SAUDI JOOD

Project Substation
CONTRACT NO. 4400005831 YEAST
REPLACEMENT OF PROTECTION IN MADINAH
TRANSFORMER FEEDER TR05

Over Current Protection HV SIDE

MLFB IN = 1 A
7 S J 8 0 fN = 60 Hz Tconst. = 80 ms

Current transformer 300 / 1 A System voltage 110 kv

RELAY SETTING

Primary Winding Power = 63.00 MVA


Secondary Winding Power = 63.00 MVA
Tertiary Winding Power = MVA
Transformer Regulation = + 12% to - 12%
Primary Winding Rated Voltage = 116 KV
Primary Winding Voltage at Max Tap = 129.92 KV
Primary Winding at Min Tap = 102.08 KV
Secondary Winding Rated Voltage = 13.8 KV
Secondary operating voltage = 13.8 KV

% Impedance = 13.50%
No of Taps = 25
Nominal Tap No = 13

HV Side Full Load Current = 63.00 MVA = 313.57 A


3 x 116 kv

Through Fault Current = 63.00 MVA = 2323 A Prim. = 7.742 A sec.


3 x 116 x 13.5% =

NOTE: This is a GT transformer and Y- Connection

Each Delat is 31.5MVA and since one Delta will be used so the power of transformer will be
considered as 31.50 MVA

So, Ifull Load = MVA/( 3 x 116) = 156.8

Low Set O/C Setting ( I > )


I> = 180% of rated current
= 282.20 primary = 0.941 A Secondary
Select I> = = 0.941 x IN
X-tic = = DT
t> = = 1.4 sec

MD-YEAST-TR-110KV-OC-DT-T05-REV0.0019/03/17 1/3
SAUDI JOOD

High Set O/C Setting ( I >> )


I >> > 7 x IF.L current = 1097 A Prim. = 3.66 A sec.
Select I >> = = 5 x IN
t >> = = 0.00 sec

Low Set Earth Fault Setting ( Io > )

Io> = 300 A = 1.00


to> = 1.4 sec

High Set E/F Setting ( Io >> )

Io >> = BLOCKED
to >> = BLOCKED

Protection Parameter Recommended Setting


I> 0.94 x IN
X-tic DT
Phase Over Current t> 1.400
I >> 5 x IN
t >> 0.00

Io > 1.00
Earth Fault to> 1.40
Io >> BLOCKED
to >> BLOCKED

MD-YEAST-TR-110KV-OC-DT-T05-REV0.0019/03/17 2/3
SAUDI JOOD

MD-YEAST-TR-110KV-OC-DT-T05-REV0.0019/03/17 3/3