride, arsenic and
level. In this way the aquifer in which the water is other chemicals get diluted and much purer water
stored shall itself be act as the distribution system can be made available.
for carrying water from one place to another with [h] The sea water intrusion on India’s coasts,
or without any minor modification in its flow pattern specially Gujarat’s Savrashtra region, Tamil Nadu’s
and so such necessity of constructing pipelines or Minjur aquifer, coastal areas of Indus basin is
canals (as required in the project of interlinking of threatening the ecology of important wet lands,
rivers) is completely eliminated, therefore cost due including Mangrove forests of over 1,30,000 ha,

134
ground water over-exploitation is the main cause of explore the ways through which the available
these sea-water intrusion. The raising of water table resources can be utilized in the best possible manner
by this artificial recharging method may help in to fulfill our needs. In total India has as many as 12
building pressure barriers to prevent seawater major rivers whose total catchment area is 252.8
intrusion in the coastal areas. million hectare (mha) of the major rivers; the Ganga-
[i] No space is required to build such reservoir. Brahmaputra-Meghna system is the biggest with the
catchments area of about 110 mha which is more
In another form of such type of project, the than 43 percent of the catchment area of all the major
reservoir can be constructed directly across the river. rivers in the country. The other major rivers with
The water from the reservoir is extracted and send catchment area more then 10 mha are Indus (32.1
to water purification plant and this water after the mha), Godavari (31.3mha), Krishna (25.9mha), and
purification is send to another reservoir which is Mahanadi (14.2mha). The catchment area of
further connected to the same system of medium rivers is about 25 mha and Subernarekha
hydroelectric power plant and ground water aquifer with 1.9mha catchment area is the largest river
as discussed above. among the medium rivers in the country. About 40
In such types of construction there is no need percent of utilizable surface water resources are
to build river intake structure and are suitable for presently in Ganga-Brahmaputra-Meghna system.
implementation in the region where there is high The distribution of water resources potential in the
probability of sudden rise in the run off due to very country shows that as against the national per capita
heavy precipitation. As, in the previous method we annual availability of water as 2,208 cubic meters,
where sending the water at the water purification the average availability in Brahmaputra and Barak
plant with the help of conduit and then transmitting is as high as 16,589 cubic metres while it is low as
this purified plant would do not be able to manage 360 cubic meters in Sabarmati Basin. Brahmaputra
their operation due to devastating floods, as they and Barak basin with 7.3 percent of geographical
could not work above their capacity. This could area 4.2 % of population of the country has 31% of
result in little higher flood peaks, all these problems the annual water resources per capita annual
can be avoided by building a reservoir fitted with availability for rest of the country excluding
dam over it, directly over the river. The water from Brahmaputra and Barak basin works out to about
the reservoir is extracted according to the capacity 1,583 cubic meters. Any situation of availability of
of water purification plant and the requirement of less than 1,000 cubic meters per capita is considered
hydel power plant and then after purification is send by international agencies as scarcity condition
to a closed large tank from where it can be supplied Cauvery, Pennar, Sabarmati, East flowing rivers and
to the power plant and so on. West flowing rivers are some of the basins which
fall into this category.
5. MOST SUITABLE LOCATIONS The technology to effectively utilize rain and
India is blessed with the wonderful gift by the river water through advanced ground water
nature in the form of Himalayan Mountain in the recharging technique can be implemented at the
north, which plays a very significant role in locations where, per capita annual availability of
providing the supplies of water the human societies water is much greater than national per capita annual
needs. The Himalayas is the source of many large availability of water. At present, most of these
rivers like Yangtse, Irrawadi, Yarlung, Tsangpo, locations are selected for the project of interlinking
Brahmaputra, Ganga, Indus, Amu Darya, etc. Indeed of Indian rivers. In this project 36 main dams had
the Himalayas can be called the water tower of Asia been planned to be constructed and hydropower of
the amount of water that India receives because of 34000 MW is estimated to be generated. At all the
such geographical conditions is capable to satisfy 30 locations where surplus river water is planned to
its presents and future water needs comfortably if be supplied to the rivers with low flow rate, my
harassed effectively. Indeed, it is true that nature project can be implemented and instead of supplying
had given us the solution of each and every problem, such water to other rivers, the complete water can
now it is the duty, of we engineers and scientists to be stored in the ground water aquifer.

135
6. VARIOUS PROPOSALS FOR WATER RECHARGING TECHNIQUE OVER
INTERLINKING OF RIVERS INTERLINKING PROJECT :
[a] The project of interlinking of rivers sounds
6.1 PENINSULAR RIVERS DEVELOPMENT good but involves a massive expenditure of about
It is planned by national water development Rs. 5,60,000 crores, for a developing country like
agency to direct about 19 KM3 of surplus flow of India if such a large amount is saved then it can be
Mahanadi River to the Godavari system and to used for development in other areas, where as my
further transfer 38 KM 3 from Godavari and its project’s cost would be negligible in front of it since
tributaries to the Krishna river downwards South. cost of construction of large canals are eliminated.
Another part of this proposal is to divert a part of [b] For the construction of canals nearly 4.5 lakh
the surplus water of West flowing rivers of Kerala people will be displayed from there homes,
to the East and generate hydropower. The third farmlands and offices and a large cost will be
segment envisages construction, storage to interlink involved in there rehabilitation for the interlinking
small rivers flowing along the West coast north of project, while such cost is not involve in my project.
Mumbai and South of Tapi. The fourth part [c] Though, through this project water would be
envisages interlinking of the Ken and the Chambal. supplied to the rivers having low run off, but it would
The proposal of peninsular river development be of no use, because with the addition of sewage
provides additional surface water in irrigation water and the water from the industrial waste the
benefits of 13 mha and generation of 4000 MW of new water system will not remain fit for drinking
power. The addition, about the 3mha area could be and other domestic purposes for much time, but in
irrigated with ground water. my technology water can be extracted from any
where, any time with the help of tube wells and can
6.2 HIMALAYAN RIVER DEVELOPMENT be consumed for domestic purposes, since it is
Out of the total water resource of the GBM completely purified.
basin of about l000 maft, less than 10% there of is [d] Whenever it will become necessary to use the
being consumptively used at present. It is estimated water through flow channel of the linked rivers, for
that by providing large storage floods can be the domestic needs it must be purified first, the
moderated providing substantial benefits of flood purification cost of this water would be
control in the downstream regions. About 600KM3 comparatively higher then what would be required
of storage is required to fully harness the water in my project, since after flowing over a large
resources of the GBM basin, but through interlinking distances, a huge percentage of impurities will mix
process only 215KM3 of storage could be provided with this water.
in India, Nepal and Bhutan on the GBM system. [e] The major drought affected areas of India are
It is proposed to divert the water from Rajasthan and Gujarat, where there is extreme need
Brahmaputra, Ganga, and Subernarekha to River to supply water as soon as possible, the interlinking
Mahanadi by five river links and then to the southern project must have been planned to transmit most of
rivers. The second segment consists of interlinking the surplus flow to those regions, to prove itself
tributaries of Ganga, as another part of the proposal beneficial to mankind, but no major steps are to be
is to Interlink Sharda, Yamuna, and Sabarmati River taken considering this aspects, while through my
by canals. project sufficient water can be supplied to the ground
If the regional view is taken, India can get water aquifer of each and every regions where
additional irrigation of 22 mha after fully meeting ground water level is depleting.
the needs of water in the other three countries. [f] India manages to loose more quantity of water
Besides, this hydropower generation of about then, what it needs to satisfy its annual domestic
30000MW is possible. needs through evaporation. The interlinking involves
construction of 30 links extending up to 10,880 KM
7. BENEFITS OF TECHNOLOGY TO occupying about 3.42 million KM 2 of the
EFFECTIVELY UTILISE RAIN AND RIVER geographical area, through this project such a large
WATER THROUGH ADVANCED GROUND amount of additional water surface area would be

136
exposed to atmosphere making evaporation of water us with uncountable benefits. It is capable of solving
a predominating problem. Indeed, it is a very all the water related problems not only through India
wasteful way of supplying domestic water needs. but also from the whole world and in addition to
While, evaporation looses are completely absent in this it would produce a large capacity of pollution
my project. free hydro electricity. I had tried to explain its every
[g] Since, whole of the water even after interlink aspects briefly in this paper.
will ultimately merge into the sea; all the efforts As such, for a country like India, where one
utilized for digging such large holes to form canals part is soaked in water, while other parts fears the
and the large money employed in this project of problems of drought. This type of mega project is
interlinking will get ruined. Where as, through my required in order to have uniform distribution of
project every single drop of water, which is water. Our country with world’s second largest
harnessed and send underground can be utilized population and ever growing demand of food and
efficiently. water, my project is required. On the other hand the
[h] The period of implementation for the gigantic ambitious plan of inter basin transfer; as per the
project of interlinking of rivers as given by Supreme experience of other countries argumentation of water
Court order, is mere 12 years. But experts say that is a very wasteful and costly option. This project
interlinking of rivers is highly complex process with will have a large social, environmental ramification.
huge backward and forward and inter-sectoral Heavy pumping machinery required continuous
linkages that may be accomplished incrementally energy supply. It is very difficulty to give constant
over to next 50-100 years. Where as, since my power supply in the period of energy crisis. So it
project is free from all such complexities, it can be will be impossible to cover stage pumping. Also,
implemented at much less time. remarkable change in eco-system will affect human
[i] Interlinking project would not be cost effective and animal life. At last, a major part of this precious
option for domestic water security in Drought-Prone and scarce water resource will get wasted, unutilized
areas as it tries to supply domestic water through due to evaporation and mixing into the sea.
collection at far away points and distribution through The project of interlinking of rivers is like a
long canals or existing river bed, with the help of few lines drawn on the map of country and I am
heavy pumping machineries. However, it is quite confident that it will remain the same even after
clear that both financial cost and the amount of water implementation, with very less benefits then what
lost, my technology would be much effective. can be achieved through my technology of artificial
[j] Ground water gets distributed equally in the ground water recharging. I request the government,
regions where water level gets depleted therefore engineers, scientists and citizens of India to please
harnessing of water through my technique will not take each and every point, which I had, mention in
give birth to conflicts isolated to water which could my paper, with little seriousness. As the project of
result due to interlinking of rivers. interlinking of rivers may not effect most of us
[k] The submergence of forests due to interlinking directly, and a few, of us will be displaced. However,
project may lead to serious implications in terms of everyone living in the country will be affected by
bio-diversity loss; there are no such problems with the long-term consequences of the project.
my project. I hope that my project of technology effectively
utilized rain and river water through advance ground
8. CONCLUSION water recharging technique would be appreciated
The technology to effectively utilize rain and by each and every community in India ad well as
river water through advanced ground water abroad with open mind and open heart as it is an
recharging technique is a project that would provide essential requirement for the prosperity of the nation.

137
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

22. Rainwater Harvesting and Northeast India : A Simple and


Cheapest Method
*Shukla Acharjee **Mangesh G. Waghmare

ABSTRACT
The present drought like situation in the lower Assam Brahmaputra Valley compelled
the people residing here to change their mindset that Northeast India won’t experience
drought. More than five lakhs farmers were affected by the unusual drought this year. Until
recent past the valley was considered to be the most vulnerably affected by flood twice a
year. However, due to global climatic change and other such factors now this region is also
experiencing drought like situation. Therefore, it is high time that people should wake up
and culture their mind to face any such situation in near future and use the resources
judiciously and learn the concept of sustainable development to preserve the natural resource
available to them for future generation. Here the authors have designed a simple model and
the cheapest method of rainwater harvesting keeping in mind the amount of precipitation,
topography, soil, depth, vegetation, cost of construction, storage and distribution system
for the poor people of northeast India. As rainfall is the main source of surface water and
its conservation is essential, therefore rainwater harvesting is one of the most promising
techniques for collection of excess runoff. In this northeastern part, bamboo is considered
the green gold. From storage to groundwater recharge in the present model bamboo has
been used which is easily available here. This technique of rainwater harvesting would be
very cheap for the farmers in particular and the masses in general living in the hilly regions
as well as in the plains of northeast India.
KEYWORDS : Rainwater harvesting, sustainable development, ground water recharge,
bamboo.

Corresponding Author: suklageo@yahoo.com

INTRODUCTION only fraction of water. Huge quantity of rainwater


Water is a key for sustainable watershed finds its way ultimately to sea through streams
development and of all the natural resources; water without much contribution to aquifer system.
plays a very vital role in lives of human beings. Hence, the only alternative is to harvest &
Presence and absence of water clearly determines conserve this precious gift of the nature by
the culture and growth of community and a healthy scientifically designed Rain Water Harvesting
economy. Rain is the only natural source of fresh structure. Ground water is the water stored in sub–
water in India. Over all the percentage of recharging surface level in soil or rock formation of earth. It is
of ground aquifers is 5-20% of total rain. It also observed that the dense forest cover is reducing for
depends on terrain, topsoil condition, sub- surface last few decades. And hence, capacity of the soil to
formation & rainfall pattern etc. Topsoil can hold hold water is also reduced. In addition to this, heavy

*Department of Applied Geology, Dibrugarh University, Dibrugarh-786006, Assam, India


**B.E (Civil), X83/14, Godrej Colony, Vikroli (E), Mumbai-400079, India

138
extraction of ground water is leading to an imbalance valley is 213 cm while the in the northeastern foothill
in ground water reserves, as the withdrawal of water belt is 414 cm. The basin as a whole has the average
is more than recharging of water. This is leading to annual rainfall of 230 cm with a variability of 15-
depletion of ground water resources resulting in 20 percent. The Himalayan sector receives 500 cm
increasing depth of ground water table from surface. of rainfall per year, the lower ranges receiving more
Though, according to recent studies by Assam State than the higher area (Goswami, 1985). The principal
Public Health Engineering Department (PHED) after rocks of Meghalaya plateau are granite and gneisses.
the current dry spell says that it have not affected At the foot of hills are found beds of conglomerates.
much the ground water table but in future chances In between these two ranges lies the narrow
are there of major depletion of ground water table. Brahmaputra valley, which is alluvial in origin and
However, time to time the scientists are giving consists of sand, sandstones, pebbles, clay and
warnings to the people that ground water table is sometimes a mixture of sand and clay with
going down every passing year in the northeastern decomposed vegetable matter. The fragile rocks of
cities because of high extraction of ground water. Arunachal Pradesh are prone to severe erosion.
Several urban settlements of the different states of
northeastern region are already facing a severe
scarcity of potable water. In this backdrop, rainwater
harvesting appears to be the only solution that could
provide some reprieve during the scorching summer.
The principle itself is very simple-collecting
rainwater during wet season and using it in times of
need. Another part of the collected water could be
used to recharge the aquifers and restore the water
level.

THE STUDY AREA


The North Eastern Region of India comprising
the states of Assam, Arunachal Pradesh, Meghalaya,
Manipur, Mizoram, Tripura, and Nagaland, is a huge
sprawling landmass made up of extensive countless
hills and mountainous terrain that rises in the north
to snow-capped heights of the Himalaya, and is the
playground of the mighty river Brahmaputra
regarded as one of the largest rivers of the world
and its tributaries (Fig:1). The climate of the region
may be called Humid Mesothermal Brahmaputra
type or ‘Cwb’ type according to Mr. W. Koppen. It
is humid sub-tropical, and high rainfall and high
humidity are the main features thereof. The number
of rainy days may sometimes equal three weeks in a
month (Table:1). The climate influences soil types.
The soils of the region are alluvium derived and are
classified into old alluvial and forest soil. Soil
profiles representing major soil orders are Entisol,
Inceptisol, and Alfisol. The region also encounters
the presence of poorly drenched soils. In addition,
the mineralogy of soils, which includes sand, silt
and clay mineralogy, is also equally important. The
average annual rainfall in the lower Brahmaputra Fig: 1. North eastern Region :The study area

139
Table 1 : Annual Rainfall and Rainy days

State Rainfall & rainy days in a year


Assam 2262.95 mm with 144 rainy days
Arunachal Pradesh 3000 mm with 200 rainy days
Manipur, Mizoram & Nagaland 1927 mm
Meghalaya 2050 mm with 200 rainy days

WHY RAIN WATER HARVESTING ?


PROBLEMS WITH GROUND WATER
1) The current precious reserves of ground water
are vanishing rapidly due to heavy extraction of
ground water, which is more than recharge. Hence,
ground water is reducing in quantity.
2) The other important factors for degrading the
quality of ground water are heavy industrialization
and contamination of surface & subsurface water
with highly toxic pollutants. Already 21 districts of
Assam have reported arsenic contamination of
ground water, while five of the districts have
reported fluoride contamination.
3) Unfortunately, we do not have system for Fig. 2 : Bamboo the Green Gold of
protecting water from contamination to stop or North East India
reduce the contamination, even to treat these ground
water reserves. SUBSYSTEM COMPONENTS OF
Considering all the above conditions and RAINWATER HARVESTING
problems of ground water, there must be some A rainwater harvesting system consists of the
solution for it. It is our duty to find out some definite following subsystems: catchment area (roof),
strategy on for solving the same; since we only have conveyance system (guttering, downspouts, first
created the problem. Rainwater harvesting is the flush and piping), filtration, storage and distribution.
best, economic and feasible solution for water crisis
in comparison with other technologies, which are Catchment Subsystem : For domestic rainwater
very costly. harvesting, the most common surface for collection
of water is the roof of the dwelling. Many other
BAMBOO-THE GREEN GOLD AND surfaces can be used. Most dwellings, however, have
RAINWATER HARVESTING a roof. Rainwater harvesting can be done with any
Bamboo, a fast growing, versatile woody grass roofing material if it is for non-drinking use only.
is found across the country. It is an economic For potable use of rainwater, the best roof materials
resource having immense potential for improving are metal, clay, cementitious and thatch (from a
the quality of life of rural and urban communities variety of organic materials), provide a surface
with environment regeneration qualities like carbon adequate for high quality water collection. In
sequestering. Bamboo provides raw material for Northeast India, locally available grass thatched roof
large industries like paper and pulp as well as for is very popular.
cottage and handicrafts industry (Fig. 2). Some Conveyance Subsystem : Guttering is used to
bamboo species can grow one metre in a day. transport rainwater from the roof to the storage

140
vessel. Guttering comes in a wide variety of shapes First Flush System : Debris, dirt, dust and droppings
and forms, ranging from the factory made PVC type will collect on the roof of a building or other collection
to home made guttering using bamboo (Fig:6) or area. When the first rains arrive, this unwanted
folded metal sheet. Guttering is usually fixed to the matter will be washed into the tank. This will cause
building or bamboo hut just below the roof and it contamination of the water and the quality will be
catches the water as it falls from the roof. Some reduced. Many DRWH (Domestic Rain Water
common gutter shapes and fixing methods are shown Harvesting) systems therefore incorporate a system
in fig.3.
for diverting this ‘first flush’ water so that it does
Guttering could be installed on one grass roof
not enter the tank. There are a number of simple
that had been constructed with a plastic membrane
beneath it – this helps to prevent UV degradation of systems that are commonly used and also a number
the plastic. The grass could be loosely thatched and of other, slightly more complex, arrangements. The
found locally. The plastic sheet guttering that was simpler ideas are based on a manually operated
installed is shown in Fig: 3. It should be designed to arrangement whereby the inlet pipe is moved away
capture all the water falling on the thatch and passing from the tank inlet and then replaced again once the
through to the plastic sheet. It should be fixed using initial first flush has been diverted. This method has
two long poles, one suspended below the eaves and obvious drawbacks in that there has to be a person
one on top of the thatch. It can also be designed to present who will remember to move the pipe. Here
be demountable from the upper surface, such that it we have designed the storage tank with a sand filter
can be ‘put away’ under the eaves when there is no fitted on the lid of the tank itself so that when the
rain. Again, this helps prevent degradation due to water is diverted to the tank pipe it would filter the
sunlight. water first then goes inside the tank (Fig: 5).

Filtration System : Again, there are wide varieties


of systems available for treating water before, during
and after storage. The level of sophistication also
varies, from extremely high-tech to very
rudimentary. The sand-charcoal-stone filter is often
used for filtering rainwater entering a tank. This type
of filter is only suitable, however, where the inflow
is low to moderate, and will soon overflow if the
inflow exceeds the rate at which the water can
percolate through the sand. Settling tanks and
partitions can be used to remove silt and other
suspended solids from the water. Many systems
found in the field rely simply on a piece of cloth or
fine mosquito mesh to act as the filter (and to prevent
mosquitoes entering the tank).

Storage Subsystem : In larger prospective of storage


system we can say; Natural storage system i.e.
recharging ground water aquifers & another is man
made that is storage tanks. They can be made of
various locally available materials, in various sizes
& shape. In addition, their cost varies according to
Fig. 3 : Bamboo hut & Plastic sheet guttering and the that.
designs of Gutters & Fixings DATA BASE AND METHODOLOGY FOR

141
NORTH EAST To prevent algae infestation, the tanks must be kept
Average annual rainfall was calculated from closed without exposure to sunlight. Therefore,
the rainfall data collected from Indian direct collection of rainwater is not safe for potable
Meteorological Department. For other related data, use. The cost of a tank having a capacity of 1500
standard literature and methods have been followed. litres is Rs.1000. If a larger tank is required, one
Methodology for rainwater harvesting are: for could make a plinth of cement and stones having
potable water - simply to collect water from the roof the desired diameter, and by using chemically treated
to a storage tank or to collect water from roof to bamboo poles, a palisade of bamboo is erected along
recharge bore well, open well, hand pump etc. For the periphery of the plinth, like a fencing (Fig:4). A
groundwater recharge abandoned well, abandoned tank having a diameter and a height of 1.2m can
or running bore well, hand pump, recharge pit, store 23,000 litres of water, which ensures a daily
recharge trench or recharge well could be used. To supply of 60 – 80 litres of clean drinking water
prevent surface runoff percolation ponds, check throughout the year. The cost of such a tank comes
dams, sub-surface dyke, recharge pit, recharge trench to about Rs.10,000. For ground water - recharge pits
could be constructed. The low-cost water tank to are with size varying from 1.5 – 3.0 meter wide and
store rain water could be made of bamboo and plastic 2.0 – 3.0 meter deep could be constructed. It should
film. Villagers in North East use a large bamboo be lined with brick / stone with openings (weep -
basket shaped like a silo, for storing grain. If this holes) at regular intervals. Top area of pit must be
silo is internally lined with a good grade polythene covered with grill.
film, it can be used as a water tank. The bamboo The recharge point allows percolation and
should be made non-biodegradable by soaking it in
a solution containing 450g of sodium dichromate,
300g of copper sulphate and 150g of boric acid
dissolved in 10litres of water. Such treated bamboo
has an outside life of between 10 and 20 years.
The distance between adjacent bamboo poles

SLOW SAND FILTER FOR


FILTERATION OF RAINWATER

Fig. 4 : Low Cost Bamboo Tank to Store Rain Water


OVER FLOW
OUTLET

1200

should be about 50 – 60 cm. The plinth can have a DRAINOUT


VALVE
OUTLET

diameter of up to 5 or 6m, but the height of the 5000

bamboo palisade should not exceed 120cm because BAMBOO WATER TANK OF
CAPACITY 23000 lit

the pressure exerted by the water column on the side


walls is determined by the column height. Using the
bamboo poles as a skeleton, the entire structure could
be woven like wickerwork, using chemically treated
bamboo strips. One can use it to collect run-off water
from the roof, or one can even allow the rain to fall Fig. 5 : Simple design for rainwater harvesting, design
directly into the tank. Once the tank is full its top for low cost percolation pit for
must be covered by another film of plastic, which ground water recharge and the design of
keeps the water clean and prevents evaporation. Both bamboo tank with a capacity of 23,000 lt. for
sunlight and nutrients are needed for algae to grow. plain and hilly areas of North-Eastern India.

142
electrical investigations). Therefore, the recharge
points should be selected only after identifying
permeable zone. If there is no permeable zone, the
groundwater cannot move from one place to other
and the water would come up through the recharge
point and reach the surface. On the other hand, the
ingress of water through the permeable zone should
be checked, as the water reduces the shear and
compressive strengths of the material of the
foundation. It should be always kept in mind that
Fig. 6 : Bamboo pipes to transfer water from the stored Rainwater harvesting is a social responsibility
rainwater tank for ground water recharge involving the whole community.

recharges the groundwater. Recharge points could Tank size – ideal tank size vs. affordability
be of various dimensions, depending upon Tank sizing techniques usually only consider
physiographic and hydro geological conditions. the optimum size for a tank based on the rainfall
Important considerations for successful rainwater available, the size of the catchment area (Table:2),
harvesting are: and the demand on the system. Little consideration
(i) location of recharge points, is usually given to the affordability of the tank. It is
(ii) hydrological properties responsible for assumed that the person will be looking at capturing
recharging the aquifers, and all the water from the roof or enough to meet all
(iii) Social responsibilities of the people. their demand.
The location of the recharge point especially In many cases, the person may not be able to
in the crystalline terrain should have a weathered afford a tank suitable for catching the optimum
material with sufficient porosity to hold substantial amount of water. In such cases, the tank size is
quantities of water and also fractures for storage of determined by the tank cost and so, in this case, we
water. Porosity, which generates the hydrological need to maximize capacity for a given (low) cost.
properties, must be identified using groundwater Below, in Table: 3 we have classified domestic tank
exploration techniques (well inventory, landscape sizes into three distinct groups – small, medium and
indicators, topographical features, geological set-up, large scale.
structural controls, drainage conditions and geo- Affordability is a strong function of tank size

Table - 2 : Showing availability of rainwater in Thousand litres

143
Table 3 : Tank scale classification water (i.e. cost per litre), we might construct a curve
such as shown in Fig: 7. Each socio-economic group
Scale of Description would have its own curve.
domestic The cost line on Fig: 7 is horizontal, which
tanks reasonably represents the situation where water is
Small-scale Any tank or jar up to seven days storage fetched, each successive litre requiring the same
or up to 1000 litres input of labour. Such a line does not fairly represent
Medium A tank up to several weeks storage or harvested roof water, where the effective cost
between 1000 and 20,000 litres storage general rises with daily consumption despite the
economies of scale in tank construction. A typical
Large Any tank with several months of
cost vs volume characteristic for Rain Water
storage or above 20,000 litres storage
Harvesting supply is shown in Fig 7.
capacity
Sometimes we find examples of water purchase
and tank design. The smaller the tank the cheaper it and use them to infer the value of water. Richer
will be and the cheaper the construction materials house holds, or those experiencing illness, may pay
and labour costs, the cheaper the tank will be. For for water to be brought to the house. More usually,
increased affordability we are therefore looking at we have to infer costs indirectly through conversion
small-scale, locally produced RWH systems that use of fetching distance/height into time and then time
local materials like bamboo. Local manufacture and into money. Such costs, like the value of water
use of local skills are design issues. Affordability is discussed above, will be lower for poorer households
a function of a number of socio-economic factors than for richer ones.
and is decided at the household level. Moreover,
we know economies of scale show the cost per litre Some careful steps to be taken before
dropping as tank size increases. In addition, factory implementation of rain water harvesting projects
made tanks are generally more expensive than • Convenient first flush device must be integrated.
locally manufactured tanks. • a good fitting, light-proof cover will prevent debris,
animals or humans from entering the tank and
Value of water prevent light from causing algae growth
As with many other goods, water has a • water quality can enhanced by putting water into
declining value with quantity. The first litre per day the tank and taking it out of the tank at the correct
is worth more than the tenth. By examining the location – low-level tank entry and floating off-takes
limited data available that relates household are devices designed to aid this approach
consumption per day to the effective unit cost of • good sanitary conditions around a tank will prevent

Fig. 7 : Showing value vs quantity and cost vs volume

144
disease being spread groundwater reserves because it is the only present
• water extraction should be such that the water is state-of-art to replenishes the ground water table
not contaminated while being drawn which would enable our dug wells and bore wells
Poorly managed water harvesting systems may to yield in a sustained manner. A sustainable human
cause soil erosion and soil instability. Therefore, community should use its resources without
water-harvesting catchments require maintenance to endangering the survival of future generations.
keep them in good condition.
ACKNOWLEDGEMENT
CONCLUSIONS The authors gratefully acknowledges thanks to
The forest covers are decreasing. Hence, water Prof. J.N.Sarma, Dept. of Applied Geology,
and soil hold by roots, plants are degraded. And, it Dibrugarh University, Dibrugarh, Assam for his
is affecting hydrological cycle badly. This is valuable suggestion. Thanks to our friend Negul
resulting in tremendous increase in depth of ground Devan K.R. (B.E) for timely help.
water level. It is high time to implement rainwater-
harvesting projects in northeastern part of India. REFERENCES
These technologies are simple to install and operate. C-3 Report by IIT Delhi, July 2000, Water quality in domestic
Local people can be easily trained to implement such roof water harvesting systems (DRWH) & Bamboo reinforced
technologies, and construction materials are also concrete construction
Gould, J.E. 1992. Rainwater Catchment Systems for Household
readily available. It is convenient in the sense that it
Water Supply, Environmental Sanitation Reviews, No. 32,
provides water at the point of consumption, and ENSIC, Asian Institute of Technology, Bangkok.
family members have full control of their own Gould, J.E. and H.J. McPherson 1987. Bacteriological Quality
systems, which greatly reduces operation and of Rainwater in Roof and Groundwater Catchment Systems in
maintenance problems. Although regional or other Botswana, Water International, 12:135-138.
local factors can modify the local climatic Nissen-Petersen, E. 1982. Rain Catchment and Water Supply
conditions, rainwater can be a continuous source of in Rural Africa: A Manual. Hodder and Stoughton, Ltd., London.
water supply for both the rural and poor. Pacey, A. and A. Cullis 1989. Rainwater Harvesting: The
Collection of Rainfall and Runoff in Rural Areas, WBC Print
The feasibility of rainwater harvesting in a
Ltd., London.
particular locality is highly dependent upon the Rao, N.S, “Important considerations for the success of rainwater
amount and intensity of rainfall. Other variables, harvesting” Hydrogeology Laboratory, Department of Geology,
such as catchment area and type of catchment Andhra University,
surface, usually can be adjusted according to Rees, D.G, Nyakaana, S & Thomas, T.H, 2000, Development
household needs. As rainfall is usually unevenly Technology Unit ,School of Engineering, University of Warwick,
distributed throughout the year, rainwater collection Domestic Rainwater Harvesting Research Programme “VERY-
LOW-COST ROOFWATER HARVESTING IN EAST
methods can serve as only supplementary sources
AFRICA” (Based on a Feasibility Study performed in the Great
of household water. Rainwater harvesting appears Lakes Region during May – July 2000) by Working Paper No.
to be one of the most promising alternatives for 55, pp. 8,9, 22,23,30,31.
supplying freshwater in the face of increasing water Schiller, E.J. and B. G. Latham 1987. A Comparison of
scarcity and escalating demand in the urban as well Commonly Used Hydrologic Design Methods for Rainwater
as in the rural areas. The pressures on rural water Collectors, Water Resources Development, 3.
supplies, greater environmental impacts associated Singh, V.P, Sharma, N & Ojha, C.S.P 2004, Ed. The
with new projects, and increased opposition from Brahmaputra Basin Water Resources, Vol. 47, Kluwer Academic
Publishers, London.
NGOs to the development of new surface water
Singh, R.V. 2003, Ed. Watershed Planning and Management,
sources, as well as deteriorating water quality in Yash Publishing House, Bikaner-334003, India.
surface reservoirs already constructed, constrain the UNEP (United Nations Environment Programme) 1982. Rain
ability of communities to meet the demand for and Storm water Harvesting in Rural Areas, Tycooly
freshwater from traditional sources, and present an International Publishing Ltd., Dublin.
opportunity for augmentation of water supplies using Wall, B.H. and R.L. McCown 1989. Designing Roof Catchment
this technology. May be with every rural and urban Water Supply Systems Using Water Budgeting Methods, Water
household participation in their unique small scale Resources Development, 5:11-18.
rainwater harvesting projects replenishes the

145
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

23. Rain Water Harvesting


*Shri S. K. Sinha

ABSTRACT
A precious source of water availability has become scarce, hence the need for
conservation. The development of water resources in the country is at cross roads. This
sustainability of water resources has been endangered by vagaries of rainfall and unplanned
development. An optimum development can be achieved by the conjuctive use of surface and
ground waters.
Rain water Harvesting is the concept, which includes a holistic approach to develop,
augments, protect and conserve water resources. This concept is to be envisaged and practice
in order to ensure the sustainability of ongoing groundwater development for multiple uses
and to provide scope for further development of growing demand/population. To maintain
the ground water resources indefinitely, a hydrologic equilibrium must exist between all water
entering and leaving the water basin of the earth. Rain water Harvesting i.e Artificial Recharge
of the ground water resources is the most commonly adopted and cost effective method of
replenishing the ground water reserves.
The Rain Water Harvesting are based on the different technique. The methods
suggested for Rain Water Harvesting is water spreading, recharge through pils, trenches,
wells, shafts and directly run off water into the existing wells. The choice/selection of any
particular method is governed by local hydrogeological, soil condition etc and ultimate use.
Rain water Harvesting needs to be implemented to avoid the paucity of water resources
for present/future demands. Since the nature has showered enough potential to recharge our
existing water bodies and also to conserve/preserve the waters for future needs/requirements.

1.0. INTRODUCTION population. To maintain the ground water resources


A precious source of water availability has indefinitely, a hydrologic equilibrium must exist
become scarce, hence the need for conservation. The between all water entering and leaving the water
development of water resources in the country is at basin of the earth. Rain Water Harvesting i.e
cross roads. This sustainability of water resources Artificial Recharge of the ground water resources is
has been endangered by vagaries of rainfall and the most commonly adopted and cost effective
unplanned development. An optimum development method of replenishing the ground water reserves.
can be achieved by the conjuctive use of surface Army cantonments to a large scale depend on
and ground waters. supply of water from civil bodies. And since the
Rain water Harvesting is the concept, which entire country is in high water stress situation, the
includes a holistic approach to develop, augment, total available water resources for various use sectors
protect and conserve water resources. This concept have decreased drastically. This has resulted in
is to be envisaged and practice in order to ensure meager an erratic water supply to cantt thereby
the sustainability of ongoing groundwater encouraging exploitation of ground and surface
development for multiple uses and to provide scope water available within the cantt by the MES. With a
for further development of growing demand/ view to conserve the already depleting reservoirs,

*SE, ME, MIE, PG (PMIR), DIRECTOR (LIAISON), HQ EAC IAF, C/O 99 APO

146
judicious management of water in each cantt shall 4.4 Reduces flood hazard and soil erosion.
be undertaken. In this paper the various 4.5 Treated urban effluent can be recharge and
technological aspect of Rain Water Harvesting has quality beneficiated by re-circulation through the
been described with basic theory and with real aquifers.
ground conditions.
5.0 SUGGESTED METHODS /
2.0 AIM TECHNIQUES
The aim of the Rain Water Harvesting by virtue Methods for local unit / area / body can be
of suitable techniques/methods to conserve the implemented in diverse hydro geological and varied
already depleting reservoirs. Therefore, the local climatic set-ups. Number of methods are available
units/area/body are impressed upon to under take to achieve the sustainability of water through rain
these feasible technique/methods through simple but water Harvesting. The best method among the
lucid description, provide small budgetary estimates available methods depends on hydrology, available
with time frame in which this can be achieved. of source of water, available of land and
Therefore, our aim is to improve the existing ground physiography of the areas. The methods/techniques
surface water through efficient rainwater harvesting are broadly categorized are as under :
management. 5.1 RECHARGE ON SURFACE
This includes the following :-
3.0 MANAGEMENT 5.1.1 Loading.
It is the technical methods, which manage the 5.1.2 Basins or percolation tanks.
existing surface, and ground water potential of the 5.1.3 Stream augmentation.
catchments or water shed areas. So as to develop, 5.1.4 Ditch and furrow.
augment and conserve them. Judicious harvesting 5.1.5 Over irrigation.
management is most inevitable to the followings:- 5.1.6 Revival of village pond concept.
3.1 Arrest ground water decline, improve ground 5.1.7 Recharge of secondary treated urban liquid
water levels and availability. effluents in identified aquifers.
3.2 Beneficiate water quality in acquirers.
3.3 Arrest seawater ingress. 5.2 DIRECT RECHARGE IN SUB
3.4 Conserve surface water run off during SURFACE AQUIFERS
monsoons. This includes the following :- Injection wells
3.5 Enhance availability of ground water at the are recharge well. In this the recharging in watershed
specific place and time. is carried out by directing discharge of rainwater
3.6 Reduce power consumption. through a settling sump to the underground waterbed.
3.7 Consume unused wastewater. These wells can be used both as percolation wells
3.8 Conserve energy. and recharge wells. The advantages of direct
3.9 Save environment from degradation. injection of rooftop run off water in the wells are :-
5.2.1 Harvesting from roof rain water.
4.0 ADVANTAGE OF RAIN WATER 5.2.2 Relatively high rate of recharge.
HARVESTING 5.2.3 Utilisation of ground water during non rainy
4.1 Enhanced sustainability of water supply days.
projects and structures;
4.2 Improved well yields and reduced pumping lifts 5.3 OPEN WELL RECHARGE
and cost; Direct recharge of the aquifer through open
4.3 Improved water quality through dilution wells will be an easier and in expensive process in
especially fluoride, nitrate and salinity. This is the shallow aquifer region. The rooftop run off water
achieved with filtration and percolation. can be directed in to the open wells through pipes
4.4 Conservation of water lost to run off and and settling pit to avoid possible turbidity.
evaporation.
5.4 RECHARGE PITS AND SHAFTS

147
TRENCHES EXISTING WELLS
5.4.1 Recharge pits. Pits are dug depending upon Ground water recharge of existing bore wells
available rooftop water from the buildings and are is one of the method of modifying the hydrological
located inside the premise and away from foundation cycle and thereby providing ground water in excess
or concrete structures so as to have its sitting over of that available by natural processes. It is
pervious soil for better and faster absorption. The accomplished by augmenting the natural infiltration
pits are preferably located near the precinct and of precipitation or surface water in to underground
thereafter filled with permeable material like formations by some method of construction, by
pebbles, gravel and sand for better percolation and providing or spreading of water or by artificially
improved water quality through dilution during changing the natural conditions.
percolation.
6.0 INDICATION OF DEPLETING WATER
5.4.2 Recharge shaft. Where the contour and YIELD
topology of a large area permit flow in unidirectional It has been observed from the post
and having step slopes, the shafts are dug. The performances of the bore wells/shallow wells/open
average depth of 10 to 15 meters with width of 1 wells that the over exploitation has gradually
meter and length of 2 meters at places depending diminished their yields. This was ascertain / evident
upon amount of water available from catchments. from the observation and are as under.
These are terminated above the aquifer level. The 6.1 Poor quality of water, occasionally muddy.
shafts are usually cased with PVC casing to prevent 6.2 Frequent lowering of submersible pump in
contamination and collapse. These are back filled order to keep the later submerged.
with pervious soils, which facilities faster and 6.3 Water output varying and found in spurts.
efficient percolation and mitigates bio and chemical 6.4 More draw out than natural recharge by rains
pollutions after filtration through the soil. etc. Bore wells being run continuously for hours
without permitting recharge.
5.5 BORE HOLE FLOODING 6.5 Sealing of natural recharge areas in and around
bore wells with impervious
5.6 NATURAL OPENINGS AND CAVITY side well, streets, parking lots and buildings. This
FILLINGS diverts ground water flow
Normally the topology of cantt is such that direction and prevent recharge.
these openings are limited. 6.6 In real ground situation, sub surface water is
diverted due to troughs and
5.7 COMBINATION OF SURFACE AND mounds, other Geological, Topological conditions.
SUB SURFACE The above factors have caused overdraft from
5.7.1 Following are the techniques usually the bore wells and must be recharged
adopted Basin/percolation tanks with pits/shaft or immediately as the yield from these bore wells have
wells are constructed to collect subsurface and been helping us to reduce dependence
surface water. on outside agency for the deficient supply of water
5.7.2 Water treatment : In this technique the especially during peak summer when
affluent/sewage/sullage is collected in a pit, the catchments go dry and reduce available water.
filtered and then supplied to required place The wells which are near surface water bodies
through gravity well or deep trenches in slope. (such as ponds, Golf course, Dairy form and play
grounds) continuing to give good yields and
5.8 In this method induce recharge from surface harvesting is naturally carried out.
water source is utilised for improving ground water
potential. Another practice is to have aquifer 7.0 COMPUTATION AND TOTAL
modification. POTENTIAL OF RECHARGE
The potential through bore well harvesting will
5.9 GROUND WATER RECHARGE OF depend upon how big catchments is diverted for

148
percolation near bore wells, through trench/pit/shaft. METHOD
The exact quantity is difficult to assess. The water is led from the roof to the storage
tank through a series of gutters and pipes.
7.1 RECHARGE Conventional gutters are normally used, but for
Exact computation of sub surface inflow and economy they can be made with “V” shaped lengths
infiltration (Water entering the soil at the surface is of tin sheet hang under the roof edge from wire or
called infiltration) need comprehensive geological lengths of rigid PVC pipe at along the length and
investigation. The recharge of bore wells can be clamped to the edge of the roof. Rigid PVC pipes
carried out through water shed approach while dried are considered as they are cheaper easier to maintain
up dug well can be used directly for storing water of and will reduce contamination.
surround catchment.
The rainwater harvesting to increase the water 8.0 DESIGN OF TRENCHES AND PITS
table should be graded so as to prevent the 8.1 TRENCHES
accumulation or retention of surface water within a Average rainfall = 780 mm
radius of 15 meters from the bore well. Available for harvesting = 390 mm (50% of
An expensive proposition is not viable for average)
Military stations where water quality can be
improved with silt filtering pit alone. Hence it is To be harvested in the water = 39 mm 10% available
being considered only at those locations to augment economically harvesting
for potable water. The shallow wells were rainwater
from surrounding catchments can be directed inside Economic width & Depth of trench = 1.5 M depth
through silt filtering unit above as the water is soft & 0.5 M Width
and does not get surface impurities.
To have economical and viable harvesting of For 1000 M2 roof top available water
rainwater in the water source, an area of approx = 1000 X 0.039 M3 = 39 M3
5,000 to 10,000 Sq m around bore well should be
made ground water collection. The area should Assuming 90 days rainfall per
commence 15 meters away from bore well. = 39M3 per rain fall rainfall average water

Total water collection/recharge per bore well 90 = 433 litter per day of rain
Average rainfall (Say) = 780 mm PVC rigid pipe for 40mm can carry water to
Available for harvesting = 390 mm the required place.
(@ 50%) after evaporation To harvest 10% of above
= 39 mm (0.039 M) 8.2 SIZE OF PIT
Total water recharge for = 10,000 x 0.039 M Average Rains yield = 3.05 M3 per shower
10,000 Sq M = 3,90,000 Liters Taking 100% extra for proper storage and
This water is available in one year (90 days of percolation without contamination by surface water.
rains) per bore well assuming unpaved area around
bore well. Size of pit = 6 Cu M
Taking 2 M Dia Pit Depth
7.2 ROOFS HARVESTING of pit (L) = 6X4
The collection and storage of rain from rooftop pX 4
run off has been practiced by man since ancient
times. This may be particularly useful for domestic = 6
use in the residential, messes and offices. The p
collection of rain water from paved or GI corrugated
roofs and court yards of houses is done either in = 1.91M
storage tank or in ground water reservoir. Say 1.9 M depth
Such pit can be easily & economically dug

149
without encountering hard rock with mechanical Method 5.1 for Recharge on surface are most
excavator if required. suitable for water harvest.
Size of Pit = 6 Cum (Dia – 2.0M, Depth – 1.9M)
15% of sand = 0.15 X 6 Cum 10.0 PREFERABLE LOCATIONS TO DO IT
20% of 20 mm = 0.20 X 6 Cum aggregate 10.1 Cantt/Military Stations/Areas can be
50% of 40 mm = 0.50 X 6 Cum aggregate subdivided into smaller catchments /
water shed and maintained under local units. These
9.0 EXPLOITATION AND HARNESSING watersheds can be.
TOTAL POTENTIAL OF WATER 10.1.1 Ranges.
HARVESTING 10.1.2 Training areas
Considering a defence land / area available for 10.1.3 Play fields
water shed is 9000 acres. 10.1.4 Open spaces and parks
These above areas are normally situated at
Area / land = 9000 acres different locations in Defence establishment.
1 acres = 4047 SQM Therefore method for smaller catchments area is
Total SQM land = 36423000 SQM more suitable and viable. The methods for smaller
Average rainfalls (Say) = 780 mm (0.780M) catchments area are as under.
Available for recharge after evaporation from soil
& water surface (evaporation & percolation losses) 10.2 METHODS FOR SMALLER AREA
= 390 mm (0.390 M) HARVESTING
Total potential = 0.39 X 36423000 M3 Assuming the followings
= 14.20 Millions KL Range Area = 500 Acres
Training area (10 Pockets) = 1000 Acres (Total)
This indicates that the total potential of water Play fields (5 Pockets) = 50 Acres (Total)
harvest in one rainy season if exploited is sufficient Open Spaces (40 Pockets) = 200 Acres (Total)
to meet the requirement to the maximum/ full extent.
This potential can be tapped from rooftop (most 10.2.1 Check Dams :
efficient use), road top (difficult to tap due to faulty Ranges can be utilised for creating check dams
slopes, berms and economics) and from water shed at low laying area and storing water. The check dam
(catchment) through soils other than paved and roof may be ailed with cheaper option to prevent fall of
top. human being and animals.

9.1 METHODS The range area = 500 Acres


Artificial charge of water source can be = 2023500 (1 Acre = 4047 SQM)
managed and developed by planned extractions of SQM
ground and surface water during periods of low With 390 MM of rainfall available for harvesting.
precipitation while subsequent replenishment can be Total water available from rains
made during periods of surplus surface supply. Such = 2023500 x 0.39 Cu M
a coordinated operation of surface and ground water = 789165 Cu M
supplies is possible if there is sufficient ground water To harness 10% of this water check dams of
storage to meet the requirements for regulation of sizes 30m x 1mx1m may be constructed in natural
local water supplies and if the aquifers possesses slope directions 3 CHECK DAMS will be
sufficient transmissibility to permit the movement economically viable to cover the area.
of recharged water to the area of extraction. The
recharged storage constructed under watershed 10.2.2 STAGGERED CONTOUR TRENCHES
approach should be devoid of losses due to (SCT) / PERCOLATION TRENCHES (PT)
evaporation and quality deterioration due to The training areas can be utilised for creating
pollution (which will make it useless for any staggered contour trenches (SCT) and percolation
application). trenches (PT). In general, the training areas are

150
scattered in defence established from all sides can be collected and allowed to drain
The training area is 1000 acres (Say) in away from sports fields to a location where storage
Military/Cantt Station/Areas. Considering there are can be made. Trenches dug should be covered with
10 Nos of pockets for training in various units. manhole cover arrangements.
Average play field in Cantt Area
Total water potential in 100 acres = 10 Acres for each pocket.
= 100 (Acres) x 4047 SqM Total water potential from rain
= 100 x 4047 x 0.39 M3 = 10 x 4047 x 0.39 M3
= 157833 M3 = 15783M3
To harvest 10% of it, trenches may be dug all
The staggered contour trenches (SCT) of round of size 0.5m x 0.5 m with manhole cover. The
dimension 3.0M x 1.0M x 1.0M (For average 20000 trench size is sufficient to carry per day rains water.
M3 of water potential area) can be created. These Which is received in 90 to 100 days of rainfalls.
are to be created at the end of slope and properly The above proposal is however very expensive
protected to prevent accidental of human/others. but will fetch a great deal of water.
Total trench length
= 1000 RM for on average 10 acres field.
The No of SCT
= Nos of Pockets x Water Potential in M3 Total excavation Per site = 1000 x 0.5 x 0.5
20000 = 250 CuM
For 5 play field site = 250 x 5 CuM
= 10 x 157833 = 78.92 = 1250 CuM
20000 Manhole cover of 1 m x 0.6 m each = 1000 No x 5
= 79 Nos = 50000 Nos for sites
Therefore, in each pocket 7 or 8 Nos of SCT
may be created. OPEN SPACES AND PARKS : At these places
creation of ponds, tanks and shaft storage at deep
Percolation Trenches (PT) may be dug away low lying can be considered.
from the training tools and located at fenced places. Total open spaces at 40 pockets in station =200 Acres
Percolation trench may be located at the down Average Area = 05 acres
stream. The trench may be size 1m x 1m and all Water potential = 7891 CUM
along the low stream at least 50 M and filled with Trenches of size 0.5 x 0.5 m can be dug to carry
impervious materials locally available and not rainwater to the storage spaces created in the form
specified provided for their purpose. Total trench of tank/ponds. These structures may be properly
length on four sides 50m (10) location = 500 RM fenced and treated with bleaching powder
of 1m x 1m. periodically approx 50 RM of trench 0.5 x 0.5 M to
carry water to 40 different storage can be considered.
10.2.3 PLAYFIELDS, OPEN SPEACES AND Cu M of trench = 50 x 40 x 0.5 x 0.5
PARKS = 500 CUM
The play fields, open space and parks areas can
be effectively utilised for rain water harvesting. Pond size can be 10 m dia at 40 locations with
average 1 m depth properly fenced on all sides.
Play fields : Considering 5 pockets with total 50
acres of play field in Defence Establishment have a Note : The capacity of ponds created is of much smaller
total water potential of 86808 CUM. A lot of care size than the water potential available for harvesting.
has to be taken to create water-harvesting structures This is kept to keep economic viability of these structures
since play fields are common places for play in the available space without hampering training/play
activities. The depth has been kept as 1 M maximum so
activities, leisure walk and other activities. The play
that if required the same can be achieved through troops
fields have natural slope duly leveled. This water labour.

151
11.0 DRAWINGS Fig – 1, Composite Plan.
The drawings showing composite plan for Fig - 2 ,Plan of Recharging.
recharging structure, design details of Ferro cement Fig – 3.1, Typical Drawing Details.
storage tank capacity 12000 Ltr, plan for recharging Fig – 3.2, Typical Roof Top Harvesting
structure, design and details of recharging structure, Fig – 3.3, Design of Storage Tank and ilters.
typical drawing details of roof water harvesting Fig - 3.4, Type of Percolation
structure, roof top rain water harvesting structure Fig – 4 and Details of Recharge Structure
and design of pits for rain water harvesting are Fig – 5 Design of Pit
attached as For understanding and execution of works.

COMPOSITE PLAN FOR RECHARGE STRUCTURE NO.1

Fig – 1 : Composite Plan

152
Plan for Recharge Structure No.1

Inlet Pipe
3.0 m
6” dia pipe

3.0 m

Plan for Recharge Structure No.2

Inlet Pipe
3.0 m
6” dia pipe

3.0 m

Fig - 2 : Plan of Recharging

153
TYPICAL DRAWING DETAILS
ROOF WATER HARVESTING STRUCTURE

Fig – 3.1 : Typical Drawing Details

154
TYPICAL ROOF TOP RAINWATER DESIGN DETAILS OF FERRO CEMENT
HARVESTING SYSTEM STORAGE TANK 12,000 Liters capacity

FILTERS USED FOR FILTERING


RAIN WATER

Fig – 3.2 Typical Roof Top Harvesting Fig – 3.3 Design of Storage Tank and ilters

155
Fig - 3.4 : Type of Percolation

156
Fig – 4 : Details of Recharge Structure

157
Fig – 5 : Design of Pit

12.0 CONTAMINATION well water may contain faecal strap-to-coccid and


Medical Authorities of civil area/SHO for should be used only for conservancy unless
Military station may object to open harvesting of otherwise tested.
water, since the harvesting surfaces being exposed 12.1 The trenches/pit so dug should be properly
through out the year and are subject to contamination fenced and kept clean. The first flush of
by dust, insects and birds and those at ground level the new rains should be run to waste.
are also liable to be contaminated by animals and 12.2 The storage tanks below ground should be fully
humans. The following precautionary measures are enclosed to prevent evaporation.
recommended:- Location from Contamination 12.3 All aperatures shall be screened to prevent the
source Recommended distance of harvesting access to mosquitoes, rodents, lizards
structure such as pit, trenches etc. from source of and other life etc.
contamination.
Building sewer 15 M 13.0 CONCLUSION
Septic tanks Disposal filed 15 M Rain Water Harvesting needs to be
Seepage pit 30 M implemented in defence area/other places in order
Swimming pool 45 M that the on going actives are not hampered due to
If any bore well or shallow well is to be charged paucity of water resources. Nature has showered
with water, which is at a distance less than above, enough potential to recharge our existing water
should permit deeper trenches with silt-setting bodies and also to store water for years to come and
chamber following by silt-filtering pit. The bore to meet the present/future demands.

158
National Seminar on Rainwater Harvesting and Water Management 11-12 Nov. 2006, Nagpur

24. Review of Rain Water Harvesting in India


*R. M. Dhoble **Dr. A. G. Bhole

INTRODUCTION 70 % of population is rural and agriculture related.


We have greatly hampered the natural ground The rainfall pattern in India is highly irregular in
water recharge by drawnif excessive water and space and time. Most of it is concentrated during
covering / paving up all the available open land. just a few months of year and that too, in a few
Rainwater harvesting is merely “putting back regions. Rainfall occurs about 70 % in about four
rainwater into the soil or in underground or above months. So, even in a year of normal rainfall, some
ground tank so that we can draw it whenever we parts of a country face several droughts. RWH
need it”. Less than 1% of world‘s water is available system benefits in many ways in rural and urban
in the form of river, pond and lake for human use. areas such as it develop improvements in infiltration
Out of total rainfall in India, run off is about 85 %, and reduction in runoff, improvement in
percolation is about 7%, evaporation is about 5% groundwater quality, reduces strain on specially
and human use is about is about 3%. Urbanization village Panchayat / Municipal/Municipal
and increase in population in the recent decades corporation water supply, improvement in
have contaminated water bodies, thus making them groundwater level and Yields etc.
unfit for drinking and use. This is coupled with
man’s growing needs and excessive tapping of Advantages and Disadvantages :
groundwater through numerous bore wells and tube Advantages:
wells, which has depleted water table to great extent. 1) It gives high agriculture returns.
Rain Water harvesting (RWH) will to some extend 2) It is a potential solution to problems of rural
help to meet the increased demand. It has been poverty and unemployments, resulting in an overall
estimated that the amount of rainwater that falls on improvement in the nation’s economy.
the terrace of the houses can take care of the water 3) Local people can be easily trained to
requirement of an average family of four members implement such technology and construction
for one year. methods. RWH is a convenient in the sense that it
RWH is a technology used for collecting and provides water at the point of consumption, which
storing rainwater from rooftops, the land surface or greatly reduces the operation and maintenance
rock catchments using simple techniques such as problem.
underground check dams. 4) It is sustainable due to decentralization and
RWH has gained tremendous interest among community participation.
academicians, institutions and layman in the past
few years. Roof top harvesting has a clearer Disadvantages :
definition as water collected from rooftop chiefly This system mainly depends upon the limited
for domestic consumption. Rain Water Harvesting supply and uncertainty of rainfall. Adoption of this
is a low cost solution to solve water crises. technology requires a bottom up approach rather
than top to bottom. This makes this system less
Need of RWH : attractive to some government agencies. If old roof
In India there are 600000 villages and almost is used as the catchment area, if it is under tree

*Sr. Lecturer,Civil Engg.Dept., G.H.Raisoni College of Engineering, Nagpur.


**Retired Prof.Civil Engg.Dept., V.N.I.T. Nagpur

159
branches, if the building relies on wood heat, or if and on the mouth of inlet of drained pipe, mesh of
the air is too polluted, then there may be possibility 850 micron screen or coarse mesh 10mm x10mm
of contamination of rain water. should be provided to prevent the entry of derbies
as shown in Fig No 2. The inlet of drained pipe
COMPONENTS OF RWH SYSTEM should be provided on the sloping side of the roof.
It consists of various stages, transporting
rainwater through pipes or drains, filtration and
storage in tanks for reuse or recharge. The common
components of RWH system consists of three stages
A) CATCHMENTS : The catchments of RWH
system, the surfaces which directly receive the
rainfall and provide water for system. It can be paved
area like a terrace or courtyard of building or an
unpaved area like a lawn or open ground. R.C.C.,
galvanized iron or corrugated sheets can also be used
for R.W.H. Following Fig. shows elements of rain
water system.
Source: A water Harvesting manual for urban area
As the rooftop is the main catchment area, the
Course mesh on roof top (Fig 2.0)
amount and quality of rainwater collected depends
upon the area of catchment, intensity of rainfall and Gutter : Channels are provided all around the edge
type of roofing materials. Galvanized corrugated of sloping roof to collect and transport rainwater to
iron, asbestos cement sheets and slate and tiles can the storage tank. It semicircular or rectangular and
collect reasonably pure water from the rooftops. could be made using
Although thatched roof tiled with bamboo gutter, • Locally available materials such as plain
laid in proper slopes can produced almost the same galvanized iron sheet (20 to 22 gauge), folded to
amount of runoff less expensively (Gould, 1992). the required shapes.
Because of possible health hazards, bamboo roofs • Semicircular gutter of PVC material can be
are least suitable and roofs with metallic paints or readily prepared by cutting those pipes into two
other coating are not recommended as they may equal semi- circular channels.
impart taste or colour to the collected water. To avoid • Bamboo or betel trunks cut vertically in half.
entry of dust, leaves and bird dropping, the roof The size of gutter should be accurate to flow water
catchment should be cleaned regularly. during highest intensity of rainfall and it is advisable
to make them 10 to 15 % over size. Gutter need to
be supported so they do not sag or fall off when
loaded with water. The way, in which the gutters
are fixed depending upon the construction of houses
having wider eaves, some method of attachment to
the rafter is necessary.

Conduit : Theses are the pipelines or drains that


carry rainwater from the catchments or rooftop area
to the harvesting system called as down conduct
can be of any materials that are commonly available.
Source – A water-harvesting manual for Urban area The following Table No 1.0 gives ideas about the
Fig. 1 diameter of pipe required for draining out rainfall
based on rainfall intensity and roof area. The down-
Course mesh – It should be provided at the roof to pipe should be atleast 100 mm diameter with 850-
prevent the passage of derbies. It should be provided micron wire screen at the inlet to prevent dry leaves
at the bottom of parapet wall as shown in figure and derbies from entering into pipe.

160
Table No 1.0 Size of rainwater pipe for roof drainage

Diameter Average rate of rainfall in mm/hour


of pipe
(mm)
50 75 100 125 150 200
50 13.4 8.9 6.6 5.3 4.4 3.3
65 24.1 16.0 12.0 9.0 8.0 6.0
75 40.8 27.0 20.4 16.3 13.6 10.2
100 85.4 57.0 42.7 34.2 28.5 21.3
125 - - 80.5 64.3 53.5 40.0
150 - - - - 83.6 62.7

mm/ h – milliliter per hour Source – National Building Code.

First flushing - First flushing device is the valve rainwater, is generally made up of PVC or other
that insures that runoff from the first spell of the inert substance to avoid corrosion of pipe due to
rain is flushed out and does not enter the system. the pH of rainwater can be low.
This needs to be done since the first spell of rain
carries a relatively large amount of pollutants from
air and the catchments surface. There are several
possible choices to collect clean water for the
storage tanks. The most common is the down- pipe
flap. With this flap it is possible to direct the first
flush of water flow through the down pipe, while
Source: A water harvesting manual for urban areas
later rainfall is diverted to the storage tank. When it manual for urban areas
starts to rain, the flap is left in closed position, First flushing arrangement
directing water to the down-pipe, and later, opened Fig. No 3
when relatively clean water can be collected
(Refer Fig. No 3). A great disadvantage of using B)FILTER : The filter is used to remove suspended
this type conveyance control system is necessarily pollutants from rainwater collected over the roof. A
to observe the runoff quality and manually operate filter unit is a chamber filled with filtering media
the flap. An alternative approach would be to such as fiber, course sand and gravel layer, to remove
automate the opening of the flap. the debris and dirt from water from before it enters
A funnel shaped insert is integrated in to the the storage tank or recharge structure. Charcoal can
down-pipe system. Because the upper edge of the be added for additional filtration.
funnel is not direct contact with the sides of down- (Refer fig. No. 4)
pipe, and a small gap exist between the down-pipe
walls and the funnel. When the rain starts, the
volume of water passing down the pipe is very small
and the contaminated water runs down the pipe,
around the funnel and discharged directly to the
recharged structure if available or over the ground.
When the rainfall continues the volume of water Source: A water harvesting manual for urban areas
increases and the clean and fresh water carried to Sand filter
the storage tank. The pipe used for collection of Fig. No 4

161
a) Sand Filter: Sand filter s have commonly available c) Filter for large roof top: This system was
sand as a filter media. Sand filters are easy and designed by R. Jaykumar. When the rainwater is
inexpensive to construct. These filters can be harvested in a large rooftop area, the filtering should
employed for treatment of water to effectively be accumulating the excess flow. A system is
remove turbidity, colour and microorganisms. In designed with three concentric circular chambers
simple sand filter that can be constructed in which the outer chamber is filled with sand, the
domestically, the top layer comprises course sand middle one with course sand and inner most layer
followed by 5-10 mm layer of gravel followed by with pebbles. In this way the area of filtration is
another 5-25 cm layer of gravel and boulder. increased for sand, in relation to the course
(Refer fig. No. 5) aggregate and pebbles.
In this system the rainwater reaches to the
center core and is collected in the sump where it is
treated with few tablets of chlorine for consumption.
Jayakumar (A builder by profession) (Refer fig.
No. 7)

Source: A water harvesting manual for urban areas


Sand Filter
Fig. No. 5

b) Dewas Filter : Most residents in Dewas in


Madhya Pradesh, have wells in their houses.
Formerly all that wells would do was exact
groundwater but then, the district administrative of
Dewas initiated the ground water recharge scheme.
The rooftop water was collected and allowed to pass
through fitter system called Dewas filter designedby
Mohan Rao, District collector of Dewas. The water
thus filtered is put into the small service tube well.
The filter consist of Polyvinyl chloride (PVC)
140 mm diameter and 1.2 m. long there are three
chambers .the first purification chamber has pebbles
varying between 2-6 mm and second chamber has
slightly larger pebbles between 6-12 mm and third
chamber has largest 12-20mm pebbles. There is
mesh at the outflow side through which clean water Source – Jayakumar Rain Water Harvest Manual P- 21
flow out after passing through three chambers. Jayakumar Filter
(Refer fig. No. 6) Fig. No. 7

d) Varun: S. Viswanath developed a filter named


‘Varun’ for purifying rainwater. According to him,
from a decently clean roof ‘Varun’ can handled
50mm/hour intensity of rainfall from 50 sq. m. of a
roof area. This means the product is relatively
standardized. Varun is made from 90-liter high
density Poly Ethylene (HDPE) drum. The lid is
tumbuer and holes are punched in it. This is the first
Dewas Filter sieve, which keeps out larger leaves, twinges etc.
Fig No. 6 rainwater coming out sieve then passes through the

162
three layers of sponge and 150 mm of thick layer of Various recharge structures are possible. Some
course sand. Presence of sponge makes the cleaning of which promote the percolation of water through
process very easy. Remove the first layer of sponge soil strata at shallow depth (recharge trenches,
and soak/ clean it in bucket of water. The sand needs permeable pavement) where other conduct water
no cleaning at all. to greater depths from where it joins the
groundwater e.g. recharge well. At many locations,
e) Horizontal Roughing filter : The introduction existing structures like wells, pits and tanks can be
of horizontal filter and slow sand filter to treat modified as recharged structures, eliminating the
surface water has made safe drinking water available need to construct any structure a fresh.
in coastal pocket of Orrisa. The major components
are as follows. Methods and Techniques :
Filter channel: 1.0m2 in cross section and 8m.in Rooftop rain water Through :
length laid across the tank embankment, the filter a) Recharge Pit : The recharge pit is generally
channel consist of three uniform compartments, first 1.5to 3.0 m wide and 2.0m to 3.0 m deep.
pocket with broken bricks, second with course sand The excavated pit is lined with a brick/stone
followed by fine sand in third compartment. The walls with weep holes at regular intervals.
horizontal roughing filter usually consist of filter The top area of the pit can be covered with
material like gravel and course sand that perforated cover. (Refer Fig. No 9)
successively decreases in size from 25 mm to
4mm.(Refer Fig. No 8). The bulk of solids in the
incoming water is separated by this course sand. At
every outlet and inlet of channel, fine graded mesh
is implanted to prevent the entry of finer materials
into the sump. The length of channel varies
accordingly to the nature of the site selected for
sump. The HRF acts as a physical filter and is
applied to retain the solid matter. Slow sand filter is
a primary biological filter, used to kill microbes in
the water. Both filter types area generally stable,
making full use of the natural purification process
of harvested surface water and do not require
chemicals.
Source- Centre of Science for Villages
Recharge pit
Fig. No. 9

b) Percolation Pit : Percolation pit is a easiest and


most effective means of harvesting rainwater are
generally not more than 60cm x 60cm x 60 cm pits
filled with pebbles or bricks jelly and river sand
covered with perforated concrete slab whenever
necessary. (Refer Fig. No 10)

Horizontal Roughing filter


Fig No. 8

C) RECHARGED STRUCTURES : Rainwater


may be charged into ground water aquifer through
Filter material
any structure like dug well, bore well, recharge
in a soakaway
trenches and recharge pit.

163
Source- Centre of Science for Village
Soak pit (Fig No10)

Source – TWAD Board


Percolation pit with bore hole
Fig. No. 12

In areas where the soil is likely to be clayey


upto say 15ft. and more, it is advisable to go in for
a percolation well upto 10ft. or 15ft. and a hand
bore pit within this well upto a depth of 10ft. to
15ft. from its bottom. A PVC pipe of 6in. diameter
is inserted into the bore for the entire length. (Refer
Fig. No 12)
Source – TWAD Board
Percolation Pit Note :
Fig No. 11 1. Above structures are meant for area with small
catchment like individual houses.
A percolation / absorption pit is a hand bore 2. RCC slab cover is optional.
made in the soil with the help of an augur and filled 3. Top (1') portion may be filled with sand.
up with pebbles and river sand on top. The depth of
these pits will be anywhere between 4 and 8 meters d) Recharged Trenches : A recharge trench is a
depending on the nature of the soil. If the soil is continuous trench excavated in the ground and
clayey, the pit has to be dug to a depth till a refilled with porous material like boulder, pebbles
reasonably sandy stratum is reached. The diameter or bricks. A recharge trench can be 0.5 m to 1.0 m
of these pits will be 25 cm (10 inches). A square / wide and 1.0m to 1.5 m deep and length should in
circular collection chamber with silt arrester is the range of 13-16 meter, which helps for good
provided at the top. Constructed in the open space percolation. The length of recharge trench is decided
at required intervals. as per the amount of runoff expected. The recharge
Size “ 1m x 1m x 1.5m (depth) trench should be periodically cleaned of
Filled with broken bricks / pebbles accumulated derbies to maintain the intake capacity
Suitable for sandy sub - soil area in term of recharge rate; recharge trenches are
One unit for 30 m2 area (approx.) (Refer Fig.No.11) relatively less effective since soil strata at a depth
of about 1.5 m is less permeable. For recharging
c) PERCOLATION PIT WITH BORE through the recharging trenches fewer precautions
METHOD have to be taken to maintain the quality of runoff.
A borehole to be drilled at the bottom of the Runoff from both paved and unpaved can be tapped.
percolation pit. Bore hole size should150 - 300 mm
dia. with 10 -15 ft depth (approx.)filled with broken e) Recharging of service tube well: In this case
bricks and suitable for clay area. the rooftop runoff is not directly fed into the service

164
tube well, to avoid the chances of contamination of filled with layer materials. In order to facilate speedy
groundwater. Instead, rainwater is collected in a recharged, boreholes are drilled at regular intervals
recharged well, which is a temporary storage tank in a trench. In design part there is no need of
(located near the service tub well) with a borehole, incorporating the influence of filler materials. (Refer
which is shallower than water table depth. This Fig. No 13)
borehole has to be provided with a casing pipe to
prevent the caving in of soil, if strata are loose. A
filter chamber comparing of sand, gravel and
boulder is provided to arrest impurities.

f) Recharge of dug well and abandoned dug


well: in alluvial and hard rock areas, there are
thousands of wells which have either gone dry or
whose water level has declined considerably. These
can be recharged directly from roof top runoff.
Rainwater that is collected on the roof top of the
building is diverted by drainpipe to a settlement or
filtration tank from which it flows into the recharge
well (bore well or dug well) if the tube well is used
as for recharging, then the causing outer pipe) should
be preferably slotted or performed pipe so that more Source: A water harvesting manual for urban areas
area is available for the to percolate. Developing a Recharged Trough
bore well would increases its recharge capacity Fig. No 13
(developing is the process where water or air is
h) Modified Injection Well: In this method water
forced into well under pressure to loosen the soil
is not pumped into the aquifer but allowed to
strata surrounding the bore to make it more
percolate through filter bed, which comprises sand
permeable)
and gravel. The modified injection well is generally
a borehole 500 mm diameter, which is drilled to the
1) If dug well used as a recharge then the well
desired depth depending upon the geological
lining should have opening (weep holes) at regular
condition, permeably 2-3.0 m below water table.
interval to allow seepage of water through the sides.
Inside this hole a slotted pipe of 200 mm diameter
Dug well should be covered to prevent mosquitoes
is inserted. The annular space between the borehole
breeding and entry of leaves and derbies. The bottom
and pipe is filled with gravel and developed with a
of recharged well should be desilted annually to
compressor till it gives clear water. To stop the
maintain the intake capacity.
suspended solid from entering the recharge tube
Providing the following elements in the system can
well, a filter mechanism is provided at top. (Refer
ensure the quality of water entering the recharge
Fig. No 14)
wells.
1) Filter mesh at entrance point of roof
catchments
2) Settlement chamber
3) Filter bed.

g) Recharged Trough: To collect the runoff from


the paved and unpaved areas draining out of a
compound, recharged troughs are commonly placed
at the entrance of residential / industrial complex.
These structures are similar to the recharged trench Modified injection well
except for the fact that the excavated portion is not Fig. No 14

165
i) For Rural Area : (Rooftop Rain water k) RWH through Percolation Tank: This
harvesting) In rural areas most of the houses are method percolation tanks are constructed to store
having Mangalore tiles roof. In this gutters are the rain water which helps in various purpose such
provided along the periphery of the roof and get as improvement in ground water table, increasing
collected in a small tank as shown in fig. No 15. crop production, increasing the prosperity of the
country etc. (Refer Fig. No 17)

Rooftop Rain water harvesting (on Mangalore

Percolation Tank
Fig No 17

l) RWH Through Check Dam: In this small


barrier built across the direction of water flow on
shallow river or stream for the rain water harvesting
Rooftop Rain water harvesting
purpose. The small dam retains excess water flow
Fig. No 15 during monsoon rains in small catchment area
behind structure which helps in various ways.
In this fig. the roof is covered with plastic Example : In Mahudi village, Dist.Dahod in
which is used to collect maximum amount of Gujarat. Population of this village was 600. In 1992,
rainwater from roof the villagers constructed the first check dam on the
seasonal river Machhan, with the help of
j) RWH through Continuous Contour N.M.Sadguru water and Development Foundation
Trenching: construction of trench on slope contour ( NMSWDF), a Dahod based NGO. In 2002 the
to detain water and sediments transported by water villagers have constructed a pipeline system to bring
gravity down slope generally constructed by light drinking water on tap from the wells near check
equipments. These are also called as contour trench dam. Villagers also control the use of water through
or contour furrows, lined with geotextile and filled the local village institutions called lift irrigation
with rock or placed in the form of erosion resisting committee. Due to the construction of check dam,
structures. (Refer Fig. No 16) the agriculture yield also increased, today formers
. irrigated about 100 acres of land during the drought
season. Refer Fig 18.

RWH through Continuous Contour Trenching


Fig No 16 Check Dam at Mahudi village, Dist.Dahod in Gujrat

166
Check Dam
Fig No. 18 Source _Centre Of Science For Village
Open well Recharging by Soak Pit Method s
m) Open well Recharging by Soak Pit Method Fig No. 19
(Centre Of Science For Villages) :In this, it is 1) Hydrogeology of the area including nature and
mentioned that construct the slope for surrounded extent of aquifer, soil cover, topography, depth of
ground of well in such a way that total runoff should water table and chemical quality of ground water.
reached toward the well. Construct pits of size 5feet 2) Area contributing for runoff i.e. how much area
wide and 6.0 feet deep to the both sides of well by and land use pattern, whether residential or garden
leaving 5.0 feet on both sides of well as shown in belt and general built up pattern area.
figure. The length of the pit should be slightly less 3) Hydro metrological characteristics viz rainfall
than the half the perimeter of the well. The slope of duration, intensity of rainfall and general pattern.
the bottom of pit should be provided in opposite
direction of well. By leaving the space of 6 inches Quantity of water harvested:
above the bottom of pit, provide PVC pipe of 4 The amount of water harvested depend up on
inches diameter from which water directly flow in 1) The frequency and intensity of rainfall 2)
to the well through the pits. Fill the pits with stones Catchments characteristics
of size 12inch to 18 inches. While filling care is 3) Water demand
taken that the gap should remain in between the Water Harvesting Potential = (Catchments area in
stones so that rainwater should pass through it. The Sq. m) X (collection efficiency) X (rainfall in mm)
bigger size of stones should be placed at bottom of The collection efficiency accounts for the facts
pit and reduces the size gradually towards the top that all the rainwater falling over the area can not
of pits. Place the course-graded sand above the top be effectively harvested, because of evaporation,
layer of stone. After completing, cover the pit with spillage etc. general values are tabulated below (
polyethylene (plastic) and cover the soil, which is Refer Table No 2 & 3) which are generally used for
excavated from the pit. During this, provide space assessing the potential.
in to polyethylene for entering the runoff water into
the infiltration pits. Runoff water after passing Table No 2
through the filtration pits reaches to the well, which
No. Type of catchments Collection efficiency
increases the level of water in the well. Refer Fig.
No 19. 1 Roof Top 0.75-0.95
2 Paved area 0.5-0.85
DESIGN CONSIDERATION:
The most important components which needs 3 Bare land 0.1-0.2
to be evaluated for designing rain water structures 4 Green area 0.05-0.1
are
Runoff coefficients for various catchment surfaces

167
Table No 3 cooking and drinking purpose is 10 liter/ cap/ day
For family of six person = 60 liters.
Type of Catchment Coefficients
For 245 days = 245 X 60
Roof Catchments = 14700 liters.
-Tiles 0.8-0.9 As per the factor of safety the tank should be
- Corrugated metal sheets 0.7- 0.9 built 20 % larger than the requirement i.e. 17640
Ground surface coverings
liters. This tank meets the basic water requirement
for a family of six members for dry period. By fixing
-Concrete 0.6-0.8
the height of the tank, the diameter can be calculated.
- Brick pavement 0.5- 0.6
Untreated ground catchments Legislation of RWH.
- Soil on slopes less than 10 per cent 0.0-0.3 Kerala: The Kerala Municipality Building Rules,
1999 was amended by a notification dated January
- Rocky natural catchments 0.2 - 0.5
12, 2004 issued by the Government of Kerala to
Untreated ground catchments include rainwater harvesting structures in new
- Soil on slopes less than 10 per cent 1.0-0.3 construction.
- Rocky natural catchments 0.2 - 0.5 109. A Rooftop rainwater harvesting
agreements.1) Unless otherwise stipulated
Source : Pacey, Arnold and Cullis, Adrian 1989, Rainwater
Harvesting: The collection of rainfall and runoff in rural
specifically in a town planning scheme, workable
areas, Intermediate Technology Publications, London.
roof top rainwater harvesting arrangements shall be
provided as in integral part of all new building
Example : constructs for the following occupancies, namely
Area of terrace = 150 sq.m. i) Group A1 — Residential (with floor area of
Height of Rainfall = 500 mm (0.5m) 100 m2 or more and plot area 200 m2 or more)
Volume of rainfall = 150 x 0.5 ii) Group A2 — Special Residential.
= 7.5 m3 = 75000 Lit. iii) Group B — Educational.
Assuming that 70 – 80 % of the total rainfall is iv) Group C — Medical / Hospital.
effectively harvested v) Group D – Assembly
Volume of water harvested = 75000 X 0.7 vi) Group E – Office / Business.
= 52500 liters. vii) Group G1 and Group G2 industrial (Only for
Generally water required for drinking, cooking is workshop, assembly plant, laboratories, dry-
10 liter / capita/day cleaning plant, diaries food processing unit and any
Suppose the family of six people other occupancies noticed by the government from
Total quantity of water required / family = 10 x 6 time to time).Provided that the floor area to be
= 60 liters. constructed shall be the total floor area in all floors:
For a year = 365 x 60 provided further that, the rainwater harvesting
= 21900 liters. arrangement is not mandatory for thatched roofed
The water required for family for drinking and building.
cooking purpose is less than the rain water harvested 2) The components of workable rooftop rain
i.e. harvested water is double than the water required water harvesting arrangements as stipulated in sub-
for main purpose. rule (1) above, shall include
i) Roof catchments area
Design of Storage tank ii) Roof gutters
Tank capacity : Tank capacity is based on dry iii) Down pipe and first flush pipe arrangement
period i.e. the period between the two consecutive iv) Filter unit
rainy seasons. Suppose monsoon is for four months v) Storage tank with provision of drawing water
i.e. 120 days , then the dry days are 245. and spillover
We know that quantity of water required for 3) The minimum capacity of storage tank as
stipulated in sub- rule (2) (v) of the roof top

168
harvesting arrangement shall be at the rate given to construct rainwater harvesting structures is
below August 31, 2003. The ordinance cautions, “Where
the rain water harvesting structure is not provided
Group A1 25 liters/ m2
as required, the Commissioner or any person
Group A2 25 liters/ m2 authorized by him in this behalf may, after giving
Group B 50 liters/ m2 notice to the owner or occupier of the building, cause
Group C 50 liters/ m2 rain water harvesting structure to be provided in such
Group D 50 liters/ m2 building and recover the cost of such provision along
with the incidental expense thereof in the same
Group E 50 liters/ m2
manner as property tax”. It also warns the citizens
Group F Nil on disconnection of water supply connection
Group G1 and G2 50 liters/ m2 provided rainwater-harvesting structures are not
Group H 25 liters/ m2 provided.
Group I Nil
Haryana: Haryana Urban Development Authority
New Delhi :Since June 2001, the Ministry of Urban (HUDA) has made rainwater-harvesting mandatory
affairs and Poverty Alleviation has made rainwater- in all new buildings irrespective of roof area. In the
harvesting mandatory in all new buildings with a notified areas in Gurgaon town and the adjoining
roof area of more than 100 sq m and in all plots industrial areas all the institutions and residential
with an area of more than 1000 sq m, that are being colonies have been asked to adopt water harvesting
developed. The Central Ground Water Authority by the CGWA. This is also applicable to all the
(CGWA) has made rainwater harvesting mandatory buildings in notified areas having a tubewell,
in all institutions and residential colonies in notified deadline was for March 31, 2002. The CGWA has
areas (South and southwest Delhi and adjoining also banned drilling of tubewells in notified areas.
areas like Faridabad, Gurgaon and Ghaziabad). This
is also applicable to all the buildings in notified areas Rajasthan: The state government has made
that have tubewells. The deadline for this was for rainwater harvesting mandatory for all public and
March 31, 2002. establishments and all properties in plot covering
more than 500 sq m in urban areas.
Indore (Madhya Pradesh): Rainwater harvesting Mumbai:The state government has made rainwater-
has been made mandatory in all new buildings with harvesting mandatory for all buildings that are being
an area of 250 sq m or more. A rebate of 6 per cent constructed on plots that are more than 1,000 sq m
on property tax has been offered as an incentive for in size. The deadline set for this was October 2002.
implementing rainwater-harvesting systems.
Gujarat: The state roads and buildings department
Kanpur (Uttar Pradesh): Rainwater harvesting has has made rainwater harvesting mandatory for all
been made mandatory in all new buildings with an government buildings.
area of 1000 sq m or more. Status of RWH in Nagpur District for the year
of 2005-2006
Hyderabad (Andhra Pradesh): Rainwater (Mahatma Jotiba Fule Jal Bhomi Sandharan
harvesting has been made mandatory in all new Abhiyan)(Refer Table No. 4)
buildings with an area of 300 sq m or more. Tentative
for enforcing this deadline was June 2001. References :
1) Centre for Science and Environment ( CSE)
2) National building code.
Tamil Nadu: Through an ordinance titled Thailand 3) A water-harvesting manual for urban area.
Muncipal Laws ordinance, 2003, dated July 19, 4) S. Vishwanath. Domestic Rainwater harvesting.
2003, the government of Tamil Nadu has made Some application in Banglore, India
rainwater harvesting mandatory for all the buildings, 5) Centre of science for villages ( www.csvtech.org)
both public and private, in the state. The deadline

169
Table No 4
No. Well Well Roof top rain Roof top rain
recharging recharging water harvesting water harvesting
(Target) (Achieved) (Target) (Achieved)
1 Nagpur 150 32 150 117
2 Kamthi 125 58 125 128
3 Hingna 150 39 150 200
4 Kalmeshwar 150 150
5 Katol 150 176 150 310
6 Narkhed 150 150
7 Sawaner 150 70 150 58
8 Parshivni 125 125
9 Ramtek 150 48 150 59
10 Mouda 125 20 125 27
11 Kuhi 125 0 125 06
12 Umared 125 14 125 44
13 Bhivapur 125 125
TOTAL 1800 457 1800 949

Target of RWH in Nagpur District for the year of 2006-2007


( Mahatma Jotiba Fule Jal Bhomi Sandharan Abhiyan)
(Refer Table No5)

No. Well recharging Roof top rain Roof top rain


(Target) water harvesting water harvesting
(Target) (Target)
Government buildings
1 Nagpur 150 150 100
2 Kamthi 125 125 100
3 Hingna 150 150 150
4 Kalmeshwar 150 150 100
5 Katol 150 150 150
6 Narkhed 150 150 100
7 Sawaner 150 150 100
8 Parshivni 125 125 100
9 Ramtek 150 150 150
10 Mouda 125 125 100
11 Kuhi 125 125 100
12 Umared 125 125 100
13 Bhivapur 125 125 150
TOTAL 1800 1800 1500