Sei sulla pagina 1di 16
VSP ENTERPRISES PVT. LTD. 60kM STONE, G.T. ROAD, VILLAGE-BARIHI, NEAR KALI MAA MANDIR, GANNAUR, DISTT.-SONEPAT (HARYANA) PACKING LIST PROJECT = 225MWp SOLARFV POWER PLANT AT VILLAGE UDALHERL, TEHSIL. ROORKEE, DISTRICT HARIDWAR, UITARAKHAND. _ POWER TRANSMISSION & DISTRIBUTION IC (SOLAR STRIVE CON TRCE ROOM CLIENT: EMAMI POWER LIMITED REF. DG NO ; 016193-TD-S-SF-CRO001 (SHEET Ga OF 9 & 5b OF 5) AND SHOP FLO VEHICLE NO. Mark: Section Plate [Length] Unit_| Weight Pes/Set| Total | Weight] Remarks No. (mm) width| (mm) | Weight] /Pe. | (Nos, | Pes. | (Kg) (mm) (Ke/M) | (Kg) {Nos.) STATEMENT OF STEEL EMA | PBI ISM) 300 7450 600] 3270 2 2 osm EMA |PBIA 1SMB/300 4800 46.00) 22080 | 2 HI ts EMA | ST Pio a0 | 298) Tazo] 2si[ 16 | 16 | aise) edad © EMA | 515 Pufi2 ee s4z0[ 339] 4 4 1356] EMA | ST Pifto 230_| 230 7850] 415] 4 4 161) EMA [PBI 1SMB|300 4270 46.00] 106.2 [ 1 1_| 1609) EMA | PB2 1SMB)50 7450 | 7240] 53938 2 2_| 10774 TEMA |PB2A 1SMB|450 4200 | 72a0] sara 2 [a [eas EMA | Si PL fo io _[ aa Taso] am 16 | 16 | or] Wed EMA | 513 Pup 120_[ 300. 940f 339] 4 4 1356] EMA | ST PLO 230230 750] 415] 4 4 160] EMA | SDL TSMC] 300 782 3630) 17359 [ 20 _| _30_| sara EMA | Sb2 1SMC|200 4331 22.30) 9658 10 | 10 | 9460] EMA | $03 SMC |200 m2 230] 4935| 4 4_| i973 EMA | Cit T[65X65XS 140, 770] 108 | 68 [68 | 73 PLft6 w0_|250_[aas.0] 756 [6s | al ea | 11 [HYSD DEFORMED ROD|I6 1660) 1se|__ 20a a8 [a | nase] Wee Prfio [210 7350) 066) 32 | 32 | an TOTAL WEIGHT OF STFEL (A) 50.6] Page 1 of VSP ENTERPRISES PVT. LTD. 60kM STONE, G.T. ROAD, VILLAG -BARHI, NEAR KALI MAA MANDIR, GANNAUR, DISTT.-SONEPAT (HARYANA) PACKING LIST PROTECT ip SOLAR POWER PLANT AT VIDLAGE UDATTEN TENSIL OOBKEE DISTRICT HARIDWAIUTTARARHAND POWER TRANSMISSION & DISTRIBUTION IC (SOLAR EIR TAEE REITER EDOM SRE OWE NTED REF ONG NO. DST S aT SHEET OFT AND STOP AOR an Mark Section Plate [Length] Unit [Weight] Pes/Set] Total | Weight] Remarks ‘No (mm) ‘width| (mm) | Weight[ 7Pc._| (Nos. | Pes. | (Kg) (mm) (Kg) |_(Kg) {Nos.) STATEMENT OF STEEL mara aaa ta | eal tom] Baa ls ie eeort oases |e wat EMI-A] 13. PLie 175, 350. 125.60] 7.69 1 1 7.69] each other Baal aD a eat mash az em pam] | malt Tele Fs wal ree 2s s0—[ asa rs | 1-19 mala ie mo-[ ss | = mastl sen] tap of a mast ete wis aah] Bia Se re a EO GO mira se rh oe GT ET ial mls ee Beate he sncigae eal nee | a Baas rite mee teat ett aaa att Te[ an ass] fai Salat it aba ed et te Baal Se mit eases ae a ae male on [= a : me | eat oe Beat Sie me eat aap tp el i 4 pepe Beats wile T| sat ise Fs | 4 maa? ates so} — este oe Brat whe alee Sea eet [| aed a EMAL rite a A Beale he aaa a sate sh =5|— eat mea | 4 | ala hs =| eat BAL ree masse amateeeset taal Bea rie re Se rit is] sd ttt te Beats ft sale feed eet ta fa Biase rit a [ose ee eee Seale a a| sat eat] Bratt rhe er ee ee SEI a es 7 A Bat rit To [ ant — sas srt ff et =e hi a BAL eh ae mee te aia rt saa fetes] ease || sal Saat aaah eT | Brats rie ao] eat ast Strats anki pert eee ee wen irate a = [| asl eat ee | aed once Beate Ziameoeaes ee BAL Zisman ce arat Zismeorte eae | ae ee | Braye zisamear os} — sat ese | a Gane crete eo ae [a Mark Section Plate [Length | Unit] Weight] Pes/Set| Total | Weight | Remarks No (mm) width| (mm) | Weight! /Pc._| (Nos) | Pes. | (Kg) (um) (KgyM) | (Key (Nos) SAGRODPZ 0 oas| aad] 66 | 20 ema) 9 ‘NUTSIE oir | 24 [24 | oa] Coupe wah TAIN WASHERS12 006 | — aan [og] Sago SAG ROD|i2 3 a3] 035] [a] aa esn-al 94 ‘NUTS|Ma oir | —s8 | an | 089] Coupe wah PLAIN WASHERS|M12 0.006 48 48 0.29] Sag Rod SAG ROD|i2 760 aa] — as [6 [6 [a Ema] 90 NUTS|Ma or | 12 [32 | — 0.0) Coupe wih PLAIN WASHERS [2 oo6| 12 [a2 [0007] SR inital io IPE |SONE Gi) mana] 1946 | 4 | 4] 7 aa ie Tr Tar sw | asl — ns] sf eee EMAL 17 Peo 35_| 100 | —7as0l oar 8] 8 | 530 Emad Pas s0_ [42a | 2925] —oms| 26 | 26 | 58 Ewa 25 PLho zus_| ama [vaso ams 2 [2 | 90 EMi-al 26 rips wass[2050_[ 196] a7 [12 | “| EMA 27 a ENTS, ans sz] —soas| a | 1 | — sae] Wadetto EMI-A[ 15_ PLhio 50. % 78.50) 0.37, 8 8 2.96] each other EMAL 28 ae PSN, 33 [ 5270] wars a1 [1 | aaa] Weta Ewa 15 eho Bo [ 95 | pasal ox 7 [7 | — 255] eachother EMA 29 PSXaNs aai_[— 5270] 3.28} a4 [1] maa] Welded EMI-A 15 io So 5 [asl os7[ 8 | 8] — 20] eachoter EMI-Ay 30 [SXEXS eat sa) same} a [| at Walaed EIA 15 Pho so 95 7as0f ox [7 7 | — 20) cachotier EMAL 31 1S iss 570| sr} —2 [2] aa EMI-Al 32 i Poxraxs m2 sm| a2 | 2 | — 39 EML-A] 35 PIPE|SONB (M) 304 8.38] 39.56 2 2 58.72] Welded to Ema a7 Piha Ta|~ 260 [rao 26 a] 4] a2] eachoter "TOTAL WEIGHT OF STEEL (A) ass.) Page 2 0f2 rev | Ate a Ko ey|sPPO BY] rev] Date a 0 8yfaPeo ey] a re [RELEASED FOR MASS TASS PROTO » | PURE LRGRTION YO GE WARETANED AS PER GEN RAND] SECTOR CS) RES Saar col as 42S) ie TOT OP GALYNIZNG 616 en fr2024-198 14750-1096 uso | * |e || ololals “pen 2002-2011 £250 GRADE ae ete preranca'mrtt ‘one | cucomeo ev | one | arrnoven ev | onte ® L&T Construction Bue 12.16 =e a LE 22SMWp SOLAR PV POWER PLANT AT VILLAGE UDALHERI Pee ae ome a eo TEHSIL ROORKEE, DIST. HARIDWAR, UTTARAKHAND. T= ee scate [108% |nos/steucturd tencysze | secTion PART No Rev 2 to ee enn, wos ‘ NTS | Bea 2 12250 'SMB_300 EMAPBI & EMAPB1A ° rev | oat D BY| Re NATE a yY|APPD BY al iat oD REVISED. Z lei * | oi revises |"? © | JRELEASED FOR MASS IS. = | Sorter FF | tot. f% = ; »~ er ff 1390. 1330 1330 1330 2 1340 1340 =4 === E: Pony FETS eh | Pa so ‘00 1 i i a 1 SUSE LOCATION TO BE WANETARED AS PER GEN RAW | =e 2S ie Sa eae are for od « [ [es[ [as] 5] ™ | TOT OP GALWAREING 6T00SH pole Pee} e tO} Ole SRE LS ct fee [isis PREPARED BY | DATE ‘crecren ey | one | approve ey | DATE ® L&T Construction ae a = eye Eig SONA ORE PUT AT VRE OER ae pl zee oe ‘TEHSIL ROORKEE, DIST. HARIOWAR, UTTARAKHAND. TS 1. ALL OMONSIONS. ARE MM US SCALE |oesonmnon| Nos/STRUCTURE LENGTH/SIZE ‘SECTION PART No. REV 2 tow ouvert ues vrs [Pe 2 2200 | rswe 450 | emapezaemaraza | 0 oa SESS me] a v0 exper oy rev] one apr er 2 ome Oo | REWSED a RELEASED FOR MASS e joo oof [ve [res | SS] as] BY a [os TT BP GaLWananG GOES 15, PER 16:2529-1985 4 15:4750~1096 cee ete 1 O|o |e IS PER 1S 2062-2011 £250 GRADE™A 2 preranep.sy | oat | cHecxen ey | oate | apmmoven ev | oaTe ® L&T Construction - she ae r TRE ZESiip SOLAR PY POWER PLANT AT VALAGE UOALTER, = is = eas [arte TEHSL ROORKEE, DSL. HAROWAR, UTARAKHAND. aS 1. ALL DMONSONS ARE Wa LO. SCALE. |,tetuthey| Nos/STRUCTURE LENGTH/SIZE | SECTION PART No. Rev 2.708 GALANTE, UOs See fr NTS | POERY 1 4270 sMB_ 300 EMAPBIB BESTE, TASTE rev] one lwo evporo ey] ev] one xo erpero ar] le Bb | REVEED e | ReWse E RELEASED FOR MASS 5 T ~ T x Bis EC EE eae ae sk eat nae Torrance | a Le zat rant z seestean pee ee a [ ds MEW Atal ee ee ee -_ T 1 1 eoTiow Face Barro Face fro of w Toe fies [las] BY | = ToT OF GALVANENG GTO hg pen f2030— toes 15 4750-1090 tecoo | * Lo Te Tel ol ols |e (AS PER 1S:2062-2011 £250 GRADE~A fwoes. £ reranco ev | oxte | ctcoaD ev | oar | arrmoveo ev | ate ® L&T Construction = a wale TICE SOLAR FV POWER PLANT AT VILAGE UOALTER, ec” | asa ers | zzizse| ws | a7s2 a Pai ee a ear a= z Samia an Dede soar [MQ6% Juos/stmucnmd uncrayrsize | secniow PART Ne. Rev 2 oor exvine, os, NTS Sea} 20 4782 IsMc 300 EMASB1 ° POSSE DMRS lal | one ESS [oe expero or] fo] tev] ome FPS oso expirro ov] 2 RELEASED FOR MASS. is| Taal T ep ae ake i Cee Pee ee Top Fuance TOP FLONGE fee of [ve Jus B[as] Sm | m [aro cane EST) fem Is taa-rons tw ea9-196 lela} ole fe ‘at's oes So fa50 Stare PREPARED BY | DATE CHECKED By | DATE | APPROVED BY | DATE. ® L&T Construction ra us rt Sale e [EEG SOR PY POWERPLANT AF VAG OAR, = = ome a at TEHSIL ROORKEE, DIST_HARIDWAR, UTTARAKH) ms = Snider [sae [SP metemoene | acme patie abate nos Fee] 10 4331 "suc 200 EMASB2 ° - MENS ——Tonco exerrv 8 SIS Fev] ONE [oun | nevsen - FESS ono evfarro or] RELEASED FOR MASS ASS dar ‘eo [elma] Bate fem sans 4739-1086 #\/olole|s ‘x5 PER 18:2062-2011 €250 GRADE-A ‘Gare ‘orecne ey | vate | aPrroven sy | DATE © UBT Construction or ; ea laa hrae-Zip SLAC FY FORE FANT AT WAGE TO, ae Les a aeieee ae a “TEHSIL ROORKEE, OIST. HARIDWAR, UTTARAKHAND. Se Palen jpg lh ban scale [Me |os/sTRUCTURE LeNcTH/size | SecTiN PART No. Rev € ed a zie isu 200 EMASES ° rev] ove E IMENSIONS: sv] pal By|apeo By] fr a Linc nfo == Se z ey RELEASED FOR MASS lo} & le | oe <324 +++ 4 : 1 : Bea Rae [s | is p=, Fe say aj eet salcaleasl food n [ve [es| Zp ]as] 2 x | a HOT DP GALVANTZNG G10GSH wool * ele lel ol ole le arene cece ee | Hotes prepared by | oATE ccuecxeo ey | care | approven ay | DATE ® L&T Construction a Eee he E-ESS Sne T AT cm a = pow z 7 TEHSIL ROORKEE, DIST. HARIOWAR, UTTARAKH/ — ee San [RE] nmin iencus)acr | secnon ae = ives = bikes N.T.S | CLEAT 68 140 LESX6SX8- EMACL1 oO DIMENSIONS Se av|appo EY] ale | one a fone erro or lo|8 | [aro newsen 1° 2 [RELEASED FOR MASS. 5 S| z| egy Scent ease a sis oerome, q : a INSERT PLATE ASSY Gases TRS AS, eS a m = a Tas] BF ~ oe [us| [as] Be] = = = Hee uoo| 14 /[$|o|o[ ole | # mma ett Bae ae ane prePaRED BY | DATE cHeoxen er | ATE | APPROVED GY | DATE ® L&T Construction TRE Zip SARE A POWER FONT AY WOLICE TORR oe faa | ors | azzrare | meas | arvas8 Si SC PU FORER PU AT VG i= ae eT soaLe [BS] noe/strucrure encm/size | section PART No Rev soe oomteuas = S urs | RST| a6 ~ 5 EmaiPt ° saad rev] osre_ | SERSONS Teneo axporo a Tew) eae OS: alee a | ONTE, [ow —[ rewse [OND Br pOrO | GD | REVERS nee | RELEASED FOR MASS ig) “ ‘5 20 pee i g vr onus owt Tousen 855 | yo Pot teune how oq | w [res] US [ms] BY me | oe TOT BP GALVAREN TOES Ee as Pen s 2520-Tons a 1 4709-1806 oolklololelol ole la Se Btn Soe son £50 oto rerarey er | ox | croc ey | owe | wenow ov | ove ® L&T Construction ox | wan es aN wus | zr [iE Zep SOUR PY POR PLANT AT WAGE WORT = ic ane ae Tar TEHSIL ROORKEE, DIST. HARIDWAR, UTTARAKHAND. Ta an 11. ALL DMENSIONS ARE IN MA. 0.0.5. SCALE ‘Nos /STRUCTURE| LENGTH /SIZE_ ‘SECTION PART No. REV 2, N.S ae 16 120x298 10MM PLATE EMASTI ° ESaE Sa Ce] one peas [ono more A oe 2 IRELEASED FOR MASSs S| 3 z q | bacod ve fee] Blas] BF | TOT BP CANE TOEHT a spe fg 329-088 14780-1006 wool € | #1S@[ ol ole tw SS Tee Sle Sh Ea ‘Gate [teas prepanen ey | cae | cecxep ey | oe | aPprowp ey | DATE @® LAT Constraction == cian | oe Pineal ae FCE-Tray SOLAR PV POWER PLANT AT VILAGE ALTER = “Te 7 * TEHSL ROORKEE, DIST. HARIDWAR, UTTARAKHAND, rie ost een oe SOAE [iG] Noe/stmucTRLENcTA/“Size | secmiON PART No Rev ners Pune] 8 aoxa-as | 10M PLATE EMAST2 ° a aa =| om anyon ot == apm 7 i a ae 2 a 3) RELEASED FOR MASS 5 E z aaa oe 4 ea 4 6 3 “2 Santhar © igsue AUS ot wg onpae = pate z \pasi= rar oq w [w fos] Qs [as] 2] a [a TT BP GRLWaNaNG BOOST ren seo. oes erste wso/¥[1¢[¢/o/ Ole | LETS et rrerancy x | ove | cecaney | one [wrmow er] one ® LB Construction = = rac eran eS TED SO BY PORE PLANT AT LACE WOR, er - = TEHSI ROORKEE, DIST_HARIDWAR, UTTARAKHAN( ie ae a SCALE [ABS J vos/smucne incrasze | seenow PART Ne nev i Sacocmonm ues —s wrs| Se [e 120x300 | aw PLATE EMASTS 0 SENSORS Terao [aero 8 TSE rev] one no orp rev] one 3 iD | RENE ie | RD 3 RELEASED FOR MASS 5 aa. ee 2 Sarthsh E 2 oss bd 8 = Sls |B [= ToT BF GALAN oe s.r ese 1008 1430-1006 $lelo/ ole ls thee avason 250 aan preraneo ev | ome | ooo ey | oat | wenown ev | oxre © LRT Construction Soaks aie ns Sar [TCE Zip SO PY POWER FANT AT VILAGE UDA = ne a sane = o TEXSIL ROORKEE, DIST. HARIDWAR, UTTARAKHAND. aS mm eee scate [400%] nox/stRucTuRe LeNcTa/size | SECTION PART No. Rev nrs| 2| 8 woaw | 10a PAE EMASTa ° DEST BD | REVS 0 erperro ey] SERS MASS |RELEASED FOR MASS. rev | care [ME Jomo avpro oy PROTO ‘MEW B1—81 ‘SECTLOM AI—Al agqgs Acicased for M \ Swttatle ME. & tssue Authority + \ wn [ie [es [as Bm [ae {pat Lor) uo] * [1] ool ole [aw z ee [Ss PREPARED BY | DATE CHECKED BY | DATE | APPROVED By | DATE & L&T Construction TE TaN SOR PY PORE PORT AY VRE WORT, so [nme] ee [ee | wus [ame Ee ie ee hee re eee Scns ja] os/stucnneliencm/seze | secnoy | PART No ev foee suman wos saicroerae MS heey - = [ ronomsetcucaiomeen | °

Potrebbero piacerti anche