Contract Job No.

Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 1
Part of Structure Date
Design for One Way Slab (Max. span = 4m ) 25/03/17
Ref. Calculations
1. Slab Reinforcement Design
1.1 Design for One Way Slab (Max. span = 4m )

Properties of Concrete
fcu = 45 N/mm
Modulus of Elasticity E = 26.4 N/mm

Properties of Reinforcement
Thickness = 200 mm
Width = 1000 mm
Concrete Ccover = 25 mm
Effective Depth d = 200 - 25 - 10 / 2 = 170 mm

For Bending Reinforcement :


fy = 460 N/mm High Yield Steel Bar
Bar Size = 10 mm
Spacing of Bar = 150 mm

Design Load
Span = 4 m max.
Live Load LL = 2.5 kPa
Finishing = 1 kPa
Partition = 2 kPa
SW of Slab = 24 x 0.2 = 4.8 kPa
Total Dead Load DL = 1 + 2 + 4.8 = 7.8 kPa
Factored Pressure n = 1.6 x 2.5 + 1.4 x 7.8 = 14.92 kPa

Moment M = = 29.84 kNm


Shear V = = 29.84 kN

Bending Reinforcement
d = 175 mm
6.7 & 6.8 K = M / b d fcu = 0.022 < K = 0.132
=> Compression reinforcement is Not required

6.10 z = d [ 0.5 + ( 0.25 - K / 0.9 ) ] = 170.68 mm > 0.95d = 166.25 => take 0.95d
=> use z = 166.25 mm
6.11 x = ( d - z ) / 0.45 = 19.444 mm

6.12 As = M / 0.87 fy z = 465 mm/m


Provide Bottom T10 @ 150 c/c (As = 524 mm) O.K.

Cl.9.3.1.1 100 As / b h = 0.2618 > 0.13 O.K.

Check Shear
vr = 0.43267 N/mm
bv = 1000 mm
Table 6.3 100 As / bv d = 0.308 < 3
vc = 0.79 ( 100 As / bv d ) ( 400 / d )0.25 / m = 0.643 N/mm
6.19 Design Shear Stress = V / (bv d ) = 0.176 N/mm
Table 6.2 < 0.5vc' = 0.322 N/mm
< vc + vr = 1.076 N/mm O.K.
< min ( 0.8 fcu, 7 ) = 5.367 N/mm
=> Not Require the Shear Reinforcement !

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 2
Part of Structure Date
Design for One Way Slab (Max. span = 4m ) 25/03/17
Ref. Calculations
Span / Depth Ratio
Table 7.3 Basic Span / Depth Ratio = 20 for simply-supported
Table 7.4 for fs = 272.1
Table 7.4 Modificaton Factor for Tension Reinforcement = 1.461 < 2, take 1.461
Table 7.5 Modificaton Factor for Compression Reinforcement = 1.000 < 1.5, take 1.000
Effective Span / Depth Ratio = 29.22 > proposed span / depth ratio = 22.86 O.K.
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 3
Part of Structure Date
Design for Two Way Slab 25/03/17
Ref. Calculations
1.2 Design for Two Way Slab(Slab Mark: 2S4)

Properties of Concrete
fcu = 45 N/mm
Modulus of Elasticity E = 26.4 N/mm

Properties of Reinforcement
For Bending Reinforcement :
fy = 460 N/mm High Yield Steel Bar
Spacing of Bar = 100 mm
Bar Size = 12 mm

Thickness = 200 mm
Width = 1000 mm
Concrete Ccover = 25 mm

Design Load
Shorter Length Ix = 5.2 m
Longer Length Iy = 6.5 m
Ratio Iy / Ix = 1.250
Table 6.5 Moment Coefficient sx = 0.089
Table 6.5 Moment Coefficient sy = 0.057

Live Load LL = 2.5 kPa


Finishing = 1 kPa
Partition = 2 kPa
SW of Slab = 24 x 0.2 = 4.8 kPa
Total Dead Load DL = 1 + 2 + 4.8 = 7.8 kPa

Factored Pressure n = 1.6 x 2.5 + 1.4 x 7.8 = 14.92 kPa


Moment Mx = sx n Ix = 35.704 kNm
Moment My = sy n Ix = 22.996 kNm

Table 6.7 Moment Coefficient vx = 0.400


Table 6.7 Moment Coefficient vy = 0.330
Shear Vsx = vx n Ix = 31.034 kN
Shear Vsy = vy n Ix = 25.603 kN

Bending Reinforcement
d = 157 mm
6.7 & 6.8 K = M / b d fcu = 0.032 < K = 0.132
=> Compression Reinforcement is Not Required !

6.10 z = d [ 0.5 + ( 0.25 - K / 0.9 ) ] = 151.17 mm > 0.95d = 149.15 => take 0.95d
=> use z = 149.15 mm
6.11 x = ( d - z ) / 0.45 = 17.444 mm

6.12 As = M / 0.87 fy z = 620 mm/m


Provide T12 @ 100 c/c (As = 1131 mm) O.K.

Cl.9.3.1.1 100 As / b h = 0.5655 > 0.13 O.K.


Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 4
Part of Structure Date
Design for Two Way Slab 25/03/17
Ref. Calculations
Check Shear
bv = 1000 mm
Table 6.3 100 As / bv d = 0.720 < 3 vr = 0.4327 N/mm
vc = 0.79 ( 100 As / bv d ) ( 400 / d )0.25 / m = 0.871 N/mm
6.19 Design Shear Stress = V / ( bv d ) = 0.198 N/mm
Table 6.2 < vc' = 0.871 N/mm
< vc + vr = 1.303 N/mm
< min ( 0.8 fcu, 7 ) = 5.367 N/mm O.K.

=> Not Require the Shear Reinforcement !

Span / Depth Ratio


Table 7.3 Basic Span / Depth Ratio = 26 for continuous
Table 7.4 for fs = 168.0
Table 7.4 Modificaton Factor for Tension Reinforcement = 1.646 < 2, take 1.646
Table 7.5 Modificaton Factor for Compression Reinforcement = 1.000 < 1.5, take 1.000
Effective Span / Depth Ratio = 42.81 > proposed span / depth ratio = 41.40 O.K.
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 5
Part of Structure Date
Design for Two Way Slab 25/03/17
Ref. Calculations
1.3 Design for Two Way Slab(Slab Mark: 2S6)

Properties of Concrete
fcu = 45 N/mm
Modulus of Elasticity E = 26.4 N/mm

Properties of Reinforcement
For Bending Reinforcement :
fy = 460 N/mm High Yield Steel Bar
Spacing of Bar = 100 mm
Bar Size = 12 mm

Thickness = 200 mm
Width = 1000 mm
Concrete Ccover = 25 mm

Design Load
Shorter Length Ix = 4.6 m
Longer Length Iy = 5 m
Ratio Iy / Ix = 1.087
Table 6.5 Moment Coefficient sx = 0.072
Table 6.5 Moment Coefficient sy = 0.061

Live Load LL = 2.5 kPa


Finishing = 1 kPa
Partition = 2 kPa
SW of Slab = 24 x 0.2 = 4.8 kPa
Total Dead Load DL = 1 + 2 + 4.8 = 7.8 kPa

Factored Pressure n = 1.6 x 2.5 + 1.4 x 7.8 = 14.92 kPa


Moment Mx = sx n Ix = 22.868 kNm
Moment My = sy n Ix = 19.299 kNm

Table 6.7 Moment Coefficient vx = 0.356


Table 6.7 Moment Coefficient vy = 0.330
Shear Vsx = vx n Ix = 24.439 kN
Shear Vsy = vy n Ix = 22.649 kN

Bending Reinforcement
d = 157 mm
6.7 & 6.8 K = M / b d fcu = 0.021 < K = 0.132
=> Compression Reinforcement is Not Required !

6.10 z = d [ 0.5 + ( 0.25 - K / 0.9 ) ] = 153.32 mm > 0.95d = 149.15 => take 0.95d
=> use z = 149.15 mm
6.11 x = ( d - z ) / 0.45 = 17.444 mm

6.12 As = M / 0.87 fy z = 397 mm/m


Provide T12 @ 100 c/c (As = 1131 mm) O.K.

Cl.9.3.1.1 100 As / b h = 0.5655 > 0.13 O.K.


Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 6
Part of Structure Date
Design for Two Way Slab 25/03/17
Ref. Calculations
Check Shear
bv = 1000 mm
Table 6.3 100 As / bv d = 0.720 < 3 vr = 0.4327 N/mm
vc = 0.79 ( 100 As / bv d ) ( 400 / d )0.25 / m = 0.871 N/mm
6.19 Design Shear Stress = V / ( bv d ) = 0.156 N/mm
Table 6.2 < vc' = 0.871 N/mm
< vc + vr = 1.303 N/mm
< min ( 0.8 fcu, 7 ) = 5.367 N/mm O.K.

=> Not Require the Shear Reinforcement !

Span / Depth Ratio


Table 7.3 Basic Span / Depth Ratio = 26 for continuous
Table 7.4 for fs = 107.6
Table 7.4 Modificaton Factor for Tension Reinforcement = 2.234 >2 take 2.000
Table 7.5 Modificaton Factor for Compression Reinforcemen = 1.000 < 1.5, take 1.000
Effective Span / Depth Ratio = 52.00 > proposed span / depth ratio = 31.85 O.K.
1 3

0.073
0.062

0.062 1 0.0724 0.062 1 0.0611


0.074 1.1 0.061 1.1
1 1.1 1.2 1.3 1.4 1.5 1.75 2
0.062 0.074 0.084 0.093 0.099 0.104 0.113 0.118
0.062 0.061 0.059 0.055 0.051 0.046 0.037 0.029

0.33 1 0.3561
0.36 1.1
1 1.1 1.2 1.3 1.4 1.5 1.75 2
0.33 0.36 0.39 0.41 0.43 0.45 0.48 0.5

0.351
0.179

Hidden
0.612
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 7
Part of Structure Date
Design for Two Way Slab 25/03/17
Ref. Calculations
1.4 Design for Two Way Slab(Slab Mark: 2S7)

Properties of Concrete
fcu = 45 N/mm
Modulus of Elasticity E = 26.4 N/mm

Properties of Reinforcement
For Bending Reinforcement :
fy = 460 N/mm High Yield Steel Bar
Spacing of Bar = 100 mm
Bar Size = 12 mm

Thickness = 200 mm
Width = 1000 mm
Concrete Ccover = 25 mm

Design Load
Shorter Length Ix = 4.1 m
Longer Length Iy = 5.4 m
Ratio Iy / Ix = 1.317
Table 6.5 Moment Coefficient sx = 0.094
Table 6.5 Moment Coefficient sy = 0.054

Live Load LL = 2.5 kPa


Finishing = 1 kPa
Partition = 2 kPa
SW of Slab = 24 x 0.2 = 4.8 kPa
Total Dead Load DL = 1 + 2 + 4.8 = 7.8 kPa

Factored Pressure n = 1.6 x 2.5 + 1.4 x 7.8 = 14.92 kPa


Moment Mx = sx n Ix = 23.582 kNm
Moment My = sy n Ix = 13.623 kNm

Table 6.7 Moment Coefficient vx = 0.413


Table 6.7 Moment Coefficient vy = 0.330
Shear Vsx = vx n Ix = 25.289 kN
Shear Vsy = vy n Ix = 20.187 kN

Bending Reinforcement
d = 157 mm
6.7 & 6.8 K = M / b d fcu = 0.021 < K = 0.132
=> Compression Reinforcement is Not Required !

6.10 z = d [ 0.5 + ( 0.25 - K / 0.9 ) ] = 153.20 mm > 0.95d = 149.15 => take 0.95d
=> use z = 149.15 mm
6.11 x = ( d - z ) / 0.45 = 17.444 mm

6.12 As = M / 0.87 fy z = 409 mm/m


Provide T12 @ 100 c/c (As = 1131 mm) O.K.

Cl.9.3.1.1 100 As / b h = 0.5655 > 0.13 O.K.


Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 8
Part of Structure Date
Design for Two Way Slab 25/03/17
Ref. Calculations
Check Shear
bv = 1000 mm
Table 6.3 100 As / bv d = 0.720 < 3 vr = 0.4327 N/mm
vc = 0.79 ( 100 As / bv d ) ( 400 / d )0.25 / m = 0.871 N/mm
6.19 Design Shear Stress = V / ( bv d ) = 0.161 N/mm
Table 6.2 < vc' = 0.871 N/mm
< vc + vr = 1.303 N/mm
< min ( 0.8 fcu, 7 ) = 5.367 N/mm O.K.

=> Not Require the Shear Reinforcement !

Span / Depth Ratio


Table 7.3 Basic Span / Depth Ratio = 26 for continuous
Table 7.4 for fs = 111.0
Table 7.4 Modificaton Factor for Tension Reinforcement = 2.193 >2 take 2.000
Table 7.5 Modificaton Factor for Compression Reinforcemen = 1.000 < 1.5, take 1.000
Effective Span / Depth Ratio = 52.00 > proposed span / depth ratio = 34.39 O.K.
1 4

0.094
0.054

0.093 1.3 0.094 0.055 1.3 0.0543


0.099 1.4 0.051 1.4
1 1.1 1.2 1.3 1.4 1.5 1.75 2
0.062 0.074 0.084 0.093 0.099 0.104 0.113 0.118
0.062 0.061 0.059 0.055 0.051 0.046 0.037 0.029

0.41 1.3 0.4134


0.43 1.4
1 1.1 1.2 1.3 1.4 1.5 1.75 2
0.33 0.36 0.39 0.41 0.43 0.45 0.48 0.5

0.362
0.185

Hidden
0.661
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 9
Part of Structure Date
Design for Two Way Slab 25/03/17
Ref. Calculations
1.5 Design for Two Way Slab(Slab Mark: 2S9)

Properties of Concrete
fcu = 45 N/mm
Modulus of Elasticity E = 26.4 N/mm

Properties of Reinforcement
For Bending Reinforcement :
fy = 460 N/mm High Yield Steel Bar
Spacing of Bar = 100 mm
Bar Size = 12 mm

Thickness = 200 mm
Width = 1000 mm
Concrete Ccover = 25 mm

Design Load
Shorter Length Ix = 4.1 m
Longer Length Iy = 5 m
Ratio Iy / Ix = 1.220
Table 6.5 Moment Coefficient sx = 0.086
Table 6.5 Moment Coefficient sy = 0.058

Live Load LL = 2.5 kPa


Finishing = 1 kPa
Partition = 2 kPa
SW of Slab = 24 x 0.2 = 4.8 kPa
Total Dead Load DL = 1 + 2 + 4.8 = 7.8 kPa

Factored Pressure n = 1.6 x 2.5 + 1.4 x 7.8 = 14.92 kPa


Moment Mx = sx n Ix = 21.508 kNm
Moment My = sy n Ix = 14.602 kNm

Table 6.7 Moment Coefficient vx = 0.394


Table 6.7 Moment Coefficient vy = 0.330
Shear Vsx = vx n Ix = 24.096 kN
Shear Vsy = vy n Ix = 20.187 kN

Bending Reinforcement
d = 157 mm
6.7 & 6.8 K = M / b d fcu = 0.019 < K = 0.132
=> Compression Reinforcement is Not Required !

6.10 z = d [ 0.5 + ( 0.25 - K / 0.9 ) ] = 153.54 mm > 0.95d = 149.15 => take 0.95d
=> use z = 149.15 mm
6.11 x = ( d - z ) / 0.45 = 17.444 mm

6.12 As = M / 0.87 fy z = 373 mm/m


Provide T12 @ 100 c/c (As = 1131 mm) O.K.

Cl.9.3.1.1 100 As / b h = 0.5655 > 0.13 O.K.


Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 10
Part of Structure Date
Design for Two Way Slab 25/03/17
Ref. Calculations
Check Shear
bv = 1000 mm
Table 6.3 100 As / bv d = 0.720 < 3 vr = 0.4327 N/mm
vc = 0.79 ( 100 As / bv d ) ( 400 / d )0.25 / m = 0.871 N/mm
6.19 Design Shear Stress = V / ( bv d ) = 0.153 N/mm
Table 6.2 < vc' = 0.871 N/mm
< vc + vr = 1.303 N/mm
< min ( 0.8 fcu, 7 ) = 5.367 N/mm O.K.

=> Not Require the Shear Reinforcement !

Span / Depth Ratio


Table 7.3 Basic Span / Depth Ratio = 26 for continuous
Table 7.4 for fs = 101.2
Table 7.4 Modificaton Factor for Tension Reinforcement = 2.317 >2 take 2.000
Table 7.5 Modificaton Factor for Compression Reinforcemen = 1.000 < 1.5, take 1.000
Effective Span / Depth Ratio = 52.00 > proposed span / depth ratio = 31.85 O.K.
1 5

0.086
0.058

0.084 1.2 0.0858 0.059 1.2 0.0582


0.093 1.3 0.055 1.3
1 1.1 1.2 1.3 1.4 1.5 1.75 2
0.062 0.074 0.084 0.093 0.099 0.104 0.113 0.118
0.062 0.061 0.059 0.055 0.051 0.046 0.037 0.029

0.39 1.2 0.3939


0.41 1.3
1 1.1 1.2 1.3 1.4 1.5 1.75 2
0.33 0.36 0.39 0.41 0.43 0.45 0.48 0.5

0.330
0.176

Hidden
0.612
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 11
Part of Structure Date
Design for Two Way Slab 25/03/17
Ref. Calculations
1.6 Design for Two Way Slab(Slab Mark: 2S13)

Properties of Concrete
fcu = 45 N/mm
Modulus of Elasticity E = 26.4 N/mm

Properties of Reinforcement
For Bending Reinforcement :
fy = 460 N/mm High Yield Steel Bar
Spacing of Bar = 100 mm
Bar Size = 12 mm

Thickness = 200 mm
Width = 1000 mm
Concrete Ccover = 25 mm

Design Load
Shorter Length Ix = 5 m
Longer Length Iy = 5 m
Ratio Iy / Ix = 1.000
Table 6.5 Moment Coefficient sx = 0.062
Table 6.5 Moment Coefficient sy = 0.062

Live Load LL = 2.5 kPa


Finishing = 1 kPa
Partition = 2 kPa
SW of Slab = 24 x 0.2 = 4.8 kPa
Total Dead Load DL = 1 + 2 + 4.8 = 7.8 kPa

Factored Pressure n = 1.6 x 2.5 + 1.4 x 7.8 = 14.92 kPa


Moment Mx = sx n Ix = 23.126 kNm
Moment My = sy n Ix = 23.126 kNm

Table 6.7 Moment Coefficient vx = 0.330


Table 6.7 Moment Coefficient vy = 0.330
Shear Vsx = vx n Ix = 24.618 kN
Shear Vsy = vy n Ix = 24.618 kN

Bending Reinforcement
d = 157 mm
6.7 & 6.8 K = M / b d fcu = 0.021 < K = 0.132
=> Compression Reinforcement is Not Required !

6.10 z = d [ 0.5 + ( 0.25 - K / 0.9 ) ] = 153.27 mm > 0.95d = 149.15 => take 0.95d
=> use z = 149.15 mm
6.11 x = ( d - z ) / 0.45 = 17.444 mm

6.12 As = M / 0.87 fy z = 401 mm/m


Provide T12 @ 100 c/c (As = 1131 mm) O.K.

Cl.9.3.1.1 100 As / b h = 0.5655 > 0.13 O.K.


Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 12
Part of Structure Date
Design for Two Way Slab 25/03/17
Ref. Calculations
Check Shear
bv = 1000 mm
Table 6.3 100 As / bv d = 0.720 < 3 vr = 0.4327 N/mm
vc = 0.79 ( 100 As / bv d ) ( 400 / d )0.25 / m = 0.871 N/mm
6.19 Design Shear Stress = V / ( bv d ) = 0.157 N/mm
Table 6.2 < vc' = 0.871 N/mm
< vc + vr = 1.303 N/mm
< min ( 0.8 fcu, 7 ) = 5.367 N/mm O.K.

=> Not Require the Shear Reinforcement !

Span / Depth Ratio


Table 7.3 Basic Span / Depth Ratio = 26 for continuous
Table 7.4 for fs = 108.8
Table 7.4 Modificaton Factor for Tension Reinforcement = 2.219 >2 take 2.000
Table 7.5 Modificaton Factor for Compression Reinforcemen = 1.000 < 1.5, take 1.000
Effective Span / Depth Ratio = 52.00 > proposed span / depth ratio = 31.85 O.K.
1 6

0.063
0.063

0.062 1 0.062 0.062 1 0.062


0.074 1.1 0.061 1.1
1 1.1 1.2 1.3 1.4 1.5 1.75 2
0.062 0.074 0.084 0.093 0.099 0.104 0.113 0.118
0.062 0.061 0.059 0.055 0.051 0.046 0.037 0.029

0.33 1 0.33
0.36 1.1
1 1.1 1.2 1.3 1.4 1.5 1.75 2
0.33 0.36 0.39 0.41 0.43 0.45 0.48 0.5

0.355
0.180

Hidden
0.612
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
13
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure Date
Beam Reinforcement Design 25/03/17
Ref. Calculations
2. Beam Reinforcement Design
2.1 Design for Beam ( 200 x 500 ) (Beam Mark: B1 to B5, B7, B9 to B11,B14 to B17)
Section Properties
fcu = 45 N/mm
Modulus of Easticity E = 26.4 N/mm
Section Breadth b = 200 mm
Concrete Depth h = 500 mm
Concrete Cover = 30 mm Span = 5 m
For Bending Reinforcement :
fy = 460 N/mm High Yield Steel Bar
Number of Tension Bar = 4
Tension Bar Size = 25 mm, no of layer = 2
For Shear Reinforcement :
fyv = 460 N/mm High Yield Steel Bar
Links Size = 12 mm
Spacing = 200 mm

Design Load ( Refer to Appendix 1 )


Max. Moment M = 180 kNm (Beam Mark B2, ETABS Mark B3, Load Comb C09)
Max. Shear Force V = 140 kN (Beam Mark B2, ETABS Mark B3, Load Comb C09)

Bending Reinforcement
d = 433 mm
6.7 & 6.8 K = M / b d fcu = 0.1067 < K = 0.132

Compression reinforcement is Not required

6.10 z = d [ 0.5 + ( 0.25 - K / 0.9 ) ] = 373.50 mm < 0.95d = 411.35 => take z
=> use z = 373.50 mm
6.11 x = ( d - z ) / 0.45 = 132.215 mm

6.12 As = M / 0.87 fy z = 1204.2 mm/m

Provide Bottom 4T25 (As = 1963 mm) (T1-2T25, T2-2T25) O.K.

Table 9.1 0.13 < 100 As / b h = 1.96 < 4 O.K.

Shear Reinforcement
bv = 200 mm
Table 6.3 100 As / bv d = 2.267 < 3 vr = 0.4327 N/mm
vc = 0.79 ( 100 As / bv d ) ( 400 / d )0.25 / m = 1.010 N/mm
6.19 Design Shear Stress = V / (bv d ) = 1.617 N/mm
Table 6.2 > 0.5 vc' = 0.505 N/mm
> vc + vr = 1.443 N/mm
< min ( 0.8 fcu, 7 ) = 5.367 N/mm O.K.
Table 6.2 Asv = bv sv (v - vc) / 0.87 fyv = > Asv / sv = 0.303

Provide S.S. T12 @ 200 c/c ( Asv / s = 1.131 ) O.K.


Span / Depth Ratio
Table 7.3 Basic Span / Depth Ratio = 20 for simply-supported
Table 7.4 for fs = 188.1
Table 7.4 Modificaton Factor for Tension Reinforcement = 0.972 < 2, take 0.972
Effective Span / Depth Ratio = 19.45 > proposed span / depth ratio = 11.547 O.K.
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
14
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure Date
Beam Reinforcement Design 25/03/17

2.2 Design for Beam ( 200 x 400 ) (Beam Mark: B6 and B18)

Section Properties
fcu = 45 N/mm
Modulus of Easticity E = 26.4 N/mm
Section Breadth b = 200 mm
Concrete Depth h = 400 mm
Concrete Cover = 30 mm Span = 5 m
For Bending Reinforcement :
fy = 460 N/mm High Yield Steel Bar
Number of Tension Bar = 4
Tension Bar Size = 25 mm, no of layer = 2
For Shear Reinforcement :
fyv = 460 N/mm High Yield Steel Bar
Links Size = 12 mm
Spacing = 200 mm

Design Load ( Refer to Appendix 1 )


Max. Moment M = 70 kNm (Beam Mark RB1, ETABS Mark B31, Load Comb C05)
Max. Shear Force V = 85 kN (Beam Mark RB1, ETABS Mark B49, Load Comb C09)

Bending Reinforcement
d = 333 mm
6.7 & 6.8 K = M / b d fcu = 0.0701 < K = 0.132
Compression reinforcement is Not required

6.10 z = d [ 0.5 + ( 0.25 - K / 0.9 ) ] = 304.63 mm < 0.95d = 316.35 => take z
=> use z = 304.63 mm

6.11 x = ( d - z ) / 0.45 = 63.041 mm

6.12 As = M / 0.87 fy z = 574.2 mm/m


Provide Bottom 4T25 (As = 1963 mm) (T1-2T25, T2-2T25) O.K.

Table 9.1 0.13 < 100 As / b h = 2.45 < 4 O.K.

Shear Reinforcement
bv = 200 mm
Table 6.3 100 As / bv d = 2.948 < 3 vr = 0.4327 N/mm
vc = 0.79 ( 100 As / bv d ) ( 400 / d )0.25 / m = 1.154 N/mm
6.19 Design Shear Stress = V / (bv d ) = 1.276 N/mm
Table 6.2 > 0.5 vc' = 0.577 N/mm
< vc + vr = 1.587 N/mm
< min ( 0.8 fcu, 7 ) = 5.367 N/mm O.K.

Table 6.2 Asv = vr bv sv / 0.87 fyv = > Asv / sv = 0.216

Provide S.S. T12 @ 200 c/c ( Asv / s = 1.131 ) O.K.

Span / Depth Ratio


Table 7.3 Basic Span / Depth Ratio = 20 for simply-supported
Table 7.4 for fs = 89.7
Table 7.4 Modificaton Factor for Tension Reinforcement = 1.346 < 2, take 1.346
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
15
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure Date
Beam Reinforcement Design 25/03/17
Effective Span / Depth Ratio = 26.91 > proposed span / depth ratio = 15.015 O.K.

2.3 Design for Beam ( 200 x 1400 ) (Beam Mark: B8)


Section Properties
fcu = 45 N/mm
Modulus of Easticity E = 26.4 N/mm
Section Breadth b = 200 mm
Concrete Depth h = 1400 mm
Concrete Cover = 30 mm Span = 7.5 m
For Bending Reinforcement :
fy = 460 N/mm High Yield Steel Bar
Number of Tension Bar = 4
Tension Bar Size = 25 mm, no of layer = 2
For Shear Reinforcement :
fyv = 460 N/mm High Yield Steel Bar
Links Size = 12 mm
Spacing = 200 mm

Design Load ( Refer to Appendix 1 )


Max. Moment M = 935 kNm (Beam Mark B9, ETABS Mark B8, Load Comb C09)
Max. Shear Force V = 420 kN (Beam Mark B9, ETABS Mark B8, Load Comb C09)

Bending Reinforcement
d = 1333 mm
6.7 & 6.8 K = M / b d fcu = 0.0585 < K = 0.132
Compression reinforcement is Not required

6.10 z = d [ 0.5 + ( 0.25 - K / 0.9 ) ] = 1239.90 mm < 0.95d = 1266.4 => take z
=> use z = 1239.90 mm
6.11 x = ( d - z ) / 0.45 = 206.884 mm

6.12 As = M / 0.87 fy z = 1884.3 mm/m


Provide Bottom 4T25 (As = 1963 mm) (T1-2T25, T2-2T25) O.K.

Table 9.1 0.13 < 100 As / b h = 0.70 < 4 O.K.

Shear Reinforcement
bv = 200 mm
Table 6.3 100 As / bv d = 0.736 < 3 vr = 0.4327 N/mm

vc = 0.79 ( 100 As / bv d ) ( 400 / d ) 0.25
/ m = 0.694 N/mm
6.19 Design Shear Stress = V / (bv d ) = 1.575 N/mm
Table 6.2 > 0.5 vc' = 0.347 N/mm
> vc + vr = 1.127 N/mm
< min ( 0.8 fcu, 7 ) = 5.367 N/mm O.K.

Table 6.2 Asv = bv sv (v - vc) / 0.87 fyv = > Asv / sv = 0.440

Provide S.S. T12 @ 200 c/c ( Asv / s = 1.131 ) O.K.

Span / Depth Ratio


Table 7.3 Basic Span / Depth Ratio = 20 for simply-supported
Table 7.4 for fs = 294.3
Table 7.4 Modificaton Factor for Tension Reinforcement = 0.981 < 2, take 0.981
Effective Span / Depth Ratio = 19.62 > proposed span / depth ratio = 5.626 O.K.
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
16
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure Date
Beam Reinforcement Design 25/03/17

2.4 Design for Beam ( 200 x 500 )(Beam Mark: B12)


Section Properties
fcu = 45 N/mm
Modulus of Easticity E = 26.4 N/mm
Section Breadth b = 200 mm
Concrete Depth h = 500 mm
Concrete Cover = 30 mm Span = 2.6 m
For Bending Reinforcement :
fy = 460 N/mm High Yield Steel Bar
Number of Tension Bar = 2
Tension Bar Size = 25 mm, no of layer = 1
For Shear Reinforcement :
fyv = 460 N/mm High Yield Steel Bar
Links Size = 12 mm
Spacing = 200 mm

Design Load ( Refer to Appendix 1 )


Max. Moment M = 90 kNm (Beam Mark B12, ETABS Mark B22, Load Comb C05)
Max. Shear Force V = 80 kN (Beam Mark 12, ETABS Mark B22, Load Comb C09)

Bending Reinforcement
d = 445.5 mm
6.7 & 6.8 K = M / b d fcu = 0.0504 < K = 0.132
Compression reinforcement is Not required

6.10 z = d [ 0.5 + ( 0.25 - K / 0.9 ) ] = 418.98 mm < 0.95d = 423.23 => take z
=> use z = 418.98 mm
6.11 x = ( d - z ) / 0.45 = 58.932 mm

6.12 As = M / 0.87 fy z = 536.7 mm/m


Provide Bottom 2T25 (As = 982 mm) O.K.

Table 9.1 0.13 < 100 As / b h = 0.98 < 4 O.K.

Shear Reinforcement
bv = 200 mm
Table 6.3 100 As / bv d = 1.102 < 3 vr = 0.4327 N/mm
vc = 0.79 ( 100 As / bv d ) ( 400 / d )0.25 / m = 0.794 N/mm
6.19 Design Shear Stress = V / (bv d ) = 0.898 N/mm
Table 6.2 > 0.5 vc' = 0.397 N/mm
< vc + vr = 1.227 N/mm
< min ( 0.8 fcu, 7 ) = 5.367 N/mm O.K.

Table 6.2 Asv = vr bv sv / 0.87 fyv = > Asv / sv = 0.216

Provide S.S. T12 @ 200 c/c ( Asv / s = 1.131 ) O.K.

Span / Depth Ratio


Table 7.3 Basic Span / Depth Ratio = 7 for cantilever
Table 7.4 for fs = 167.7
Table 7.4 Modificaton Factor for Tension Reinforcement = 1.364 < 2, take 1.364
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
17
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure Date
Beam Reinforcement Design 25/03/17
Effective Span / Depth Ratio = 9.55 > proposed span / depth ratio = 5.836 O.K.

2.5 Design for Beam ( 200 x 500 )(Beam Mark: B13)


Section Properties
fcu = 45 N/mm
Modulus of Easticity E = 26.4 N/mm
Section Breadth b = 200 mm
Concrete Depth h = 500 mm
Concrete Cover = 30 mm Span = 1.6 m
For Bending Reinforcement :
fy = 460 N/mm High Yield Steel Bar
Number of Tension Bar = 2
Tension Bar Size = 25 mm, no of layer = 1
For Shear Reinforcement :
fyv = 460 N/mm High Yield Steel Bar
Links Size = 12 mm
Spacing = 200 mm

Design Load ( Refer to Appendix 1 )


Max. Moment M = 23 kNm (Beam Mark B13, ETABS Mark B23, Load Comb C01)
Max. Shear Force V = 32 kN (Beam Mark B13, ETABS Mark B23, Load Comb C01)

Bending Reinforcement
d = 445.5 mm
6.7 & 6.8 K = M / b d fcu = 0.0130 < K = 0.132
Compression reinforcement is Not required

6.10 z = d [ 0.5 + ( 0.25 - K / 0.9 ) ] = 438.98 mm > 0.95d = 423.23 => take 0.95d
=> use z = 423.23 mm
6.11 x = ( d - z ) / 0.45 = 49.500 mm

6.12 As = M / 0.87 fy z = 137.0 mm/m


Provide Bottom 2T25 (As = 982 mm) O.K.

Table 9.1 0.13 < 100 As / b h = 0.98 < 4 O.K.

Shear Reinforcement
bv = 200 mm
Table 6.3 100 As / bv d = 1.102 < 3 vr = 0.4327 N/mm
vc = 0.79 ( 100 As / bv d ) ( 400 / d )0.25 / m = 0.794 N/mm
6.19 Design Shear Stress = V / (bv d ) = 0.359 N/mm
Table 6.2 < 0.5 vc' = 0.397 N/mm
< vc + vr = 1.227 N/mm
< min ( 0.8 fcu, 7 ) = 5.367 N/mm O.K.

Table 6.2 Asv = vr bv sv / 0.87 fyv = > Asv / sv = 0.216

Provide S.S. T12 @ 200 c/c ( Asv / s = 1.131 ) O.K.

Span / Depth Ratio


Table 7.3 Basic Span / Depth Ratio = 20 for simply-supported
Table 7.4 for fs = 42.8
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
18
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure Date
Beam Reinforcement Design 25/03/17
Table 7.4 Modificaton Factor for Tension Reinforcement = 2.988 > 2 take 2.000
Effective Span / Depth Ratio = 40.00 > proposed span / depth ratio = 3.591 O.K.

2.6 Design for Beam ( 200 x 400 )(Beam Mark: RB1- RB8)
Section Properties
fcu = 45 N/mm
Modulus of Easticity E = 26.4 N/mm
Section Breadth b = 200 mm
Concrete Depth h = 400 mm
Concrete Cover = 30 mm Span = 2.8 m
For Bending Reinforcement :
fy = 460 N/mm High Yield Steel Bar
Number of Tension Bar = 2
Tension Bar Size = 25 mm, no of layer = 1
For Shear Reinforcement :
fyv = 460 N/mm High Yield Steel Bar
Links Size = 12 mm
Spacing = 200 mm

Design Load ( Refer to Appendix 1 )


Max. Moment M = 70 kNm (Beam Mark RB5, ETABS Mark B31, Load Comb C05)
Max. Shear Force V = 79 kN (Beam Mark RB5, ETABS Mark B31, Load Comb C05)

Bending Reinforcement
d = 345.5 mm
6.7 & 6.8 K = M / b d fcu = 0.0652 < K = 0.132
Compression reinforcement is Not required

6.10 z = d [ 0.5 + ( 0.25 - K / 0.9 ) ] = 318.35 mm < 0.95d = 328.23 => take z
=> use z = 318.35 mm
6.11 x = ( d - z ) / 0.45 = 60.324 mm

6.12 As = M / 0.87 fy z = 549.4 mm/m


Provide Bottom 2T25 (As = 982 mm) O.K.

Table 9.1 0.13 < 100 As / b h = 1.23 < 4 O.K.

Shear Reinforcement
bv = 200 mm
Table 6.3 100 As / bv d = 1.421 < 3 vr = 0.4327 N/mm
vc = 0.79 ( 100 As / bv d ) ( 400 / d )0.25 / m = 0.897 N/mm
6.19 Design Shear Stress = V / (bv d ) = 1.139 N/mm
Table 6.2 > 0.5 vc' = 0.448 N/mm
< vc + vr = 1.329 N/mm
< min ( 0.8 fcu, 7 ) = 5.367 N/mm O.K.

Table 6.2 Asv = vr bv sv / 0.87 fyv = > Asv / sv = 0.216

Provide S.S. T12 @ 200 c/c ( Asv / s = 1.131 ) O.K.

Span / Depth Ratio


Table 7.3 Basic Span / Depth Ratio = 20 for simply-supported
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
19
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure Date
Beam Reinforcement Design 25/03/17
Table 7.4 for fs = 171.6
Table 7.4 Modificaton Factor for Tension Reinforcement = 1.214 < 2, take 1.214
Effective Span / Depth Ratio = 24.28 > proposed span / depth ratio = 8.104 O.K.
20

2
2 1

0.613

( Cl.9.9.1.1 tension reinforcement should not exceed 2.5 % , compression rein. should not be less than 1/2 of tension rein )

1.121

0.268

188.08

0.594
21

2 2

0.292

( Cl.9.9.1.1 tension reinforcement should not exceed 2.5 % , compression rein. should not be less than 1/2 of tension rein )

0.804

0.191

89.677
22

0.558

2 3

0.960

( Cl.9.9.1.1 tension reinforcement should not exceed 2.5 % , compression rein. should not be less than 1/2 of tension rein )

1.398

0.389

294.3

0.287
23

2 4

0.547

( Cl.9.9.1.1 tension reinforcement should not exceed 2.5 % , compression rein. should not be less than 1/2 of tension rein )

0.732

0.191

167.66
24

0.611

2 5

0.140

( Cl.9.9.1.1 tension reinforcement should not exceed 2.5 % , compression rein. should not be less than 1/2 of tension rein )

0.293

0.191

42.786
25

0.090

2 6

0.560

( Cl.9.9.1.1 tension reinforcement should not exceed 2.5 % , compression rein. should not be less than 1/2 of tension rein )

0.857

0.191
26

171.62

0.334
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 18
Part of Structure Date
Proposed wall Design 25/03/17
Ref. Calculations
3. Proposed wall Design
3.1 Check Wall W5, W6, W14 Y

fcu = 45 N/mm h X
fy = 460 N/mm
Section breadth (b) = 200 mm
Concrete depth (h)= 600 mm b
Concrete cover = 25 mm Lo = 2.7 m
Links size = 10 mm x = 1 Braced
Rebar size = 16 mm y = 1 Braced
Max. moment (M) = 44.100 KNm Lex = 2.7 m
Max. shear force (V) = 25.900 KN Ley = 2.7 m
Max. Axial force (N) = 378.000 KN Lex / h = 4.500 < 15, Short Column.
Ley / b = 13.500 < 15, Short Column.
Anc = 120000 mm
Asc = 804 mm for 4T 16 e= 0 mm

For slender braced Column : 60 b/h= 12 > Lo O.K.


100b/h = 6.667 > Lo O.K.

Nbal = 0.25fcubh= 1350.000 KN


Nuz = 0.45 fcu Anc + 0.87 fy Asc = 2751.761 KN

K = (Nuz-N)/(Nuz-Nbal) = 1.693 >1 Take K= 1


a = ( Le / b ) / 2000 = 0.091

au = a K h = 54.675 mm, Madd = N au = 20.667 KNm

M1 = 11.900 KNm, M2 = 44.100 KNm,

Mi = 0.4 M1 + 0.6 M2 = 31.220 > 0.4 M2 = 17.640 KNm O.K.


emin = h/20 = 30 < 20, take= 20 mm

M2 = 44.100 KNm d= 557 mm


Mi + Madd = 51.887 KNm = Design Moment d/h = 0.93
M1 + Madd/2 = 22.234 KNm
emin N = 7.560 KNm

K Mt M/bhfcu N/bhfcu As/bhfcu As Nuz K


1 51.887 0.02 0.07 0.00004 216 2516.443 1.833 ~= initial K
O.K.
Provide 4T16 (As = 804 mm/m) > 216
100As/bh = 0.67 > 0.4 & < 4 O.K.
Shear
M/N = 116.667 < 0.6h = 360

100As/bvd = 0.7217 vc = 0.635 N/mm

v= V/(bvd) = 0.232 N/mm < vc No shear reinf. required. O.K.

Provide T12-200 c/c (Asv/s = 2.83 ) O.K.


Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 19
Part of Structure Date
Proposed wall Design 25/03/17
Ref. Calculations

3.2 Check Wall W8, W11, W13, W15, W16, W21 Y

fcu = 45 N/mm h X
fy = 460 N/mm
Section breadth (b) = 200 mm
Concrete depth (h)= 800 mm b
Concrete cover = 25 mm Lo = 2.7 m
Links size = 10 mm x = 1 Braced
Rebar size = 16 mm y = 1 Braced
Max. moment (M) = 121.500 KNm Lex = 2.7 m
Max. shear force (V) = 62.900 KN Ley = 2.7 m
Max. Axial force (N) = 523.300 KN Lex / h = 3.375 < 15, Short Column.
Ley / b = 13.500 < 15, Short Column.
Anc = 160000 mm
Asc = 804 mm for 4T 16 e= 0 mm

For slender braced Column : 60 b/h= 12 > Lo O.K.


100b/h = 5 > Lo O.K.

Nbal = 0.25fcubh= 1800.000 KN


Nuz = 0.45 fcu Anc + 0.87 fy Asc = 3561.761 KN

K = (Nuz-N)/(Nuz-Nbal) = 1.725 >1 Take K= 1


a = ( Le / b ) / 2000 = 0.091

au = a K h = 72.900 mm, Madd = N au = 38.149 KNm

M1 = 3.600 KNm, M2 = 121.500 KNm,

Mi = 0.4 M1 + 0.6 M2 = 74.340 > 0.4 M2 = 48.600 KNm O.K.


emin = h/20 = 40 < 20, take= 20 mm

M2 = 121.500 KNm = Design Moment d= 757 mm


Mi + Madd = 112.489 KNm d/h = 0.95
M1 + Madd/2 = 22.674 KNm
emin N = 10.466 KNm

K Mt M/bhfcu N/bhfcu As/bhfcu As Nuz K


1 121.500 0.02 0.07 0.00004 288 3355.258 1.821 ~= initial K
O.K.
Provide 4T16 (As = 804 mm/m) > 288
100As/bh = 0.50 > 0.4 & < 4 O.K.
Shear
M/N = 232.180 < 0.6h = 480

100As/bvd = 0.5310 vc = 0.531 N/mm

v= V/(bvd) = 0.415 N/mm < vc No shear reinf. required. O.K.


Provide T12-200 c/c (Asv/s = 2.83 ) O.K.

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 20
Part of Structure Date
Proposed wall Design 25/03/17
Ref. Calculations

3.3 Check Wall W1, W2, W9, W12, W17, W19, W22 Y

fcu = 45 N/mm h X
fy = 460 N/mm
Section breadth (b) = 200 mm
Concrete depth (h)= 1400 mm b
Concrete cover = 25 mm Lo = 2.7 m
Links size = 10 mm x = 1 Braced
Rebar size = 16 mm y = 1 Braced
Max. moment (M) = 512.000 KNm Lex = 2.7 m
Max. shear force (V) = 141.800 KN Ley = 2.7 m
Max. Axial force (N) = 1608.300 KN Lex / h = 1.929 < 15, Short Column.
Ley / b = 13.500 < 15, Short Column.
Anc = 280000 mm
Asc = 1608 mm for 8T 16 e= 0 mm

For slender braced Column : 60 b/h= 12 > Lo O.K.


100b/h = 2.857 > Lo O.K.

Nbal = 0.25fcubh= 3150.000 KN


Nuz = 0.45 fcu Anc + 0.87 fy Asc = 6313.522 KN

K = (Nuz-N)/(Nuz-Nbal) = 1.487 >1 Take K= 1


a = ( Le / b ) / 2000 = 0.091

au = a K h = 127.575 mm, Madd = N au = 205.179 KNm

M1 = 3.750 KNm, M2 = 512.000 KNm,

Mi = 0.4 M1 + 0.6 M2 = 308.700 > 0.4 M2 = 204.800 KNm O.K.


emin = h/20 = 70 < 20, take= 20 mm

M2 = 512.000 KNm d= 1357 mm


Mi + Madd = 513.879 KNm = Design Moment d/h = 0.97
M1 + Madd/2 = 106.339 KNm
emin N = 32.166 KNm

K Mt M/bhfcu N/bhfcu As/bhfcu As Nuz K


1 513.879 0.03 0.13 0.0001 1260 6174.252 1.510 ~= initial K
O.K.
Provide 8T16 (As = 1608 mm/m) > 1260
100As/bh = 0.57 > 0.4 & < 4 O.K.
Shear
M/N = 0.318 < 0.6h = 840

100As/bvd = 0.5925 vc = 0.476 N/mm


v= V/(bvd) = 0.522 N/mm < vc No shear reinf. required. O.K.

Provide T12-200 c/c (Asv/s = 2.83 ) O.K.

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 21
Part of Structure Date
Proposed wall Design 25/03/17
Ref. Calculations

3.4 Check Wall W7, W18, W24, W25 Y

fcu = 45 N/mm h X
fy = 460 N/mm
Section breadth (b) = 200 mm
Concrete depth (h)= 2300 mm b
Concrete cover = 25 mm Lo = 2.7 m
Links size = 10 mm x = 1 Braced
Rebar size = 20 mm y = 1 Braced
Max. moment (M) = 359.500 KNm Lex = 2.7 m
Max. shear force (V) = 95.900 KN Ley = 2.7 m
Max. Axial force (N) = 1374.900 KN Lex / h = 1.174 < 15, Short Column.
Ley / b = 13.500 < 15, Short Column.
Anc = 460000 mm
Asc = 3770 mm for 12 20 e= 0 mm

For slender braced Column : 60 b/h= 12 > Lo O.K.


100b/h = 1.739 > Lo O.K.

Nbal = 0.25fcubh= 5175.000 KN


Nuz = 0.45 fcu Anc + 0.87 fy Asc = 10823.754 KN

K = (Nuz-N)/(Nuz-Nbal) = 1.673 >1 Take K= 1


a = ( Le / b ) / 2000 = 0.091

au = a K h = 209.588 mm, Madd = N au = 288.162 KNm

M1 = 6.130 KNm, M2 = 359.500 KNm,

Mi = 0.4 M1 + 0.6 M2 = 218.152 > 0.4 M2 = 143.800 KNm O.K.


emin = h/20 = 115 < 20, take= 20 mm

M2 = 359.500 KNm d= 2255 mm


Mi + Madd = 506.314 KNm = Design Moment d/h = 0.98
M1 + Madd/2 = 150.211 KNm
emin N = 27.498 KNm

K Mt M/bhfcu N/bhfcu As/bhfcu As Nuz K


1 506.314 0.01 0.07 0.00004 828 9646.366 1.850 ~= initial K
O.K.
Provide 8T20 (As = 3770 mm/m) > 828
100As/bh = 0.82 > 0.4 & < 4 O.K.
Shear
M/N = 0.261 < 0.6h = 1380
100As/bvd = 0.8359 vc = 0.470 N/mm

v= V/(bvd) = 0.213 N/mm < vc No shear reinf. required. O.K.

Provide T12-200 c/c (Asv/s = 2.83 ) O.K.

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 22
Part of Structure Date
Proposed wall Design 25/03/17
Ref. Calculations

3.5 Check Wall W3, W4, W10, W20, W23 Y

fcu = 45 N/mm h X
fy = 460 N/mm
Section breadth (b) = 200 mm
Concrete depth (h)= 3400 mm b
Concrete cover = 25 mm Lo = 2.7 m
Links size = 10 mm x = 1 Braced
Rebar size = 20 mm y = 1 Braced
Max. moment (M) = 796.000 KNm Lex = 2.7 m
Max. shear force (V) = 219.300 KN Ley = 2.7 m
Max. Axial force (N) = 1912.800 KN Lex / h = 0.794 < 15, Short Column.
Ley / b = 13.500 < 15, Short Column.
Anc = 680000 mm
Asc = 5027 mm for 16 20 e= 0 mm

For slender braced Column : 60 b/h= 12 > Lo O.K.


100b/h = 1.18 < Lo

Nbal = 0.25fcubh= 7650.000 KN


Nuz = 0.45 fcu Anc + 0.87 fy Asc = 15781.805 KN

K = (Nuz-N)/(Nuz-Nbal) = 1.706 >1 Take K= 1


a = ( Le / b ) / 2000 = 0.091

au = a K h = 309.825 mm, Madd = N au = 592.633 KNm

M1 = 7.900 KNm, M2 = 796.000 KNm,

Mi = 0.4 M1 + 0.6 M2 = 480.760 > 0.4 M2 = 318.400 KNm O.K.


emin = h/20 = 170 < 20, take= 20 mm

M2 = 796.000 KNm d= 3355 mm


Mi + Madd = 1073.393 KNm = Design Moment d/h = 0.99
M1 + Madd/2 = 304.217 KNm
emin N = 38.256 KNm

K Mt M/bhfcu N/bhfcu As/bhfcu As Nuz K


1 1073.393 0.01 0.06 0.00004 1224 14259.845 1.868 ~= initial K
O.K.
Provide 16T20 (As = 5027 mm/m) > 1224
100As/bh = 0.74 > 0.4 & < 4 O.K.
Shear
M/N = 0.416 < 0.6h = 2040

100As/bvd = 0.7492 vc = 0.410 N/mm

v= V/(bvd) = 0.327 N/mm < vc No shear reinf. required. O.K.

Provide T12-200 c/c (Asv/s = 2.83 ) O.K.


3
3 1
3
3 2
3
3 3
3
3 4
3
3 5
Contract
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long
SWAL Asia Limited Drg. Ref. Calcs by Checked by
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure
UC Design
Ref. Calculations
4. UC Design
4.1 305 x 305 x 137 kg/m UC (Beam Mark: B20)

Dimension & Section Properties


Flange & Web Thk T = 21.7 mm t = 13.8 mm
Depth D = 320.5 mm B = 309.2 mm
Area Ag = 174 cm
Cl. 4.2.3 Shear Area Avx = 2T(B-t) = 128.20 cm
Cl. 4.2.3 Shear Area Avy = tD = 44.23 cm
Moment of Inertia Ix = 32800 cm Iy = 10700 cm
Elastic Modulus Zx = 2050 cm Zy = 692 cm
Plastic Modulus Sx = 2300 cm Sy = 1050 cm
Radius of Gyration rx = 13.70 cm ry = 7.83 cm
Tosional Constant J = 249 cm

Design Load ( Refer to Section 14.1.3 )


Length L = 7.54 m

Design Member Force ( Refer to Appendix )


Compression Fc = 0.00 kN
Tension Ft = 0.00 kN
Shear Fvy = 400.00 kN (Beam Mark 1SB7, ETABS Mark B20, Load Comb C09)
Moment Mx = 685.0 kNm (Beam Mark 1SB2, ETABS Mark B2, Load Comb C09)

Properties of Steel
Grade = S355
Design Strength py = 345 MPa
Modulus of Elasticity E = 205000 MPa

Section Classification
Constant = ( 275 / py ) = 0.89
~ Bending about x-x
outstand element - b / T = 309.2 / 2 / 21.7 = 7.12 8 = 7.1
web - d / t = ( 320.5 - 2 x 21.7 ) / 13.8 = 20.08
80 / ( 1 + r ) = 80.0 = 71.4
where r = Fc / d t pyw = 0.00
This is a plastic section
Cl. 8.4.6 Shear Buckling
~ Shear along y-y d/t = ( 320.5 - 2 x 21.7 ) = 20.08 70 = 62.5

Check Shear
Shear Capacity Pvy = py Avy / 3 = 881.0 kN 400.0 kN

Check Moment
Max Shear Fvy = 400.0 kN 0.6 Pvy = 528.6 kN
Moment Capacity Mcx = py Sx 1.2 py Zx = 793.5 kNm 685.0 kNm
Contract
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long
SWAL Asia Limited Drg. Ref. Calcs by Checked by
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure
UC Design
Ref. Calculations

Cl.8.3.5.3 Check Buckling


Table 8.4a Equivalent Uniform Moment Factor mLT = 1 ( Conservatively )
Appendix 8.1 Equivalent Uniform Moment = 1.000 x 685.000 = 685.000 kNm
Effective Length Le = 1.2 x 1 = 1.200 m ( Cl. 8.3.4 )
Slenderness = Le / ry = 15.3
Bending Strength pb = 345 MPa
Buckling Resistance Moment Mb = pb Sx = 793.5 kNm 685.0 kNm

Cl.8.7.6 Check Compression


Appendix 8.4Effective Length Ley = 1 x 4.5 = 4.500 m
Cl.6.6.4 Slenderness y = Ley / ry = 57.5 200
Compressive Strength pcy = 273 MPa
Compression Resistance pcy = pcy Ag = 4742 kN 0.0 kN

Cl.8.6.3 Check Tension


Area Ae = Ag - a = 174.00 cm
Tensile Capacity Pt = py Ae = 6003 kN 0.0 kN

Combined Tension & Moment = Ft / Pt + Mx / Mcx + My / Mcy = 0.863 1

Cross Section Capacity = Fc / Ag py + Mx / Mcx + My / Mcy = 0.863 1

=> Adopt 305 x 305 x 137 kg/m UC (Beam Mark: B20) ( Grade S355 )
No need!
Contract
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long
SWAL Asia Limited Drg. Ref. Calcs by Checked by
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure
Steel Frame Calculation
Ref. Calculations

14.1.6 305 x 305 x 137 kg/m UC (B20)

Dimension & Section Properties


Flange & Web Thk T = 21.7 mm t = 13.8 mm
Depth D = 320.5 mm B = 309.2 mm
Area Ag = 174 cm
Cl. 4.2.3 Shear Area Avx = 2T(B-t) = 128.20 cm
Cl. 4.2.3 Shear Area Avy = tD = 44.23 cm
Moment of Inertia Ix = 32800 cm Iy = 10700 cm
Elastic Modulus Zx = 2050 cm Zy = 692 cm
Plastic Modulus Sx = 2300 cm Sy = 1050 cm
Radius of Gyration rx = 13.70 cm ry = 7.83 cm
Tosional Constant J = 249 cm

Design Load ( Refer to Section 14.1.3 )


Length L = 7.54 m

Design Member Force


Compression Fc = 0.00 kN
Tension Ft = 0.00 kN
Shear Fvy = 315.00 kN
Moment Mx = 685.0 kNm

Properties of Steel
Grade = S355
Design Strength py = 345 MPa
Modulus of Elasticity E = 205000 MPa

Section Classification
Constant = ( 275 / py ) = 0.89
~ Bending about x-x
outstand element - b / T = 309.2 / 2 / 21.7 = 7.12 8 = 7.1
web - d / t = ( 320.5 - 2 x 21.7 ) / 13.8 = 20.08
80 / ( 1 + r ) = 80.0 = 71.4
where r = Fc / d t pyw = 0.00
This is a plastic section
Cl. 8.4.6 Shear Buckling
~ Shear along y-y d/t = ( 320.5 - 2 x 21.7 ) = 20.08 70 = 62.5

Check Shear
Shear Capacity Pvy = py Avy / 3 = 881.0 kN 315.0 kN
Check Moment
Eff. Elastic Modulus Zx,eff = 0 cm Zy,eff = 0 cm
Eff. Plastic Modulus Sx,eff = 0 cm Sy,eff = 0 cm
Max Shear Fvy = 315.0 kN 0.6 Pvy = 528.6 kN
Moment Capacity Mcx = py Sx 1.2 py Zx = 793.5 kNm 685.0 kNm

Contract
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long
SWAL Asia Limited Drg. Ref. Calcs by Checked by
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure
Steel Frame Calculation
Ref. Calculations

14.1.6 305 x 305 x 118 kg/m UC (B8)

Dimension & Section Properties


Flange & Web Thk T = 18.7 mm t = 12 mm
Depth D = 314.5 mm B = 307.4 mm
Area Ag = 150 cm
Cl. 4.2.3 Shear Area Avx = 2T(B-t) = 110.48 cm
Cl. 4.2.3 Shear Area Avy = tD = 37.74 cm
Moment of Inertia Ix = 27700 cm Iy = 9060 cm
Elastic Modulus Zx = 1760 cm Zy = 589 cm
Plastic Modulus Sx = 1960 cm Sy = 895 cm
Radius of Gyration rx = 13.60 cm ry = 7.77 cm
Tosional Constant J = 161 cm

Design Load ( Refer to Section 14.1.3 )


Length L = 6.46 m

Design Member Force


Compression Fc = 0.00 kN
Tension Ft = 0.00 kN
Shear Fvy = 200.00 kN
Moment Mx = 425.0 kNm

Properties of Steel
Grade = S275
Design Strength py = 265 MPa
Modulus of Elasticity E = 205000 MPa

Section Classification
Constant = ( 275 / py ) = 1.02
~ Bending about x-x
outstand element - b / T = 307.4 / 2 / 18.7 = 8.22 9 = 9.2
web - d / t = ( 314.5 - 2 x 18.7 ) / 12 = 23.09
80 / ( 1 + r ) = 79.3 = 80.8
where r = Fc / d t pyw = 0.00
This is a compact section
Cl. 8.4.6 Shear Buckling
~ Shear along y-y d/t = ( 314.5 - 2 x 18.7 ) = 23.09 70 = 71.3

Check Shear
Shear Capacity Pvy = py Avy / 3 = 577.4 kN 200.0 kN

Check Moment
Max Shear Fvy = 200.0 kN 0.6 Pvy = 346.4 kN
Moment Capacity Mcx = py Sx 1.2 py Zx = 519.4 kNm 425.0 kNm

Contract
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long
SWAL Asia Limited Drg. Ref. Calcs by Checked by
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure
Steel Frame Calculation
Ref. Calculations

Cl.8.3.5.3 Check Buckling


Table 8.4a Equivalent Uniform Moment Factor mLT = 1 ( Conservatively )
Appendix 8.1 Equivalent Uniform Moment = 1.000 x 425.000 = 425.000 kNm
Effective Length Le = 1.2 x 4.5 = 5.400 m ( Cl. 8.3.4 )
Slenderness = Le / ry = 69.5
Bending Strength pb = 224 MPa
Buckling Resistance Moment Mb = pb Sx = 438.3 kNm 425.0 kNm

Cl.8.7.6 Check Compression


Appendix 8.4Effective Length Ley = 1 x 4.5 = 4.500 m
Cl.6.6.4 Slenderness y = Ley / ry = 57.9 200
Compressive Strength pcy = 217 MPa
Compression Resistance pcy = pcy Ag = 3255 kN 0.0 kN

Cl.8.6.3 Check Tension


Area Ae = Ag - a = 150.00 cm
Tensile Capacity Pt = py Ae = 3975 kN 0.0 kN

Combined Tension & Moment = Ft / Pt + Mx / Mcx + My / Mcy = 0.818 1

Cross Section Capacity = Fc / Ag py + Mx / Mcx + My / Mcy = 0.818 1

Member Buckling Resistance = Fc / Pc + mx Mx / Mb + my My / py Zy = 0.970 1


mx = 1 my = 1

=> Adopt 305 x 305 x 118 kg/m UC (B8) ( Grade S275 )


Contract
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long
SWAL Asia Limited Drg. Ref. Calcs by Checked by
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure
Steel Frame Calculation
Ref. Calculations

14.1.6 368 x 368 x 153 kg/m UC (B20)

Dimension & Section Properties


Flange & Web Thk T = 20.7 mm t = 12.3 mm
Depth D = 362 mm B = 370.5 mm
Area Ag = 195 cm
Cl. 4.2.3 Shear Area Avx = 2T(B-t) = 148.29 cm
Cl. 4.2.3 Shear Area Avy = tD = 44.53 cm
Moment of Inertia Ix = 48600 cm Iy = 17600 cm
Elastic Modulus Zx = 2680 cm Zy = 948 cm
Plastic Modulus Sx = 2960 cm Sy = 1430 cm
Radius of Gyration rx = 15.80 cm ry = 9.49 cm
Tosional Constant J = 251 cm

Design Load ( Refer to Section 14.1.3 )


Length L = 7.54 m

Design Member Force


Compression Fc = 0.00 kN
Tension Ft = 0.00 kN
Shear Fvy = 315.00 kN
Moment Mx = 685.0 kNm

Properties of Steel
Grade = S275
Design Strength py = 265 MPa
Modulus of Elasticity E = 205000 MPa

Section Classification
Constant = ( 275 / py ) = 1.02
~ Bending about x-x
outstand element - b / T = 370.5 / 2 / 20.7 = 8.95 9 = 9.2
web - d / t = ( 362 - 2 x 20.7 ) / = 26.07
80 / ( 1 + r ) = 79.3 = 80.8
where r = Fc / d t pyw = 0.0000
This is a compact section
Cl. 8.4.6 Shear Buckling
~ Shear along y-y d/t = ( 362 - 2 x 20.7 ) / = 26.07 70 = 71.3

Check Shear
Shear Capacity Pvy = py Avy / 3 = 681.2 kN 315.0 kN

Check Moment
Eff. Elastic Modulus Zx,eff = 0 cm Zy,eff = 0 cm
Eff. Plastic Modulus Sx,eff = 0 cm Sy,eff = 0 cm
Max Shear Fvy = 315.0 kN 0.6 Pvy = 408.7 kN
Moment Capacity Mcx = py Sx 1.2 py Zx = 784.4 kNm 685.0 kNm

Contract
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long
SWAL Asia Limited Drg. Ref. Calcs by Checked by
ENGINEERING CONSULTANT D.C. D.T.
Part of Structure
Steel Frame Calculation
Ref. Calculations

Cl.8.3.5.3 Check Buckling


Table 8.4a Equivalent Uniform Moment Factor mLT = 1 ( Conservatively )
Appendix 8.1 Equivalent Uniform Moment = 1.000 x 685.000 = 685.0 kNm
Effective Length Le = 1.2 x 4.5 = 5.4 m ( Cl. 8.3.4 )
Slenderness = Le / ry = 56.9
Ratio w = 1
Buckling Parameter u = 0.9 ( Conservatively )
Torsional Index x = 16.2
Cl.8.3.5.3 Slenderness Factor v = [ 1 + 0.05 ( / x ) ] =-0.25 0.887
Cl.8.3.5.3 Equivalent Slenderness LT= u w = 45.415
Limiting Equivalent Slenderness Lo = 0.4 ( E / py ) = 34.951
Perry Factor LT = 0.007 ( LT - Lo ) = 0.073 0
pE = ( E ) / ( LT ) = 981 MPa
LT = [ py + ( LT + 1 ) pE ] / 2 = 659 MPa
Bending Strength pb = ( pE py ) / [ LT + ( LT - pE py ) ] = 242 MPa
Bending Strength pb = 242 MPa
Buckling Resistance Moment Mb = pb Sx = 714.9 kNm 685.0 kNm

Cl.8.7.6 Check Compression


Appendix 8.4Effective Length Ley = 1 x 4.5 = 4.5 m
Cl.6.6.4 Slenderness y = Ley / ry = 47.4 200
Compressive Strength pcy = 232 MPa
Compression Resistance pcy = pcy Ag = 4528 kN 0.0 kN

Cl.8.6.3 Check Tension


Area Ae = Ag - a = 195.00 cm
Tensile Capacity Pt = py Ae = 5168 kN 0.0 kN
Combined Tension & Moment = Ft / Pt + Mx / Mcx + My / Mcy = 0.873 1.0

Cross Section Capacity = Fc / Ag py + Mx / Mcx + My / Mcy = 0.873 1.0

Member Buckling Resistance = Fc / Pc + mx Mx / Mb + my My / py Zy = 0.958 1.0


mx = 1 my = 1

=> Adopt 368 x 368 x 153 kg/m UC (B20) ( Grade S275 )


Job No.
90295/11

Calc. Sht. No.


23
Date
25/03/17

4
4 1

Rolled UC 305 305 137

652.105797
3.74773447

14.1.3

d Comb C09)
Comb C09)

=> plastic
8 9 13 outstand elemb / T
=> plastic 80 100 120 web d/t

=> no shear buckling

O.K. 0.454

( low shear )
O.K. 0.863
Job No.
90295/11

Calc. Sht. No.


24
Date
25/03/17

1.4 Cantilever
1.2 1.000

O.K. 0.863

1 4.500

O.K. 0.000

O.K. 0.000

O.K. 0.863

O.K. 0.863
Job No.
90295/11

Calc. Sht. No.

Date
25/03/17

14 1 6

Rolled UC 305 305 137

652.105797
3.74773447

14.1.3

=> plastic
8 9 13 outstand elemb / T
=> plastic 80 100 120 web d/t

=> no shear buckling

O.K. 0.358
( low shear )
O.K. 0.863

Job No.
90295/11

Calc. Sht. No.

Date
25/03/17

14 1 6

Rolled UC 305 305 118

665.841176
7.7876161

14.1.3

=> compact
8 9 13 outstand elemb / T
=> plastic 79.3430147 98.77319 119.159947 web d/t
=> no shear buckling

O.K. 0.014

( low shear )
O.K. 0.047

Job No.
90295/11

Calc. Sht. No.

Date
25/03/17

1.4 Cantilever
1.2 4.500

O.K. 0.081

1 4.500

O.K. 0.008

O.K. 0.004

O.K. 0.051

O.K. 0.051

O.K. 0.089
Job No.
90295/11

Calc. Sht. No.

Date
25/03/17

14 1 6

Rolled UC 368 368 153

665.841176
7.7876161

14.1.3

=> compact
8 9 13 outstand elemb / T
=> plastic 79.3430147 98.77319 119.159947 web d/t

=> no shear buckling

O.K. 0.014

( low shear )
O.K. 0.047

Job No.
90295/11

Calc. Sht. No.

Date
25/03/17

1.4 Cantilever
1.2 4.500

2 x 0.007 Lo
2 0.4803397

O.K. 0.081

1 4.500

O.K. 0.008

O.K. 0.004
O.K. 0.051

O.K. 0.051

O.K. 0.089
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11
SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 25
Part of Structure Date
Fillet weld 25/03/17
Ref. Calculations
5. Filled Weld
5.1 5 mm Fillet Weld Fixing 305 x 305 x 137 UC to Steel Plate y

Dimension & Section Properties


Weld Size s = 5 mm x
Weld Length L = 320.5 mm ( y - direction )
Spacing of Weld S = 309.2 mm ( x - direction )
Web t = 13.8 mm
Flange T = 21.7 mm
Effective Length Le = 172.100 mm
Total Effective Length Le = 2Le = 344.200 mm
Distance from centre r = [ ( Le / 2 ) + ( se / 2 ) ] = 176.9 mm
Moment of Inertia Ix = 30767768 mm
Moment of Inertia Iy = 5490231 mm
Moment of Inertia Iz = Ix + Iy = 36257999 mm
Effective Width se = 382.200 mm
Total Effective width D = 2*se = 764.400 mm
Properties of Weld
Type of Weld = Fillet Weld
Electrode Classification = 35
Grade of Steel = S275
Design Strength pw = 220 MPa

Design Load
Compression Fz = 0.000 kN
Shear Fx = 0.000 kN
Shear Fy = 400.000 kN
Moment Mx = 0.000 kNm
Moment My = 0.000 kNm
Torsion Mz = 0.000 kNm

Stress
Stress due to Fz = Fz / (Le+D)*10 = 0 N/mm
Stress due to Fx = Fx / Le10 = 0 N/mm
Stress due to Fy = Fy / D10 = 523 N/mm
Stress due to Mx = Mx( Le / 2 ) / Ix10 = 0 N/mm
Stress due to My = My( S / 2 ) / Iy10 = 0 N/mm
Stress due to Mz = Mzr / Iz10 = 0 N/mm
Longitudinal Stress FL = 0 + 523 + 0 = 523 N/mm
Transverse Stress FT = 0+0+0 = 0 N/mm

Check Stress
Weld Capacity PL = 0.7 s pw = 770 N/mm 523 N/mm OK!
Angle = tan -1 ( 0 / 523 ) - 45 = -45.0
Coefficient K = 1.25 [ 1.5 / ( 1 + cos ) ] = 1.25
Weld Capacity PT = K PL = 963 N/mm 0 N/mm OK!
Stress Resultant = ( FL / PL ) + ( FT / PT ) = 0.462 1.000 OK!

=> Adopt 5 mm Fillet Weld ( L = 2 x 320.5 mm )


Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11
SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 26
Part of Structure Date
Fillet weld 25/03/17
Ref. Calculations
5.2 Slab to UC

Dimension & Section Properties


Weld Size s = 5 mm
Diameter D = 20 mm
No of bars n = 2.50
Total Effective Length Le = 78.540 mm
Total Effective width D = 78.540 mm
Distance from centre r = 20.00 mm
Moment of Inertia Ix = nD3 = 62832 mm
Moment of Inertia Iy = nD3 = 62832 mm
Moment of Inertia Iz = Ix + Iy = 125664 mm

Properties of Weld
Type of Weld = Fillet Weld
Electrode Classification = 35
Grade of Steel = S275
Design Strength pw = 220 MPa

Design Load (Node=5)


Compression Fz = kN
Shear Fx = 24.240 kN
Shear Fy = 0.000 kN
Moment Mx = 0.000 kNm
Moment My = 0.000 kNm
Torsion Mz = 0.000 kNm

Stress
Stress due to Fz = Fz / (Le+D)*10 = 0 N/mm
Stress due to Fx = Fx / Le/210 = 617 N/mm
Stress due to Fy = Fy / Le/210 = 0 N/mm
Stress due to Mx = Mx( D / 2 ) / Ix10 = 0 N/mm
Stress due to My = My( D / 2 ) / Iy10 = 0 N/mm
Stress due to Mz = Mzr / Iz10 = 0 N/mm
Longitudinal Stress FL = 617 + 0 + 0 = 617 N/mm
Transverse Stress FT = 0+0+0 = 0 N/mm

Check Stress
Weld Capacity PL = 0.7 s pw = 770 N/mm 617 N/mm OK!
Angle = tan -1 ( 0 / 0 ) - 45 = -45.0
Coefficient K = 1.25 [ 1.5 / ( 1 + cos ) ] = 1.25
Weld Capacity PT = K PL = 963 N/mm 0 N/mm OK!
Stress Resultant = ( FL / PL ) + ( FT / PT ) = 0.643 1.000 OK!

=> Adopt 5 mm Fillet Weld


5
5 1
Load case: 1.4DL+1.4WL(y)
305 x 305 x 137 UC to Steel Plate

0.680

0.707
0.000
0.462
5 2

305 x 305 x 137 UC to Steel Plate

0.802

0.707
0.000
0.643
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11
SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 27
Part of Structure Date
Through Bolt Design 25/03/17
Ref. Calculations
6. Through Bolt check
6.1 Through Bolt Design (For 2SB2 to W3)

Try Grade ISO 8.8 M25 bolt with screw and nut
Reaction Force
Mymax = 0 KNm Mzmax = 0 KNm
Fxmax () = 0.000 KN (Compaction)
Fxmax ()= 0.000 KN (Tension)
Vymax = 400.000 KN
Vzmax = 0 KN
( Fy+Fz) = 400.000 KN For nos. of bolt = 4

N= Fxmax/2+Mmax/D = 0.000 KN/bolt


V= ( Fy+Fz) = 400.000 KN = 100.000 KN/bolt

Freq = (N+V) = 400.000 KN = 100.000 KN/bolt

Shear check
Long Joints

Lj = 350 mm
L = ( 5500 - Lj ) / 5000 = 1.030 >1 take 1.000
>1
Long grip length

Grip Length Tg = 20 mm < 5d = 135 mm


p = 1.000 <1 take 1.000

Bolts through packing

Packing thickness tpa = 20.00 mm > d/3 = 9.00 mm


p = 9d / ( 8d + 3tpa) = 0.880 < 10 take 0.880

A= xD d= 27 mm
= 572.557 mm

ps = 375 N/mm
pse = peLPP = 330.163 N/mm

Ps = ps As = 189.037 KN >V O.K.

Bearing check

tp = 20.00 mm
pbb = 0.7 (Ub + Yb) = 1000 N/mm
Pbb = D tp pbb = 540.00 KN >V O.K.

Contract Job No.


Proposed Asphalt Plant at HK International Airport at M680/S1 Chek Lap Kok 90220/10
SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 28
Part of Structure Date
Through Bolt Design 25/03/17
Ref. Calculations

5.1 Through Bolt Design (For 2SB2 to W3)

Try Grade ISO 8.8 M25 bolt with screw and nut
Reaction Force
Mymax = 0 KNm Mzmax = 0 KNm
Fzmax () = 0 KN (Compaction)
Fzmax ()= 0.000 KN (Tension)
Fymax = 400.000 KN
Fxmax = 0 KN
( Fx+Fy) = 400.000 KN For nos. of bolt = 4

N= Fxmax/2+Mmax/D = 0.000 KN/bolt


V= ( Fy+Fz) = 400.000 KN = 100.000 KN/bolt

Freq = (N+V) = 400.000 KN = 100.000 KN/bolt

Bearing Capacity of connected parts check

kbs = 1 for standard holes


e= 40 mm from top of base plate
lc = 225 mm bolt spacing
pbs = 460 MPa for connected steel grade = 275 MPa
Us = 375 MPa
Ub = 560 MPa

Pbs = kbs x d x tp x pbs = 780.396 KN

Pbs = 0.5 x kbs x e x tp x pbs = 184 KN

Pbs = 1.5 x lc x tp x Us = 2531.25 KN


> 2 x d x tp x Ub = 604.8 KN
take, Pbs = 604.8 KN >V O.K.
Tension Check

pt = 560 N/mm

Pt = As Pt = 320.632 KN >N O.K.

Prying Force Check

Section not UB, UC, T section, so no need to check prying force! O.K.

Combined shear and tension check


Without prying force: Fs/Ps + Ft / Pnom = 0.53 < 1.4 O.K.
6
6 1
5 1
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 17
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations
3. Proposed wall Design
3.1 Check Wall W5, W6, W14

y
My Y*
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 600 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 16 mm x = 1 Braced
Max. moment (M1), Mx = 12 KNm y = 1 Braced
Max. moment (M2), My = 44 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 7 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 26 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 378 KN Ley / b = 4.500 < 15, Short Column.
h' = 157 mm
b' = 549 mm

Design Mx = 11.900 KNm, Vx = 25.900 KN


Design My = 44.100 KNm, Vy = 6.800 KN

For Major Axis Moment (Mx/Mx')

6.51 a = ( Ley / h ) / 2000 = 0.091


6.48 au = a K b = 54.675 mm 'K' assume = 1, Conservative!

Madd = N au = 20.667 KNm


M1 = M2 = Mx = 11.900 KNm, Conservative!
Mi = 0.4 M1 + 0.6 M2 = 11.900 > 0.4 M2 = 4.760 KNm O.K.
emin = b/20 = 30 > 20, take= 20 mm

M2 = 11.900 KNm, Mi + Madd = 32.567 KNm


M1 + Madd/2 = 22.234 KNm, emin N = 7.560 KNm

Design Mx = 11.900 KNm

6.7 K = Mx/ hb'fcu = 0.0044 < K = 0.12

Compression reinforcement is NOT required!

6.1 z = b'[0.5+(0.25-K/0.9)] = 546.311 mm, > 0.95b' 521.6 mm, z = 521.55

6.11 x = (b'-z)/0.4= 6.723 mm

As'x = 0.000 mm
6.12 Asx = Mx / ( 0.87 fy z ) = 57.013 mm
Contract Job No.
Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 18
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations

y
My
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 600 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 16 mm x = 1.000 Braced
Max. moment (M1), Mx = 12 KNm y = 1.000 Braced
Max. moment (M2), My = 44 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 7 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 26 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 378 KN Ley / b = 4.500 < 15, Short Column.
h' = 157 mm
b' = 549 mm

For Major Axis Moment (My/My')

6.51 a = ( Lex / b ) / 2000 = 0.010


6.48 au = a K h = 2.025 mm 'K' assume = 1, Conservative!

Madd = N au = 0.765 KNm


M1 = M2 = My = 44.100 KNm, Conservative!
Mi = 0.4 M1 + 0.6 M2 = 44.100 > 0.4 M2 = 17.640 KNm O.K.
emin = h/20 = 10 < 20, take= 10 mm

M2 = 44.100 KNm, Mi + Madd = 44.865 KNm


M1 + Madd/2 = 44.483 KNm, emin N = 0.250 KNm

Design My = 44.865 KNm

6.7 K = My/ bh'fcu = 0.0674 < K = 0.12 Compression reinforcement is NOT required!

6.1 z = h'[0.5+(0.25-K/0.9)] = 144.196 mm, < 0.95h' 149.2 mm, z = 144.20

6.11 x = (h'-z)/0.4= 32.011 mm

As'y = 0.000 mm
6.12 Asy = My / ( 0.87 fy z ) = 777.468 mm

For Compaction Force

0.4 fcuAc = 2160 KN > N= 378.000 KN No compression steel required !

Asc = 0 mm

For Tension Force


N > 0, No tension steel required ! Ast = N/ fy = -821.739 mm

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 19
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations

y
My
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 600 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 16 mm x = 1.0 Braced
Max. moment (M1), Mx = 11.900 KNm y = 1.0 Braced
Max. moment (M2), My = 44.100 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 6.800 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 25.900 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 378.000 KN Ley / b = 4.500 < 15, Short condition
h' = 157 mm
b' = 549 mm

Asx req = Asx - Asc / 4 = 57.013 mm


As'x req = As'x + Asc / 4 = 0.000 mm
Provide 4T16 E.F. (Asx or As'x = 804 mm) O.K.

Provide 4T16 E.F. (Asy or As'y = 804 mm)

Total steel area, As = 2Asx + 2Asy = 1608 mm


100As/bh = 1.3 > 0.4 & < 4 O.K.
Shear

For Vx My/N = 0.117 < 0.6h = 120 No shear check is required!


Table 6.3 100As/bh' = 1.7070 = 1.707006369 vc = 1.161 N/mm

6.22 vc' = vc+0.6(N/Ac)(Vxh/My)= 1.383 N/mm Vxh/My = 0.117 <1 O.K.


6.23 vc' = vc [1+(N/Acvc)] = 2.237 N/mm vc' = 1.383 N/mm
Table 6.2 vx = Vx/(bh') = 0.072 N/mm < 0.5vc' = 0.691 N/mm
Asvx = vr b sv / 0.87fyv < vc' + vr =' 1.815 N/mm
Asvx/sv = 0.649 < 0.8fcu= 5.367 N/mm
< 7 N/mm O.K.

For Vy Mx/N = 0.031 < 0.6b = 360 No shear check is required!


Table 6.3 100As/hb' = 1.4645 = 1.464480874 vc = 0.807 N/mm

6.22 vc' = vc+0.6(N/Ac)(Vyb/Mx)= 1.455 N/mm Vxyb/Mx = 0.343 <1 O.K.


6.23 vc' = vc [1+(N/Acvc)] = 1.786 N/mm vc' = 1.455 N/mm
Table 6.2 vy = Vy/(hb') = 0.062 N/mm < 0.5vc' = 0.727 N/mm
Asvy = vr h sv / 0.87fyv < vc' + vr =' 1.887 N/mm
Asvy/sv = 0.216 < 0.8fcu= 4.071 N/mm
< 7 N/mm O.K.

Max. Asv/sv = 0.649


Provide T12-200 c/c (Asv/s = 2.83 ) O.K.

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 20
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations
3. Proposed wall Design
3.2 Check Wall W8, W11, W13, W15, W16, W21

y
My Y*
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 800 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 16 mm x = 1 Braced
Max. moment (M1), Mx = 4 KNm y = 1 Braced
Max. moment (M2), My = 122 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 2 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 63 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 523 KN Ley / b = 3.375 < 15, Short Column.
h' = 157 mm
b' = 749 mm

Design Mx = 3.600 KNm, Vx = 62.800 KN


Design My = 121.500 KNm, Vy = 1.600 KN

For Major Axis Moment (Mx/Mx')

6.51 a = ( Ley / h ) / 2000 = 0.091


6.48 au = a K b = 72.900 mm 'K' assume = 1, Conservative!

Madd = N au = 38.149 KNm


M1 = M2 = Mx = 3.600 KNm, Conservative!
Mi = 0.4 M1 + 0.6 M2 = 3.600 > 0.4 M2 = 1.440 KNm O.K.
emin = b/20 = 40 > 20, take= 20 mm

M2 = 3.600 KNm, Mi + Madd = 41.749 KNm


M1 + Madd/2 = 22.674 KNm, emin N = 10.466 KNm

Design Mx = 3.600 KNm

6.7 K = Mx/ hb'fcu = 0.0007 < K = 0.12

Compression reinforcement is NOT required!

6.1 z = b'[0.5+(0.25-K/0.9)] = 748.406 mm, > 0.95b' 711.6 mm, z = 711.55

6.11 x = (b'-z)/0.4= 1.485 mm

As'x = 0.000 mm
6.12 Asx = Mx / ( 0.87 fy z ) = 12.642 mm

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 21
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations

y
My
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 800 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 16 mm x = 1.000 Braced
Max. moment (M1), Mx = 4 KNm y = 1.000 Braced
Max. moment (M2), My = 122 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 2 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 63 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 523 KN Ley / b = 3.375 < 15, Short Column.
h' = 157 mm
b' = 749 mm

For Major Axis Moment (My/My')

6.51 a = ( Lex / b ) / 2000 = 0.006


6.48 au = a K h = 1.139 mm 'K' assume = 1, Conservative!

Madd = N au = 0.596 KNm


M1 = M2 = My = 121.500 KNm, Conservative!
Mi = 0.4 M1 + 0.6 M2 = 121.500 > 0.4 M2 = 48.600 KNm O.K.
emin = h/20 = 10 < 20, take= 10 mm

M2 = 121.500 KNm, Mi + Madd = 122.096 KNm


M1 + Madd/2 = 121.798 KNm, emin N = 0.250 KNm

Design My = 122.096 KNm

6.7 K = My/ bh'fcu = 0.1376 > K' = 0.12 Compression reinforcement is required!

6.13 z = h'[0.5+(0.25-K'/0.9)] = 132.126 mm z = 132.13

6.14 x = (h'-z)/0.4= 62.186 mm

6.15 As'y = [(K-K') fcu b h']/[0.87fy(h-h')] = 907.244 mm


6.16 Asy = K' fcu d h' / (0.87 fy z) + As'y = 2921.054 mm

For Compaction Force

0.4 fcuAc = 2880 KN > N= 523.300 KN No compression steel required !


Asc = 0 mm

For Tension Force

N > 0, No tension steel required ! Ast = N/ fy = -1137.609 mm

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 22
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations

y
My
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 800 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 16 mm x = 1.0 Braced
Max. moment (M1), Mx = 3.600 KNm y = 1.0 Braced
Max. moment (M2), My = 121.500 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 1.600 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 62.800 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 523.300 KN Ley / b = 3.375 < 15, Short condition
h' = 157 mm
b' = 749 mm

Asx req = Asx - Asc / 4 = 12.642 mm


As'x req = As'x + Asc / 4 = 0.000 mm
Provide 4T16 E.F. (Asx or As'x = 804 mm) O.K.

Provide 4T16 E.F. (Asy or As'y = 804 mm)

Total steel area, As = 2Asx + 2Asy = 1608 mm


100As/bh = 1.0 > 0.4 & < 4 O.K.
Shear

For Vx My/N = 0.232 < 0.6h = 120 No shear check is required!


Table 6.3 100As/bh' = 1.2803 = 1.280254777 vc = 1.055 N/mm

6.22 vc' = vc+0.6(N/Ac)(Vxh/My)= 1.258 N/mm Vxh/My = 0.103 <1 O.K.


6.23 vc' = vc [1+(N/Acvc)] = 2.136 N/mm vc' = 1.258 N/mm
Table 6.2 vx = Vx/(bh') = 0.013 N/mm < 0.5vc' = 0.629 N/mm
Asvx = vr b sv / 0.87fyv < vc' + vr =' 1.690 N/mm
Asvx/sv = 0.865 < 0.8fcu= 5.367 N/mm
< 7 N/mm O.K.

For Vy Mx/N = 0.007 < 0.6b = 480 No shear check is required!


Table 6.3 100As/hb' = 1.0734 = 1.073431242 vc = 0.673 N/mm

6.22 vc' = vc+0.6(N/Ac)(Vyb/Mx)= 1.371 N/mm Vxyb/Mx = 0.356 <1 O.K.


6.23 vc' = vc [1+(N/Acvc)] = 1.629 N/mm vc' = 1.371 N/mm
Table 6.2 vy = Vy/(hb') = 0.011 N/mm < 0.5vc' = 0.685 N/mm
Asvy = vr h sv / 0.87fyv < vc' + vr =' 1.803 N/mm
Asvy/sv = 0.216 < 0.8fcu= 6.340 N/mm
< 7 N/mm O.K.

Max. Asv/sv = 0.865

Provide T12-200 c/c (Asv/s = 2.83 ) O.K.

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 23
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations
3. Proposed wall Design
3.3 Check Wall W1, W2, W9, W12, W17, W19, W22

y
My Y*
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 1400 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 16 mm x = 1 Braced
Max. moment (M1), Mx = 4 KNm y = 1 Braced
Max. moment (M2), My = 512 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 1 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 142 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 1608 KN Ley / b = 1.929 < 15, Short Column.
h' = 157 mm
b' = 1349 mm

Design Mx = 3.800 KNm, Vx = 141.800 KN


Design My = 512.000 KNm, Vy = 1.400 KN

For Major Axis Moment (Mx/Mx')

6.51 a = ( Ley / h ) / 2000 = 0.091


6.48 au = a K b = 127.575 mm 'K' assume = 1, Conservative!

Madd = N au = 205.141 KNm


M1 = M2 = Mx = 3.800 KNm, Conservative!
Mi = 0.4 M1 + 0.6 M2 = 3.800 > 0.4 M2 = 1.520 KNm O.K.
emin = b/20 = 70 > 20, take= 20 mm

M2 = 3.800 KNm, Mi + Madd = 208.941 KNm


M1 + Madd/2 = 106.370 KNm, emin N = 32.160 KNm

Design Mx = 3.800 KNm

6.7 K = Mx/ hb'fcu = 0.0002 < K = 0.12

Compression reinforcement is NOT required!

6.1 z = b'[0.5+(0.25-K/0.9)] = 1348.652 mm, > 0.95b' 1281.6 mm, z = 1281.55


6.11 x = (b'-z)/0.4= 0.870 mm

As'x = 0.000 mm
6.12 Asx = Mx / ( 0.87 fy z ) = 7.409 mm

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 24
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations

y
My
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 1400 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 16 mm x = 1.000 Braced
Max. moment (M1), Mx = 4 KNm y = 1.000 Braced
Max. moment (M2), My = 512 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 1 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 142 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 1608 KN Ley / b = 1.929 < 15, Short Column.
h' = 157 mm
b' = 1349 mm

For Major Axis Moment (My/My')

6.51 a = ( Lex / b ) / 2000 = 0.002


6.48 au = a K h = 0.372 mm 'K' assume = 1, Conservative!

Madd = N au = 0.598 KNm


M1 = M2 = My = 512.000 KNm, Conservative!
Mi = 0.4 M1 + 0.6 M2 = 512.000 > 0.4 M2 = 204.800 KNm O.K.
emin = h/20 = 10 < 20, take= 10 mm

M2 = 512.000 KNm, Mi + Madd = 512.598 KNm


M1 + Madd/2 = 512.299 KNm, emin N = 0.250 KNm

Design My = 512.598 KNm

6.7 K = My/ bh'fcu = 0.3301 > K' = 0.12 Compression reinforcement is required!

6.13 z = h'[0.5+(0.25-K'/0.9)] = 132.126 mm z = 132.13

6.14 x = (h'-z)/0.4= 62.186 mm

6.15 As'y = [(K-K') fcu b h']/[0.87fy(h-h')] = 18958.639 mm


6.16 Asy = K' fcu d h' / (0.87 fy z) + As'y = 22482.808 mm

For Compaction Force


0.4 fcuAc = 5040 KN > N= 1608.000 KN No compression steel required !

Asc = 0 mm

For Tension Force

N > 0, No tension steel required ! Ast = N/ fy = -3495.652 mm

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 25
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations

y
My
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 1400 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 16 mm x = 1.0 Braced
Max. moment (M1), Mx = 3.800 KNm y = 1.0 Braced
Max. moment (M2), My = 512.000 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 1.400 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 141.800 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 1608.000 KN Ley / b = 1.929 < 15, Short condition
h' = 157 mm
b' = 1349 mm

Asx req = Asx - Asc / 4 = 7.409 mm


As'x req = As'x + Asc / 4 = 0.000 mm
Provide 8T16 E.F. (Asx or As'x = 1608 mm) O.K.

Provide 8T16 E.F. (Asy or As'y = 1608 mm)

Total steel area, As = 2Asx + 2Asy = 3216 mm


100As/bh = 1.1 > 0.4 & < 4 O.K.
Shear

For Vx My/N = 0.318 < 0.6h = 120 No shear check is required!


Table 6.3 100As/bh' = 1.4631 = 1.463148317 vc = 1.103 N/mm

6.22 vc' = vc+0.6(N/Ac)(Vxh/My)= 1.294 N/mm Vxh/My = 0.055 <1 O.K.


6.23 vc' = vc [1+(N/Acvc)] = 2.747 N/mm vc' = 1.294 N/mm
Table 6.2 vx = Vx/(bh') = 0.006 N/mm < 0.5vc' = 0.647 N/mm
Asvx = vr b sv / 0.87fyv < vc' + vr =' 1.726 N/mm
Asvx/sv = 1.514 < 0.8fcu= 5.367 N/mm
< 7 N/mm O.K.

For Vy Mx/N = 0.002 < 0.6b = 840 No shear check is required!


Table 6.3 100As/hb' = 1.1920 = 1.19199407 vc = 0.602 N/mm
6.22 vc' = vc+0.6(N/Ac)(Vyb/Mx)= 2.379 N/mm Vxyb/Mx = 0.516 <1 O.K.
6.23 vc' = vc [1+(N/Acvc)] = 1.954 N/mm vc' = 1.954 N/mm
Table 6.2 vy = Vy/(hb') = 0.005 N/mm < 0.5vc' = 0.977 N/mm
Asvy = vr h sv / 0.87fyv < vc' + vr =' 2.386 N/mm
Asvy/sv = 0.216 < 0.8fcu= 9.526 N/mm
< 7 N/mm O.K.

Max. Asv/sv = 1.514

Provide T12-200 c/c (Asv/s = 2.83 ) O.K.

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 28
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations
3. Proposed wall Design
3.4 Check Wall W7, W18, W24, W25

y
My Y*
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 2300 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 16 mm x = 1 Braced
Max. moment (M1), Mx = 6 KNm y = 1 Braced
Max. moment (M2), My = 360 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 2 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 96 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 1375 KN Ley / b = 1.174 < 15, Short Column.
h' = 157 mm
b' = 2249 mm

Design Mx = 6.000 KNm, Vx = 95.900 KN


Design My = 359.500 KNm, Vy = 2.300 KN

For Major Axis Moment (Mx/Mx')

6.51 a = ( Ley / h ) / 2000 = 0.091


6.48 au = a K b = 209.588 mm 'K' assume = 1, Conservative!

Madd = N au = 288.162 KNm


M1 = M2 = Mx = 6.000 KNm, Conservative!
Mi = 0.4 M1 + 0.6 M2 = 6.000 > 0.4 M2 = 2.400 KNm O.K.
emin = b/20 = 115 > 20, take= 20 mm

M2 = 6.000 KNm, Mi + Madd = 294.162 KNm


M1 + Madd/2 = 150.081 KNm, emin N = 27.498 KNm

Design Mx = 6.000 KNm

6.7 K = Mx/ hb'fcu = 0.0001 < K = 0.12


Compression reinforcement is NOT required!

6.1 z = b'[0.5+(0.25-K/0.9)] = 2248.671 mm, > 0.95b' 2136.6 mm, z = 2136.55

6.11 x = (b'-z)/0.4= 0.824 mm

As'x = 0.000 mm
6.12 Asx = Mx / ( 0.87 fy z ) = 7.017 mm

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 29
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations

y
My
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 2300 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 16 mm x = 1.000 Braced
Max. moment (M1), Mx = 6 KNm y = 1.000 Braced
Max. moment (M2), My = 360 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 2 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 96 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 1375 KN Ley / b = 1.174 < 15, Short Column.
h' = 157 mm
b' = 2249 mm

For Major Axis Moment (My/My')

6.51 a = ( Lex / b ) / 2000 = 0.001


6.48 au = a K h = 0.138 mm 'K' assume = 1, Conservative!

Madd = N au = 0.189 KNm


M1 = M2 = My = 359.500 KNm, Conservative!
Mi = 0.4 M1 + 0.6 M2 = 359.500 > 0.4 M2 = 143.800 KNm O.K.
emin = h/20 = 10 < 20, take= 10 mm

M2 = 359.500 KNm, Mi + Madd = 359.689 KNm


M1 + Madd/2 = 359.595 KNm, emin N = 0.250 KNm

Design My = 359.689 KNm

6.7 K = My/ bh'fcu = 0.1410 > K' = 0.12 Compression reinforcement is required!

6.13 z = h'[0.5+(0.25-K'/0.9)] = 132.126 mm z = 132.13

6.14 x = (h'-z)/0.4= 62.186 mm


6.15 As'y = [(K-K') fcu b h']/[0.87fy(h-h')] = 3111.752 mm
6.16 Asy = K' fcu d h' / (0.87 fy z) + As'y = 8901.457 mm

For Compaction Force

0.4 fcuAc = 8280 KN > N= 1374.900 KN No compression steel required !

Asc = 0 mm

For Tension Force

N > 0, No tension steel required ! Ast = N/ fy = -2988.913 mm

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 30
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations

y
My
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 2300 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 16 mm x = 1.0 Braced
Max. moment (M1), Mx = 6.000 KNm y = 1.0 Braced
Max. moment (M2), My = 359.500 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 2.300 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 95.900 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 1374.900 KN Ley / b = 1.174 < 15, Short condition
h' = 157 mm
b' = 2249 mm

Asx req = Asx - Asc / 4 = 7.017 mm


As'x req = As'x + Asc / 4 = 0.000 mm
Provide 8T16 E.F. (Asx or As'x = 1608 mm) O.K.

Provide 8T16 E.F. (Asy or As'y = 1608 mm)

Total steel area, As = 2Asx + 2Asy = 3216 mm


100As/bh = 0.7 > 0.4 & < 4 O.K.
Shear

For Vx My/N = 0.261 < 0.6h = 120 No shear check is required!


Table 6.3 100As/bh' = 0.8906 = 0.890612019 vc = 0.934 N/mm

6.22 vc' = vc+0.6(N/Ac)(Vxh/My)= 1.030 N/mm Vxh/My = 0.053 <1 O.K.


6.23 vc' = vc [1+(N/Acvc)] = 1.915 N/mm vc' = 1.030 N/mm
Table 6.2 vx = Vx/(bh') = 0.006 N/mm < 0.5vc' = 0.515 N/mm
Asvx = vr b sv / 0.87fyv < vc' + vr =' 1.463 N/mm
Asvx/sv = 2.487 < 0.8fcu= 5.367 N/mm
< 7 N/mm O.K.
For Vy Mx/N = 0.004 < 0.6b = 1380 No shear check is required!
Table 6.3 100As/hb' = 0.7150 = 0.714984438 vc = 0.446 N/mm

6.22 vc' = vc+0.6(N/Ac)(Vyb/Mx)= 2.028 N/mm Vxyb/Mx = 0.882 <1 O.K.


6.23 vc' = vc [1+(N/Acvc)] = 1.238 N/mm vc' = 1.238 N/mm
Table 6.2 vy = Vy/(hb') = 0.005 N/mm < 0.5vc' = 0.619 N/mm
Asvy = vr h sv / 0.87fyv < vc' + vr =' 1.671 N/mm
Asvy/sv = 0.216 < 0.8fcu= 7.834 N/mm
< 7 N/mm O.K.

Max. Asv/sv = 2.487

Provide T12-200 c/c (Asv/s = 2.83 ) O.K.

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 31
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations
3. Proposed wall Design
3.5 Check Wall W3, W4, W10, W20, W23

y
My Y*
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 3400 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 20 mm x = 1 Braced
Max. moment (M1), Mx = 8 KNm y = 1 Braced
Max. moment (M2), My = 796 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 2 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 219 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 1913 KN Ley / b = 0.794 < 15, Short Column.
h' = 155 mm
b' = 3345 mm

Design Mx = 7.900 KNm, Vx = 219.300 KN


Design My = 796.000 KNm, Vy = 1.900 KN

For Major Axis Moment (Mx/Mx')

6.51 a = ( Ley / h ) / 2000 = 0.091


6.48 au = a K b = 309.825 mm 'K' assume = 1, Conservative!

Madd = N au = 592.633 KNm


M1 = M2 = Mx = 7.900 KNm, Conservative!
Mi = 0.4 M1 + 0.6 M2 = 7.900 > 0.4 M2 = 3.160 KNm O.K.
emin = b/20 = 170 > 20, take= 20 mm

M2 = 7.900 KNm, Mi + Madd = 600.533 KNm


M1 + Madd/2 = 304.217 KNm, emin N = 38.256 KNm
Design Mx = 7.900 KNm

6.7 K = Mx/ hb'fcu = 0.0001 < K = 0.12

Compression reinforcement is NOT required!

6.1 z = b'[0.5+(0.25-K/0.9)] = 3344.708 mm, > 0.95b' 3177.8 mm, z = 3177.75

6.11 x = (b'-z)/0.4= 0.729 mm

As'x = 0.000 mm
6.12 Asx = Mx / ( 0.87 fy z ) = 6.212 mm

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 32
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations

y
My
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 3400 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 20 mm x = 1.000 Braced
Max. moment (M1), Mx = 8 KNm y = 1.000 Braced
Max. moment (M2), My = 796 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 2 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 219 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 1913 KN Ley / b = 0.794 < 15, Short Column.
h' = 155 mm
b' = 3345 mm

For Major Axis Moment (My/My')

6.51 a = ( Lex / b ) / 2000 = 0.000


6.48 au = a K h = 0.063 mm 'K' assume = 1, Conservative!

Madd = N au = 0.121 KNm


M1 = M2 = My = 796.000 KNm, Conservative!
Mi = 0.4 M1 + 0.6 M2 = 796.000 > 0.4 M2 = 318.400 KNm O.K.
emin = h/20 = 10 < 20, take= 10 mm

M2 = 796.000 KNm, Mi + Madd = 796.121 KNm


M1 + Madd/2 = 796.060 KNm, emin N = 0.250 KNm

Design My = 796.121 KNm

6.7 K = My/ bh'fcu = 0.2166 > K' = 0.12 Compression reinforcement is required!
6.13 z = h'[0.5+(0.25-K'/0.9)] = 130.443 mm z = 130.44

6.14 x = (h'-z)/0.4= 61.394 mm

6.15 As'y = [(K-K') fcu b h']/[0.87fy(h-h')] = 19713.567 mm


6.16 Asy = K' fcu d h' / (0.87 fy z) + As'y = 28163.234 mm

For Compaction Force

0.4 fcuAc = 12240 KN > N= 1912.800 KN No compression steel required !

Asc = 0 mm

For Tension Force

N > 0, No tension steel required ! Ast = N/ fy = -4158.261 mm

Contract Job No.


Proposed Redevelopment at Ma Tin Tsuen, Shap Pat Hueng, Yuen Long 90295/11

SWAL Asia Limited Drg. Ref. Calcs by Checked by Calc. Sht. No.
ENGINEERING CONSULTANT D.C. D.T. 33
Part of Structure Date
Wall Design 25/03/17
Ref. Calculations

y
My
fcu = 45 N/mm +ve
fy = 460 N/mm b x
Section breadth (b) = 3400 mm Mx
Concrete depth (h)= 200 mm
Concrete cover = 25 mm h
Links size = 10 mm Lo = 2.700 m
Rebar size = 20 mm x = 1.0 Braced
Max. moment (M1), Mx = 7.900 KNm y = 1.0 Braced
Max. moment (M2), My = 796.000 KNm For My,Lex= 2.700 m
Max. shear force (V1), Vy = 1.900 KN For Mx,Ley= 2.700 m
Max. shear force (V2), Vx = 219.300 KN Lex / h = 13.500 < 15, Short Column.
Max. Axial force (N) = 1912.800 KN Ley / b = 0.794 < 15, Short condition
h' = 155 mm
b' = 3345 mm

Asx req = Asx - Asc / 4 = 6.212 mm


As'x req = As'x + Asc / 4 = 0.000 mm
Provide 8T20 E.F. (Asx or As'x = 2512 mm) O.K.

Provide 8T20 E.F. (Asy or As'y = 2512 mm)

Total steel area, As = 2Asx + 2Asy = 5024 mm


100As/bh = 0.7 > 0.4 & < 4 O.K.
Shear

For Vx My/N = 0.416 < 0.6h = 120 No shear check is required!


Table 6.3 100As/bh' = 0.9533 = 0.953320683 vc = 0.959 N/mm

6.22 vc' = vc+0.6(N/Ac)(Vxh/My)= 1.052 N/mm Vxh/My = 0.055 <1 O.K.


6.23 vc' = vc [1+(N/Acvc)] = 1.902 N/mm vc' = 1.052 N/mm
Table 6.2 vx = Vx/(bh') = 0.004 N/mm < 0.5vc' = 0.526 N/mm
Asvx = vr b sv / 0.87fyv < vc' + vr =' 1.485 N/mm
Asvx/sv = 3.676 < 0.8fcu= 5.367 N/mm
< 7 N/mm O.K.

For Vy Mx/N = 0.004 < 0.6b = 2040 No shear check is required!


Table 6.3 100As/hb' = 0.7510 = 0.750971599 vc = 0.411 N/mm

6.22 vc' = vc+0.6(N/Ac)(Vyb/Mx)= 1.791 N/mm Vxyb/Mx = 0.818 <1 O.K.


6.23 vc' = vc [1+(N/Acvc)] = 1.151 N/mm vc' = 1.151 N/mm
Table 6.2 vy = Vy/(hb') = 0.003 N/mm < 0.5vc' = 0.575 N/mm
Asvy = vr h sv / 0.87fyv < vc' + vr =' 1.584 N/mm
Asvy/sv = 0.216 < 0.8fcu= 11.847 N/mm
< 7 N/mm O.K.

Max. Asv/sv = 3.676

Provide 2T12-200 c/c (Asv/s = 5.65 ) O.K.


3
3 1
3
3 2
3
3 3
3
3 4
3
3 5

Potrebbero piacerti anche