1.0 GENERAL INFORMATION .......................................................................................... 2


2.0 GENERAL SITE DATA ................................................................................................ 2
3.0 PROVISION OF WATER SUPPLY .............................................................................. 3
4.0 PREVAILING WIND ..................................................................................................... 3
5.0 CANE QUALITY AND THROUGHPUT ........................................................................ 3
6.0 EXPECTED PERFORMANCE ..................................................................................... 4
7.0 PRODUCT QUANTITY & QUALITY ............................................................................ 4
8.0 COGENERATION ........................................................................................................ 4
9.0 STEAM GENERATION ................................................................................................ 4
10.0 ELECTRCIAL SYSTEM PARAMETERS .................................................................... 5
11.0 FACTORY TIME ACCOUNT....................................................................................... 5
J P MUKHERJI & ASSOCIATES PVT. LTD.

TSFP BASIC PROJECT PARAMETERS Section-VII-A


Page - 2/5
BID DOCUMENT FOR
FACTORY WORKSHOP

SECTION - VII-A

BASIC PROJECT PARAMETERS


BASIC PARAMETERS TO BE CONSIDERED FOR THE PROJECT (WHEREVER
APPLICABLE)

1.0 GENERAL INFORMATION

The objective of the Tendaho Sugar Factory Project is to establish a new sugar plant
with a total design cane crushing capacity of 26,000 tons per day to produce about
600,000- tons/annum of raw sugar and 50 % of raw sugar is to be refined to produce
refined sugar of EEC Grade II specifications. The project site comprises of Tendaho
dam and the proposed sugar factory which is located in the lower portion [delta
region] of the Awash basin and in Afar Regional State of Ethiopia. The dam site is
located 575 km away from Addis Ababa, capital city of Ethiopia, and is connected
through a very well developed highway from Addis Ababa to City of Djibouti.

Semera is the new capital city of the Afar Regional State, which is still under
construction, is located on the Addis Ababa Djibouti highway at a distance of 580
km from Addis Ababa. Logia, Dubti and Asaita are other towns in the nearby area.

The detailed picture of Ethiopia showing Tendaho is shown in Figure 1a and the
project area/Site is shown in Figure 1b.

2.0 GENERAL SITE DATA

Road approach Project site is located in the lower Awash valley of the
Afar Administration region and about 600 km North
East to Addis Ababa. Road transport on all weathered
surfaced road almost up to the site is available.

Sea Port Port of entry for imported goods by marine transport is


Port Djibouti. The transportation from Port Djibouti to
Tendaho site is by Addis Djibouti tarmac highway.

Air Port Port of entry for air transport is Addis Ababa (about 600
km from project site).

Factory coordinates UTME 764700 E and UTME 1278600 N


Height above msl 350 m
Rainy season July to October
Average rainfall 235 mm

Climatic condition Hot & dry; climatic condition records indicate that the
hot season will normally restrict the crushing period to
about 39 Weeks, extending from October through to
June.
J P MUKHERJI & ASSOCIATES PVT. LTD.

TSFP BASIC PROJECT PARAMETERS Section-VII-A


Page - 3/5
BID DOCUMENT FOR
FACTORY WORKSHOP

Relative humidity 96 % Max & 37% Min


Wet bulb temperature 24 C
Dry bulb temperature 39 C
Ambient temperature Maximum 45 0C and Minimum17 0C
Seismic data Located in seismic zone

3.0 PROVISION OF WATER SUPPLY

Water supply to factory - Awash water through Irrigation


Canals upto factory water sump.

For cooling and service water - Re-circulation and cooling by


cooling towers

For drinking water in Factory - Treated canal water

For sugar plant condensers - Once through (receive from


canal, use and discharge to
canal)

For DEC condenser - Re-circulation and cooling by


cooling towers

4.0 PREVAILING WIND

During the milling season the prevailing winds are approximately South Westerly
from May to October, North-easterly from November to April. The factory building
should be designed for wind speed of 79 km/h.

5.0 CANE QUALITY AND THROUGHPUT

Cane harvesting - Burnt cane manually and/or


mechanically harvested and
mechanically loaded before
transport to factory

Pol % Cane - 12.98

Fibre % cane (average) - 13.79


(For sugar factory capacity) - 14.50
(For cogeneration plant capacity) - 13.79

Cane through put - 1,085 TCH


26,040 TCD on 24 hours basis
J P MUKHERJI & ASSOCIATES PVT. LTD.

TSFP BASIC PROJECT PARAMETERS Section-VII-A


Page - 4/5
BID DOCUMENT FOR
FACTORY WORKSHOP

6.0 EXPECTED PERFORMANCE

Performance (targeted) at 1085 TCH

Reduced mill extraction (RME)


- milling plant - 96 %
- diffusion plant - 97.5 %

Reduced boiling house recovery (RBHR) - 90%

Imbibition % fibre - 250 (max) for milling


- 350 (max) for Diffusion

7.0 PRODUCT QUANTITY & QUALITY

Raw sugar - 100% of production


Direct consumption White sugar - Nil
Refined sugar - 50 % of raw sugar produced to
be refined
Specification of refined sugar - EEC Gr2
Refined Sugar expansion - Space is to be provided for future
expansion to 100 % refined
sugar.

8.0 COGENERATION

Duration of Operation

No of operating days During Season - 270 days


Time efficiency - 95 %
Grid availability - 98 %
Fuel - Bagasse
Auxiliary fuel - Fuel Oil (Bunker C grade)

9.0 STEAM GENERATION

No of boilers - Nos. - 5
Main fuel - Bagasse
Auxiliary fuel - Furnace oil
Capacity of each boiler - t/h - 150

Pressure at main
steam stop valve - bar (a) - 66

Temperature at
0
Superheater outlet - C - 510 5
J P MUKHERJI & ASSOCIATES PVT. LTD.

TSFP BASIC PROJECT PARAMETERS Section-VII-A


Page - 5/5
BID DOCUMENT FOR
FACTORY WORKSHOP

10.0 ELECTRCIAL SYSTEM PARAMETERS

Generation - Voltage - 11000 V


- Frequency Hz - 50
- Phase - 3

Factory distribution
- Voltage - 11000 & 400 V
- Frequency Hz - 50
- Phase - 3

Lighting system, Control & instrumentation


- Voltage - 110 & 230 V
- Frequency Hz - 50
- Phase - 3
- DC Power - 110 V

Power Export
- Voltage - 230000 V
- Frequency Hz - 50
- Phase - 3

Other Voltages

Low Voltage 400 V 3 ph 50 Hz


Welding supplies 400 V 3 ph 50 Hz
Socket outlets 400 V/230V 3ph /1 ph 50 Hz
Anti-condensation heater 230 V 1 ph 50 Hz
Portable tool 230 V 1 ph 50 Hz
Hand lamp transformers 230 V 1 ph 50 Hz
Control circuit 110 V DC
Emergency lighting 230 V 1ph 50Hz
Tripping supplies 110 V DC

11.0 FACTORY TIME ACCOUNT

- Gross campaign hours in a year - 6480 hrs (100.00 %)


- Out of cane hours - 324 hrs (5.00 %)
- Preventive maintenance hours - 432 hrs (6.67 %)
- Net milling hours - 5724 hrs (88.33 %)
- Un planned stoppages hours - 216 hrs (3.33 %)
- Actual grinding hours - 5508 hrs (85.00 %)