Sei sulla pagina 1di 8

Formate-I

S. No.
DR submitted by the utility EL submitted by the utility
End A End B End A End B
Name of the Elements along Sent* Reason Sent* Reason Sent* Reason Sent* Reason M-I*
Relay Indication End A Relay Indication End B
with voltage level if not if not if not if not
sent sent sent sent

CP-Main II Prot Trip, A/R optd


RP- Main-I (Micom)-Alarm, Active
group-I, Start Ph BCN, Z-2,
Freq=50.05H3,
Fault duration=254ms,
I1=412.2A,
I2=3545A,
I3=3234A,
VAN=245.8KV,
VBN=110.3KV
Trip Y-PH, Trip B-PH,
400kv Moradabad-Bareilly-II VCN=111.2KV,
Fault Resistance=1.07 I2=19.17KA, yes yes
Line 09.01.2017
Main-II (ABB) Start, Trip I3=15.91KA,
Gen Trip, Y-PH Trip, B-PH, Z-1, Carrier
send Reco. time= 3.76 Sec, Post fault time
= 3 Sec
Fault Loop= L2L3, A/R
start, A/R Block,
I1=312A,
I2=3600.9A,
I3= 3250.3A
IN= 2008.6A
86 AX(3T), 86BX (3T), 86 CX(3T),
RXMN2
A/R Panel= 27R, 21Y
optd Alarm
RP-Main-I (Micom)
2 Alarm, Action group-I,
start PH AC, Z-2, Freq= 49.94 H3, fault
duration=203.0ms,
IA=3252A,
IB=236.8A,
IC=3071A,
VAN=143.3KV,
VBN=234.6KV,
VCN=145.5KV
Main-II (ABB)Start Trip, Gen Trip, R-PH
Trip, B-PH Trip, Z-1, Carrier send, A/R
start, A/R Block, R time= 3.71 Sec,
400kv Moradabad-Bareilly-I Pre fault time = 0.50 Sec, P. fault time =3 R-PH, B-PH, Z-1
Sec, I1=17.12KA, yes yes yes
Line 10.01.2017
fault Loop= L1L3, I3=17.2KA,
I1=3204A,
I2= 238A,
I3=3020A,
IN= 85A,
UL1= 131KV,
UL2= 235.1KV,
UL3=145 KV,
UN=9.84KV,
86AX(3T), 86BX(3T), 86CX (3T),
RXMH2
A/R Panel =27 R, 27 Y
3

RP= Main-I (Micom)


Active group-I, start PH A, Trip ABC, O/V
start V>1, o/v Trip V>1, fault Alarm NO
I1=96.01A,
I2=92.56A,
I3=103.8A,
VAN= 235.7KV,
VBN=251.3KV
400kv Moradabad-Bareilly-I VCN=249KV, NOT AVAILABLE yes yes yes
Line 27.01.2017 Fault in Zone None, 86A, 86B,
86C1, 86T, 86T2, 86A2
86B2, 86C2, 85LO
Main-II (ABB)
IA=90.96A,
IB=89.63A
IC=100.55A
IN=4.64A,
VL1= 243.05KV,
VL2=250 KV, VL3=253.9KV
VN=8.29KV, 86X,
86XX
4

CP-M-I Prot optd, M-2 Prot. optd,Carrier


Receive, A/R optd,
RP- Main-I (ABB)-
start Trip, Gen Trip, Y-PH Trip, Carrier
Receive, fault Loop L2N
I1=496.3A,
I2=5043.2A, M-I Y-PH,
I3=184.8A,
400kv Moradabad-Bareilly-I fault current=5.85 KA,
IN=5496.8A, yes yes
Line 30.01.2017 UL1=183.8KV,
M-2 Y-PH, Z-1,
UL2=175.67KV I2= 5.82KA,
UL3=255.9KV,
UN=123KV,
Main-II (Siemens)-Y-PH Trip, Carrier
Receive, P/U Time=65ms, Loop L2E,
I2=4.99KA,
Dist T. Send on, E/F Block on, E/F Trip
Block on, E/F forward on, E/F L2 Selec. No,
E/F 310P pick up on,
start A/R (2T), M-2 Carrier send, M-2 Carrier
Receive, 186Y, 286Y,
A/R Panel= A/R optd, RXMH2

5
6

* Yes or No
# Details of the Protection
Annex-IX

Protection operation Reason of Protection Mis-operation or Mal-operation

End A End B Relay at End A Relay at End B


M-II* Any other Fault locator Auto M-I* M-II* Any Fault locator Auto Inaccura Pholoso Design/ Remdial Inaccura Pholoso Design/ Remdial
Protectional# details reclosur other details reclosur te phy Logic measure te phy Logic measure
e status Protecti e status setting issue Issue s setting issue Issue s
onal#

yes 75.45km 11.8km


75.96km 11.6km
yes 52.1km AR yes yes 52.2km

Potrebbero piacerti anche