CALM BUOY AND

FPSO/FSO OFFTAKE
HAWSER ASSEMBLIES

www.survitecgroup.com
Calm Buoy and FPSO/FSO Offtake Hawser Assemblies 03

Only the highest quality


materials are used to OCIMF
standards A BESPOKE Research and
PACKAGE development
Unparalleled product Survitec Group can provide a comprehensive range of As a leading supplier to the offshore industry, the
development, technical support equipment for Offshore Mooring Systems designed to Survitec Group team work at the cutting edge of
and distribution suit the specific requirements of different locations and mooring technology. We use the latest computer
water temperatures. The focus is always on operational aided design software (AutoCad) to design and
Full range of Marine Hose performance, reliability, safety and on time delivery. manufacture systems that are safe yet highly cost
Ancillary equipment available to effective.
Our bespoke packages cover everything from:
OCIMF standards
Mooring hawsers Our approach is always underpinned by practical
experience in the field. We custom design Single
Global distribution network High quality Pick-up and Messenger ropes
Point and Tandem mooring systems to suit the
Chafe chains individual project requirement. Work is carried out
Support buoys under stringent quality assurance conditions which
Shackles conform to appropriate classification requirements
and/or the latest OCIMF Guidelines.
Associated fittings
Load monitoring equipment The Survitec Group rope sales and engineering
Marine hose ancillary equipment to team has many years experience in the industry
OCIMF standard. with particular expertise in design, development and
product engineering. We have the resources to carry
out a full range of forensic analysis tests as well as
the in-house capability to evaluate reverse bend,
HIGH QUALITY elongation, abrasion and tensile loading of yarn and

MATERIALS fibre rope.

(OCIMF 2000)
We only use the best quality yarns of multifilament nylon, Worldwide
HT polyester and blended fibres to manufacture our
mooring hawsers. These hawsers can be supplied with
support
an inherent buoyancy flotation system and/or total PU Survitec Group continues to develop a global site/
encapsulation for increased durability and operational office network worldwide in addition to a dedicated
cost savings. global network of agents/representatives.

Our Circular Braid and Double Braid mooring hawsers


are manufactured and supplied in strict accordance with Customer care
the OCIMF 2000 Guidelines for the Purchasing & Testing and technical support
of SPM Hawsers, following an exhaustive documented
prototype testing fully witnessed and certified by Class. Our rope sales and engineering team is always on
hand to provide a comprehensive customer care
and technical support service. This may involve
offering advice over the telephone, by fax or email.
Work in Alternatively we may visit a customers operation

partnership and discuss their individual needs on site. Whatever


the application requirement, we are committed to
In addition to working very closely with customers, providing a fast and efficient solution. All our systems
Survitec Group has established exclusive partnerships can be supplied with high quality drawings and fully
with major manufacturers. Survitec Group is responsible documented manuals to accompany the QA and/or
for marketing and supplying these high quality products independent inspection authority certification.
to the offshore market. Together, we provide unparalleled
product development, technical support and distribution
for offshore mooring systems worldwide.
04 Calm Buoy and FPSO/FSO Offtake Hawser Assemblies Calm Buoy and FPSO/FSO Offtake Hawser Assemblies 05

MOORING HAWSER
Superline Circular Braid Viking Double Braid Nuflex Offshore 8
Nylon SPM Nylon SPM Strand SPM

Made from polyamide (nylon) Made from polyamide (nylon) Made from composite fibre
Construction of load-bearing cores with Double braided construction Construction 8-strand plaited
a protective polyamide cover Treated with marine finish White in colour with tri-colour marker
Good abrasion resistance White in colour with a green marker Specific Gravity 1.14
White in colour with a green marker Specific Gravity 1.14 Melting point of 1650C/2600C
Excellent UV resistance Melting point 215 C 0
Excellent abrasion resistance
Specific Gravity of 1.14 Excellent UV resistance Excellent UV resistance
Workable in sub-zero temperature Can be stowed wet Wet strength equals dry strength
Melting point of 2150C
Can be stowed wet

For Single Point Mooring systems nylon is a well Ropes with a double-braid design were traditionally the Nuflex Offshore 8 Strand SPM is a composite fibre
established material because of its excellent stretch preferred construction for Single Point Mooring hawsers. with polyester as the strength member, with excellent
characteristics. The behaviour of nylon is influenced Polyamide (nylon) was the first suitable synthetic fibre fatigue characteristics and abrasion resistance.
by water, which can be seen when dry and wet discovered with the best elongation properties so is now The fatigue life is comparable to pure polyester, but
breaking strengths are compared. Typically for nylon better established than polyester alternatives. The double the weight for a given strength is comparable to that
ropes this reduction in strength can be as much as braiding provides an outer jacket which helps prevent of nylon. The behaviour of the rope is not influenced
10%, but in the Superline Circular Braid Nylon SPM UV degradation as with circular braid construction and by water, thus wet and dry strength are identical.
utilising a special marine finish on the yarns, the wet improves life expectancy of the rope. Because of material and its life cycle under use,
strength is only 5% lower than the dry strength. 8 Strand is a cost-effective solution for SPM hawsers.
The rope is a circular braid design developed to give
a rope extra protection against wear and tear without The initial elongation is lower than that of nylon
significantly changing the primary characteristics. alternatives, however it does not change significantly
It is a logical development from the double-braid, in use, while nylon rapidly stiffens. As a result average
where the outer braid protects the inner braid and mooring forces will be comparable. The fatigue life
contributes to the strength. In the circular braided of the hawser is influenced by both the fibre and the
design this duality has been abandoned. rope design. Nuflex Offshore 8 Strand SPM ropes
have a plaited construction. This design is well
The cover is optimised for wear and abrasion established because of its ease of handling and
resistance and the core optimised for strength. non-rotating behaviour.
This results in both a higher strength and a better
life for this rope design. The core is manufactured

e:e:
Superline Circular Braid Nylon SPM Viking Double Braid Nylon SPM Nuflex Offshore 8 Strand SPM
from a number of sub-ropes laid parallel to each
Break Load Break Load Break Load Break Load Break Load Break Load
other. Produced in both right-hand and left-hand lay Dia Size Weight New Dry New Wet Weight New Dry New Wet Weight New Dry New Wet
ensures that the finished rope has a torque balanced mm inch kg/100m tf kN tf kN kg/100m tf kN tf kN kg/100m tf kN tf kN
construction. The circular braided cover protects the 96 12 610 214.98 2109 197.96 1942 570 207.95 2040 197.76 1940 569 198 1945 198 1945
e:e:

cores against wear. Only after the cover has been 104 13 700 253.01 2482 232.01 2276 670 248.73 2440 235.47 2310 692 239 2347 239 2347
worn through and the cores damaged will strength 112 14 830 293.99 2884 270.03 2649 780 287.46 2820 273.19 2680 800 275 2699 275 2699
be affected. 120 15 950 338.2 3316 309.99 3041 890 327.22 3210 310.91 3050 915 313 3072 313 3072
128 16 1040 385.02 3777 353.01 3463 1020 367.99 3610 348.62 3420 1037 353 3461 353 3461
136 17 1170 434.96 4267 398.98 3914 1140 418.96 4110 397.55 3900 1190 402 3947 402 3947
144 18 1320 487.97 4787 448.01 4395 1280 469.93 4610 445.46 4370 1336 449 4409 449 4409
152 19 1460 544.04 5337 500.00 4905 1430 520.90 5110 494.39 4850 1496 500 4908 500 4908
160 20 1620 603.98 5925 554.03 5435 1580 576.96 5660 547.40 5370 1649 549 5382 549 5382
168 21 1780 665.95 6533 611.01 5994 1740 635.07 6230 602.45 5910 - - - - -
06 Calm Buoy and FPSO/FSO Offtake Hawser Assemblies Calm Buoy and FPSO/FSO Offtake Hawser Assemblies 07

Mooring Flotation
Survitec Group supply a number Inherent Buoyancy Flotation System SSD Nutech
of hawser flotation methods: A common issue in offshore mooring applications made from high tenacity co-polymer yarns, available
utilising hawsers with conventional lace-on floats, is that
Lace-on Float in 3, 4, 8, 12 and 24 strand. a competitive alternative
during the lifetime of the hawser the floats tend to suffer to nylon and Staple Polypropylene.
Survitec Group lace-on floats are manufactured damage and can be ripped away from the rope. This
from a heavy duty polyamide fabric with expanded means operators having to secure replacement floats
polyethylene closed cell foam strips. Floats are and organise a maintenance crew to replace damaged SSD Nutech Plus
workable between temperatures -30C and +65C or missing floats. Our Inherent Buoyancy Flotation
Constructed principally from high tenacity
and offer good resistance against oil and chemicals. System overcomes these issues, and in addition offers
Polypropylene with outer yarns alternating with
Each float has brass eyelets and available in either many other operational benefits.
Polyester for increased abrasion resistance.
1.06mtrs or 2.06mtrs lengths. The width will depend
Hawsers that incorporate our Integral Floatation Systems
upon the rope size. The float is orange colour on the
outside, and white colour on the inside.
are supplied with an additional layer of closed cell SSD Nuflex/Megaflex
buoyancy foam ensuring that sufficient buoyancy is
calculated to support the hawser in seawater. This is made from High tenacity Polypropylene & Polyester
Floating Pick-up/Messenger Rope secured using an additional outer protective layer which composite fibres, offering exceptional abrasion and
can also be covered in a tough resilient polyurethane frictional heat damage resistance with an enhanced
Made from high tenacity co-polymer yarns and fatigue life.
elastomer coating.
available in 3, 4 or 8 strand
Flexible & easy to handle The Inherent Buoyancy Flotation System DOES
NOT need to be replaced during the hawser lifetime,
SSD Winchtech
Specific gravity 0.91
cutting down the need for spare floats and expensive a 100% high tenacity, low elongation nylon
Fully UV stabilised maintenance crews (mono and multifilament) 6 strand cross laid rope.
Hi-vis yellow colour The make up of the Inherent Buoyancy Flotation
Excellent abrasion resistance and strength System enhances the mooring hawsers abrasion
resistance to external items in the field, ie. Floating
SSD Nuflex Winchfloat
Wet strength equal to dry strength
Permanent flotation in water hose flanges. The polyurethane elastomer outer skin a floating winch line with a 12 strand core made from
is tough and very hardwearing co-polymer fibre, overbraided with Survitec nuflex
Also available in SPUNSTAPLE Polypropylene.
Especially in CALM buoy systems where hawsers yarns lending itself to mooring line applications.
may be left floating in the water between offtakes,
Chafe Chains the Inherent Buoyancy Flotation System has the
SSD High Performance Ropes
added benefit of reducing the amount the rope will
(Please note: Chafe chains can be supplied flex with the wave action. This in turn reduces internal Constructed from ultra High modulus Polyethylene
configured to a customers own specification) yarn-on-yarn abrasion damage, and helps to extend (uHmPe) fibre and available in 8/12 strand or
retirement times overbraided constructions.
C
 hafe Chain A OCIMF 1993 - for use with full
range of ship sizes Where ropes are left floating in the water between
offtakes, the Inherent Buoyancy Flotation System
C
 hafe Chain B OCIMF 1993 - for use with ships
prevents water wash through the rope which on
of 350,000 tonnes or less deadweight
conventional ropes can over time remove the unique
C
 hafe Chain C OCIMF 1993 - for use only in marine finishes applied to reduce internal abrasion/
combination with chafe chain A or B at terminals fatigue damage.
accepting ships fitted with 54mm chain stoppers
C
 hafe Chains as per OCIMF 2007, 4th Edition
Tubular Rope Float
Recommendations for Equipment Employed
in the Bow Mooring of Conventional Tankers at Survitec Group tubular rope floats are manufactured
Single Point Moorings. from closed cell polyethylene foam, encapsulated
within a tough polyurethane elastomer skin. This
high performance outer skin is resistant to ultraviolet
degradation and provides protection from abrasion.
Tubular rope floats can be supplied factory fitted,
or split for retro-fitting to existing hawser operations
by banding or strapping.
08 Calm Buoy and FPSO/FSO Offtake Hawser Assemblies Calm Buoy and FPSO/FSO Offtake Hawser Assemblies 09

CHAIN SUPPORT BUOY


Swivel End Type Buoy Chain Through Type Buoy
Nett Weight A B C Tube Nett Weight A B C Tube
Buoyancy Body Length O/A Length Body Dia. Size Buoyancy Body Length O/A Body Dia. Size
lb kg m m m mm lb kg m m m mm
2000 569 1.68 2.13 1.14 330 2000 569 1.68 2.13 1.14 330
3000 612 1.68 2.13 1.30 330 3000 612 1.68 2.13 1.30 330
4000 675 1.90 2.36 1.37 330 4000 675 1.90 2.36 1.37 330
5000 780 1.98 2.44 1.49 381 5000 780 1.98 2.44 1.49 381
6000 858 2.13 2.59 1.55 381 6000 858 2.13 2.59 1.55 381
8000 1165 2.91 3.35 1.56 432 8000 1165 2.91 3.35 1.56 432
9000 1163 2.61 3.05 1.70 432 9000 1163 2.61 3.05 1.70 432
10000 1397 2.61 3.05 1.82 483 10000 1397 2.61 3.05 1.82 483
12000 1564 3.22 3.66 1.78 483 12000 1564 3.22 3.66 1.78 483

Survitec Group standard range of chain support buoys have a The buoys can be supplied configured with swivel eyes
typical reserve buoyancy of 2000 lb up to 12000 lb - but our top and bottom, or with a chain through/locking plate
flexible production process allows us to manufacture products arrangement. We also supply pick-up buoys with a reserve
to suit our customers exact buoyancy requirements. buoyancy of up to 500kg.

CAST SPM HAWSER THIMBLE


Material: cast steel/stainless steel
Finish: galvanised or plastic coated on request

Rope Size S A B C D F K W X Y Weight


mm mm mm mm mm mm mm mm mm mm kg
11"-13" 120 170 330 540 330 476 175 160 89 85 40
14"-15" 150 252 367 655 480 607 200 183 100 124 78
16"-18" 187 280 420 795 551 724 254 212 128 128 115
19"-21" 215 335 497 940 665 875 309 267 150 180 296
22"-24" 250 420 650 1052 715 895 362 300 180 200 385

TUBULAR HAWSER THIMBLE


Material: mild steel
Finish: galvanised or plastic coated on request

Rope Size A B C D E F G H H1 H2 Weight


mm mm mm mm mm mm mm mm mm mm kg
12" 521 420 260 194 144 130 20 10 130 140 50
15" 625 510 312 194 144 150 25 40 158 168 80
18" 727 610 368 219 169 175 30 40 183 194 140
21" 829 740 415 219 169 200 30 40 206 219 180
24" 930 880 465 273 201 225 40 40 229 245 260

BELLMOUTH HAWSER THIMBLE


Material: carbon steel/stainless steel
Finish: galvanised

Rope Size A B C D E F G H Weight


mm mm mm mm mm mm mm mm kg
10"-12" 366 606 480 195 166 147 146 86 80
15"-16" 440 746 608 248 191 172 186 105 125
18"-21" 454 844 660 300 226 207 210 118 -
10 Calm Buoy and FPSO/FSO Offtake Hawser Assemblies Calm Buoy and FPSO/FSO Offtake Hawser Assemblies 11

CHAIN SUPPORT BUOY


Survitec Group can offer load monitoring system Over the years we have built up a vast wealth of
packages for SPM and Tandem mooring operations. knowledge in manufacturing and supply, gaining us
We have the flexibility to simply measure hawser a wide-ranging customer base for our products.
loading, through to a fully integrated system offering Our focus is always on the continued development
load monitoring and recording with radio data transfer and improvement of our products to service the
from the SPM to ship, shore or platform. changing requirements of our customers.

All equipment is designed for use in an offshore In the past few years we have developed a new
environment and to withstand the harshest conditions. generation of high performance synthetic fibre
ropes that are superior to steel wire. The ropes are
Monitoring systems provide vital information on the manufactured from Ultra High Modulus Polyethylene
safety of the mooring system. Monitoring enables (UHMPE) material and used in applications such as:
loading to continue in marginal weather conditions
in the knowledge that design limits are not being Deepwater installation and lifting lines
exceeded. This can permit more cost effective use of Submerged turret buoy pull in lines
both SPM and tankers. Load monitoring reduces the Retrieval lines
risk of break-out with consequent savings in hawser Heavy lift slings
and hose replacement costs. Towing lines
Work wires. Making preparations for a residual break test in the Survitec Group, Lowestoft facilities.

Operating within known safety margins improves


safety for operational personnel. It may be possible
to develop operational practices at the terminals
which reduce both peak and average loads. This will
assist in extending hawser life and reducing wear on HAWSER SHACKLE
the buoy itself.
Material: forged high alloy steel
Monitoring can provide: Finish: galvanised or painted
Accurate indication of mooring loads Minimum break load 5 x SWL
Audible and visual alarms
A B C D E Weight SWL
Historic information of the hawser loads for analysis Size mm mm mm mm mm kg Tonnes

Optional data on hawser service history for 11/13 65 76 175 350 165 65 60

fatigue life assessment 14/15 80 90 220 390 178 87 85


16/18 90 102 254 430 210 146 110
A safer mooring operation. 19/21 100 114 280 480 235 194 130
22/23 125 133 300 600 265 354 175
Features of our load monitoring solutions:
24+ 130 146 333 720 305 410 225
Load monitoring on the buoy is suitable for
hazardous locations
Systems can include handheld monitors
Optional estimation of hawser residual life
based on the OCIMF Guidelines

RESIDUAL HAWSER
Integrated GPS available to monitor buoy STRENGTH TESTING
position and relative speed with shuttle tanker.
Survitec Group can help operators to understand the
Survitecs International Rope Sales team offer a hawser behaviour and performance in specific field
diverse range of proven high performance synthetic operations by residual strength testing of used/retired
fibre ropes for commercial shipping, harbour and mooring hawsers.
escort towage, naval and the offshore exploration and
Our high tech laboratory has the capability to analyse
production industries. Products are manufactured
mooring hawsers for condition, signs of internal abrasion
to ISO standards and conform to International
damage or ingress of foreign particles, and perform
Classification regulations.
a residual break test. All this information will help
operators understand the hawsers in use at their terminal
better and make informed judgements on current and
future retirement programmes. Survitec Group engineers
are able to offer advice and guidance on this.
12 Calm Buoy and FPSO/FSO Offtake Hawser Assemblies Calm Buoy and FPSO/FSO Offtake Hawser Assemblies 13

EQUIPMENT
SELECTION
Calm Buoy/FPSO Side
1 2 3 2
Mooring Hawsers
When selecting hawsers, terminal operators should
take into account not only strength but also energy
absorption and fatigue performance (OCIMF
Thousand Cycle Load Level). Detailed information
can be found in the OCIMF 2000 Guidelines for the
Purchasing and Testing of SPM Hawsers.
4 6 7
The NWBS (New Wet Break Strength), energy
absorption and fatigue performance of hawsers will
deteriorate during service under the influence of
factors such as service life, cyclic load history, hawser 1. Calm/FPSO Chain Chafe
type, construction, environmental conditions, damage
2. Hawser Shackle
and stowage arrangements between use. 5
Terminal operators should take these factors into 3. Mooring Hawser
account when determining the appropriate hawser 4. Shuttle Tanker Chafe Chain
for the mooring system and hawser retirement criteria. 5. Chain Support Buoy Arrangement
Survitec Group can help operators with hawser
6. Pick-Up Buoy Rope
retirement criteria. It is recommended that terminal
operators develop hawser retirement procedures 7. Pick-Up Buoy Arrangement
based on a combination of manufacturers
recommendations, their own experience at the
location and the results of hawser testing. Service
data gained using hawser load monitoring equipment
can be valuable in this respect. Weak Links Pick-up/Messenger Rope
Weak links, if fitted, should be selected such that the The pick-up rope is connected to the ship end of the
Chafe Chains
recommended bow chain stopper, chafe chain, hawser chafe chain and typically consists of 150 metres of
Each mooring hawser should terminate at its or connection to the SPM do not constitute the weakest floating rope (generally polypropylene based) complete
shipboard end with a chafe chain. The standard yield strength of MBL component of the entire system. with an eye at each end. The rope can vary in length
recommended size of the chafe chain has been Weak links, if fitted, should be designed, manufactured from 120-180 metres, and in diameter from 64-80mm.
established at 76mm base on the diameter of the and tested under a certification scheme. Survitec Group At some terminals where the pick-up rope is not
material forming the common stud links. can provide guidance on inspection criteria. kept connected to the chafe chain when the berth is
Terminal operators should select the appropriate unoccupied, differing arrangements may be employed to
facilitate connection/disconnection of the pick-up rope.
chain by taking into account the designed SPM Support Buoys
mooring arrangement, SWL required and the
properties of the chain grade selected. Typically chafe When the berth is unoccupied, each chafe chain may
chains form a single chain of approximately 8 metres be supported by flotation devices. One method is to use
or more in length, composed of 76mm stud link a swivel-ended type support buoy that is connected by
chain. If through-type chain support buoys are utilised a short length of chain to the end link of the chafe chain,
the length of the chain may have to be increased. adjacent to the hawser. Another method is to use a
Each chain should terminate at the shipboard end through-type chain support buoy. Support buoys should
with an oblong plate for connecting the chain to the have reserve buoyancy equivalent to at least 20% of the
pick-up rope bow shackle. weight in air of the material to be supported.
14 Calm Buoy and FPSo/FSo oFFtake HawSer aSSemBlieS Calm Buoy and FPSo/FSo oFFtake HawSer aSSemBlieS 15

MARINE HOSE ANCILLARY UK SITES & CONTINENTAL SITES


EQUIPMENT TO OCIMF STANDARDS
Survitec Group are able to source and supply marine Pick-up & Snubbing Chains, marker Buoys 1 ABERDEEN 8 PLYMOUTH 13 ROTTERDAM
hose ancillary equipment meeting oCimF standards. Studbolts, nuts & Gaskets Survitec House, Kirkton Drive, Dyce, Unit 9a, Meadow Close, Langage Industrial Estate, Sheffieldstraat 89, 3047 AN,
Products include: Aberdeen AB21 0BG United Kingdom. Plympton, Plymouth, Devon PL7 5EX United Kingdom. Rotterdam The Netherlands.
Hinged Hose Floats for Submarine T: +44 (0) 1224 214 444 F: +44 (0) 1221 214 446 Marine T: +31 (0) 10 2 380 380 F: +31 (0) 10 4 293 95
Butterfly Valves, Camlock Couplings, Hoseline Systems
E: aberdeen@survitecgroup.com T: +44 (0) 1752 331 442 F: +44 (0) 1752 331 466 E: rotterdam@survitecgroup.com

Blind Flanges 2 BIRKENHEAD E: plymouth@survitecgroup.com 14 HAMBURG


Spool Pieces, reducers, y-Pieces. Marine Lifting Winsbergring 8, D-22525 Hamburg Germany.
Unit 5, Valiant Way, Lairdside Technology Park, T: +44 (0) 1752 231 700 F: +44 (0) 1752 335 475 T: +49 (0) 40 67 50 96-0 F: +49 (0) 40 67 50 96-11
Off New Chester Road, Birkenhead, Merseyside E: plymouth@survitecgroup.com E: hamburg@survitecgroup.com
CH41 9HS United Kingdom. 15 KIEL
T: +44 (0) 151 650 5600 F: +44 (0) 151 650 5619 9 SOUTHAMPTON
Unit 5, West Quay Industrial Estate, West Quay Road, Eckernfrder Strae 163, D-24116 Kiel Germany.
E: birkenheadservice@survitecgroup.com T: +49 (0) 431 543 73 F: +49 (0) 431 54 89 21
Southampton, SO15 1GZ United Kingdom.
Lifting T: +44 (0) 2380 337 666 F: +44 (0) 2380 829 512 E: kiel@survitecgroup.com
1 5 Beaufort Road, Birkenhead, E: southampton@survitecgroup.com 16 ROSTOCK
Merseyside CH41 1HQ United Kingdom. Alter Hafen Nord 325, D-18069 Rostock Germany.
T: +44 (0) 151 670 5424 F: +44 (0) 151 670 5439 10 ANTWERP
Vitshoekstraat 4, Haven 1033, T: +49 (0) 381 811 27 80 F: +49 (0) 381 811 26 04
E: birkenheadlifting@survitecgroup.com E: rostock@survitecgroup.com
2070 Zwijndrecht Belgium.
3 DARTFORD T: +32 3 210 95 95 F: +32 3 210 95 90 17 CALAIS
Marine | Aviation E: antwerp@survitecgroup.com 214 Rue de Bruxelles. Z.I.
625-649 Princes Road, Dartford, Les Estaches 62730 Les Attaques France
Kent DA2 6EF United Kingdom. 11 BARCELONA
Av. Juan Carlos I, N 40, T: +33 321 000 810 F: +33 321 000 811
T: +44 (0) 1322 275 513 F: +44 (0) 1322 292 639 E: RFD.france@survitecgroup.com
OCIMF - Special valves 1 OCIMF - Special valves 2 OCIMF - Submarine Hose OCIMF - Winker Lights E: dartford@survitecgroup.com 08908 Hospitalet de Llobregat, Barcelona Spain.
and Flotation Aids 1 T: +34 902 488 388 F: +34 932 895 366
4 EDINBURGH E: barcelona@survitecgroup.com
4 Albert Road, Leith, Edinburgh,
EH6 7DP United Kingdom. 12 GROU
T: +44 (0) 131 554 8531 F: +44 (0) 131 554 8061 De Muldijk 7, Grou, 9001XV
E: edinburgh@survitecgroup.com The Netherlands.
T: +31 (0) 566 623 884 F: +31 (0) 566 621 064
5 GRIMSBY E: grou@survitecgroup.com
Kiln Lane, Worldwide Way, Stallingborough,
Grimsby, DN41 8DY, United Kingdom
T: +44 01469 563800 F: +44 01469 563801
E: grimsby@survitecgroup.com
6 GLASGOW
398 Townmill Road, Glasgow
G31 3AN United Kingdom.
T: +44 (0) 141 763 2541 F: +44 (0) 141 763 2542
Spool Piece Special Steel Hoses Blind Flange Breakaway Coupling E: glasgow@survitecgroup.com
7 NEWLYN 1
Harbour Road, Newlyn, Penzance,
Cornwall TR18 5HA United Kingdom.
T: +44 (0) 1736 363 094 F: +44 (0) 1736 351 623 6
4
E: newlyn@survitecgroup.com

5 15
2
16
14
12

Composite Hoses Hose Support Saddles Marine Breakaway Coupling Chemical Hoses
9 3 13
7 8
10
17

Y Piece Connector OCIMF - Camlock OCIMF - Lifting Hose Bar OCIMF - Submarine Hose
and Flotation Aids 2

11
Copyright Notice
The copyright, trademarks, domain names and other intellectual property rights in all material and information in this presentation belongs to Survitec Group Limited. All rights are reserved.

Disclaimer
This document provides general information about Survitec Group and its companies, its products and services, and summarises general capabilities and offerings which we deem to be of relevance
to our customers. Whilst Survitec has taken appropriate steps to ensure the accuracy of the information contained in this document, Survitec gives no warranty regarding the accuracy or completeness
of such information.
This presentation was prepared to provide information and does not constitute a contract. Survitec reserves the right, without prior notice, to change, delete, supplement, or otherwise amend at any time
the information, images, and offerings contained in this presentation, or other documents. Survitec shall not be liable for any loss or damage of whatever nature (whether direct, indirect, consequential or
other) that may arise as a result of any third party relying on the information contained in this document (but nothing in this disclaimer excludes liability for death or personal injury arising from negligence
or any fraudulent misrepresentation).
For further detailed information, prices, terms and conditions, customers should contact Survitec at info@survitecgroup.com

Survitec Group
SURVITEC SERVICE & DISTRIBUTION
Unit 5 Valiant Way, Lairdside Technology Park,
Birkenhead, Merseyside, CH41 9HS, United Kingdom.
Tel: +44 (0) 151 650 5600 / Fax: +44 (0) 151 650 5619
Email: info@survitecgroup.com
www.survitecgroup.com

Potrebbero piacerti anche