VAT 0.00%
Grand total
VAT 0.00%
Grand total
= Tk. 137.50
= Tk. 30.00
= Tk. 50.00
= Tk. 100.00
= Tk. 4,567.50
= Tk. 456.75
= Tk. 137.03
Tk. 5,161.28
= Tk. -
= Tk. 5,161.28
= Tk. 5.16
= Tk. 62.50
= Tk. 900.00
= Tk. 962.50
= Tk. 96.25
= Tk. 28.88
Tk. 1,087.63
= Tk. -
= Tk. 1,087.63
= Tk. 1.09
= Tk. 6.25
One layer brick flat soling in foundation or in floor.
Considering 100 sft of work
1. Bricks 350 Nos. @ 7.00 Per Nos.
2. Fine sand (with wastage) 5.25 cft. @ 10.00 Per cft.
3. Labor Charge 100 sft @ 3.00 each
6. Local carriage, sundries, T & P etc. L.S.
Total
Contractor's profit 10.00%
Overhead expenses 3.00%
VAT 0.00%
Grand total
= 3,257.23
= 32.57
CC Casting (Cement : Sand: Brick chips= 1:3:6) with brick chips & 100% local sand of F.M. 1.2
consider 100 cft work
1 Bricks for 90 cft chips(with wastage) 780 nos @ 7
2 Sand ( Local, F.M = 1.2, with wastage) 46 cft @ 20
3 Cement (ordinary portland) 12 bag @ 410
Grand Total
Shuttering material
2.10 cft
2.42 cft 15% for wastage, nail, wires
1016.31 tk 420Tk/cft with carriage
254.078125 Tk using 4 times
Shuttering Labour
For a footing base size 8 ftx 8ft
Casting volume of cc work (8.5 ftx8.5 ftx 3in)
18.0625 cft
= 19256.40
= 192.56
RCC Casting for footings : ( Cement : sand : Stone Chips=1 : 1.5 : 3 )
considering 100 cft of work
1 Cement (ordinary portland) 22 bag @ 410
2.a Stone chips (3/4 inch with wastage) 46 cft @ 145
2.b Stone chips (1/2 inch and pie with wastage) 46 cft @ 140
3 Sylhet Sand (F.M = 2.5, with wastage) 45 cft @ 35
4 Labour costing ( RCC Casting , Material loading, curing) 100 cft @ 20
5 Labour costing ( Shuttering) 100 cft @ 10.5
6. Shuttering material cost 100 cft @ 8.5
7. Mixture machine, pump, local carriage, sundries, T & P etc. 100 cft @ 4
Subtotal
Contractors pro 8.00 %
Overhead 3.00 %
VAT
Grand Total
Shuttering material
For a footing base size 8 ftx 8ft
Casting volume of RCC work (8 ftx8 ftx 12in)
64 cft
Shuttering material
5.26 cft
2209.38 tk 420Tk/cft with carriage
552.34 Tk using 4 times
Shuttering Labour
For a footing base size 8 ftx 8ft
Casting volume of RCC work (8 ftx8 ftx 12in)
64 cft
= 310.86
VAT =
Grand Total =
RCC Casting for Column, beam & Stair Base: Cement : sand : Stone Chips=1 : 1.5 : 3 ( for 1st floor)
considering 100 cft of work
1 Cement (ordinary portland) 22 bag @ 410 tk per bag
2.a Stone chips (3/4 inch with wastage) 46 cft @ 145 Tk per cft
2.b Stone chips (1/2 inch and pie with wastage) 46 cft @ 140 Tk per cft
3 Sylhet Sand (F.M = 2.5, with wastage) 45 cft @ 35 tk per cft
4 Labour costing ( RCC Casting , Material loading, curing) 100 cft @ 20 tk per cft
5 Labour costing ( Shuttering) 100 cft @ 28.8 tk per cft
6. Shuttering material cost 100 cft @ 39.84 tk per cft
7. Mixture machine, pump, local carriage, sundries, T & P etc. 100 cft @ 5 tk per cft
Subtotal =
Contractors profit 8.00 % =
Overhead 2.50 % =
VAT =
Grand Total =
Shuttering material
For a column size 15 in x 15 in x10 ft
Casting volume of RCC work (15 in x 15 in x10 ft)
27.78 cft
Shuttering material
Wood 7.40 cft
3106.25 tk 420Tk/cft with carriage
776.56 Tk using 4 times
Bamboo 132 ft
3.77 nos bamboo
1320 Tk
330 Using 4 times
Material Cost /cft= 39.84 Tk
Shuttering Labour
For a column size 15 in x 15 in x10 ft
Casting volume of RCC work (15 in x 15 in x10 ft)
27.78 cft
363.75
9020
6670
6440
1575
2000
2880
3984
500
33069.00
2645.52
826.725
36541.25
0.00 %
36541.25
365.41
RCC Casting for Ground Floor (Cement : Sand : Brick Chips=1 : 2 : 4)
Grand Total
Shuttering material
Wood 20.86 cft
8760.94 tk 420Tk/cft with carriage
2190.23 Tk using 4 times
Bamboo 252 ft
7.20 nos bamboo
2520 Tk 350/ each
630 Using 4 times
Material Cost /cft= 2.26 Tk
Shuttering Labour
For a slab size 50 ft x 50 ft x6 in
Casting volume of RCC work (50 ft x 50 ft x6 in)
1250.00 cft
= 201
RCC Casting for 1st Floor (Cement : Sand : Brick Chips=1 : 2 : 4)
Grand Total
Shuttering material
For a slab size 50 ft x 50 ft x6 in
Casting volume of RCC work (50 ft x 50 ft x6 in)
1250.00 cft
Shuttering material
Wood 10.92 cft
4587.73 tk 420Tk/cft with carriage
1146.93 Tk using 4 times
Bamboo 780 ft
22.29 nos bamboo
7800 Tk 350/ each
1950 Using 4 times
Material Cost /cft= 2.48 Tk
Shuttering Labour
For a slab size 50 ft x 50 ft x6 in
Casting volume of RCC work (50 ft x 50 ft x6 in)
1250.00 cft
= 206
RCC Casting for 2nd Floor (Cement : Sand : Brick Chips=1 : 2 : 4)
Grand Total
Shuttering material
For a slab size 50 ft x 50 ft x6 in
Casting volume of RCC work (50 ft x 50 ft x6 in)
1250.00 cft
Shuttering material
Wood 10.92 cft
4587.73 tk 420Tk/cft with carriage
1146.93 Tk using 4 times
Bamboo 780 ft
22.29 nos bamboo
7800 Tk 350/ each
1950 Using 4 times
Material Cost /cft= 2.48 Tk
Shuttering Labour
For a slab size 50 ft x 50 ft x6 in
Casting volume of RCC work (50 ft x 50 ft x6 in)
1250.00 cft
= 211
Supplying, fabrication etc of M.S. rod in RCC works : 72.5 / 60 grade deformed bar (GF)
Considering 50 kg of work
1 Cost of materials:
i) M.S. rod: 72.5 / 60 grade 50 kg @ Tk. 61.00
iii) G.I. wire 1 kg @ Tk. 95.00
2 Cost of labour 50 kg Tk. 5.00
Contractor's profit
Overhead expenses
Rate per Kg
Supplying, fabrication etc of M.S. rod in RCC works : 72.5 / 60 grade deformed bar (1st Fl)
Considering 50 kg of work
1 Cost of materials:
i) M.S. rod: 72.5 / 60 grade 50 kg @ Tk. 61.00
iii) G.I. wire 1 kg @ Tk. 95.00
2 Cost of labour 50 kg Tk. 5.50
Contractor's profit
Overhead expenses
Rate per Kg
Supplying, fabrication etc of M.S. rod in RCC works : 72.5 / 60 grade deformed bar ( 2nd Fl
Considering 50 kg of work
1 Cost of materials:
i) M.S. rod: 72.5 / 60 grade 50 kg @ Tk. 61.00
iii) G.I. wire 1 kg @ Tk. 95.00
2 Cost of labour 50 kg Tk. 6.00
Contractor's profit
Overhead expenses
72.5 / 60 grade deformed bar (GF)
Grand total =
125 mm brick work with 1st class bricks (Cement : Sand = 1:6) in superstructure ( for 1st floor)
Considering 100 sft. work
1. Bricks 480 Nos. @ 7.50
2. Sand (Local, F.M. 1.2 , with wastage) 18 cft. @ 20.00
3. Cement (portland) 1.75 bags @ 410.00
4. Labour (soaking & cleaning bricks, screaning sand) 480 No. @ 1.00
5. Labour (Brick work) 100 sft. @ 11.00
6. Scaffolding material & labour charge 25 sft. @ 13.00
7. Local carriage, storage & sundries etc. L.S.
Total =
Contractor's profit 10.00% =
Overhead expenses 3.00% =
Grand total =
125 mm brick work with 1st class bricks (Cement : Sand = 1:6) in superstructure ( for 2nd floor)
Considering 100 sft. work
1. Bricks 480 Nos. @ 7.50
2. Sand (Local, F.M. 1.2 , with wastage) 18 cft. @ 20.00
3. Cement (portland) 1.75 bags @ 410.00
4. Labour (soaking & cleaning bricks, screaning sand) 480 No. @ 1.00
5. Labour (Brick work) 100 sft. @ 12.00
6. Scaffolding material & labour charge 25 sft. @ 14.00
7. Local carriage, storage & sundries etc. L.S.
Total =
Contractor's profit 10.00% =
Overhead expenses 3.00% =
Grand total =
7,522.98
75.23
oor)
7,720.73
77.21
loor)
7,974.98
79.75
10 inch Brick Work (1:3:6)
Considering 100 cft. of work:
1. Bricks ( With Wastage) 1152 Nos. @ 7.5 Per Nos.
2. Sand (F.M 1.2) in/c wastage 46 cft. @ 20 Per cft.
3. Cement (portland) 6 bags @ 410 Per bag
Grand total
4. Labour cost ( Soaking & carrying, scraning sand) 1152 Nos. @ each
0.5
5. Labour cost ( brick work) 100 cft. @ 13.5 each
Grand total
= 1,152.00
= 1,200.00
= 300.00
= 100.00
= 14,772.00
= 1,477.20
= 443.16
16,692.36
= 16,692.36
= 166.92
= 9,792.00
= 920.00
= 2,760.00
= 576.00
= 1,350.00
= 275.00
= 150.00
= 15,823.00
= 1,582.30
= 474.69
17,879.99
= 17,879.99
= 178.80
RCC Casting for Lintel, Sun Shade and Drop Slab (1:2:4)
Grand Total
Shuttering material
For a lintle size 20 ft x 10 in x5 in
Casting volume of RCC work (20 ft x 10 in x5 in)
6.94 cft
Shuttering material
Wood 5.76 cft
2417.19 tk 420Tk/cft with carriage
604.30 Tk using 4 times
Bamboo 56 ft
1.60 nos bamboo
560 Tk 350/ each
140 Using 4 times
Material Cost /cft= 107.18 Tk
Shuttering Labour
For a slab size 50 ft x 50 ft x6 in
Casting volume of RCC work (50 ft x 50 ft x6 in)
6.94 cft
= 429
with carriage
labour charge