Sei sulla pagina 1di 4

LOGO

SUPPLIER AUDIT CHECKL


SUPPLIER : ____________________________________________________________________________________________________________________________
CONCERNED PERSONNEL : _____________________________________________________________________________________________________________
AUDITOR : ____________________________________________________________________________________________________________________________

PARTS AUDITED : ______________________________________________________________________________________________________________________

SR. NO. CHECK POINTS

ISO :
1
ISO Certificate, Quality Manual, Policy, Objectives, Implementation

CONTROL OF NON-CONFIRMITY OF PRODUCT :


a. Is rejection recorded
2
b. Is preventive action taken on rejections
c. Is record maintained of preventive action

CALIBRATION OF INSTRUMENTS :
3 a. Are all Inspection, Testing & Measuring instruments used in manufacturing process calibrated up-to-date.
b. Is calibration certificate available.

RAW MATERIAL TESTING :


4
a. Is testing of raw material carried out by NABL approved lab.

INWARD MATERIAL IDENTIFICATION AND STORAGE :


5 a. Is material inspected at inward stage
b. Is there a system followed to store different material grades separately

TRACEBILITY OF MATERIAL :
6 a. Is identification mark(Heat No, Lot No., etc.) available on all material(raw, inprocess, finished)
b. Is Test certificate available

MANUFACTURING PROCESS :
7 a. Is manufacturing process plan available
b. Is it supervised

PREVENTIVE MAINTENANCE :
8 a. Is scheduled maintenance of machines carried out
b. Is record available

NDT :
9
a. Is NDT process carried out
INPROCESS & FINAL INSPECTION:
10 a. Is inprocess check & Final inspection carried out
b. Is record maintained
HANLDING PACKING, PRESERVATION & DELIVERY :
11 a. Does supplier have product packing and preservation procedure
b. Does the supplier deliver material on time

TOTAL

Quality Scoring Guide :


A ) Rating :
0-This element is not included in the suppliers quality system.
1-The element is included in the system, however planning & execution requires substantial improvement.
2-The element is included in the system, planning & execution is satisfactory.
3-The element is included in the system, planning & execution is good.
4-The supplier has innovated in this area & system procedures are excellent.

Audited By
COMPANY NAME

LIER AUDIT CHECKLIST


_________________________________________________________________ LOCATION : __________________
___________________________________________________________________
__________________________________________________________________ REPORT NO : ________________

___________________________________________________________________ DATE : ______________________

FINAL SCORE
SUPPLIER'S PLAN/AUDITOR'S OBSERVATION / SUGGESTIONS
SCORE 0 1 2 3 4
TAL

FOR SUPPLIER : Points ________out of _______


Rating : _____________

Quality Scoring Guide :


B) Scoring C) If the score is

1. Whatever data is not applicable write "N.A" >90 % Rating "A"


2. Add up all grading points. 75-90 % Rating "B"
3. Calculate the percentage points scored out of the total points. 60-75 % Rating "C"
Below 60 % Rating "D"

Verified & Checked By: