Sei sulla pagina 1di 7

P ORTFOLIO

William D Mack
William D. Mack CONTENTS
53 Emmons Street, Milford, MA 01757
will.d.mack01@gmail.com, 508-282-7505
STONE ACRES FARM
linkedin.com/in/william-mack-b1720688
Education
ROGER WILLIAMS UNIVERSITY, Bristol RI FALL RIVER SOUTH PARK BRANCH LIBRARY
Bachelor of Science in Architecture, May 2016, GPA 3.49
Minor: Historic preservation
Master of Architecture (Expected May 2018) TWO URBAN LOFTS
Work Experience
Exhibitions and Publications Assistant, RWU SAAHP, January 2015 to May 2016
• involved formatting printing, and mounting in-house exhibitions
URBAN DESIGN: OLNEYVILLE 6/10 CONNECTOR CONVERSION
• additional responsibilities included laser etching and inking custom plaques for in-
house display and producing archival-quality scans of large-format construction INFILL CONSTRUCTION, FACADE DESIGN
documents
Historic Preservation Research Assistant, Roger Williams University, August 2012 to May
2013
• scanned and compiled various documents for use in teaching
• assisted in a faculty member’s research by providing digital copies of books and
other printed material
Additional Experience
Historic Structure Report, RWU, Spring 2016
• collaborated on producing a full report on Anawan Station No. 6 in Fall River, MA
• documented and prioritized the state of structural systems, mechanical systems, and
finishes
Community Partnerships Center design studio, RWU, Spring 2015
• produced a design to fulfill the needs of Project Goal, a local non-profit that provides
afterschool academic help and soccer-related activities to underprivileged children
• the design included a preliminary construction budget as well as cost-savings
estimations for several on-site renewable energy sources and HVAC systems size
calculations
AIAS Freedom By Design volunteer, Spring and Fall 2014
• involved participation in several design charrettes in the spring semester of 2014 for
a breast cancer awareness and memorial garden
• aided in the planting and construction of the garden in the fall semester of 2014
High School Independent Study, January2012June2012
• instructed a class in basic architectural drafting using dataCAD software
• produced the schematic design for a small house (built 2013; Pascoag, Burrillville,
RI)
Skills
Software: AutoCAD, Revit, Sketchup, InDesign, Photoshop, Illustrator, Rhino
Physical model building
Board and exhibition layout design

William D Mack
will.d.mack01@gmail.com
William D Mack STONE ACRES FARM
will.d.mack01@gmail.com PRODUCTION - COMMUNITY - MARKET
William D Mack FALL RIVER SOUTH PARK BRANCH LIBRARY
will.d.mack01@gmail.com MEETING - MEDIA - LEARNING
William D Mack TWO URBAN LOFTS
will.d.mack01@gmail.com
KEY:
Retail

Multi Family

Office

Mixed Use (Retail+Office)

Industrial

Apartments

William D Mack URBAN DESIGN: OLNEYVILLE 6/10 CONNECTOR CONVERSION


will.d.mack01@gmail.com
ROOF ASSEMBLYROOF ASSEMBLY - R 30.88
- R 30.88
- 5/8" WATERPROOF- 5/8"MEMBRANE
WATERPROOF MEMBRANE
- 4" POLYISOCYANURATE
- 4" POLYISOCYANURATE INSULATION, INSULATION,
FOIL FACED FOIL FACED
- 4" CONCRETE
- 4" CONCRETE SLAB ON METAL SLAB
DECKON METAL DECK 2 2
AIR / VAPOR
AIR / VAPOR BARRIER ADHEREDBARRIER
TO ADHERED TO
SURFACE SURFACE
- SUSPENDED
- SUSPENDED ACOUSTIC ACOUSTIC TILE CEILING
TILE CEILING

T.O. PARAPET T.O. PARAPET T.O. PARAPET T.O. PARAPET


147' 2" 147' 2" 147' 2" 147' 2"

T.O. ROOF T.O. ROOF T.O. ROOF T.O. ROOF


144' 4" 144' 4" 144' 4" 144' 4"

TYPICAL PARAPET TYPICAL PARAPET ASSEMBLY


ASSEMBLY
- 21" FIBERGLASS RAIN
- 21" FIBERGLASS
SCREEN, RAIN SCREEN,
FASTENED TO VERTICAL
FASTENED TRACKS
TO VERTICAL TRACKS
SPACED 16" OC SPACED 16" OC
- 1" AIR SPACE - 1" AIR SPACE
- 4" MINERAL WOOL - 4" PANEL,
MINERAL WOOL PANEL,
FIBERGLASS FACED FIBERGLASS FACED
- AIR / VAPOR BARRIER
- AIR / VAPOR BARRIER
- 5/8" GWB SHEATHING
- 5/8" GWB SHEATHING
- 6" METAL STUD -WALL,
6" METAL
STUDS
STUD
@ WALL,
18" OCSTUDS @ 18" OC
- 4" MINERAL WOOL - 4" PANEL,
MINERAL WOOL PANEL,
FIBERGLASS FACED FIBERGLASS FACED
- 5/8" PLYWOOD SHEATHING
- 5/8" PLYWOOD SHEATHING
- MOISTURE BARRIER- MOISTURE BARRIER
(WRAPPED OVER(WRAPPED
4" HORIZONTAL
OVER 4" HORIZONTAL
INSULATION PANEL, INSULATION
BELOW METAL
PANEL, BELOW METAL
CAP) CAP)

BALCONY ASSEMBLYBALCONY ASSEMBLY - R 24.1


- R 24.1
- 1" WOOD FINISH- 1" WOOD FINISH FLOOR
FLOOR
- WATERPROOF MEMBRANE
- WATERPROOF MEMBRANE
- 1/2" PLYWOOD SHEATHING
- 1/2" PLYWOOD SHEATHING
- 2X6 CONTINUOUS- 2X6 CONTINUOUS
BLOCKING, BLOCKING, 16" OC
16" OC
W/ MINERAL WOOL W/ INSUL.
MINERAL WOOL INSUL. INFILL
INFILL
SLOPED TO SCUPPERSLOPED AT TO
END SCUPPER
WALL AT END WALL
- AIR / VAPOR BARRIER
- AIR / VAPOR BARRIER
- 6" CONCRETE
- 6" CONCRETE SLAB ON METAL SLABDECKON METAL DECK
- W6X16 DECK
- W6X16 DECK SUPPORT, 24" OCSUPPORT, 24" OC
- SUSPENDED
- SUSPENDED ACOUSTIC ACOUSTIC TILE CEILING
TILE CEILING

FIN. THIRD FLOOR


FIN. THIRD FLOOR FIN. THIRD FLOOR
FIN. THIRD FLOOR
129' 11" 129' 11" 129' 11" 129' 11"

DETAIL WORKSHOP 3 - EXTERIOR ASSEMBLIES

DETAIL WORKSHOP 3 - EXTERIOR ASSEMBLIES


ARCH 331 - CONSTRUCTION MATERIALS AND ASSEMBLIES II

ARCH 331 - CONSTRUCTION MATERIALS AND ASSEMBLIES II


OVERHANG ASSEMBLY OVERHANG ASSEMBLY
- 1" WOOD FINISH- 1" WOOD FINISH FLOOR
FLOOR
- 7 5/16" CONCRETE- 7 5/16"
SLABCONCRETE
ON METAL SLAB
DECKON METAL DECK
- W6X16 DECK
- W6X16 DECK SUPPORT, 24" OCSUPPORT, 24" OC
- 5/8" GWB SHEATHING
- 5/8" GWB SHEATHING
- AIR / VAPOR BARRIER
- AIR / VAPOR BARRIER
- 4" MINERAL WOOL - 4" PANEL,
MINERAL WOOL PANEL,
FIBERGLASS FACED FIBERGLASS FACED
- 1" AIR SPACE - 1" AIR SPACE
- 21" FIBERGLASS PANEL
- 21" FIBERGLASS
RAIN SCREEN,
PANEL RAIN SCREEN,
FASTENED TO HORIZONTAL
FASTENED TOTRACKS
HORIZONTAL TRACKS
SPACED 16" OC SPACED 16" OC

FIN. SECOND FLOOR


FIN. SECOND FLOOR FIN. SECOND FLOOR
FIN. SECOND FLOOR
118' 7" 118' 7" 118' 7" 118' 7"

TYPICAL WALL ASSEMBLY


TYPICAL WALL- R 13.4
ASSEMBLY - R 13.4
- 21" FIBERGLASS PANEL
- 21" FIBERGLASS
RAIN SCREEN,
PANEL RAIN SCREEN,
FASTENED TO VERTICAL
FASTENED TRACKS
TO VERTICAL TRACKS
SPACED 16" OC SPACED 16" OC
- 1" AIR SPACE - 1" AIR SPACE
- 4" MINERAL WOOL - 4" PANEL,
MINERAL WOOL PANEL,
FIBERGLASS FACED FIBERGLASS FACED
- AIR / VAPOR BARRIER
- AIR / VAPOR BARRIER

NOV. 28, 2015

NOV. 28, 2015


- 5/8" GWB SHEATHING
- 5/8" GWB SHEATHING

1/2" = 1'-0"

1/2" = 1'-0"
- 6" METAL STUD -WALL,
6" METAL
STUDS
STUD
@ WALL,
18" OCSTUDS @ 18" OC
-1/2" INTERIOR GWB-1/2" INTERIOR GWB

SCALE :

SCALE :
DATE:

DATE:
GROUND FLOORGROUND FLOOR
- 1" WOOD FINISH- 1" WOOD FINISH FLOOR
FLOOR
- AIR / VAPOR
- AIR / VAPOR / WATER BARRIER/ WATER BARRIER
- 5" CONCRETE SLAB
- 5" CONCRETE SLAB
2" INSULATED
2" INSULATED JOINT JOINT AROUND EDGE
AROUND EDGE
- 4" RIGID INSULATION
- 4" RIGID INSULATION
- 6" GRAVEL LAYER- 6" GRAVEL LAYER

EXTERIOR PAVING EXTERIOR PAVING


- 4" X 4'TILES
- 4" X 4' X4' LIMESTONE X4' LIMESTONE TILES
- 1" GROUT - 1" GROUT
- 6" GRAVEL - 6" GRAVEL

FIN. FIRST FLOOR


FIN. FIRST FLOOR FIN. FIRST FLOOR
FIN. FIRST FLOOR
104' 7" 104' 7" 104' 7" 104' 7"

TYPICAL
TYPICAL FOUNDATION FOUNDATION
WALL ASSEMBLYWALL ASSEMBLY
- 2" RIGID INSULATION
- 2" RIGID INSULATION
- AIR / VAPOR
- AIR / VAPOR / MOISTURE / MOISTURE BARRIER
BARRIER
- 14" CONCRETE -FOUNDATION
14" CONCRETE FOUNDATION WALL
WALL

WILLIAM MACK

WILLIAM MACK
B.O. FOOTING B.O. FOOTING B.O. FOOTING B.O. FOOTING
99' 8" 99' 8" 99' 8" 99' 8"

WALL SECTION WALL SECTION SOUTH ELEVATION SOUTH ELEVATION


2 2 SCALE: 1/2" = 1'-0"
SCALE: 1/2" = 1'-0"
1 1 SCALE: 1/2" = 1'-0"
SCALE: 1/2" = 1'-0"

William D Mack URBAN INFILL CONSTRUCTION, FACADE DESIGN


will.d.mack01@gmail.com

Potrebbero piacerti anche