Sei sulla pagina 1di 2

URBAN PERMIT

All information regarding the status of your case you


can get by : THE MUNICIPALITY OF
Sending a message to a number 061 760 960. The BOSANSKA KRUPA
message should consist of the word STATUS and an
THE MUNICIPALITY OF
indentification number of your case. Example: "Status 07- Department of spatial planning, legal BOSANSKA KRUPA
Department of spatial planning,
2-38-xxxx/12", property and geodesy affairs
legal property and geodesy affairs
Call the Info desk at numbers:
037 / 471 088, 037 / 471 089,
037 / 471 120, 037 / 471 091,
037 / 471 263 Street: Terzia bb.
Contact person: Mr. Suvad Alievi, the consultat expert
for the legal affairs Hours: between 08:00 and 13:00, 77240 Bosanska Krupa URBAN
Visit the Info desk, between 08:00 and 13:00,
PERMIT
More information via e-mail :
suvada@opcinabosanskakrupa.ba

Web: www.opcinabosanskakrupa.ba
E-mail: opcina.bosanskakrupa@bih.net.ba
T e l./ F a x ; 03 7 / 4 7 1 0 06 , B o s an sk a Kru p a , 2 0 1 5 .
B o s a n s k a Kr u p a , 2 0 1 5 .
U R B A N P E R M IT

Urban permit process


The administrative fees for the issuance of the urban
Urban permit is an administrative document that permit depends on the type of construction, its surface,
defines the planning and technical conditions for etc. Before applying for the Urban permit, interested
the design, construction and performance of other clients can check which planning documents are adopted for
operations in the area, where no detailed for residential buildings; 50,00 BAM the relevant site. The request for the resolution can be
for residential and commercial buildings; 70,00 BAM submitted in to the counter for receipt of submissions in the
planning document for the area exists. for commercial buildings:
To 100 m; 70,00 BAM Services Center of the Municipality of Bosanska Krupa
Along with the request for urban permit Over 100 m; 250,00 BAM which is located in the counter hall, by filling out the
interested persons shall submit: Prefabricated buildings-kiosks; 100,00 BAM appropriate form. The documentation submitted with the
Weekend facilities; 100,00 BAM application shall be original or certified copy.
1. copy of the cadastral plan, indicating the ancillary buildings (sheds, garages, summer kitchen, fences,
The urban permit is issued in accordance with the
occupants of the neighboring land, retaining walls, etc.); 50,00 BAM provisions of the Spatial Planning and construction of the
2. preliminary project, which includes: situational for agricultural buildings; 60,00 BAM Una Sana Canton - revised text ("Official Gazette of USC"
solution with disposition, height, gauges, for energy facilities; 250,00 BAM No. 12/13). Upon receiving a request for location
purpose of the object and, if necessary, the for industrial and infrastructure facilities; 150,00 BAM information, the completeness of the application will be
basic technical - technological characteristics sports - recreational facilities; 70,00 BAM checked. If the request is complete, the ministry or the
of the intended project in the area, to change the purpose of part of living space in a business; municipal authority, responsible for planning affairs, prior
3. description of the proposed technology work, 50,00 BAM to preparation of urban-planning requirements shall obtain
if it is a production facility, to change the purpose of part of office space in the a written statement, opinion, consent, conditions or
4. Environmental permit or preliminary plan of housing; 50,00 BAM certificate of public enterprises and other relevant
management of construction waste (for to place ads: institutions within five days of receipt of a complete
buildings for which that is prescribed by a on housing and other facilities; 50,00 BAM application (if necessary) where thise institutions are
special law), freestanding advertisements; 80,00 BAM obliged to submit their written statement, opinion, consent,
conditions or certificate within 15 days of receipt of a
5. other information or documents which the jumbo billboards; 100,00 BAM formal request, after which the competent authority shall
Ministry or other competent municipal office for temporary facilities (presentation of goods, amusement issue a location information within 20 days.
find relevant for the preparation and parks); 100,00 BAM
development of location information for a The administrative fees for an overview of the site and If the utility or another public company fails to
specific spatial intervention, proceduore of the planning and technical conditions submit their written statement, opinion, consent, conditions or
6. payment slip for paid administrative fee for depends on the type of construction, its surface etc. certificate within 15 days, it is considered that there are no
obtaining the location information (under for residential buildings; 40,00 BAM special conditions and urban - technical conditions are
Tariff Item 38. of the Decision on Municipal for residential - commercial buildings; 60,00 BAM made on the basis of the situation on the ground. Public
Administrative Fees "Off. Gazette of the for commercial buildings; 90,00 BAM companies and other relevant institutions shall not impose
municipality Bos. Krupa" no. 1/14, 2/14, any additional requirements for the construction and
Weekend objects; 75,00 BAM connection to the infrastructure that is managed after the
6/14), ancillary buildings (sheds, garages, fences, etc.); 35,00 BAM issue of urban approval. Prior to the issuance of urban
7. payment slip for paid administrative fee to for agricultural facilities; 30,00 BAM permit, the competent administrative authority shall give the
the inspection of the site, and production of for energy facilities; 120,00 BAM parties an insight into the preliminary design works of
Planning and Techincal conditions (under for industrial and infrastructure facilities; 120,00 BAM Position.
Tariff Item 40 and 41 of the Decision on sports - recreational facilities; 85,00 BAM
Municipal Administrative Fees "Off. Gazette to change the purpose of part of living space into a Urban Permit is valid for one year from the day of
of the municipality Bos. Krupa" no. 1/14, business; 60,00 BAM its issuance and in that period it may be applied for the
2/14, 6/14). to change the purpose of part of office space into issuance of building permit. Exceptionally, the validity of
residential; 40,00 BAM the urban permit may be extended for another year.

opcina.bosanskakrupa@bih.net.ba www.opcinabosanskakrupa.ba
B o san sk a K ru p a , 2 0 1 5 .

Potrebbero piacerti anche