PRESUPUESO - TRAMO I

ALUMNA : GINA MAYTE CONDORI VILLAVICENCIO


CURSO : DISEO MODERNO DE PAVIMENTOS
CARRETERA: CALLEJON DE HUAYALAS - CHACAS SAN LUIS
TRAMO I : CARHUAZ - SHILLA
PARTIDA DESCRIPCIN UND METRADO PRECIO PARCIAL

01. TRABAJOS PRELIMINARES


01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Glb 1.00 1,073,329.96 1,073,329.96
01.02 TOPOGRAFIA Y CONTROL TOPOGRAFICO mes 24.00 34,021.07 816,505.68
01.03 GEOREFERENCIACION pto 14.00 1,023.00 14,322.00
01.04 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL glb 1.00 737,890.09 737,890.09
01.05 CAMPAMENTO DE OBRA glb 1.00 657,898.00 657,898.00
01.06 CARTEL DE OBRA und 2.00 1,749.05 3,498.10
01.07 REUBICACION DE POSTES und 95.00 951.96 90,436.20
02 TRABAJOS PRELIMINARES -
02.01 DESBROCE Y LIMPIEZA ha 49.43 6,866.95 339,433.34
02.02 DEMOLICION Y REMOCION DE ESTRUCTURAS EXISTENTES m3 3,582.17 129.20 462,816.36
02.03 EXCAVACION PARA EXPLANACIONES -
02.03.01 EXCAVACION PARA EXPLANACIONES EN SUELO m3 607,739.00 11.67 7,092,314.13
02.03.02 EXCAVACION PARA EXPLANACIONES EN ROCA SUELTA m3 133,532.00 22.63 3,021,829.16
02.03.03 EXCAVACION PARA EXPLANACIONES EN ROCA FIJA m3 141,185.00 33.95 4,793,230.75
02.04 REMOCION DE DERRUMBES m3 83,600.00 8.74 730,664.00
02.05 PERFILADO Y COMPACTACION EN ZONA DE CORTE m2 209,764.00 2.69 564,265.16
02.06 PERFILADO EN ZONA DE CORTE EN ROCA m2 103,782.00 5.50 570,801.00
02.07 CONFORMACION DE TERRAPLENES m3 29,468.00 15.25 449,387.00
02.08 MATERIAL DE CANTERA PARA RELLENO m3 15,262.00 20.26 309,208.12
02.09 PEDRAPLEN m3 15,684.00 69.55 1,090,822.20
02.10 CONFORMACION DE SUBRASANTE EN SUELOS CON DENSIDADES NO ESPECIFICADAS m3 35,753.00 22.38 800,152.14
02.11 MEJORAMIENTO DE SUBRASANTE CON MATERIAL ADICIONADO m3 15,262.00 19.72 300,966.64
03 SUB BASE Y BASE -
03.01 SUB BASE GRANULAR E=0.15M m3 12,547.00 48.21 604,890.87
03.02 BASE GRANULAR E=0.15M m3 38,245.00 59.02 2,257,219.90
03.03 BASE GRANULAR E=0.20M m3 15,929.00 57.64 918,147.56
03.04 LAVADO DE MATERIAL GRANULAR m3 49,714.00 11.57 575,190.98
03.05 LAVADO DE MATERIAL DE SUB BASE DRENANTE m3 10,757.00 16.89 181,685.73
04 PAVIMENTO ASFALTICO -
04.01 IMPRIMACION ASFALTICA m2 323,672.00 0.75 242,754.00
04.02 CARPETA ASFALTICA EN CALIENTE CON POLIMEROS m3 20,229.00 204.62 4,139,257.98
04.03 CEMENTO ASFALTICO CON POLIMEROS kg 2,771,439.00 2.88 7,981,744.32
04.04 ASFALTO DILUIDO TIPO MC-30 gl 97,101.00 6.57 637,953.57
04.05 FILLER MINERAL (CAL HIDRATADA) kg 1,314,916.00 0.39 512,817.24
04.06 ADITIVO MEJORADOR DE ADHERENCIA kg 15,172.00 16.18 245,482.96
05 PAVIMENTO CONCRETO PORTLAND -
05.01 PAVIMENTO DE CONCRETO HIDRAULICO m2 31,823.00 146.79 4,671,298.17
06 OBRAS DE ARTE Y DRENAJE -
06.01 EXCAVACION PARA ESTRUCTURAS m3 39,165.00 28.69 1,123,643.85
06.02 RELLENO PARA ESTRUCTURAS CON MATERIAL CHANCADO 3/4" m3 13,521.00 73.87 998,796.27
06.03 FILTRO DRENANTE m3 798.05 123.51 98,567.16
06.04 CONCRETO F'C=210 KG/CM2 m3 683.10 407.13 278,110.50
06.05 CONCRETO F'C=175 KG/CM2 + 30% P.M. m3 3,580.44 281.14 1,006,604.90
06.06 CONCRETO F'C=140 KG/CM2 m3 - -
06.07 CONCRETO F'C=140 KG/CM2 + 30% P.G. m3 3,701.95 268.67 994,602.91
06.08 CONCRETO F'C=100 KG/CM2 m3 51.14 314.46 16,081.48
06.09 ENCOFRADO Y DESENCOFRADO m2 19,214.55 68.60 1,318,118.13
06.10 ACERO DE REFUERZO FY=4200 KG/CM2 kg 39,266.88 5.85 229,711.25
06.11 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR D=0.60M m 549.99 326.15 179,379.24
06.12 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR D=0.90M m 655.29 471.41 308,910.26
06.13 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR D=1.20M m 666.63 720.49 480,300.25
06.14 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR D=1.50M m 126.36 1,037.38 131,083.34
06.15 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR D=1.80M m 9.72 1,419.40 13,796.57
06.16 CUNETA TRAPEZOIDAL REVESTIDA m 48,210.00 78.07 3,763,754.70
06.17 CUNETA RECTANGULAR URBANA m 2,440.00 737.05 1,798,402.00
06.18 ZANJA DE CORONACION REVESTIDA m 3,430.00 50.06 171,705.80
06.19 BORDILLO m 44.00 154.58 6,801.52
06.20 LIMPIEZ DE ALCANTARILLAS m3 54.00 49.00 2,646.00
06.21 LIMPIEZA DE CURSOS DE AGUA m3 654.70 6.19 4,052.59
06.22 DEFENSAS RIVEREAS m3 3,312.60 110.67 366,605.44
06.23 GEOTEXTIL NO TEJIDO CLASE 2 m2 266.00 3.27 869.82

Pgina 1 de 3
PRESUPUESO - TRAMO I
ALUMNA : GINA MAYTE CONDORI VILLAVICENCIO
CURSO : DISEO MODERNO DE PAVIMENTOS
CARRETERA: CALLEJON DE HUAYALAS - CHACAS SAN LUIS
TRAMO I : CARHUAZ - SHILLA
PARTIDA DESCRIPCIN UND METRADO PRECIO PARCIAL

06.24 ELEMENTO DE MURO DE TIERRA ARMADA m3 122.00 291.77 35,595.94


06.25 PIEDRA ACOMODADA m3 46.20 112.08 5,178.10
06.26 GEOCOMPUESTO DRENANTE m2 167.74 29.20 4,898.01
06.27 MICROPILOTE EXCAVADO und 54.00 1,247.38 67,358.52
06.28 PERNO ANCLAJE und 54.00 1,156.22 62,435.88
06.29 TUBO DE PVC D=2" m 24.00 6.64 159.36
06.30 TUBO DE PVC D=3" m 560.75 9.00 5,046.75
06.31 TUBO DE PVC D=4" m 500.00 29.79 14,895.00
06.32 JUNTA DE MUROS m2 703.17 13.16 9,253.72
06.33 EMBOQUILLADO DE PIEDRA E=0.15M m2 15,124.29 83.91 1,269,079.17
06.34 NIVELACION DE BUZON DESAGUE und 5.00 449.58 2,247.90
07 TRANSPORTE -
07.01 TRANSPORTE DE MATERIAL GRANULAR D<=1KM m3-km 81,619.68 6.56 535,425.10
07.02 TRANSPORTE DE MATERIAL GRANULAR D>=1KM m3-km 980,103.24 2.96 2,901,105.59
07.03 TRANSPORPTE DE MATERIAL PARA PAVIMENTOS D<=1KM m3-km 74,359.00 5.19 385,923.21
07.04 TRANSPORPTE DE MATERIAL PARA PAVIMENTOS D>=1KM m3-km 1,276,388.00 1.60 2,042,220.80
07.05 TRANSPORTE DE MATERIAL EXCEDENTE D<=1KM m3-km 1,018,366.84 7.25 7,383,159.59
07.06 TRANSPORTE DE MATERIAL EXCEDENTE D>=1KM m3-km 5,203,714.04 3.02 15,715,216.40
07.07 TRANSPORTE DE MEZCLA ASFALTICA D<=1KM m3-km 23,264.00 8.01 186,344.64
07.08 TRANSPORTE DE MEZCLA ASFALTICA D>=1KM m3-km 761,927.00 2.08 1,584,808.16
07.09 TRANSPORTE DE ROCA D<=1KM m3-km 18,996.60 7.50 142,474.50
07.10 TRANSPORTE DE ROCA D>=1KM m3-km 268,567.17 3.56 956,099.13
08 SEALIZACION Y SEGURIDAD VIAL -
08.01 SEALES PREVENTIVAS und 241.00 606.38 146,137.58
08.02 SEALES REGLAMENTARIAS und 135.00 740.11 99,914.85
08.03 SEAL INFORMATIVA m2 24.32 506.39 12,315.40
08.04 TUBO DE SOPORTE DE SEAL INFORMATIVA m 187.40 127.00 23,799.80
08.05 CIMENTACION DE SEAL INFORMATIVA und 42.00 1,005.60 42,235.20
08.06 TACHAS DELINEADORAS und 32,184.00 16.30 524,599.20
08.07 MARCAS EN EL PAVIMENTO m2 15,000.00 8.67 130,050.00
08.08 GUARDAVIAS METALICAS m 910.00 443.65 403,721.50
08.09 POSTE KILOMETRAJE und 50.00 218.74 10,937.00
09 PROTECCION AMBIENTAL -
09.01 PLAN DE ACCION PREVENTIVO, CORRECTIVO Y/O MITIGACION -
09.01.01 PROGRAMA PARA LA REHABILITACION / MEJORAMIENTO VIAL -
09.01.01.01 RIEGO DE SUPERFICIE CON CISTERNA mes 18.00 9,228.80 166,118.40
09.01.02 PROGRAMA PARA LAS AREAS AUXILIARES DE APOYO TEMPORAL -
09.01.02.01 RESTAURACION DE AREAS AFECTADA POR CAMPAMENTO Y PATIO DE MAQUINAS m2 5,000.00 4.45 22,250.00
09.01.02.02 REHABILITACION DE AREAS OCUPADAS POR PLANTAS INDUSTRIALES m2 7,000.00 4.45 31,150.00
09.01.02.03 REHABILITACION DE CANTERAS DE LECHO DE RIO ha 23.18 3,241.87 75,146.55
09.01.02.04 REHABILITACION DE CANTERA DE TIERRA ha 3.91 21,041.87 82,273.71
09.01.02.05 CONSTRUCCION DE DEPOSITOS DE MATERIAL EXCEDENTE (TRAMO I) glb 1.00 344,342.66 344,342.66
09.01.02.06 ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE m3 2,037,990.70 4.63 9,435,896.94
09.01.03 PROGRAMA DE MANEJO DE RESIDUOS -
09.01.03.01 MANEJO DE RESIDUOS SOLIDOS glb 1.00 19,331.16 19,331.16
09.01.03.02 DISPOSICION FINALD RESIDUOS PELIGROSOS viaje 5.00 18,000.00 90,000.00
09.01.03.03 TRATAMIENTO DE AGUAS RESIDUALES glb 1.00 52,429.50 52,429.50
09.01.04 PROGRAMA DE SEALIZACION AMBIENTAL -
09.01.04.01 SEALIZACION AMBIENTAL und 93.00 457.40 42,538.20
09.01.05 PROGRAMA DE MONITOREO Y SEGUIMIENTO AMBIENTAL -
09.01.05.01 MONITOREO Y SEGUIMIENTO AMBIENTAL glb 1.00 14,088.00 14,088.00
09.01.06 PLAN DE PREVENCION DE RIESGOS -
09.01.06.01 IMPLEMENTACION DEL PLAN DE PREVENCION DE RIESGOS glb 1.00 247,704.60 247,704.60
09.01.07 PLAN DE CONTINGENCIAS -
09.01.07.01 IMPLEMENTACION DEL PROGRAMA DE CONTINGENCIAS glb 1.00 19,734.20 19,734.20
09.01.08 PLAN DE MANEJO DE ASUNTOS SOCIALES -
09.01.08.01 CAPACITACION Y EDUCACION AM BIENTAL mes 24.00 3,066.00 73,584.00
09.01.08.02 PROGRAMA DE RELACIONES COMUNITARIAS mes 24.00 1,000.00 24,000.00
10 PONTONES -
10.01 OBRAS PRELIMINARES -
10.01.01 DEMOLICIONES Y REMOCION DE ESTRUCTURAS EXISTENTES m3 1,534.40 129.20 198,244.48
10.01.01 OBRAS DE DESVIO und 15.00 77,287.65 1,159,314.75

Pgina 2 de 3
PRESUPUESO - TRAMO I
ALUMNA : GINA MAYTE CONDORI VILLAVICENCIO
CURSO : DISEO MODERNO DE PAVIMENTOS
CARRETERA: CALLEJON DE HUAYALAS - CHACAS SAN LUIS
TRAMO I : CARHUAZ - SHILLA
PARTIDA DESCRIPCIN UND METRADO PRECIO PARCIAL

10.02 MOVIMIENTO DE TIERRAS -


10.02.01 EXCAVACION PARA ESTRUCTURAS m3 18,941.62 28.69 543,435.08
10.02.02 EXCAVACION PARA ESTRUCTURAS BAJO AGUA m3 2,707.56 29.13 78,871.22
10.02.03 RELLENO PARA ESTRUCTURAS m3 14,414.64 73.87 1,064,809.46
10.03 OBRAS DE CONCRETO -
10.03.01 CONCRETO F'C=280 KG/CM2 m3 619.10 448.98 277,963.52
10.03.02 CONCRETO F'C=210 KG/CM2 m3 985.58 407.13 401,259.19
10.03.03 CONCRETO F'C=175 KG/CM2 + 30% P.G. m3 6,994.91 282.86 1,978,580.24
10.03.04 CONCRETO F'C=100 KG/CM2 m3 66.27 314.48 20,840.59
10.03.05 ENCOFRADO Y DESENCOFRADO m2 12,436.70 58.60 728,790.62
10.03.06 ACERO DE REFUERZO FY=4200 KG/CM2 kg 127,243.80 5.85 744,376.23
10.04 VARIOS -
10.04.01 FALSO PUENTE PARA PONTONES m 116.50 3,143.90 366,264.35
10.04.02 JUNTA DE DILATACION METALICA m 270.00 1,340.35 361,894.50
10.04.03 DISPOSITIVO DE APOYO und 30.00 3,010.67 90,320.10
10.04.04 TUBO DE DRENAJE DE PVC D=3" m 38.50 9.00 346.50
10.04.05 ACABADO DE VEREDAS m2 185.60 14.74 2,735.74
10.04.06 BARANDAS METALICAS m 246.00 806.73 198,455.58
10.05 TRANSPORTE -
10.05.01 TRANSPORTE DE MATERIAL GRANULAR D<=1KM m3-km 23,102.59 6.56 151,552.99
10.05.02 TRANSPORTE DE MATERIAL GRANULAR D>=1KM m3-km 485,769.64 2.96 1,437,878.13
10.05.03 TRANSPORTE DE MATERIAL EXCEDENTE D<=1KM m3-km 23,183.58 7.25 168,080.96
10.05.04 TRANSPORTE DE MATERIAL EXCEDENTE D>=1KM m3-km 41,123.37 3.02 124,192.58
11 MURO ANCLADO -
11.01 OBRAS DE ARTE Y DRENAJE -
11.01.01 EXCAVACION PARA ESTRUCTURAS m3 867.47 28.69 24,887.71
11.01.02 RELLENO PARA ESTRUCTURAS m3 29.72 73.87 2,195.42
11.01.03 MURO ANCLADO m2 318.78 10,927.41 3,483,439.76
11.01.04 TRANSPORTE DE MATERIAL GRANULAR D<=1KM m3-km 227.50 6.56 1,492.40
11.01.05 TRANSPORTE DE MATERIAL GRANULAR D>=1KM m3-km 7,488.05 2.96 22,164.63
11.01.06 TRANSPORTE DE MATERIAL EXCEDENTE D<=1KM m3-km 867.47 7.25 6,289.16
11.01.07 ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE m3 867.47 4.63 4,016.39
COSTO DIRECTO 119,266,673.47
GASTOS GENERALES 5% 5,963,333.67
UTILIDAD 10% 11,926,667.35
SUBTOTAL 137,156,674.49
IMPUESTO IGV 18% 24,688,201.41
PRESUPUESTO TOTAL 161,844,875.90

Pgina 3 de 3