Sei sulla pagina 1di 7

Daily Report

www.GQIS.co.uk

Project: Hinkley Jetty Design


Customer: Egden Murray
Finalisation
Sub-Vendor: Zhejiang Chankong Steel
Vendor: ESC Group
Pipe CO.,LTD
Sub-Vendor Address: Tianning, Jiashan,
Vendor Address: Putuo, Shanghai,China
Zhejiang
Vendor Reference: Sub-Vendor Reference:

GQIS Assignment No: Customer Reference:

Purchase Order No: 3568 Report No: 008

8PM 30th,August-8AM
Date of Visit:
31th,August,2016
MATERIAL INSPECTED THIS VISIT
Item No. Quantity Description Tag No., Batch No., Serial No., Cast,
Heat No.
1# 1 Raw material inspection Detail as below table

SUMMARY / AREAS OF CONCERN

GUI-036-00 (Revision 0) Flash Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

1. SMMARY / AREAS OF CONCERN:


1.1 Raw material inspection.
GQIS inspector performed raw material inspection according to ITP and specification, the detail inspection
scope as below table, all inspection data found in conformity with ITP & specification and traceability, the
surface hasnt found any indication of damage. The result is satisfactory.
Serial No. Material Grade Size Heat No. Delivering Specification
Condition
1630598106 S355J2 35X3000X 16305981 Hot Rolled EN 10025-2 2004: S355J2
0101 10955

1.2 Witness hydrostatic testing for flexible hose


As per ITP, GQIS inspector witness hydrostatic testing for flexible hose; Before testing, GQIS inspector
reviewed flexible hoses certificates, verified the drawing and specification requirement, checked calibration
certificate for hydrostatic testing equipment and valid time and confirmed that are satisfactory. Not any
indication of leakage was found during test, test duration 15 seconds and testing pressure was 20 Bar, which
in line with the drawing and specification.

1.3 Visual and dimension inspection for supports of pile 3568-C04-065 and 3568-C04-066
GQIS inspector performed visual and dimension inspection for supports of pipe No.3568-C04-065 and 3568-
C04-066 according to drawing and project specification, not found any dimension out of tolerance, but found
some scratches which was produced by flame cut when open the 95mm hole, already marked on supports
and factory stated they would repair that and then will inspection again.

1.4 Visual and dimension inspection for pile of 3568-C12-052-C


According to ITP, GQIS inspector randomly conducted visual and dimension inspection in-process, checked
pile of 3568-C12-052-C the length about 27240mm, outside diameter about1772mm~1784, the
roundness about 12mm, which in accordance with the drawing and specification, not found any surface
defect or damage, the result found acceptable.

Picture 5

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Raw material inspection

Raw material inspection

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Witness hydrostatic testing for flexible hose

Witness hydrostatic testing for flexible hose

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Visual and dimension inspection for supports

Visual and dimension inspection for supports

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Found some scratches which was produced by flame cut

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Visual and dimension inspection for pile

Accepted Yes Non-Compliant No

Technical Specialist: Su Jinlong Operations Coordinator:

Date: 8PM 30th, August-8AM 31th, August, 2016 Date:

007 (Revision 0) Daily Report Dated: 29nd August 2016

Potrebbero piacerti anche