Date of Visit: -8AM 7th,September,2016 MATERIAL INSPECTED THIS VISIT Item No. Quantity Description Tag No., Batch No., Serial No., Cast, Heat No.
SUMMARY / AREAS OF CONCERN
GUI-036-00 (Revision 0) Flash Report Dated: 22nd March 2016
Daily Report www.GQIS.com Customer: Edgen Murray Purchase Order 3568 No.:
1. SMMARY / AREAS OF CONCERN:
1.3 Inspection lifting lug production and installation of pile 3568-C06-058.
As per ITP step 15(Production and installation of ancillary) , GQIS inspector carried out visual and dimension inspection for lifting lug during/after fabrication, finding the lifting hole dimension on cheek plate was irregular and too small, the minimum dimension was 60mm that cant satisfied the drawing requirement 74mm, sub-vendor stated that they would repair accordance with drawing. After finished repair I will inspected again according to drawing. Picture
Inspection lifting lug installation and production
Actual lifting hole
dimension was 60mm that not in line with drawing requirement of 74mm. Inspection lifting lug installation and production
Accepted Not Non-Compliant No
Technical Specialist: Su Jinlong Operations Coordinator:
Date: 8PM 6th, September -8AM Date:
7th,September,2016
007 (Revision 0) Daily Report Dated: 29nd August 2016