Daily Report

www.GQIS.co.uk

Project: Hinkley Jetty Design


Customer: Edgen Murray
Finalisation
Sub-Vendor: Zhejiang Chankong Steel
Vendor: ESC Group
Pipe CO.,LTD
Sub-Vendor Address: Tianning, Jiashan,
Vendor Address: Putuo, Shanghai,China
Zhejiang
Vendor Reference: Sub-Vendor Reference:

GQIS Assignment No: Customer Reference:

Purchase Order No: 3568 Report No: 015

8PM 6th, September


Date of Visit:
-8AM 7th,September,2016
MATERIAL INSPECTED THIS VISIT
Item No. Quantity Description Tag No., Batch No., Serial No., Cast,
Heat No.

SUMMARY / AREAS OF CONCERN

GUI-036-00 (Revision 0) Flash Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: Edgen Murray Purchase Order 3568
No.:

1. SMMARY / AREAS OF CONCERN:

1.3 Inspection lifting lug production and installation of pile 3568-C06-058.


As per ITP step 15(Production and installation of ancillary) , GQIS inspector carried out visual and
dimension inspection for lifting lug during/after fabrication, finding the lifting hole dimension on cheek plate
was irregular and too small, the minimum dimension was 60mm that cant satisfied the drawing
requirement 74mm, sub-vendor stated that they would repair accordance with drawing.
After finished repair I will inspected again according to drawing.
Picture

Inspection lifting lug installation and production

Actual lifting hole


dimension was 60mm
that not in line with
drawing requirement of
74mm.
Inspection lifting lug installation and production

Accepted Not Non-Compliant No

Technical Specialist: Su Jinlong Operations Coordinator:

Date: 8PM 6th, September -8AM Date:


7th,September,2016