MAIN ENTRANCE GATE

MEASUREMENTS SHEET
MEASUREM
PAY ITEM
DESCRIPTION
NO. No of bar Cut Length

Fabritionof high tensile steel deformed bars


conformed to astm_A615.
3 reinforcemnt deformed
bas (G-60) STEEL 3/8" and 1/2"

Columns footing

(2x16) 6.75
main 1/2" @ 6"c/c

(2x12) 8.25
distt 1/2" @ 6"c/c

(2x3) 31
columns vert bars 3/4" (outer)

(2x3) 30
columns vert bars 3/4" (oinner)

(2x53) 4.5
ring 3/4"@

beam b-1

1 (3+3) 21.75
T4b 3/4"@

(1x41) 4.5
ring 3/8"@

SUMMARY
184X.384X.454= 32.07
3/8"

414X.668X.454=125.55
1/2"

973X1.502X.454
3/4"

TOTAL WT IN KG

4 smaaliron work
L- iron (1 1/2 x 1 1/ 2x 1/4) (vert)
L- iron (1 1/2 x 1 1/ 2x 1/4) (vert)

L- iron (1 1/2 x 1 1/ 2x 1/4) (vert)

braces

SUMMARY =
Total QTY

M/S Syed Construction Company


TRANCE GATE
MENTS SHEET
MEASUREMENTS

Total length Shape Remarks

3/8" 1/2" 3/4"

216

198

186

180

477

130.5

184.5

184X.384X.454= 32.07 32.07

414X.668X.454=125.55 125.55

973X1.502X.454 638.94

AL WT IN KG 796.6 KG

NO.S L QTY
(2x2) 2.5 10

(2x2) 5 20

(1x2) 6.5 13

18 1 18

61X2.25X454=62.31KG

Total QTY 62.31KG

NESPAK
Measurments sheet
Item.
DESCRIPTION NO.s
No

L B H

PCC 1.4.8 in fondation

longwall 2 53.15 2.4 0.34

shortwall 2 18.35 2.4 0.34

Total cft

Flooring pcc 1:4:8 50 20

Total cft

Brick work in fondation 1:6

longwall 2 52.65 1.9 0.75

shortwall 2 18.35 1.9 0.75

longwall 2 52.25 1.5 0.75

shortwall 2 18.35 1.5 0.75

Total cft
brick work

DPC 1:2:4 1.5 inches thick 1 146 1.5 0.125


Total cft

Brick work in super structure 1:6

longwall
2 51.5 0.75 10

shortwall
2 20 0.75 10
Total cft
brick work

water proofing slab 50 20


QTY
Remarks

86.7408

29.9472

116.688

1000

1000

150.0525

52.2975

117.5625

41.2875

361.2

27.375
27.375

772.5

300

1072.5

1000
Measurments sheet
Item.
DESCRIPTION
No
QTY
Nos L B H

Plaster work 1:6

long wall 2 50 10 1000

short wall 2 20 10 400

Decductions of doors and windows 280

Total sft 1120

Precast slab 1 51.5 21.5 1120

Total sft 1107.25

Steel doors size 4x7 2 28 56

Total sft 56

Steel windows 4x4 14 16 224


Total sft 224

Flooring PCC 1:4:8 1000 0.25 250

Total CFT 250

Flooring PCC 1:2:4 1000 0.17 170

Total CFT 170


Remarks
item no DESCRIPTION OF ITEM

1 Brick work 1:6

2 Concrete 1:2:4

3 Pcc 1:4:8

4 Plaster 1:6

5 Precast slab

Waterproofing of
slab

Steel door size


6 4x7

Steel windows
7 4x4

Description unit rate

cement bag 500


sand cft. 22
aggregate cft. 32

add wastage percent 5


add for water percent 1
machine rent
8 labourers @ PKR 500/day
1 machine operator @ PKR 1000/day
1 mason at PKR 1000/day

curing
small T&P
add for form work 250 sft at 20 PKR

DIVIDE by 0.75

CLASS C UNDERGROUND 9905.29 28,031.97


CLASS C ON GROUND 10765.34 30,465.91
CLASS C ELEVATED 11209.79 31,723.71

CSR RATES RAWALPINDI UNIT MANPOWER


Concrete class C (UNDERGROUND) CM 893.88
Concrete class C (UNDERGROUND) CFT 2,529.68
OUR CONCRETE 1:2:4 CFT 750
UNIT QTY RATE

cft 1,434.00

cft 198.00

cft 367.00

sft 1,120.00

sft 1,107.25

sft 1,000.00

sft 56.00

sft 224.00

cement bags 500


sand 22
crsh 30

1:2:4 1:1.5:3 1:3:6


quantity amount quantity amount quantity amount
17.6 8800 22.5 11250 12.5 6250
44 968 44 968 44 968
88 2816 88 2816 88 2816
12584 15034 10034
13213.2 15785.7 10535.7
13345.332 15943.557 10641.057
375 375 375
500 500 500
125 125 125
125 125 125
93.75 93.75 93.75
100 100 100
100 100 100
5000 5000 5000
19,014.08 16,612.31 11,309.81
25,352.11
2.83

EQUIPMENT MATERIAL OH-PROFIT RATE conversion factor


2,690.11 4,340.24 1,981.06 9,905.29
7,613.01 12,282.88 5,606.40 28,031.97
13345.332 25,352.11
AMONT

44cft
88cft

1:4:8
quantity amount
9.6 4800
44 968
88 2816
8584
9013.2
9103.332
375
500
125
125
93.75
100
100
5000
9,772.08