Sei sulla pagina 1di 39

Schlumberger Private

Anti Collision RISK and Survey


Management
D&M-SQ-S002
Luis Felipe Gonzalez
Importance of Well Surveying

 Certainty of well trajectory

Schlumberger Private
 Reach the geological target

 Manage Collision Risk with offset wells or LIH Tools

 Intersect relief wells

 Comply with local regulations

2
Surveys Uncertainty
 Errors due to sensors resolution
 Errors in Depth Measurement

Schlumberger Private
 Errors in surface coordinates and elevations
 Errors due to Magnetic Interference
 Errors due to tool misalignment

3
Surveys Uncertainty
(Ellipses of Uncertainty EOU)
 This is a method to quantify errors produced on directional
surveys.

Schlumberger Private
 The size of the EOUs is in function of:
 Surveying Tool Semi-minor axis

 Surveys frequency
 Magnetic Interference
 Inclination and direction
 of the well
 Geographical Location
Semi-major axis

4
Ellipses of Uncertainty (EOUs)

 EOUs size increases along the


well
EOUs size is in function of the

Schlumberger Private

survey tool error code used
 This tool error code has been
defined by the ISCWA

5
Ellipses of Uncertainty (EOUs)
Major - Azimuth
Ellipsoid Axes
Minor Inclination
Survey
Depth

Schlumberger Private
Inclination
Azimuth

6
Do you know the
cumulative uncertainty
in your well trajectory?

Schlumberger Private
7
Importance of Preventing Well Collisions

Safety Gas and Oil flow with high pressure

Environment Protection Hydrocarbons spills

Schlumberger Private
Reputation - Credibility and Company Image

Economics Legal issues, loss of revenue,

equipment damage, well abandonment, etc.

Business Strategy Loss of drilling license

8
Schlumberger Archive

Schlumberger Private
9
Causes of Well Collision
Human failures (Main Cause)

Bad procedures or drilling practices

Schlumberger Private
Lack of communication

Lack of quality control on surveying data

Inability to recognize early signals of collision

Lack of Anti-Collision Awareness and Risk Management

10
World Wide Wells

Schlumberger Private
SPE 101719, SPE 108279, SPE 121040
11
World Wide Exemptions

Schlumberger Private
SPE 101719, SPE 108279, SPE 121040
12
Schlumberger Private
World Wide Wells

13
World Wide Exemptions

Schlumberger Private
14
Reasons of Higher Collision Risk

Schlumberger Private
15
Reasons of Higher Collision Risk

Schlumberger Private
16
How to Prevent a Collision?
 Anti-Collision Process Training
 AC Risk Awareness and Management
 Understanding of AC Policy and drilling procedures

Schlumberger Private
 Survey Management and Shallow Kick Off (Nudge)
 Validation of Survey Database
 Use of separation factors
 Proper planning of future wells (Slot Distribution)
 Proper use of well references (North and Elevations)
 Enough Non-Magnetic material in the BHA

17
Well with Nudge to avoid collision at surface
sections

Schlumberger Private
18
Proper Planning for Future Wells
-6 -5 -5 -4 -4 -3 -3 -2 -2 -1 -1 0 1 1 2 2 3 3

8 8

8 8

7 7

7 Zaap 27/RE/24-Ago-06/Gyro Final 7

Schlumberger Private
6 6

D
800 TV

200
900 TVD

6 6

T VD
700
TVD
<<< S Scale = 1(cm):0.5(m) N >>>

5 5
0 TVD
10
0T

600 TVD
VD

5 5

10
00
4 TV
D 4
500 TVD

4 4

3 3
400 TV
D

3 3

2 Zaap 25/RE/26-Oct-06/Gyro Final + MWD + Blnd 2

2 300 TV
D
2

1 1
True

Grid

1 1
Mag
200 TVD

0 0 TVD 0
100
TVD

-1 -1

-6 -5 -5 -4 -4 -3 -3 -2 -2 -1 -1 0 1 1 2 2 3 3
<<< W Scale = 1(cm):0.5(m) E >>>

19
Survey and AC Standard

Schlumberger Private
20
Schlumberger Private
21
SLB Anti Collision Rules

 OSF >1.5 and ct-to-ct > MASD (Surface Rule) or > 30


ft (non Pad) :
Drill ahead

Schlumberger Private
 OSF < 1.5 or ct-to-ct < MASD (Surface Rule) or < 30 ft
(non Pad) :
STOP Drilling, invoke Exemption and drill ahead with P,
VP or GM approval and Client Indemnification

22
Separation Factor

Subject EOU
Separation
Well Offset Well
Factor = 1.5
EOU Separated by
1.5 x Sum of

Schlumberger Private
Esferas de .
Cierre EOUs Radius

EOU
Ct to Ct Offset Well
Subject Well Distance at closer point

23
Separation Factor

Separation
Factor = 1 EOUs
Offset
Well
EOUs touch each other

Schlumberger Private
Offset
Well
Ct to Ct
EOUs Distance at closer point
Subject Well
Subject Well

24
Oriented Separation Factor

Schlumberger Private
OSF

 OSF doesnt take into account the major axis, but the size of the EOU
in direction to the offset well
 The result is a bigger separation between ellipses, therefore we get
a less conservative analysis

25
Surface Rule, MASD

Schlumberger Private
R1 R2
ct-to-ct

clearance

MASD = (0.8*clearance)+R1+R2
Ct-to-ct distance must be larger than MASD at all time

26
Land PAD Drilling

Schlumberger Private
16 ft 8 ft

Murray 1-14B, 1-14A, 1-14C and 1-14D

27
Alert Zones
Buffer Zone
1.5 < OSF < 5
There is no risk of

Schlumberger Private
collision
Drilling is safe but
constant monitoring is
necessary otherwise the
subject well might fall
into a minor risk zone.

28
Alert Zones
Minor Risk
1 < OSF < 1.5
There is a minor risk of

Schlumberger Private
collision
The minimum separation
factor rule has been
violated, drilling is not
possible unless a proper
exemption has been
approved.

29
Alert Zones
Major Risk
OSF < 1
There is a major risk of

Schlumberger Private
collision.
Drilling must be suspended.
SLB recommends to use
Gyro tools to reduce
uncertainty and increase
OSF. Exemption is required
to drill ahead.

30
Anti-Collision Summary Report

Schlumberger Private
31
Real Example of Collision

Schlumberger Private
32
Traveling Cylinder
North
0
340 20
150

320 40
125

100
When the subject well
si at 1628 MD, the

Schlumberger Private
300 60
75

offset well will be at


Plan Subject Well 50
138m Ct-Ct to 110 deg
280 80
25
azimuth
Surveys Actual Trajectory ADP
25

25
Well C West
50

50
260 100
75

75
0
10

10

16
5

0
12

28
12
When the subject well is

16
0
15

15
40 0
240 120

16
at 1677 MD, the offset
16 68

53
16 7
65
MD Actual Well
well will be at 55m Ct-Ct
16
7
16

220 140

to 160deg azimuth Well C West


90

Offset Well
17
02

200 160
17

180

No-Go Zone
15

33
Anti-Collision Risk

 HSE Risk
Not acceptable

Schlumberger Private
Dealt case by case basis
Require D&M P, VP approval
 Financial Risk
Acceptable
Require D&M GM approval

34
Hazard Analysis and Risk Control

Risk Assessment Matrix -25 to -20

-16 to -10
BLACK
RED
NON-OPERABLE: Evacuate the zone and or area/country
INTOLERABLE: Do not take this risk

-9 to -5 YELLOW UNDESIRABLE: Demonstrate ALARP before proceeding

-4 to -2 GREEN ACCEPTABLE: Proceed carefully, with continuous improvement

-1 BLUE NEGLIGIBLE: Safe to proceed

Likely
Improbable

Unlikely

Possible

Probable
Mitigation

Schlumberger Private
Control
Measures 1 2 3 4 5

Prevention LIKELIHOOD

-1 -2 -3 -4 -5
Light -1 1L 2L 3L 4L 5L

-2 -4 -6 -8 -10
Serious -2 1S 1S 3S 4S 5S

SEVERITY
-3 -6 -9 -12 -15
- SPE 121040, Anti-Collision Risk Management Major -3 1M 2M 3M 4M 5M

Standard for Well Placement Catastrophic -4


-4
1C
-8
2C
-12
3C
-16
4C
-20
5C

- SPE 108279 , Minimizing the Risk of Well Multi-Catastrophic -5


-5 -10 -15 -20 -25
1MC 2MC 3MC 5MC

Collisions in Land and Offshore Drilling


4MC

White arrow indicates decreasing risk

35
Production Environment

Schlumberger Private
36
Examples Of Well Collision Murray 1-14D
 Immediate tangible cost is estimated at USD $ 200 K
Remediation work to retrieve and replace the damaged tubing
Damage to the 4 1/2 tubing (replaced) and 8 5/8 casing (not repaired)
 Intangible cost includes:

Schlumberger Private
Client man-hours
Loss of production from resulting delay to complete the well
Client relationship and professional reputation of Schlumberger

37
Examples Of Well Collision Ku-1271
 Ku-1271 collide with a no-documented SideTrack of Ku-62
 Platform productions suspended 1 week to take new Gyros

Schlumberger Private
38
Drilling Office -Official Software

Schlumberger Private
AC Report Spider Plot DD ToolBox

T-Plot
Travelling Cylinder Visualization

39

Potrebbero piacerti anche