Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Roles
YES
Production Leadership
NO
1.1.1
Respond to emergency
Assess the severity of the situation
Coordinate environmental NO
activities
YES
Coordinate Health, Safety &
Environment
Plan production
Coordinate training
YES
NO
1.1.2
1.1.3
Is emergency response assistance is
Initiate Emergency Plan, Procedure
required from the site and / or local
and Notification
emergency services?
Injured persson will be attended here
1.1.4
Track and document events as they
occur whenever feasible
1.1.5
Determine initial response plan and
required resources
1.1.6
Is equipment shutdown required?
NO
YES
1.1.7
Initiate initial response action as
required
1.2 Develop Emergency Response Plan and Obtain Resources
1.2.1 1.2.2
Secure existing procedure and/or Are additional Resources Required
modify temporary crisis response to contain the Emergency
plan Response?
NO
YES
NO NO
Input from
T/S 6.1.1
Input from
T/S 6.2.5
1.2.3
Obtain additional resources required
1.3 Response to resolve the situation
1.3.1
This RTE team will give input to RCFA team.
Coordinate plant and emergency
response plans
1.3.2
Perform actions to resolve immediate
crisis situation
1.4 Equipment repair and post emergency activities
1.4.1
De-activate emergency response
system to normal condition (if
required)
mergency activities
1.4.2 1.4.3
Assess the plant conditions and Is further equipment repair and
determine resources required to further personnel medical treatment
return to normal conditions needed?
Expert in inspection should
contacted to inspect asset integrity,
medical specialist if there is injured
person
1.4.4
Is equipment repair
urgent?
1.4.5 1.4.6
Can the work team repair the Contact service provider and initiate
equipment a service request
1.5 Review incident and
improve operating discipline
1.5.1
Initiate and conduct a post crisis
review and root cause investigation /
analysis
Production Leader assign
independent RCFA team
Stage 2.1 Initiate a value added service request
Roles
Respond to emergency
2.1.1
Has the request for service passed an
Schedule operation activities
initial value assessment from
other process?
Plan production
Secure product quality
Coordinate training
Input From;
1. WP RAN 3.1.1
Linkages to / from other sub 2. WP S/A 4.4.3
processes 3. WP S/D 5.4.3, 5.9.1
4. WP T/S 6.4.3, 6.5.4, 6.5.5
5. WP RTE 1.5.4
Tools
e request
NO
2.1.2
Perform an initial value added
assessment for the request for service
Value Added Assessment
Tools
YES
2.1.3
2.1.4
Did the request for service
Ensure Management of Change
pass the value
requirements are met (if required)
assessment?
NO
Do not pursue the
request for service.
Return to originator
work process
1. OeXMS - Management
of Change
2.1.5
Generate a value added service
request
Applicable
Work Process
YES
NO
2.2.2
2.2.1
Does the originator have the skills,
Are Subject Matter Expert
knowledge, authority and time to plan
(SME) required?
and schedule the service request?
YES
NO
2.2.3
Review the service request
1. POINT - eTASK
2. Primavera
NO
YES
2.2.4 2.2.5
Is the entire service request best Select and route the entire service
coordinated by an Subject Matter request to the applicable Subject
Expert (SME)? Matter Expert (SME).
2.2.6
Select and route applicable task(s) to the
Subject Matter Expert (SME)
2.3 Plan the service request
NO
YES
2.3.2
2.3.1
Time to do planning
Is planning required?
now?
YES
Maintain
Asset
NO
2.3.3
Put the planning task on applicable
Master Task List
Input from:
T/S 6.5.1
2.3.4
Retrieve and review Operating
2.3.5
Discipline plans, permits and
Are Operating Discipline plans and
procedures, job scope, safety, procedures adequate for performing the
industrial hygiene, environmental, activities for the task?
quality, production, monitoring
requirements etc.
NO
Input to:
T/S 6.1.1
OeXMS
YES
2.3.6
Determine human resources, parts, tools,
equipments or facilities needed for the
activities of the task.
YES
NO
2.3.7 2.3.8
Will the service request still Communicate status of the service
add value? request to the originator
Do not pursue the request
for service.
Return to originator work
process
rk
2.3.10
Compile and attach plans and procedures
to the service request if required
1. POINT - eTASK
2.4 Schedule the service request
2.4.1
Add task(s) to the applicable Master Task
List
1. S/U 4.1.1
2. S/U 4.6.1
3. S/D 5.1.1
4. S/D 5.9.1
5. S/D 5.4.3
6. RAN 3.2.3
1. POINT - eTASK
Level 3.1 Determine plant goals and assign normal staffing (annually or as required) 3.2 Team task assigning
Roles
Respond to emergency
Coordinate environmental
activities
3.1.3
Schedule operation activities Determine value adding tasks
YES
3.2.1 3.2.2
The work team reviews the Master Sufficient human resources
Run asset normal Task List, Logbook and opportunities to safely operate
the plant?
NO
Run asset process control
Plan production
Coordinate training
3.1.1 3.1.4
Production Leadership Develop plant and process area Determine normal staffing to perform
specific goal value adding tasks
3.1.2 3.1.5
Shift Team Manning Determine work schedules for all Assign individuals to work schedules
3.2.3 Secure human
Coordinator applicable work teams and work teams
resources
Roles
Respond to emergency
Coordinate environmental
activities
NO
NO YES
Run asset process control
Plan production
Coordinate training
Production Leadership
Input from;
Linkages to / from other sub - RTE 1.6.1, SOA 2.4.1 Input to: Input to: Input from;
processes - S/U 4.5.4, T/S 6.3.3 T/S 6.1.1 T/S 6.1.1 T/S 6.4.3, 6.5.1
- Maintain Asset; 3.2.22
Roles
Respond to emergency
Coordinate environmental
activities
YES
NO NO
Run asset process control
Plan production
Coordinate training
Production Leadership
Input to:
Linkages to / from other sub Input to: Maintain Asset Input to:
processes T/S 6.1.1 Work Process T/S 6.1.1
3.2.1
Roles
Respond to emergency
Coordinate environmental
activities
3.6.2
Confirm status of the task list and, if
Schedule operation activities required, communicate to applicable
NO people any tasks which were not
completed by specific deadline
3.6.3
Plan production Update process performance records
and plant goal measurements
Coordinate training
Production Leadership
1. POINT - eTASK
Tools 1. POINT - eTASK &
1. OExMS 1. POINT - eLOG 1. POINT - eTASK 2. POINT - eLOG
eMANNING
3. OExMS
-
O
e
X Define skill sets required for
DAS
M Ex Inspector
S
(
r
el
at
e
Line-CM d
p
r
o
c
NO e
YES d
NO
YES
Mnt Trainer u
r
e
s)
-
K
e
y
HR-CM P
la
n
ni
n
g
&
DM B
u
d
g
et
In
Input
Input p
- OeXMS ut
from:
from:
( related -
S/D
SOA
procedures) S
5.1.1
2.4.1
M
S
O
r
e
q
ui
r
e
m
e
nt
s
M
S
O
r
e
q
1.0 Tools ui
2.0 Input r
3.0 Output e
m
e
nt
s
-
5
y
e
a
rs
T
A
m
a
st
e
r
pl
a
n
-
M
O
C
/
P
r
oj
e
ct
s
ndiddate Selection 2.0 Perfo
Perform screening
NO
Approved by CDWC?
1. Business needs
4.0 Certification & Re-certification
Update to CDWC
NO NO
NO NO
Roles
Respond to emergency
Coordinate environmental
activities
Plan production
Secure product quality
Coordinate training
Production Leadership
YES
- OeXMS (related pr
Input to: Input from: - Key Planning & Bu
S/A 4.1.2 S/A 4.1.1 - SMSO requiremen
- 5 years TA master
- MOC / Projects
- SMSO requiremen
- 5 years TA master
- MOC / Projects
NO
- OeXMS
(related
procedures)
*If procedure inadequate go back to
retrieve and review
5.2 Assemble Shutdown team
5.2.1
Define/review skill sets required for
Shutdown needs
5.2.2 5.2.3
Check skills available on existing Locate and obtain additional
teams and adjust team composition resources with the appropriate skills
to meet Shutdown needs if required
- OeXMS (related
procedures)
- OeXMS (related
procedures)
5.3 Perform training
NO
5.3.1 YES
Is additional training
required?
5.3.2 NO
5.3.3
Does training exist in the plant or on
Secure training packages
the site?
YES
5.3.4
Individual(s) complete(s) training
5.3.5
Update training records
- OeXMS
(related
procedures)
5.4 Shutdown preparation
5.4.1 5.4.2
Retrieve and compile Shutdown Work team reviews and assigns Run
documentation Assets plant Shutdown tasks
POINT - eTASK
5.4.3
Layout required equipment and
materials at the field location
NO
5.4.4
Retrieve Shutdown procedures and
prepare equipment for Shutdown
YES 5.5.1
Perform equipment shutdown as per
procedures and commence
Shutdown monitoring as per plan
from: Input from:
.4.3 RTE 1.1.6
NO
5.5.2 NO 5.5.3
Abnormality detected in equipment Is the equipment
during shutdown for maintenance
Shutdown or upgrading ?
YES
Input to: Input from:
T/S 6.1.1 T/S 6.1.3
YES
5.5.4
Review job plans and prepare
equipment for maintenance or
upgrading activities e.g. preservation
etc.
5.6 Equipment turnover
5.6.1
Complete Shutdown documentation
and turnover equipment to applicable
functions
5.7.1
Monitor the plant,process area and
equipment and adjust changing
condition as required. Review
equipment monitoring plan and
adjust monitoring as required
Input from: Input from:
T/S 6.4.3 T/S 6.1.1
5.8 Equipment return to Start-up
5.8.1 5.8.2
Complete handover checklists and Has Start-up planning been
remove tags completed?
NO Parallel Path
OeXMS
Input to: Input to:
(related
S/U 4.1.2 S/U 4.4.1
procedures)
5.9 Review Start-up and improve Operating Discipline
5.9.1
YES Conduct a post shutdown meeting to
identify any improvement
opportunities, reduce cycle time,
bottlenecks
arallel Path
OeXMS (related
1 procedures)
erating Discipline
5.9.2
Initiate improvements to plans and
procedures as required
related
es)
Stages 6.1 Work Process Selection 6.2 Resolve Myself
Roles
Respond to emergency
Coordinate environmental
activities
Schedule operation
activities
NO
YES YES
NO NO NO YES
6.1.6
6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 6.1.7 6.2.1 6.2.2
Does event meet PGB RCFA
Run asset normal Gap identified between Is it an emergency Did Something Is immediate action required Define problem detail & Log event / gap in incident Is the root cause of the Can perform
trigger YES
should and is situation? Shutdown? to stabilized process? impact notification system problem known? quick fix?
criteria?
NO NO
YES YES
Troubleshooter /
Diagnostician
Parallel Path
Plan production
Coordinate training
Maintain Asset
Maintain Asset Work
Linkages to other work RTE S/D RAN Work Process
From Any W/P Process 1.3.1 Develop
process 1.1.1 5.5.3 3.5.2 1.1.3 Improve
Work Scope
Reliability
Roles
Respond to emergency
Coordinate environmental
activities
Schedule operation
activities
YES
YES
NO YES
YES
Troubleshooter /
Diagnostician
Plan production
Coordinate training
RTE 1.5.5
Maintain Asset Work
Linkages to other work RAN SOA RAN 3.3.2 SOA 2.3.5 SOA
Process 1.1.1 Advance
process 3.5.3 2.1.1 SD 5.5.1 WP Maintain 2.3.4
Troubleshooting
Asset 1.2.3
Roles
Respond to emergency
Coordinate environmental
activities
Schedule operation
activities
Troubleshooter /
Diagnostician
Plan production
Coordinate training
1. POINT 1. OeXMS
Supporting Tools / IT 2. OeXMS 2. e-PTW
No Date Changes Remarks
1 ### Change to 6.5.1 linkages to RAN 3.3.2 to SOA 2.3.4