Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
100
Percentage of strength - 28 day
90
80
70
60
50
40
30
20
10
0
1 3 7 14 28
No of days
Notes:
The curves serve as a guide and may vary.
The following results are attained under standard testing and curing conditions.
Actual performance on site may vary due to adverse climatic conditions.
Detailed strength gain curves by project may be requested from technical services.
1) The time of removal of formwork allowing for the surface Plastic shrinkage cracking
finish is to be decided by the designer. This table should be The underlying cause of these cracks is the rapid removal
regarded as a guide only. or evaporation of water from the concrete. This is
2) In cool weather, stripping times are to be determined by exasperated with higher concrete or ambient
interpolation between the periods specified for normal and temperatures, relative humidities or wind velocities. It
cold weather. can also result due to absorbent formwork. The cracks
usually appear within two hours after compacting but
Optimal product offering are often not noticed until the following day. Plastic
The more workable a concrete mix is, the easier it is to shrinkage cracking may be prevented by:
place, compact and finish. Suspended Slab Mix has been Erection of wind breaks.
formulated in conjunction with our product specialist Protection with moisture retaining covers.
customers and is optimally designed to provide perfect Fog spray before finishing of concrete.
rate of strength gain and workability for the application.
Plastic settlement cracking
Performance Matrix The underlying cause of these cracks is solid particles
settling which displaces mixing water that rises to the
surface. These cracks form immediately in the vicinity of
reinforcing steel or deeper sections.
Strength gain category
AfriSam
Suspended Slab Mix
4 5 6
1 2 3
Contact the regional office in your area for Sales or Technical Services
or any other information.
customer.service@za.afrisam.com
www.afrisam.com
17617