Item Quantit Method Output Plant Labour Duration Reference
y (days) BQ NO.2 DEMOLITIO N AND RECTIFICATI ON WORKS
Demolition Demolish including foundation base, remove all debris
Works away from site, make good all defects (fill measured separately). 176m - Monsoon Drain 3.4 m/hr Back hoe 4 labours 19 days Appendix 198m - Chain Link Fencing 3.4 m/hr Dump track 4 labours 21 days 2(a) Bill 2 Dismantle including foundation base, remove all debris Demolition away from site, make good all defects (fill measured separately). 1 NO - Main Gates Back hoe 3 labours 1 day Dump truck Rectification Hack off and remove surplus spoil from site to Works Contractors own dump. 90m2 - Concrete floor slab 0.4m2/hr 5 labours 1 day Appendix 20m2 - Concrete floor surface 0.4m2/hr Concrete 1 day 2(b) - Floor tile 10m2 8m2/hr breaker/Ha 2 days Bill 2 - Wall tile 1365m2 - Aluminium foil 1.2m2/hr cker 41 day Rectificatio 1481m2 - Composite timber louvre panel 1.1 m2/hr Air 41 day n works 54m2 - Ceiling finishes 4.8 m2/hr compressor 7 day 700m2 3.5 m2/hr 61 day
Dismantle and remove surplus soil from site to
Contractors own dump. - Door frame 7 NO - Door leaf 0.4 no/hr 2 labours 1 day 7 NO 0.6 no/hr Jack 1 day hammer