11 1 Designacion No.

4 5 5 5
12 a m 2.50 3.00 3.50 4.25
13 b m 0.20 0.25 0.25 0.25
14 a L m 2.70 3.25 3.75 4.50
15 Peso Unit. kg 2.67 5.04 5.81 6.98
16 b Cantidad un 16 12 16 16
17 Peso total kg 42.77 60.45 93.00 111.60
18 2 Designacion No. 3 3 3 3
19 a m 0.46 0.46 0.46 0.46
b
20 b m 0.08 0.08 0.08 0.08
21 L m 2.00 2.00 2.00 2.00
a
22 Peso Unit. kg 1.12 1.12 1.12 1.12
23 Separacin m 0.10 0.12 0.12 0.12
a
24 Cantidad un 24 24 29 35
25 Peso total kg 26.88 26.88 32.48 39.20
26 2A Designacion No. 3 0 3 3
27 a m 0.14 0.00 0.13 0.13
28 b m 0.08 0.00 0.08 0.08
29 b L m 0.30 0.00 0.29 0.29
30 b Peso Unit. kg 0.17 0.00 0.16 0.16
31 a Separacin m 0.10 0.00 0.12 0.12
32 Cantidad un 96 0 116 140
33 Peso total kg 16.13 0.00 18.84 22.74
34 3 Designacion No. 4 4 4 4
35 a m 1.75 1.75 1.75 1.75
36 b m 0.20 0.20 0.20 0.20
37 L m 2.15 2.15 2.15 2.15
38 b b Peso Unit. kg 2.13 2.13 2.13 2.13
a
39 Separacin m 0.22 0.22 0.20 0.20
40 Cantidad un 18 18 20 20
41 Peso Total kg 38.31 38.31 42.57 42.57
42 4 Designacion No. 4 4 4 4
43 a m 1.05 1.05 1.05 1.05
44 a b m 0.36 0.36 0.36 0.36
45 b b L m 2.16 2.16 2.16 2.16
46 Peso Unit. kg 2.14 2.14 2.14 2.14
2 TORRE Am8-9 Am8-9 Am8-9 Am8-9 47 Separacin m 0.29 0.29 0.29 0.29
3 SUELO SECO SECO SECO SECO 48 Cantidad un 8 8 8 8
63 MATERIAL ROCA ROCA ROCA ROCA 49 Peso Total kg 17.15 17.15 17.15 17.15
2
4 CAPACIDAD t/m 20 20 20 20 50 5 Designacion No. 4 4 4 4
5 TP (m) 0.60 0.60 0.60 0.60 51 a m VAR VAR VAR VAR
6 HG (m) 0.25 0.75 1.25 2.00 52 a b m VAR VAR VAR VAR
7 D (m) 2.40 2.40 2.40 2.40 53 b b L m VAR VAR VAR VAR
8 HS (m) 2.10 2.10 2.10 2.10 54 Peso Unit. kg 1.95 1.95 1.95 1.95
9 B (m) 0.30 0.30 0.30 0.30 55 Separacin m 0.29 0.29 0.29 0.29
64 F (m) 0.25 0.25 0.25 0.25 56 Cantidad un 6 6 6 6
10 LB (m) 1.90 1.90 1.90 1.90 57 Peso Total kg 11.67 11.67 11.67 11.67
58 CONCRETO (m3) 1.86 2.04 2.22 2.49
59 EXCAVACION (m3) 8.84 8.84 8.84 8.84 APROB: C. HERNNDEZ
60 RELLENO (m3) 6.89 6.89 6.89 6.89 REVIS: J. HUERTAS
61 PESO REFUERZO (kg) 153 154 216 245 DISE: E. ESPINOSA DISEO DE LA LNEA DE TRANSMISIN A 220KV FRIASPATA - MOLLEPATA
3
62 SOLADO (m ) 0.18 0.18 0.18 0.18 PE-FRMO-DILT-K0139-ZA-D-04-REV 4 CIMENTACIONES TIPO ZAPATA- TORRE Am8-9
FECHA: JUNIO-2016 SUELO SECO ROCA - 20 t/m2 - Dfmin 2.30m - HG 0.25m A 2.00m