Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Schlumberger Private
Reach the geological target
2
Surveys Uncertainty
Errors due to sensors resolution
Errors in Depth Measurement
Schlumberger Private
Errors in surface coordinates and elevations
Errors due to Magnetic Interference
Errors due to tool misalignment
3
Surveys Uncertainty
(Ellipses of Uncertainty EOU)
This is a method to quantify errors produced on directional
surveys.
Schlumberger Private
The size of the EOUs is in function of:
Surveying Tool Semi-minor axis
Surveys frequency
Magnetic Interference
Inclination and direction
of the well
Geographical Location
Semi-major axis
4
Ellipses of Uncertainty (EOUs)
Schlumberger Private
survey tool error code used
This tool error code has been
defined by the ISCWA
5
Ellipses of Uncertainty (EOUs)
Major - Azimuth
Ellipsoid Axes
Minor Inclination
Survey
Depth
Schlumberger Private
Inclination
Azimuth
6
Do you know the
cumulative uncertainty
in your well trajectory?
Schlumberger Private
7
Importance of Preventing Well Collisions
Schlumberger Private
Reputation - Credibility and Company Image
8
Schlumberger Archive
Schlumberger Private
9
Causes of Well Collision
Human failures (Main Cause)
Schlumberger Private
Lack of communication
10
World Wide Wells
Schlumberger Private
SPE 101719, SPE 108279, SPE 121040
11
World Wide Exemptions
Schlumberger Private
SPE 101719, SPE 108279, SPE 121040
12
Schlumberger Private
World Wide Wells
13
World Wide Exemptions
Schlumberger Private
14
Reasons of Higher Collision Risk
Schlumberger Private
15
Reasons of Higher Collision Risk
Schlumberger Private
16
How to Prevent a Collision?
Anti-Collision Process Training
AC Risk Awareness and Management
Understanding of AC Policy and drilling procedures
Schlumberger Private
Survey Management and Shallow Kick Off (Nudge)
Validation of Survey Database
Use of separation factors
Proper planning of future wells (Slot Distribution)
Proper use of well references (North and Elevations)
Enough Non-Magnetic material in the BHA
17
Well with Nudge to avoid collision at surface
sections
Schlumberger Private
18
Proper Planning for Future Wells
-6 -5 -5 -4 -4 -3 -3 -2 -2 -1 -1 0 1 1 2 2 3 3
8 8
8 8
7 7
Schlumberger Private
6 6
D
800 TV
200
900 TVD
6 6
T VD
700
TVD
<<< S Scale = 1(cm):0.5(m) N >>>
5 5
0 TVD
10
0T
600 TVD
VD
5 5
10
00
4 TV
D 4
500 TVD
4 4
3 3
400 TV
D
3 3
2 300 TV
D
2
1 1
True
Grid
1 1
Mag
200 TVD
0 0 TVD 0
100
TVD
-1 -1
-6 -5 -5 -4 -4 -3 -3 -2 -2 -1 -1 0 1 1 2 2 3 3
<<< W Scale = 1(cm):0.5(m) E >>>
19
Survey and AC Standard
Schlumberger Private
20
Schlumberger Private
21
SLB Anti Collision Rules
Schlumberger Private
OSF < 1.5 or ct-to-ct < MASD (Surface Rule) or < 30 ft
(non Pad) :
STOP Drilling, invoke Exemption and drill ahead with P,
VP or GM approval and Client Indemnification
22
Separation Factor
Subject EOU
Separation
Well Offset Well
Factor = 1.5
EOU Separated by
1.5 x Sum of
Schlumberger Private
Esferas de .
Cierre EOUs Radius
EOU
Ct to Ct Offset Well
Subject Well Distance at closer point
23
Separation Factor
Separation
Factor = 1 EOUs
Offset
Well
EOUs touch each other
Schlumberger Private
Offset
Well
Ct to Ct
EOUs Distance at closer point
Subject Well
Subject Well
24
Oriented Separation Factor
Schlumberger Private
OSF
OSF doesnt take into account the major axis, but the size of the EOU
in direction to the offset well
The result is a bigger separation between ellipses, therefore we get
a less conservative analysis
25
Surface Rule, MASD
Schlumberger Private
R1 R2
ct-to-ct
clearance
MASD = (0.8*clearance)+R1+R2
Ct-to-ct distance must be larger than MASD at all time
26
Land PAD Drilling
Schlumberger Private
16 ft 8 ft
27
Alert Zones
Buffer Zone
1.5 < OSF < 5
There is no risk of
Schlumberger Private
collision
Drilling is safe but
constant monitoring is
necessary otherwise the
subject well might fall
into a minor risk zone.
28
Alert Zones
Minor Risk
1 < OSF < 1.5
There is a minor risk of
Schlumberger Private
collision
The minimum separation
factor rule has been
violated, drilling is not
possible unless a proper
exemption has been
approved.
29
Alert Zones
Major Risk
OSF < 1
There is a major risk of
Schlumberger Private
collision.
Drilling must be suspended.
SLB recommends to use
Gyro tools to reduce
uncertainty and increase
OSF. Exemption is required
to drill ahead.
30
Anti-Collision Summary Report
Schlumberger Private
31
Real Example of Collision
Schlumberger Private
32
Traveling Cylinder
North
0
340 20
150
320 40
125
100
When the subject well
si at 1628 MD, the
Schlumberger Private
300 60
75
25
Well C West
50
50
260 100
75
75
0
10
10
16
5
0
12
28
12
When the subject well is
16
0
15
15
40 0
240 120
16
at 1677 MD, the offset
16 68
53
16 7
65
MD Actual Well
well will be at 55m Ct-Ct
16
7
16
220 140
Offset Well
17
02
200 160
17
180
No-Go Zone
15
33
Anti-Collision Risk
HSE Risk
Not acceptable
Schlumberger Private
Dealt case by case basis
Require D&M P, VP approval
Financial Risk
Acceptable
Require D&M GM approval
34
Hazard Analysis and Risk Control
-16 to -10
BLACK
RED
NON-OPERABLE: Evacuate the zone and or area/country
INTOLERABLE: Do not take this risk
Likely
Improbable
Unlikely
Possible
Probable
Mitigation
Schlumberger Private
Control
Measures 1 2 3 4 5
Prevention LIKELIHOOD
-1 -2 -3 -4 -5
Light -1 1L 2L 3L 4L 5L
-2 -4 -6 -8 -10
Serious -2 1S 1S 3S 4S 5S
SEVERITY
-3 -6 -9 -12 -15
- SPE 121040, Anti-Collision Risk Management Major -3 1M 2M 3M 4M 5M
35
Production Environment
Schlumberger Private
36
Examples Of Well Collision Murray 1-14D
Immediate tangible cost is estimated at USD $ 200 K
Remediation work to retrieve and replace the damaged tubing
Damage to the 4 1/2 tubing (replaced) and 8 5/8 casing (not repaired)
Intangible cost includes:
Schlumberger Private
Client man-hours
Loss of production from resulting delay to complete the well
Client relationship and professional reputation of Schlumberger
37
Examples Of Well Collision Ku-1271
Ku-1271 collide with a no-documented SideTrack of Ku-62
Platform productions suspended 1 week to take new Gyros
Schlumberger Private
38
Drilling Office -Official Software
Schlumberger Private
AC Report Spider Plot DD ToolBox
T-Plot
Travelling Cylinder Visualization
39