3 EXECUTION OF WORKS
Execution of Works

TABLE OF CONTENTS

Sr.# Description Page #

3.3 EXECUTION OF WORKS..............................................................................................


3.3.1 Proposed Delivery/Construction Schedule..............................................................
3.3.2 Method of Performing the Work..............................................................................
3.3.2.1 Organization Chart.................................................................................................
3.3.2.2 Mobilization at Site.................................................................................................
3.3.2.3 Method of Executing the Works..............................................................................
3.3.2.4 Quality Control of the Work....................................................................................
3.3.3List of Major Equipment and Related Items to be Used by the Contractor....................................
3.3.4 Construction Camp and Housing Facilities.............................................................
3.3.5 List of Sub-contractors...........................................................................................
3.3.6 Estimated Progress Payments...............................................................................
3.3.7 Organization Chart of the Supervisory Staff and Labour........................................
3.3.8 Qualified or Alternative Offers...............................................................................
3.3.9 Standards..............................................................................................................

April 10, 2017 EXE-W3-3.W51 1


Execution of Works

3.3 EXECUTION OF WORKS

3.3.1 Proposed Delivery/Construction Schedule


Pursuant to Clause 4.2.43 (Condition of Contract, Time of Completion) Conditions of Contract, the
Works shall be completed on or before the date started in the Special Conditions of
Contract. The Tenderer shall provide a Construction Schedule in bar chart form showing
the sequence of work items and the period of time during which he proposes to complete
each work item in such a manner that his proposed programme for completion of the
whole of the Works and parts of the Works may meet Employer's completion targets
noted below.

1.Time for commencement (vide Special Conditions of Contract)

2. Time for completion of the whole works (vide Special Conditions of Contract)

April 10, 2017 EXE-W3-3.W51 1


Execution of Works

3.3.2 Method of Performing the Work


The Tenderer is required to submit a narrative outlining the method of performing the work. The
narrative should indicate in detail and include but not be limited to:

1.Organization chart including head office and field office personnel involved in management and
supervision, engineering, equipment maintenance and purchasing.

2.Mobilization in Pakistan, the type of facilities including personnel accommodation, office


accommodation, provision for maintenance and for storage, communications,
security and other services to be used.

3.The method of executing the Works, the procedures for installation of equipment and machinery, and
the transportation of equipment and materials to the Site.

4.Measures to be taken by the Contractor to control the quality of Work.

5.Description of alternative items, if proposed by the Tenderer.

April 10, 2017 EXE-W3-3.W51 2


Execution of Works

METHOD OF PERFORMING THE WORK

3.3.2.1 Organization Chart

April 10, 2017 EXE-W3-3.W51 3


Execution of Works

METHOD OF PERFORMING THE WORK

3.3.2.2 Mobilization at Site

April 10, 2017 EXE-W3-3.W51 4


Execution of Works

METHOD OF PERFORMING THE WORK

3.3.2.3 Method of Executing the Works

April 10, 2017 EXE-W3-3.W51 5


Execution of Works

METHOD OF PERFORMING THE WORK

3.3.2.4 Quality Control of the Work

April 10, 2017 EXE-W3-3.W51 6


Execution of Works

3.3.3List of Major Equipment and Related Items to be Used by the Contractor


The Tenderer will provide on the following pages of this Appendix a list of all major equipment and
related items, under separate headings for items owned, to be purchased or leased by
him to carry out the Works. The information shall include make, type, and capacity, and
anticipated period of utilization for all equipment which shall be in sufficient detail to
demonstrate fully that the equipment will meet all requirements of the Specifications.

This list shall particularly include a detailed description of the equipment specified in the Technical
Specifications, and the alternative equipment if proposed by the Contractor.

April 10, 2017 EXE-W3-3.W51 7


Execution of Works

LIST OF MAJOR EQUIPMENT REQUIRED FOR THE WORKS

Owned, Description of Capacity Present Projected


Purchased Unit (Make, kW Rating Location Delivery Period of Use
or Leased Model) Year Condition or Source Date on Works

a. Owned

b. To be Purchased

c. To be Leased

April 10, 2017 EXE-W3-3.W51 8


Execution of Works

3.3.4 Construction Camp and Housing Facilities


The Contractor, in accordance with Clause 4.2.34.11 of the (Conditions of Contract, Housing ........ )
shall provide a description of his construction camp's facilities and staff housing
requirements. The Employer will allocate free of charge adequate space at a suitable site
for the construction camp of the Contractor.

The Contractor shall be responsible for pumps, electrical power, water and electrical distribution
systems, and sewerage system including all fittings, pipes and other items necessary for
servicing the Contractor's construction camp.

The Tenderer shall list or explain his plans for providing these facilities for the service of the Contract as
follows:

1. Site Preparation (clearing, land preparation, etc.)

2. Provision of Services

2.a Power (expected power load, etc.

2.b Water (required amount, and system proposed)

2.c Sanitation (sewerage disposal system, etc.)

April 10, 2017 EXE-W3-3.W51 9


Execution of Works

3. Construction of Physical Plan

3.aEmployers, Engineers and Contractor's Offices, Workshop and Work Areas (area
required and proposed layout, type of construction of buildings, etc.)

3.bWarehouses and Storage Areas (area required, type of construction and layout)

3.cHousing and Staff Facilities (Plans for housing for proposed staff, layout, type of
constructions, etc.)

April 10, 2017 EXE-W3-3.W51 10


Execution of Works

4.Construction Equipment Assembly and Preparation (detailed plans for carrying this
out)

5. Other Items Proposed (Security services, etc.)

6. Recreation Facilities to be provided by the Contractor for his Staff.

April 10, 2017 EXE-W3-3.W51 11


Execution of Works

3.3.5 List of Sub-contractors


I/We intend to sub-contract the following parts of the Work to sub-contractors. In my/our opinion, the
sub-contractors named hereunder are reliable and competent to perform that part of the
Work for which each is listed.

Enclosed are documents outlining experience of sub-contractors, the curriculum vitae and experience
of their key personnel who will be assigned to the Contract, equipment to be supplied by
them, size, location and type of contracts carried out in the past.

Part of Work Sub-Contractor Address

April 10, 2017 EXE-W3-3.W51 12


Execution of Works

3.3.6 Estimated Progress Payments


(Tenderer`s estimate of the value of Work which would be executed by him during each of the periods
stated based on his program of Works and the Rates in the Bill of Quantities)
Quarter
year period Currency

(1) (2)

1st Quarter

2nd Quarter

3rd Quarter

4th Quarter

etc.

Total

TENDER PRICE:

April 10, 2017 EXE-W3-3.W51 13


Execution of Works

3.3.7 Organization Chart of the Supervisory Staff and Labour

April 10, 2017 EXE-W3-3.W51 14


Execution of Works

3.3.8 Qualified or Alternative Offers


In the Tenderer wishes to make any departure from or modifications to the Conditions of Contract and
Conditions of Particular Application, Specification, Bill of Quantities or Drawings, he shall
set out his proposals clearly hereunder and refer to them in a covering letter attached to
his Tender.

In no alternative is offered the Tender shall state NIL and sign.

Page Clause or Item

April 10, 2017 EXE-W3-3.W51 15


Execution of Works

3.3.9 Standards
The Tenderer shall list below any proposed standards on which his Tender is based, together with the
equivalent standard specified for the Work concerned.

Unless modified by subsequent correspondence, the proposals entered in this Annexure shall be
binding under the Contract.
Proposed
Standard Alternative
Page Clause Specified Standard

April 10, 2017 EXE-W3-3.W51 16


Execution of Works

April 10, 2017 EXE-W3-3.W51 17