Sei sulla pagina 1di 16

SESSION PLAN

Sector : CONSTRUCTION
Qualification Title : CARPENTRY NC II
Unit of Competency: STAKE-OUT BUILDING LINES
Module Title : STAKING-OUT BUILDING LINES
Learning Outcomes
LO1. Prepare materials for stake-out building lines
LO2. Stake-out building lines
LO3. Fix building lines
A. Introduction
This module covers the knowledge, skills, and attitude for preparing stake-out materials and fixing stake-out building lines.
B. Learning Activities
LO 1. Prepare materials for stake-out building lines

Learning Content Method Presentation Practice Feedback Resources Date/


Time
1. Interpretation of Modular Read Information Sheet Answer Self-check no. Compare to Answer CBLM on Preparing
Plans and No. 1.1-1 on 1.1-1 Key No. 1.1-1 materials for Staking-
Details Interpretation of Plans out Building Lines
and Details
2. Material Modular Read Information Sheet Answer Self-check no. Compare to Answer Claw Hammer
Specifications No. 1.1-2 on Material 1.1-2 key No. 1.1-2 Marking Tools
Specifications Water hose level
3. Board Foot Modular Read Information Sheet Answer Self-check No. Compare to Answer Nylon String
Computations No. 1.1-3 on Board Foot 1.1-3 key No. 1.1-3 Plumb Bob
Computations Steel Square
4. Tools, Materials Modular Read Information Sheet Answer Self-check No. Compare to Answer Cold chisel
and Equipment No. 1.1-4 Tools, Materials 1.1-4 Key No. 1.1-4 Ripping/wrecking/
for Staking-out and Equipment for claw Bar
Building Lines Staking-out Building Lines Pull-push rule
5. Company Rules Modular Read Information Sheet Answer Self-check No. Compare to Answer Try-square
No. 1.1-5 Company Rules Hand Saw
and Regulations and Regulations 1.1-5 Key No. 1.1-5 Chalk Line
Bolo
Sledge Hammer
Personal Protective
Equipment

Plan and working


drawings
Lumber
Nails
LO 2. Stake-out building lines
1. Setting Batter Modular/ Read Information Sheet Answer Self-check No. Compare to Answer CBLM
Boards No. 1.2-1 on Setting 1.2-1 Key No. 1.2-1
Demonstration Batter Boards Claw Hammer
Perform Job Sheet No. Trainee evaluates Pencil/marking pen
1.2-1 on Installing output using Pull-push rule
Batter boards Performance Criteria Nylon String
Checklist No. 1.2-1 Plumb Bob
Steel Square
Trainee evaluates Try-square
Perform Operation
Sheet No. 1.2-1a on output using Hand Saw
Layout the Performance Criteria Chalk Line
(Rectangular) Site Checklist No. 1.2-1a Personal Protective
Equipment
Perform Operation Trainee evaluates
Sheet No. 1.2-1b on output using Plan and working
Set and Stake Performance Criteria drawings
Procedure Checklist No. 1.2-1b Lumber
Nails
Perform Operation Trainee evaluates
Sheet No. 1.2-1c on output using
Determining the Performance Criteria
Location of the Batter Checklist No. 1.2-1c
Boards and Construct
Them
LO 3. Fix building lines
1. Squaring Lines Modular Read Information Sheet Answer Self-check No. Compare to Answer CBLM
No. 1.3-1 on Squaring 1.3-1 Key No. 1.3-1
Demonstration Lines Claw Hammer
Perform Operation Trainee evaluates Pencil/marking pen
Sheet No. 1.3-1 on output using Pull-push rule
Extending and Performance Criteria Steel Square
Squaring Lines Checklist No. 1.3-1 Try-square
Personal Protective
Equipment

Nails
Plywood
C. Assessment Plan
Written Test: Question on Tools, materials and equipment for staking-out building lines, material estimates, properties of wood, board foot
computation, and concepts in setting batterboards

Performance Test: The performance will include the following:


Staking-out building lines
Setting batter boards
Squaring lines

Prepared by:
GLENN F. SALANDANAN
JZGMSAT
SESSION PLAN
Sector : CONSTRUCTION
Qualification Title : CARPENTRY NC II
Unit of Competency : FABRICATE FORMWORKS
Module Title : FABRICATING FORMWORKS
Learning Outcomes:
LO 1. Prepare materials, tools and equipment for fabricating formworks according to job requirements
LO 2. Lay-out and cut to dimension of form sheating and stiffeners
LO 3. Assemble form panels
A. Introduction
This module covers the knowledge, skills and attitude in selecting and preparing materials, tools and equipment for fabricating
formworks, laying-out, cutting to dimensions of form sheating and stiffeners and assembling form panels.
B. Learning Activities
LO 1. Prepare materials, tools and equipment for fabricating formworks according to job requirements

Learning Content Method Presentation Practice Feedback Resources Date/


Time
1. Tools , materials Modular Read Information Sheet Answer Self-check No. Compare to Answer CBLM
and equipment No. 2.1-1 on Tools , 2.1-1 Key No. 2.1-1
for fabricating materials and equipment Claw Hammer
formworks for fabricating formworks Pencil/Marking pen
2. Material for Modular Read Information Sheet Answer Self-check No. Compare to Answer Pull-Push Rule
fabricating No. 2.1-2 on Material for 2.1-2 Key No. 2.1-2 Nylon String
formworks fabricating formworks Steel Square
Try-square
3. Mechanical Modular Read Information Sheet Answer Self-check No. Compare to Answer Hand Saw
properties of No. 2.1-3 on Mechanical 2.1-3 Chalk Line
Key No. 2.1-3
lumber properties of lumber Personal Protective
4. Economic use of Modular Read Information Sheet Answer Self-check No. Compare to Answer Equipment
materials No. 2.1-4 on Economic 2.1-4 Portable Circular saw
Key No. 2.1-4
use of materials
Plan and working
drawings
Lumber
Nails

LO 2. Lay-out and cut to dimension of form sheating and stiffeners


1. Form Design Modular Read Information Sheet Answer Self-check No. Compare to Answer CBLM
No. 2.2-1 on Form Design 2.2-1 Key No. 2.2-1
2. Prefabrication of Modular/ Read Information Sheet Perform Operation Claw Hammer
Trainee evaluates
Formwork panels No. 2.2-2 on Pencil/Marking pen
Sheet No. 2.2-2 on output using
Demonstration Prefabrication of Prefabricate form Performance Criteria Pull-Push Rule
Formwork panels panels and stiffeners Checklist No. 2.2-2 Steel Square
Try-square
Hand Saw
Chalk Line
Personal Protective
Equipment
Portable Circular saw

Plan and working


drawings
Lumber
Nails
LO 3. Assemble form panels
1. Assembling form Modular/ Read Information Sheet Perform Operation Trainee evaluates CBLM
panels and No. 2.3-1 on Assembling Sheet No. 2.3-1 on output using
stiffeners Demonstration form panels and stiffeners Assembling form Performance Criteria Hammer
panels and stiffeners Checklist No. 2.3-1 Marking Tools
Measuring Tools
Steel Square
Try-square
Personal Protective
Equipment

Plan and working


drawings
Lumber
Nails
C. Assessment Plan

Written Test: Question on tools and materials in fabricating formworks, mechanical properties of lumber, economic use of materials, and
form design

Performance Test: The performance will include the following:


Prefabrication of formwork panels
Assemble form panels and stiffeners

Prepared by:

GLENN F. SALANDANAN
JZGMSAT
SESSION PLAN
Sector : CONSTRUCTION
Qualification Title : CARPENTRY NC II
Unit of Competency : INSTALL FORMWORK COMPONENTS
Module Title : INSTALLING FORMWORK COMPONENTS
Learning Outcomes:
LO 1. Select and prepare materials and tools for installing formworks
LO 2. Lay-out/assemble scaffolds and braces
LO 3. Set/fix form panels of building components
A. Introduction
This module covers the knowledge, skills and attitude in selecting and preparing materials and tools for installing formworks,
Laying-out/ assembling scaffolds and braces, setting/fixing form panels of building components.
B. Learning Activities
LO 1. Select and prepare materials and tools for installing formworks

Learning Content Method Presentation Practice Feedback Resources Date/


Time
1. Materials, power Modular Read Information Sheet Answer Self-check No. Compare to Answer CBLM
and hand tools No. 3.1-1 on Materials, 3.1-1 Key No. 3.1-1
and equipment power and hand tools and Claw Hammer
uses and equipment uses and Pencil/marking pen
specifications specifications Pull-push pen
2. Properties of Modular Read Information Sheet Answer Self-check No. Compare to Answer Nylon String
Wood No. 3.1-2 on Properties of 3.1-2 Key No. 3.1-2 Steel Square
Wood Try-square
3. Housekeeping Modular Read Information Sheet Answer Self-check No. Compare to Answer Hand Saw
No. 3.1-3 on 3.1-3 Key No. 3.1-3 Chalk Line
Housekeeping Personal Protective
Equipment
Portable Circular
Saw
Plan and working
drawings
Lumber
Nails
Plywood
LO 2. Lay-out/assemble scaffolds and braces
1. Types of Modular Read Information Sheet Answer Self-check no. Compare to Answer CBLM
scaffolds No. 3.2-1 on Types of 3.2-1 Key No. 3.2-1
scaffolds Scaffolds
2. Different Modular Read Information Sheet Answer Self-check No. Compare to Answer Locks and
scaffold fittings No. 3.2-2 on Different 3.2-2 Key No. 3.2-2 Connectors
and their uses scaffold fittings and their
uses Plan and working
3. Scaffolds safety Modular Read Information Sheet Answer Self-check No. Compare to Answer drawings
rules No. 3.2-3 on Scaffolds 3.2-3 Key No. 3.2-3
safety rules
4. Assemble Modular/ Read Information Sheet Perform Operation Trainee evaluates
scaffolds Demonstration No. 3.2-4 on Assemble Sheet No. 3.2-4 on output using
scaffolds Assembling scaffolds Performance Criteria
Checklist No. 3.2-4
LO 3. Set/fix form panels of building components
1. Formwork Modular/ Read Information Sheet Answer Self-check No. Compare to Answer CBLM
components No. 3.3-1 on Formwork 3.3-1 Key No. 3.3-1
assembly Demonstration components assembly Claw Hammer
Perform Operation Trainee evaluates Wrecking bar
Sheet No. 3.3-1a on output using Pencil/marking pen
Install column forms Performance Criteria Pull-push rule
Checklist No. 3.3-1a Try-square
Hand Saw
Trainee evaluates Plumb bob
Perform Operation
Spirit level
Sheet No. 3.3-1b on output using Personal Protective
Install beam forms Performance Criteria Equipment
Checklist No. 3.3-1b Portable Circular
Saw

Plan and working


drawings
Lumber
Nails
Plywood
C. Assessment Plan

Written Test: Question on Materials, power and hand tools and equipment uses and specifications, properties of wood, types of scaffolds,
different scaffold fittings and their uses, and scaffolds safety rules

Performance Test: The performance will include the following:


Assemble and disassemble scaffolding
Install column forms
Install beam forms

Prepared by:

GLENN F. SALANDANAN
JZGMSAT
SESSION PLAN
Sector : CONSTRUCTION
Qualification Title : CARPENTRY NC II
Unit of Competency : STRIP FORMWORKS COMPONENTS
Module Title : STRIPPING FORMWORKS COMPONENTS
Learning Outcomes:
LO 1. Prepare staging area, tools and equipment
LO 2. Strip formworks of building components
LO 3. Shore or/and re-shore and removal
A. Introduction
This module covers the knowledge, skills and attitudes in stripping formworks components and accessories for concrete work. It
includes preparing tools, equipment and staging of materials and shoring and re-shoring operations.
B. Learning Activities
LO 1. Prepare staging area, tools and equipment
Learning Content Method Presentation Practice Feedback Resources Date/
Time
1. Company rules Modular Read Information Sheet Answer Self-check Compare to Answer CBLM on Select and
and regulations No. 4.1-1 on Company No. 4.1-1 Key No. 4.1-1 prepare materials
rules and regulations and tools for
installing formworks
LO 2. Strip formworks of building components
1. Removing Modular Read Information Sheet Answer Self-check Compare to Answer CBLM
formworks No. 4.2-1 on Removing No. 4.2-1 Key No. 4.2-1
formworks Tools and Equipment
2. Maintenance and Modular/ Read Information Sheet Answer Self-check Compare to Answer Crow bar
storage of Demonstration No. 4.2-2 on Maintenance No. 4.2-2 Key No. 4.2-2 Claw Hammer
formworks and storage of formworks Pliers
Perform Operation Trainee evaluates Wrench
Sheet No. 4.2-1 on output using Shovel
Stripping formwork Performance Criteria Scaffolding
Checklist No. 4.2-1 Hard hat
Perform Operation Trainee evaluates Safety shoes
Sheet No. 4.2-2 on output using Goggles
Maintaining and Performance Criteria Gloves
storing of forms Checklist No. 4.2-2 Circular Saw
Brooms
LO 3. Shore or/and re-shore and removal
1. Shore and Modular Read Information Sheet Answer Self-check No. Compare to Answer CBLM
reshore removal No. 4.3-1 on Shore and 4.3-1 Key No. 4.3-1
reshore removal Tools and Equipment
Crow bar
Claw Hammer
Pliers
Wrench
Shovel
Scaffolding
Hard hat
Hard shoes
Goggles
Gloves
Circular Saw
Brooms
C. Assessment Plan
Written Test: Question on company rules and regulations, removing formworks, maintenance and storage of formworks.
Performance Test: The performance will include the following:
Stripping formwork
Maintaining and storing of forms
Prepared by:

GLENN F. SALANDANAN
JZGMSAT
SESSION PLAN
Sector : CONSTRUCTION
Qualification Title : CARPENTRY NC II
Unit of Competency : INSTALL FRAMING WORKS
Module Title : INSTALLING FRAMING WORKS

Learning Outcomes:
LO 1. Prepare appropriate materials, tools and equipment for installing framing works
LO 2. Lay-out/erect and assemble post and girt
LO 3. Lay-out/install floor joists
LO 4. Lay-out/install wall studs
LO 5. Lay-out/fabricate/install roof frames
LO 6. Lay-out/install ceiling joist
A. Introduction

This module covers the required competencies in preparing appropriate materials, tools and equipment for installing framing
works, laying-out/erecting and assembling post and girt, laying-out/installing floor joists , laying-out/installing wall studs, laying-
out/fabricating/installing roof frames, laying-out/installing ceiling joist.

B. Learning Activities
LO 1. Prepare appropriate materials, tools and equipment for installing framing works

Learning Content Method Presentation Practice Feedback Resources Date/


Time
1. Classification of Modular Read Information Sheet Answer Self-check No. Compare to Answer CBLM
Philippine No. 5.1-1 on 5.1-1 Key No. 5.1-1
lumber Classification of Mock-up of a Framed
Philippine lumber House
2. Different Modular Read Information Sheet Answer Self-check No. Compare to Answer
materials, sizes, No. 5.1-2 on Different 5.1-2 Key No. 5.1-2
grades and uses materials, sizes, grades
and uses
3. Parts of a Modular Read Information Sheet Answer Self-check No. Compare to Answer
framed house No. 5.1-3 on Parts of a 5.1-3 Key No. 5.1-3
framed house
LO 2. Lay-out/erect and assemble post and girt
1. Post Modular Read Information Sheet Answer Self-check No. Compare to Answer CBLM
No. 5.2-1 on Post 5.2-1 Key No. 5.2-1
Demonstration TOOLS AND
EQUIPMENT
Perform Operation Trainee evaluates
Sheet No. 5.2-1 on output using Claw Hammer
Erecting Post Performance Criteria Pencil/Markin
Checklist No. 5.2-1 g pen
2. Girts and Modular Read Information Sheet Answer Self-check No. Compare to Answer Pull-Push
Girders No. 5.2-2 on Girts and Rule
5.2-2 Key No. 5.2-2
Girders Steel Square
Try-square
3. Load Conditions Modular Read Information Sheet Answer Self-check No. Compare to Answer
Hand Saw
and Structural No. 5.2-3 on Load 5.2-3 Key No. 5.2-3
System Conditions and Structural Chalk Line
Response System Response PPE
Portable
Circular Saw
Lumber
Nails
LO 3. Lay-out/install floor joists
1. Floor Joist Modular Read Information Sheet Answer Self-check No. Compare to Answer CBLM
No. 5.3-1 on Floor Joist 5.3-1 Key No. 5.3-1
2. Standard Size of Modular Read Information Sheet Answer Self-check No. Compare to Answer
Floor Opening No. 5.3-2 on Standard 5.3-2 Key No. 5.3-2
Size of Floor Opening
LO 4. Lay-out/install wall studs
1. Components of Modular/ Read Information Sheet Perform Operation Trainee evaluates CBLM
Wall No. 5.4-1 on Components Tools, Materials and
Demonstration of Wall Sheet No. 5.4-1 on output using Equipment
Layout Wall Performance Criteria
Checklist No. 5.4.1 Claw Hammer
Pencil/marking pen
Pull-push rule
Nylon String
Try-square
Hand Saw
Water Hose Level
Plumb Bob
Scaffolding
Plan and working
drawings
Nails
2. Measuring and Modular/ Read Information Sheet Perform Operation Trainee evaluates CBLM
Cutting Stud No. 5.4-2 on Measuring Sheet No. 5.4-2a on output using Tools Materials and
Demonstration and cutting studs Assemble Wall Performance Criteria Equipment
Checklist No. 5.4.2a circular saw
hand saw
Trainee evaluates hammer
Perform Operation
Sheet No. 5.4-2b on output using wrecking bar
Erecting Wall Performance Criteria folding rule
Checklist No. 5.4.2b try square
chalk line
Trainee evaluates
Perform Operation
output using
Sheet No. 5.4-2c on
Performance Criteria
Plumb and align a
Checklist No. 5.4.2c
Wall
LO 5. Lay-out/fabricate/install roof frames
1. Types of roof Modular Read Information Sheet Answer Self-check No. Compare to Answer CBLM
designs No. 5.5-1 on Types of roof 5.5-1
designs Key No. 5.5-1 TOOLS AND
EQUIPMENT
2. Roof Frames Modular Read Information Sheet Answer Self-check No. Compare to Answer Claw Hammer
No. 5.5-2 on Procedures 5.5-2 Key No. 5.5-2 Pencil/Marking pen
in fabricating and
Pull-Push Rule
installing roof frames
Nylon String
3. Parts of a roof Modular Read Information Sheet Answer Self-check No. Compare to Answer Steel Square
No. 5.5-3 on Parts of a 5.5-3 Key No. 5.5-3 Try-square
roof Hand Saw
Perform Operation Trainee evaluates Chalk Line
Sheet No. 5.5-3 on output using PPE
Laying out Truss Performance Criteria Portable Circular
Checklist No. 5.5-3 Saw
Plan and working
4. Tension and Modular Read Information Sheet Answer Self-check No. Compare to Answer
drawings
compression of No. 5.5-4 on Tension and 5.5-4 Key No. 5.5-4 Lumber
parts compression of part
Nails
Plywood
LO 6. Lay-out/install ceiling joist
1. Ceiling Joist Modular/ Read Information Sheet Perform Operation Trainee evaluates CBLM
No. 5.6-1 on Types of Sheet No. 5.6-1 on output using
Demonstration Roof Design Install Ceiling Joist Performance Criteria TOOLS AND
Checklist No. 5.6-1 EQUIPMENT
Claw Hammer
Pencil/marking pen
Pull-push rule
Nylon String
Steel Square
Try-square
Hand Saw
Chalk Line
Water Hose Level
Sledge Hammer
Plumb Bob
Hand Saw
Scaffolding
Personal
Protective
Equipment
Portable Circular
Saw
Plan and working
drawings
Lumber
Nails
C. Assessment Plan

Written Test: Question on Classification of Philippine lumber, different material sizes, grades and uses, parts of a framed house,
different type of rood design, and parts of a roof

Performance Test: The performance will include the following:


Install floor joist
Install vertical and horizontal wall studs
Install ceiling joints

Prepared by:

GLENN F. SALANDANAN
JZGMSAT

Potrebbero piacerti anche