Paysandu_

PAYSANDU; Uruguay Print Date:


Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

LIST OF CONTENTS Page

GENERAL COMMENTS 2

PLANT SITE DATA 3

PRICE SUMMARY 4

811 - POWER DISTRIBUTION EQUIPMENT 5

821 - MOTORS & DRIVES 11

831 - INSTALLATION EQUIPMENT 14

841 - CONTROL EQUIPMENT 33

851 - INSTRUMENTATION 35

861 - ELECTRICAL AUXILIARY EQUIPMENT 43

891 - SINGLE MACHINE EQUIPMENT 44


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

GENERAL COMMENTS

Enclosed "Bill of Quantity" covers the amount of Electrical Equipment, which


has to be handled and erected during the construction of mentioned Cement Plant
project.

The "Bill of Quantity" is preliminary and the amounts are not limited to listed.

Preamble for the erection work is described for each group of equipment.

Equipment to be erected, fitted and aligned by Mechanical Contractor is


shown grey shaded and marked by MC in Info column. This equipment is
only listed for information.
It is the same for activities, which the Civil Contractor, CC, is in charge of.
See also the document "Borderline Activities" describing interfaces to other
Contractors.

The quantities listed under Dept. 891, "Single Machines" shall be erected
on the respective machines and the amount of equipment, cables and cable
termination's are additional quantities to listed quantities in i.e. 831 Installation
Equipment.
Unit erection prices for each item shall be filled-in at the green shaded cells (see right).
Please notice that total prices and summary will be calculated automatically based on
filled-in unit price and quantity.
Unit prices for equipment and materials to be supplied by the Electrical Contractor
shall be filled-in at the yellow shaded cells (see right).
Please notice that total prices and summary will be calculated automatically based on
filled-in unit price and quantity.
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
PLANT SITE DATA
Plant Power Supply:

- High Voltage level : 31.5 kV

- Medium Voltage level: 6.3 kV

- Low Voltage Level : 400 V

- AC Control Power Supply : 230 V

- Control Voltage, PLC interface : 24 VDC

- Lighting: 230 V

- Frequency : 50 Hz

Site Conditions:
- Max. ambient temperature : 40 deg.C
- Average ambient temperature : 31 deg.C
- Min. ambient temperature : 5 deg.C
- Max. ambient temperature, electrical rooms : 40 deg.C

- Average Relative Humidity : 0 %

- Altitude above Sea Level : 120 meters

Equipment Standards: IEC


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
PRICE SUMMARY
Erection
811 POWER DISTRIBUTION EQUIPMENT
- Medium Voltage System
- Low Voltage System
- Stand-by Power Supply System
821 MOTORS & DRIVES

831 INSTALLATION EQUIPMENT


- Cable System 27,930
- Cable Rack and Conduit System 98,143
- Earthing and Lightning Protection System 4,430
- Lighting System 19,557
841 CONTROL EQUIPMENT
851 INSTRUMENTATION
861 Electrical Auxiliary Equipment
871 Ventilation and Air-condition Equipment
891 SINGLE MACHINES
Weigh Feeders
Hydraulic and Lubrication Units
Dedusting Filters
Burner Stations

Grand Total
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
811 POWER DISTRIBUTION EQUIPMENT

MEDIUM VOLTAGE SYSTEM


Reference drawings:
- One Line Diagram, dwg. No. 10195879
- General Plant Layout, dwg. No. 10194399
- Substation Layout Sketches
unit
811.MV220 1 set MV Switchgears 4 Cubicles
metal-clad and partitioned, factory assembled, type tested
cubicles, designed for indoor installation.
The cubicles are equipped with air-insulated single copper
bus bar system, draw-out type vacuum or SF6 circuit breaker,
control and metering devices and cable compartment,
Service voltage: 6.3 kV
consisting of:

Preamble MV Switchgears
The requested unit price for the erection (unit price = total price)
for below listed switchgears shall comprise:
- transport from storage to relevant substation
- erect and align each panel according to lay-out and instruction
- ensure proper tightened bus bar system to next panel(s)
- re-termination of dismantled internal cables
- test and commissioning assistance
Unit
MV Main Switchgear 801MV100 0 Cubicles 0 0 N/A
installed in Coal Mill Substation, composed of:
Incoming feeder cubicle 0 0 0 0
Bus coupler/riser cubicle 0 0 0 0
Outgoing feeder cubicles 0 0 0 0
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
MV Substation Switchgear 490MV300 4 Cubicles 0 0 N/A
installed in Coal Mill Substation, composed of:
Incoming feeder cubicle 1 pcs 2.2x0.8x1.5 500
Transformer feeder cubicle 1 pcs 2.2x0.8x1.5 700
Motor feeder cubicle 2 pcs 2.2x0.8x1.5 700

Auxiliary Power Supplies

Preamble 110 V DC Control Power Supplies


The requested unit price for the erection shall comprise:
- transport from storage to relevant substation
- erect and align each unit according to lay-out and instruction
- re-termination of dismantled internal cables, if any
- test and commissioning assistance
Unit
811.LV230 110 V DC Power Supply 1 units 1.2x1.2x0.6 400 0 0 N/A
Battery charger and batteries installed in cabinet.
Rated power: 80-150 Ah
Application: Main Transformer Station

Total Medium Voltage System 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

LOW VOLTAGE SYSTEM


Reference drawings:
- One Line Diagram, No. 10195879
- Electrical Load List, No. 80017512
- Motor-Starter Wiring Diagrams 80017509

811.TA510 Distribution Transformers 1 units


Three-phase oil-immersed transformers mounted in corrugated
steel tank designed for ONAN cooling.
Voltage ratio: 6,3 kV / 400 V

Preamble Distribution Transformers


The requested unit price for the erection shall comprise:
- transport from storage to relevant transformer cell
- ensure correct location and alignment in the cell
- fit and re-terminate dismantled items and cables, if any
- checking of transformer oil, if required
- test and commissioning assistance
Unit

1600 kVA Transformer 1 pcs 1.8x1.1x1.8 3.090 0 0 N/A

811.LV530 LV Switchgears/MCC 1 boards


metal-enclosed, free standing, factory-assembled type tested
cubicles, designed for indoor installation.
The cubicles are subdivided into three compartments:
- bus bar compartment
- equipment compartment with draw-out units
- cable compartment
Service/rated voltage: 400/690 V
Rated bus bar current: 800-3000 A
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
Info LV Switchgears
with horizontal main bus bar system L1, L2, L3, PE + N,
incoming section with circuit breaker, outgoing load feeders and
normally LV capacitor banks
Motor Control Centers, MCC's
with horizontal main bus bar system L1, L2, L3, PE,
incoming section with load break switch, outgoing load feeders
and motor starter units in draw-out design.
MDB and MCC will be an integrated board, if suitable.

Preamble LV-switchgear/MCC
The requested unit price for the erection shall comprise:
- transport from storage to relevant substation
- assembling of transport sections
- erect and align each panel according to lay-out and instruction
- ensure proper tightened bus bar system
- re-termination of dismantled internal cables
- test and commissioning assistance
LV-switchgear consisting of:
Unit
LV-switchgear/MCC 401LV100 1 pcs 2.2x7.0x0.5 7.600 0 0 N/A
installed in coal mill substation 491
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
LV Capacitor Banks 1 units
metal enclosed, factory-assembled units, designed for indoor
installation with reactive power controller and reactors for
harmonic damping.
Note LV Capacitors are usually integrated in LV-Switchgears.

Preamble LV Capacitor Banks


The requested unit price for the erection shall comprise:
- transport from storage to relevant electrical room
- erect and align each panel according to lay-out and instruction
- re-termination of dismantled internal cables
- test and commissioning assistance

250 kVAr Capacitor banks, Internal in LV-switchgear/MCC 1 pcs 2.2x1.0x0.5 500 0 0 N/A

Total Low Voltage System 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
STAND-BY POWER SUPPLY SYSTEMS

811.UP620 UPS, Uninterruptible power supply 1 sets

Preamble UPS System


with rack mounted batteries installed in cabinet.
The requested unit price for the erection shall comprise:
- transport from storage to relevant electrical room
- erect and align each panel according to lay-out and instruction
- re-termination of dismantled internal cables
- test and commissioning assistance

811.UP620 UPS, Uninterruptible power supply 1 set 0 0 N/A


installed in Central Control Building, consisting of:
- Cabinet containing, Rectifier, Inverter and Electronic by-pass 1 pcs 1.8x1.0x0.6 700
- Cabinet containing, Lead-acid battery, battery fuses 1 pcs 1.8x1.2x0.6 1.500
- Distribution cabinet with miniature circuit breakers 1 pcs 1.0x1.0x0.2 50
Rated output: 15 kVA, 3-phases

Total Stand-by Power Supply Systems 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
821 MOTOR & DRIVES
Reference drawings:

- One Line Diagram, drw. No. 10224202


- Electrical Load List, No. 80017512

MV Squirrel Cage Motors 1 motors


with capacitor bank

Preamble MV Squirrel Cage Motors


- as above

MV Capacitor Bank 1 pcs 1.0x0.5x0.5 620 kg 0 0 N/A


MC MV Squirrel Motor 430 kW 1 motor 3470 kg

MV Variable Speed Drives 1 drives


with step-down transformer

Preamble Variable Speed Drives


Motors:
MC - transport from storage to motor foundation
- - erect and align motor and coupling to the related machine
The requested unit price for electrical erection shall comprise:
- electrical test and commissioning assistance
Frequency Converter
- transport from storage to relevant substation
- erect and align converter according to lay-out and instruction
- re-termination of dismantled internal cables, if any
- test and commissioning assistance
Step-down transformer
- transport from storage to relevant transformer cell
- ensure correct location and alignment in the cell
- fit and re-terminate dismantled items and cables, if any
- checking of transformer oil, if required
- test and commissioning assistance

Frequency Drive Unit: 455 kW 1 drive 0 0 N/A


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
MC LV Squirrel Cage Motor 1 pcs 3400 kg
LV Frequency Converter 1 pcs 1.6x0.6x0.5 1240 kg
Step-down Transformer, MV/LV 1 pcs 1.4x0.8x1.2 1810 kg

LV Variable Speed Drives 4 drives

Preamble Variable Speed Drives


- as above

Frequency Drive Unit: 4 drive 0 0 N/A


MC LV Squirrel Cage Motor 4 pcs
LV Frequency Converter 2 pcs 50
LV Frequency Converter 1 pcs 135
LV Frequency Converter 1 pcs 540

LV SC-Motors and Geared Motors 64 motors

Preamble LV Motors
MC - transport from storage to motor foundation
- - erect and align motor and coupling to the related machine
The requested unit price for electrical erection shall comprise:
- electrical test and commissioning assistance

MC LV-SC Motors, 0.1 - 2.2 kW 11 pcs 0 0 N/A

MC LV-SC Motors, 3 - 7.5 kW 12 pcs 0 0 N/A

MC LV-SC Motors, 11 - 30 kW 21 pcs 0 0 N/A

MC LV-SC Motors, 37 - 90 kW 6 pcs 0 0 N/A

MC LV-SC Motors, 110 - 160 kW 13 pcs 0 0 N/A

MC LV-SC Motors, 200 - 315 kW 1 pcs 0 0 N/A


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
Motor-Operated Actuators 10 actuator

Preamble Actuators
MC - transport from storage to motor foundation
- - erect and align motor and coupling to the related machine
The requested unit price for electrical erection shall comprise:
- installation of control box
- test and commissioning assistance

MC Linear Actuators, Raco-motors, 0,1 - 2 kW 1 pcs 0 0 N/A


Control box 1 pcs 0.6x0.4x0.2 30

MC Servo-Motors, single/three phase, 0,1 - 1 kW 9 pcs 0 0 N/A


with position transmitter

Total Motors & Drives 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
831 INSTALLATION EQUIPMENT

CABLE INSTALLATION Total

Preamble Cable Installation


The below listed amount of cables are foreseen to be used for
the following installation works:
- MV power distribution system, motors and drives
- LV power distribution system, motors and drives
- Field Control and Instrumentation

Cable Laying Distribution:


The average unit price (price/meter) for pulling and fixation of
cables shall be based on to the following distribution of installation
conditions:
Cable Racks Imbedded Pipes Conduit
HT cables: 100 %
MV cables: 80 % 20 %
LV cables (>10 mm2): 90 % 5% 5%
LV cables (?10 mm2): 85 % 10 % 5%
Control cables: 80 % 10 % 10 %
Signaling cables: 80 % 10 % 10 %

Cable Fixation
Cables laying on cable racks shall be proper arranged and fixed by
cable straps.

Cable Terminations:
Number of cable cuts are listed at "Info" and number of
terminations (two/cut) at "Qty" for each type of cable.
Unit price for cable termination shall be based on the
following termination method:
- MV-cables: - termination with MV termination kits and cable lugs
- LV-cables (? 6 mm2): - termination with cable lugs
- LV-cables (? 4 mm2): - termination in terminals
- Control and signal cables: - termination in terminals

Cable Numbering
Cable number labels shall be fitted at both cable-ends on all cables.
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
Price for fitting of labels shall be included in termination work.

831.CB020 Total MV Power Cables (H) 705 m 5,931


Cross linked polyethylene (XLPE) insulation (2X)
Copper wire screen (S)
Screen of copper tape applied on each phase (SE)
PVC outer sheath (Y)
Rated voltage: 6/10 kV
Cross section: mm2
Cable
Cuts

Three phase cable, type 2XSEY


0 3 x 70 RM/16 cable 0 0 - 0 0 N/A
Cable terminations 0 0 0 0

7 3 x 95 RM/16 cable 210 m 1,425 0 0 N/A


Cable terminations 14 pcs 0 0

6 3 x 150 RM/25 cable 495 m 4,506 0 0 N/A


Cable terminations 12 pcs 0 0
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
831.CB030 Total LV Power Cables (W) 14,781 m 15,285
Cross linked polyethylene (XLPE) insulation (2X)
Concentric neutral conductor (C )
PVC outer sheath (Y)
PE conductor (G)
Without PE conductor (O)
Rated voltage: 0,6/1 kV
Cross section: mm2

Cuts Three phase cable, type 2XY-G 13,680


42 4 x 2.5 RE cable 3,800 m 889 0 0 N/A
Cable terminations 84 pcs 0 0

40 4 x 4 RE cable 3,550 m 1,087 0 0 N/A


Cable terminations 80 pcs 0 0

6 4 x 6 RM cable 670 m 287 0 0 N/A


Cable terminations 12 pcs 0 0

2 5 x 2,5 RE cable 100 m 28 0 0 N/A


Cable terminations 4 pcs 0 0

2 5 x 4 RE cable 100 m 37 0 0 N/A


Cable terminations 4 pcs 0 0

2 5 x 10 RM cable 100 m 78 0 0 N/A


Cable terminations 4 pcs 0 0

3 5 x 25 RM cable 120 m 202 0 0 N/A


Cable terminations 6 pcs 0 0

8 5 x 35 RM cable 500 m 1,302 0 0 N/A


Cable terminations 16 pcs 0 0

3 5 x 95 RM cable 100 m 584 0 0 N/A


Cable terminations 6 pcs 0 0

3 3 x 2,5 RE cable 200 m 81 0 0 N/A


Cable terminations 6 pcs 0 0

3 3 x 35 SM/1G16 RM cable 100 m 160 0 0 N/A


Cable terminations 6 pcs 0 0
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
4 3 x 50 SM/1G25 RM cable 300 m 563 0 0 N/A
Cable terminations 8 pcs 0 0

9 3 x 70 SM/1G35 RM cable 1,017 m 2,652 0 0 N/A


Cable terminations 18 pcs 0 0

3 3 x 95 SM/1G50 RM cable 220 m 783 0 0 N/A


Cable terminations 6 pcs 0 0

3 3 x 150 SM/1G70 RM cable 200 m 1,074 0 0 N/A


Cable terminations 6 pcs 0 0

11 4 x 10 RM/10 cable 845 m 521 0 0 N/A


Cable terminations 22 pcs 0 0

9 4 x 16 RM/16 cable 990 m 901 0 0 N/A


Cable terminations 18 pcs 0 0

10 4 x 25 RM/25 cable 768 m 921 0 0 N/A


Cable terminations 20 pcs 0 0

Three phase cable, type 2XCY 501


3 3 x 35 RM/16 cable 110 m 198 0 0 N/A
Cable terminations 6 pcs 0 0

5 3 x 70 SM/35 cable 187 m 517 0 0 N/A


Cable terminations 10 pcs 0 0

6 3 x 120 SM/70 cable 204 m 950 0 0 N/A


Cable terminations 12 pcs 0 0

Single phase cable, type 2XY-O 600

10 1 x 240 RM cable 600 m 1,470 0 0 N/A


Cable terminations 20 pcs 0 0
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

831.CB040 Total Control Cables (M) 17,877 m 3,352


PVC insulation (Y)
PVC outer sheath (Y)
PE conductor (G)
Rated voltage: 600/1000 V
Cross section: mm2
Cuts Control cable, type YY-G
220 3 x 1.5 RE cable 14,935 m 2,615 0 0 N/A
Cable terminations 440 pcs 0 0

33 4 x 1.5 RE cable 2,642 m 602 0 0 N/A


Cable terminations 66 pcs 0 0

4 5 x 1.5 RE cable 70 m 17 0 0 N/A


Cable terminations 8 pcs 0 0

4 7 x 1.5 RE cable 100 m 29 0 0 N/A


Cable terminations 8 pcs 0 0

5 14 x 1.5 RE cable 200 m 89 0 0 N/A


Cable terminations 10 pcs 0 0
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
831.CB050 Total Signaling Cables (C ) 37,517 m 3,362
Instrumentation cable (MSR)
Polyethylene insulation (2Y)
Overall screen of Al laminated foil in contact with a drain wire (St)
PVC outer sheath (Y)
Rated voltage: 300 V
Cross section: mm2
Cuts Screened signal cables, type MSR-2Y(St)Y
143 1x2x1 + 1 RM cable 14,640 m 933 0 0 N/A
Cable terminations 286 pcs 0 0

220 1x4x1 + 1 RM cable 19,198 m 1,632 0 0 N/A


Cable terminations 440 pcs 0 0

100 4x2x1 + 1 RM cable 2,590 m 427 0 0 N/A


Cable terminations 200 pcs 0 0

10 8x2x1 + 1 RM cable 889 m 254 0 0 N/A


Cable terminations 20 pcs 0 0

5 32x2x0,5 + 0,5 RM cable 200 m 116 0 0 N/A


Cable terminations 10 pcs 0 0

Accessories for Cable Installation


(price for fitting to be included Cable Termination)
831.CB100 Info MV Termination Kits 1 lot 28 N/A N/A
for MV power cables, heat shrinking type

831.CB110 Info Cable Lugs 1 lot 35 N/A N/A


for power cables ? 6 mm2, press tool erection

831.CB120 Info Cable Numbering System 1 lot 200 N/A N/A


Tools for fabrication of cable number labels
Materials for cable number labels

Total Cable System 27,930 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
CABLE RACK AND CONDUIT SYSTEM

831.CM210 Total Cable Rack System 5,290 m 18,333


cable trays and cable ladders are fabricated of galvanized steel
plates and sections, supplied in standard lengths of approx. 4 m.
Standard accessories as bends, joints, wall rails, brackets, pendants,
bolts, nuts and washers are included in the supply.

Preamble Erection of Cable Rack System and Conduit


The average unit price (price/meter) for erection of cable rack system
and conduit shall be based on max. 2 m between the supports
and the following distribution of erection conditions:
Concrete Steel Structure Brick Wall
Tray, 100 mm: 50 % 30 % 20 %
Tray, 300 mm: 60 % 30 % 10 %
Tray, 500 mm: 90 % 10 %
Ladder, 200 mm: 80 % 10 % 10 %
Ladder, 300 mm: 80 % 10 % 10 %
Ladder, 600 mm: 100 %
Ladder, 900 mm: 100 %
Conduit (25 mm): 50 % 30 % 20 %
Conduit (50 mm): 80 % 20 %

Erection
Vertical distance between parallel running rack system containing
cables for different voltage level shall be a least 300 mm.
The cables shall be separated according to the following voltage
levels:
- Communication cables (Y) - top level
- Signal cables (C )
- EX-zones cables (I)
- Control cables (M)
- LV power cable (W)
- MV power cable (H) - bottom level

Cable Tray, width: 100 mm 3,700 m 8,510 0 0 N/A

Cable Trays, width: 300 mm 212 m 868 0 0 N/A

Cable Trays, width: 500 mm 50 m 480 0 0 N/A


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

Cable Ladders, width: 200 mm 574 m 2,412 0 0 N/A

Cable Ladders, width: 300 mm 238 m 1,033 0 0 N/A

Cable Ladder, width: 500 mm 307 m 1,441 0 0 N/A

Cable Ladder, width: 600 mm 209 m 1,074 0 0 N/A

Cable racks installed outdoor or places with risk for cable damage
shall be protected by covers.

Covers for Cable Trays, 100 mm 900 m 1,125 0 0 N/A

Covers for Cable Trays, 300 mm 26 m 100 0 0 N/A

Covers for Cable Trays, 500 mm 26 m 100 0 0 N/A

Covers for Cable Ladders, 200 mm 200 m 615 0 0 N/A

Covers for Cable Ladders, 300 mm 50 m 230 0 0 N/A

Covers for Cable Ladders, 500 mm 25 m 115 0 0 N/A

Covers for Cable Ladders, 600 mm 50 m 230 0 0 N/A

831.CM220 Total Steel Conduits 492 m 2,310


Rigid galvanized steel pipes including clamps and end-bushings
supplied in standard lengths for cable laying and protection

Steel Conduit: 26 mm 102 m 173 0 0 N/A

Steel Conduit: 48 mm 390 m 2,137 0 0 N/A


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
831.CM230 Total Duct Bank Conduit 7,700 m 38,500
PVC pipes for underground cable duct banks.
CC The Civil Contractor shall be responsible for:

- - excavation of trenches and back-filling


- - placing of duct banks pipes with pull wire

- PVC Conduit: 200 mm 7,700 m 38,500 N/A

831.CM250 Total Accessories 39 tonnes 39000


Info Cable Binders N/A
Cable binders/straps, UV resistant for cable fixation
1 lot: 1000 binders

Info Steel Plate and Sections N/A


Electrical Erection Contractor shall be responsible for the supply,
design and manufacturing of supports, as follows:
Steel plates and sections for manufacturing of rails, supports and
brackets required for proper erection of the cable rack system.
All steel items shall be painted with primer and colour paint after
manufacturing.

Info Fixation Items N/A


Expansion bolts for erection of the cable rack system and
conduits on concrete and brick walls.
Bolts, nuts, screws and plugs required for proper erection of
cable rack system and conduit, where expansion bolts are not
suitable to use.
Total Cable Rack and Conduit System 98,143 0
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
EARTHING AND LIGHTNING PROTECTION SYSTEM
Earthing and Lightning installation shall be carried out according
to FLS Instruction Manual - Earthing and Bonding 36681-02,
and local Standards and Regulations.

831.LN310 Total Earthing System 1 lot 4,337

Preamble Primary earthing system


Primary earthing system carried out as a meshed network
of clamped concrete steel bar, earth electrodes, ring conductor
around buildings and interconnection conductors between buildings.

Earthing Outlets will be fitted to the MV Clamps embedded in


concrete walls or foundation as connection points to the
meshed network.
CC This work will be executed by the Civil Contractor

Earth electrodes
As supplement to the meshed earthing network a number of
earth pits with electrodes shall be placed in the ground around
substations and other buildings. The earth electrodes shall be
interconnected by ring-conductor and connected to earthing rail.
CC Excavating of trenches and back-filling will be executed by others.

Earthing Rail and Equipotential Earth Connector


Earthing Rails shall be erected on the walls in each substation
cable basement. Equipotential Earth Connector shall be erected
on walls in other buildings, cable tunnel or at foundations.
Earthing Outlets shall be connected to the nearest earthing rail
equipotential earth connector

Interconnecting Bonding
All earthing rails and equipotential earth connectors shall be inter-
connected by a ring-conductor bonding of 120 mm2 bare Cu cables
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
Equalization Bonding
In general all metallic parts shall be at earth potential obtained by
bonding to earthing rails, test clamps or bonding bars, such as:
- steel structure
- doors and frames
- ducting and piping
- ladders and staircases
- transformer body and rails
- cable trays and ladders
- motor frames
- electric panels and boxes
- conveyors
- filters

831.LN310 Primary Earthing:


CC MV clamps (to clamp the reinforcement steel bars) 280 pcs 129

CC Earthing outlets (embedded and tightened to MV clamps) 70 pcs 23

Ring-conductor, 95 mm2, Bare Cu 2,270 m 2,171 0 0 N/A


for interconnection of earth electrodes to the earthing rails

Earth electrode, 1.5 m, Bare Cu with coupling for ring-conductor 53 pcs 159 0 0 N/A
connection, - placed in earth pits mainly around substations

Interconnection conductor, 120 mm2, Bare Cu 330 m 361 0 0 N/A


Conductor terminations 13 pcs 0 0
for interconnection of earthing rails, test clamps and bonding bars

Bonding wire, 16 mm2, Flexible Cu 90 m 15 0 0 N/A


Bonding terminations 284 pcs 0 0
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
831.LN320 Secondary Earthing
Earthing Rails, 35 x 6 mm, Bare Cu 80 m 150 0 0 N/A
with distance holders for mounting on walls in substation basements

Bonding wire, 95 mm2, Bare Cu 770 m 709 0 0 N/A


Bonding terminations 132 pcs 0 0

Equipotential earth bars with 10 connectors 60 pcs 126 0 0 N/A


with attachment for mounting on walls or foundations

Bonding wire, 16 mm2,yellow/green Cu conductor 2,690 m 418 0 0 N/A


Bonding terminations 555 pcs 0 0

Cable lugs, 16 - 120 mm2 1,280 pcs 26

Standard bolts, nuts, screw and washers for fixation 1 lot 50


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
831.LN340 Total Lightning Protection System 1 lot 93

Preamble Meshed Earthing Network


The lightning protection system will be carried out as an
integrated installation of the primary earthing system and it
will also be used to discharge lightning strikes to the ground.
Earthing and Lightning protection will be an integrated system.
Lightning Outlets will be embedded in the building roof and walls
as base for lightning conductors.
Embedding of MV Clamps and Lightning Outlets will be executed
by the Civil Contractor

Lightning rods
Lightning rods on roofs shall be mounted on Concrete Bases.
Lightning rods shall be interconnected by horizontal lightning
conductors by rod clamps.

Down-conductors
Down-conductors shall be erected on buildings with brick or plate
walls.

Test-Joints
Test-Joints shall be placed 1 m above ground level as termination
point for down-conductors and/or reinforcements to the underground
earthing ring-network.

Lightning System Materials


CC MV clamps (to clamp the reinforcement steel bars) 10 pcs

CC Lightning outlets (embedded and tightened to MV clamps) 25 pcs

Horizontal lightning conductors, 50 mm2 Bare Al 296 m 41 0 0 N/A


with conductor-holders for mounting on lightning outlets

Test-joints for down-conductors 4 pcs 1 0 0 N/A

Cross joints for lightning conductor interconnection 1 lot 1

Standard bolts, nuts, screw and washers for fixation 1 lot 50

Total Earthing and Lightning Protection System 4,430 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

LIGHTING SYSTEM

831.LG410 Total Lighting Equipment 1 lot 19,557 N/A


for illumination in and around process buildings, substations,
Central Control Building and Plant Roads

Preamble The lighting system will be a combination of fluorescent lamps


and high bay lamps, depending on application, conditions and
building layout.

Mounting
Depending on the application the lighting fixtures will be mounted
in one of the following ways:
- directly on the ceiling construction
- suspended, - usually several fixtures mounted on a common rail
- wall brackets, - usually outdoor fixtures
- in the suspended ceiling, i.e. central control building

Degree of protection
Degree of protection for lighting fixtures, switches and socket will be
IP54 to IP65 depending on application.

Back-up
A number of fluorescent lamps (approx. 10%) are equipped with
built-in battery for 1 hour illumination back-up.

Foundation blocks
Concrete foundation blocks for road lighting poles will be
constructed by civil contractor. Excavating of cable trenches for
road lighting cables and back-filling will also be executed by others.

Lighting Distribution Panels


Lighting Distribution Panels will normally be installed in the relevant
substation room.
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
Lighting Cable Installation
Feeding cables to a lighting group shall be pulled in the LV power
cable rack system. Distribution lighting cables in a lighting group
shall be pulled into conduit fitted to the construction. Connection
boxes shall be used to branch off to the group lighting fixtures.

831.LG410 Lighting Equipment, Process areas


Fluorescent lamps in fixture with cover, 36 W single or double 875 pcs 4,375 0 0 N/A
fixtures partly supplied with hooks for wire suspension.

High bay fixtures, mercury or sodium lamps, 150 W, 250 W, 400 W 16 pcs 240 0 0 N/A
with bracket for ceiling or wall mounting

Exit fixtures with 8 W fluorescent lamp and battery for back-up 28 pcs 56 0 0 N/A

Lighting switches and push buttons, 10 A with cable glands, IP55 7 pcs 1 0 0 N/A

Connection boxes with 3-6 cable glands 410 pcs 82 0 0 N/A

Plug Socket 15 pcs 75 0 0 N/A


Industrial design with cable glands, 1P+N+PE, 10A.

831.LG440 Light Distribution Panels 3 pcs 880 0 0 N/A


metal-enclosed, free-standing cubicles for indoor installation

831.LG450 Plug Socket Centre 11 pcs 310 0 0 N/A


Industrial design with cable glands, 3P+N+PE, 16A.

831.LG460 Plug Sockets, Welding 5 pcs 0,2x0,1x0,2 25 0 0 N/A


Industrial design with cable glands, 3P+N+PE, 125A.

831.LG470 Total LV Power Cables (W) 7,690 m 5,520


Cross linked polyethylene (XLPE) insulation (2X)
Concentric neutral conductor (C )
PVC outer sheath (Y)
PE conductor (G)
Without PE conductor (O)
Rated voltage: 0,6/1 kV
Cross section: mm2
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
Three phase cable, type 2XY-G
320 5 x 2.5 RE cable 2,300 m 616 0 0 N/A
Cable terminations 640 pcs 0 0

16 5 x 4 RE cable 300 m 110 0 0 N/A


Cable terminations 32 pcs 0 0

33 5 x 6 RM cable 600 m 309 0 0 N/A


Cable terminations 66 pcs 0 0

20 5 x 16 RM cable 390 m 436 0 0 N/A


Cable terminations 40 pcs 0 0

0 5 x 25 RM cable 0 0 - N/A 0 N/A


Cable terminations 0 0 N/A 0

38 5 x 35 RM cable 710 m 1,645 0 0 N/A


Cable terminations 76 pcs 0 0

22 5 x 50 RM cable 500 m 1,554 0 0 N/A


Cable terminations 44 pcs 0 0

Rubber cable, type H05 VV-F


220 3 x 1 cable 750 m 56 0 0 N/A
Cable terminations 440 pcs 0 0

130 4 x 1 cable 160 m 15 0 0 N/A


Cable terminations 260 pcs 0 0

Single phase cable, type 2XY-G


55 3 x 2.5 RE cable 2,500 m 478 0 0 N/A
Cable terminations 110 pcs 0 0

22 3 x 4 RE cable 850 m 213 0 0 N/A


Cable terminations 44 pcs 0 0

6 3 x 6 RM cable 250 m 88 0 0 N/A


Cable terminations 12 pcs 0 0
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
831.LG480 Total Cable Conduit 1,704 m 2,473 0 0 N/A
PVC and/or steel conduit, 20-40 mm supplied in standard lengths
with clamps for screw/raw plug erection on walls and ceiling

Total Lighting System 19,557 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
841 CONTROL EQUIPMENT

PROCESS CONTROL SYSTEM

841.CS010 Total Process Control System 1 system -


for central control and local control rooms
See Control System Configuration.

Preamble Operator System


Total price for installation of listed hardware

PLC System
Unit price for installation of PLC and I/O cabinets at proper
locations.

Network Cables
Cables laying on cable rack or in conduit, proper arranged and fixed
according to instructions
Terminations:
Number of cable cuts are listed at "Info" and number of terminations
(two/cut) at "Qty" for each type of cable.
Unit price for cable termination shall be based on the proper fitting
of included terminations kits

Control Desk
Total price for handling, installation and alignment of desk units
according to instruction and arrangement layout.

Operator System 1 system Unit 0 0 N/A


- Server PC mounted in cabinet 0 0 0
- Client Operator Stations for CCR 2 pcs 30
- Industrial Operator Stations mounted in cabinet for LCR 0 0 0
- Engineering Station 0 0 0
- Printers 1 pcs 30
- Switch boxes, for network cables 1 pcs 20

PLC System 1 system N/A


- PLC Cabinets with terminal rows (installed in electrical rooms) 1 pcs 2.0x1.2x0.5 200 0 0
- I/O Cabinets with terminal rows (installed in electrical rooms) 2 pcs 2.0x1.2x0.5 200 0 0
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
- Remote I/O boxes (installed in the field) 0 0 0 0 0 0

Communication Network 1 system 0 N/A


The network in CCR (Operator system to Switch boxes A&B)
is carried out with Ethernet RJ45 Twisted Pair cables
The network from Switch Boxes A&B in CCR to PLC cabinets in
electrical rooms is carried out by Fiber Optic cables.
Field bus cables will be used to connect Sub-control system to the
PLC System.
Cuts
1 CCR Network, Twisted Pair cables 50 m 5 0 0 N/A
Twisted Pair cable terminations 2 pcs 0 0

8 Fiber Optic cables, armored 1,076 m 204 0 0 N/A


Fiber Optic cable terminations 16 pcs 0 0

9 Field bus cables, Twisted Pair cables 400 m 40 0 0 N/A


Twisted Pair cable terminations 18 pcs 0 0

Total Control System 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
851 INSTRUMENTATION

GAS ANALYZER SYSTEMS

Preamble The mechanical contractor will be responsible for:


MC - fitting of flanges for sampling probes
- - fitting and erection of probe extraction devices
- - installation of water supply system
- - installation of compressed air supply system

Electrical Erection Work:


The unit price shall include the following erection works:
- install and align analyzer control cabinet
- install and align water control cabinet
- fitting and mounting of internal water and compressed air pipes
- fitting and mounting of internal sampling hoses
- re-termination of dismantled internal cables
- pulling and termination of special cables

851.AM840 Coal Filter/Bin Gas Analysis System 1 system 1,225 0 0 N/A


consisting of:
- Single dry filter probe 1 pcs
- Single dry silo probe 1 pcs
- Gas Monitoring Unit with PLC 1 pcs 0.6x1.1x0.6
- Sampling hoses 1 set

851.AM886 Dust Monitoring System 1 system 138 0 0 N/A


for mounting on Coal Mill stack, consisting of:
- Measuring head 1 pcs 0,6x0,3x0.2
- Mounting flange 1 pcs
- Control and display unit 1 pcs
- Light trap 1 pcs
- Purge air unit 1 pcs
- Weather protection cover 1 set

Total Gas Analyzing Systems 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

FIELD CONTROL EQUIPMENT

Preamble Erection
Unit price for installation of support or stands and fitting of the
relevant field control equipment.
The main part of field control equipment shall be mounted on a
fabricated support and erected on the construction or structure.
Field control equipment can also partly be installed direct
on the construction or structure.
Erection on fabricated stands can also be an needed option.

Unit
851.FC910 Local Control Switches with Pushbutton 1 set 29
one set/motor, consisting of:
- Start/Stop Push-button station 68 pcs 0 0 N/A
- Emergency Stop Switch, mushroom type 75 pcs 0 0 N/A

851.FC950 Sirens and/or Horns, 220 V 12 pcs 63 0 0 N/A


for start-up warning

851.FC970 Terminal Boxes 49 pcs 68 0 0 N/A


with max. 40 terminals for transfer of digital and analog signals

Steel Plate and Sections 1 tonnes 1000 0


Electrical Erection Contractor shall be responsible for the supply,
design and manufacturing of these supports, as follows:
Steel plates, sections and/or 2" pipes for manufacturing of supports
required for proper erection of above mentioned field control devices
Supports for local control switches shall be designed with protection cap.
All steel items shall be painted with primer and colour paint after
manufacturing.

Fixation Items 1 LOT 0


Bolts, nuts, washers screw and plugs required for fixation of field
instruments shall be supplied by Electrical Erection Contractor

Total Field Control System 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

851.IP990 PROCESS INSTRUMENTATION 78 unit

MC - fitting of resistance thermometer, Pt-100 for bearing temperature


- - fitting of flange sockets for temperature sensors
- - fitting of flange support on kiln hood for pyrometer
- - fitting of pipe sockets for pressure measurement
- - fitting of measuring flange for flow measurement
- - fitting of flange support for level measurement
- - prepare measure point for fitting of oscillation pick-up
- - fitting of stand for Folaphone system
- - erection and alignment of position transducers
- - erection of solid flow meter including load cell
- - erection of belt weighers including load cell
- - erection of tank weighing system including load cells
- - erection of bridge weighing system including load cells
- - fitting of supports on conveyors for switches
- - fitting of supports for pull rope wire

Electrical Erection Work


The unit price for each item shall include the following erection
works:
- installation of junction boxes for Pt-100 sensors
- fitting of temperature sensors on flange socket
- installation of temperature transducers
- pulling and connection of compensation cables for thermocouples
- installation of units and transmission cables for Indutherm system
- installation of pressure and flow transmitters
- fitting of measuring pipes for pressure measurement
- installation of level measuring equipment on supporting flange
- installation of transducers for vibration monitors
- installation of units for Folaphone system
- installation of weighing amplifiers for weighing systems
- fabrication of steel supports for transducers and transmitters
- fitting of switches for conveyors
- installation of junction boxes for proximity switches
General:
- fitting and alignment of field instruments, shall be executed in
co-operation with mechanical erection contractor and in
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
accordance with FLS instruction and supervision

Temp.
Process Temperature Measurement 4 unit 0 0 N/A
each unit consisting of:
- Thermocouple or PT-100 insert with and head mounted transmitter 1 pcs
- Fitting accessories with female muff for mounting on flange socket 1 set

Machine Temperature Measurement 3 unit 0 0 N/A


each unit consisting of:
- Pt-100 sensors with 2 m flexible cable 1 pcs
- Junction boxes installed next to Pt-100 sensors 1 pcs
-Temperature transducer 1 pcs
- Pulling and termination of cables. Sensor-Junction box-Transducer 10 m
2
Bearing Temperature Measurement (2) 2 unit 0 0 N/A
each unit consisting of:
- Pt-100 sensors with 2 m flexible cable 2 pcs
- Junction boxes installed next to Pt-100 sensors 2 pcs
- TEMAX temperature transducer for 2 pc Pt-100 sensors 1 pcs
- Pulling and termination of cables. Sensor-Junction box- TEMAX 10 m

Motor Winding Temperature Measurement (3) 2 unit 0 0 N/A


each unit consisting of:
- Pt-100 sensors are pre-connected to junction box on motor frame 4 pcs
- TEMAX temperature transducer for 4 pc Pt-100 sensors 1 pcs
- Pulling and termination of cables. Sensor-Junction box- TEMAX 20 m

Pressure Measurement 4 unit 0 0 N/A


for measuring of process pressure, each consisting of.
- Pressure transmitter mounted on 2" steel pipe support 1 pcs 1
- Measuring pipe, " reinforced plastic, - proper supported 2-10 m
- Fittings for measuring pipe connection 1 set

Differential Pressure Measurement 1 unit 0 0 N/A


for measuring of differential pressure and flow, each consisting of.
- Pressure transmitter mounted on 2" steel pipe support 1 pcs 1
- Measuring pipe, " reinforced plastic, 2 lines, - proper supported 4-16 m
- Fittings for measuring pipe connection 2 set
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
Level
Silo level 6 unit 0 0 N/A
electronic level measurement in silos, each consisting of:
- Silo measurement, mounted on flange support on top of silo 1 pcs 60
- Control box mounted on support and installed close to Silo level. 1 pcs 5

Level Limit Switch 2 pcs 5 0 0 N/A


capacitive or tuning fork level switch with head mounted electronic
for direct mounting on flange support on silo top

Level Limit Switch 2 pcs 0 0 N/A


capacitive or tuning fork, high temperature, each consisting of
'- Capacitive or tuning fork detector mounted on flange support 1 pcs 5
- Control unit mounted next to detector 1 pcs 1

Vibration
Vibrocontrol 2 pcs 0 0 N/A
for vibration monitoring of vertical mills, main gears, main ventilators
and big motors, each consisting of:
- Oscillation pick-up with transmission cable 1 pcs
- Measuring transducer installed next to pick-up 1 pcs 1

Tank Weighing Equipment 2 pcs 0 0 N/A


for measuring of quantity in steel silos, each consisting of:
MC - Load cells (mechanical erection) 3 pcs
- Junction box for connection of load cell cable 1 pcs 1
- Weighing amplifier installed next to tank weighing system 1 pcs 20
-
Motion Detectors 18 pcs 0 0 N/A
normally installed at tale-end of conveyors, each consisting of:
- Proximity switches with flexible cable 1 pcs 1
- Junction box installed next to proximity switch 1 pcs 1

Pull Rope Switches 16 pcs 0 0 N/A


installed along belt conveyors with a distance of 10-100 m depending
on length of conveyor, each consisting of:
- Pull rope switch 1 pcs 3
- Pull rope wire including fitting clamps, - average length 30 m 1
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
Belt Drift Switches 4 pcs 0 0 N/A
installed on long belt conveyors in drive and tale end and also in
between on very long belt conveyor, each consisting of:
- Belt drift switch 1 pcs 1

Position
Position Transducers 2 pcs N/A
MC installed on louver dampers by mechanical erection contractor

Limit Switches 5 pcs N/A


MC installed on valves, gates and dampers by mechanical erection
contractor

Total Steel Plate and Sections 2 tonnes 2000 0


Electrical Erection Contractor shall be responsible for the supply,
design and manufacturing of these supports, as follows:
Steel plates, sections and/or 2" pipes for manufacturing of supports
required for proper erection of above mentioned field control devices
Supports for temperature transducers and pressure transmitters
shall be designed with protection cap.
All steel items shall be painted with primer and colour paint after
manufacturing.

Fixation Items 1 lot 0


Bolts, nuts, washers screw and plugs required for fixation of field
instruments shall be supplied by Electrical Erection Contractor

Total Process Instumentation 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
861 ELECTRICAL AUXILIARY EQUIPMENT

FIRE DETECTION SYSTEM

Preamble Electrical Erection Work


The erection price shall include total price for the following works:
- complete installation work

861.FI010 Fire Detection and Alarm 1 system 80 0 0 N/A


consisting of:
- Annunciate panel 1 pcs 1.2x0.6x0.3
- Terminal Racks 1 pcs
- Smoke Detectors 15 pcs
- Alarm Push-buttons 7 pcs
- Alarm Bells 3 pcs
- 1 x 2 x 0.8 mm Cables 1000 m

861.FI020 Fire Fighting Equipment 5 unit 85 0 0 N/A


6 kg portable CO2 fire extinguisher with wall bracket

Total Fire Detection System 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
891 SINGLE MACHINES

Preamble The mechanical contractor will be responsible for:


MC - erection of below mentioned items marked with grey shade
- - erection of electrical cabin with pre-installed cabinets
- - fixation of cable conduit
- - fixation of supports for lighting fixtures

Electrical Erection Work


The unit price shall include the following erection works:
- installation of listed items (not shaded)
- pulling and termination of cable drum cables
- pulling and termination flexible power and control cables

WEIGH FEEDERS

Preamble The mechanical contractor will be responsible for:


MC - erection of below mentioned items marked with grey shade

Electrical Erection Work


The unit price shall include the following erection works:
- installation of listed items (not shaded)
- pulling and termination flexible power and control cables

241.WF150 DOSAX or DOSIMAT Weigh Feeders 2 pcs 0 0 N/A


241.WF250 for Coal Mill feed, each consisting of:
MC - SC-Motor, 1,1 - 11 kW 1 pcs
- - Load Cell 2 pcs
- - Limit Switch 1 pcs
- - Junction Boxes 3 pcs
Local Control Panel 1 unit 420
containing power supply, frequency converters and controller
for above 4 Weigh Feeders
- Cables for Load cells 200 m
- Cable terminations 28 pcs
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
461.RL620 Coal Feed System, DRW 2 pcs 0 0 N/A
461.RL570 for coal firing in calciner and/or kiln, consisting of:
MC - Load cells for tank weighing 3 pcs
- - Load cell for weighing system 1 pcs
- - VFD-Drive-motor, 5,5 - 11 kW 1 pcs
- - Speed and Synchronic sensor 1 pcs
- - Shut-off valves with limit switches 2 pcs
- - Solenoid valves 16 pcs
- - Junction boxes for solenoid valves 2 pcs
- Emergency stop 1 pcs
- Junction Box for load cell cables 1 pcs
- Local Control Box on Feeder, prewired 1 pcs
- Local Control Panel 1 pcs 2.0x1.8x0.7 250
- Special control cables 100 m
- Cable terminations 30 pcs

Total Weigh Feeders 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

HYDRAULIC AND LUBRICATION SYSTEMS

461.HY110 Hydraulic Grinding Pressure Unit, AM-HY 1 pc 0 0 N/A


for vertical mill, consisting of:
MC - SC-Motors, 3 - 22 kW for pumps 2 pc
- - Heating element 1 pc
- - Terminal box on hydraulic unit, prewired to sensors 1 pc
- - Switches for roller position 3 pc
- - Layer thickness meter 1 pc
- - Pressure switch 3 pc
- Emergency stop 1 pc
- Local Control Panel 1 pc 1.2x1.0x0.3 250
- Cable terminations 50 pc

461.LQ120 Roller Lubrication Unit, AM-LU 1 pc 0 0 N/A


for vertical mill, consisting of:
MC - SC-Motors, 0,37 -3 kW for pumps 7 pc
- - Heating element 2 pc
- - Terminal box on lubrication unit, prewired to sensors 1 pc
- Emergency stop 1 pc
- Local Control Panel 1 pc 1.2x1.0x0.3 250
- Cable terminations 80 pc
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
461.LQ145 Mill Gear Lubrication Unit, AM-GE 1 pc 0 0 N/A
for vertical mill gear, consisting of:
MC - SC-Motors, 7,5 - 30 kW for pumps 3 pc
- - Terminal box on lubrication unit, prewired to sensors 1 pc
- - Temperature transmitters 5 pc
- - Thermostats 1 pc
- - Flow sensors 3 pc
- - Pressure switches 12 pc
- Emergency stop 1 pc
- Local Control Panel 1 pc 1.2x1.0x0.3 300
- Cable terminations 80 pc

461.GS155 Grease Lubrication Unit, GLU 1 pc 0 0 N/A


for RAR separator, consisting of:
MC - DC-Motors for pump 1 pc
- - Proximity switches 2 pc
- Local Terminal/Control Box 1 pc 0.7x0.7x0.3 20
- Cable terminations 8 pc

Total Hydraulic and Lubrication units 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

MAIN DEDUSTING FILTERS

Preamble The mechanical contractor will be responsible for:


MC - erection of below mentioned items marked with grey shade

Electrical Erection Work


The unit price shall include the following erection works:
- installation of listed items (not shaded)
- pulling and termination of power and control cables as listed

231BF410 Jet Pulse Filter 10 units 0 0 N/A


231BF420 type IN, each equipped with:
231BF460 MC - Diaphragm Valves 6 pcs
231BF530 - Jetcon Control Box 1 pcs 0.6x0.6x0.3 20
231BF540 - Cable 2 x 1.5 mm2 20 m
231BF610 - Cable terminations 12 pcs
231BF620
211BF070 Jet Pulse Filter 1 units 0 0 N/A
type CE1, each equipped with:
MC - Diaphragm Valves 4-12 pcs
- Terminal Box for diaphragm valves 1 pcs
- Jetcon Control Box 1 pcs 0.6x0.6x0.3 20
- 100 mm Cable Plate 3 m
- Cable 2 x 1.5 mm2 30 m
- Cables 12x1.5 mm2 5 m
- Cable terminations 24 pcs

461BF300 Jet Pulse Filter 1 units 0 0 N/A


type CE2, each equipped with:
MC - Diaphragm Valves 10-55 pcs
- Terminal Box for diaphragm valves 3 pcs
- Jetcon Control Box 1 pcs 0.6x0.6x0.3 20
- 100 mm Cable Plate 10 m
- Cable 2 x 1.5 mm2 100 m
- Cables 12x1.5 mm2 20 m
- Cable terminations 60 pcs
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

Total Dedusting Filters 0


Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

BURNER STATIONS

Preamble The mechanical contractor will be responsible for:


MC - erection of below mentioned items marked with grey shade

Electrical Erection Work


The unit price shall include the following erection works:
- installation of listed items (not shaded)
- pulling and termination of power and control cables as listed
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
461.HG700 Heat Generator for oil / gas 1 units 0 0 N/A
type B-HGO, equipped with:
MC - Terminal box on flow control unit, prewired to: 1 pcs
- . oil flow transmitter
- . oil temperature switch
- . oil pressure min.
- . solenoid valves
- . motorized oil valve
- - Terminal box on burner unit, prewired to: 1 pcs
- . oil pressure
- . oil valves
- . valve positions
- . pressure stat
- . ignition unit
- . oil valves
- . valve positions
- . UV sensor
- - Fan unit, consisting of: 1 pcs
- . air fan, 22-45 kW
- . inlet vane control
- . air flow control
- . emergency stop
- Local Control Panel 1 pcs 2.0x1.0x0.4 150
- Cable terminations 32 pcs

431.BU510 Oil Burner Station for Kiln 2 units 0 0 N/A


432.BU510 type B-OK, equipped with:
MC - Terminal box on flow control unit, prewired to: 1 pcs
- . oil flow transmitter
- . oil pressure min.
- - Terminal box on shut-off unit, prewired to: 1 pcs
- . oil temperature
- . oil pressure
- . oil valves
- . valve positions
- . pressure stat
- - Terminal box on burner lance, prewired to: 1 pcs
- . motorized oil spindle with up/down control
- Emergency stop 1 pcs
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
- Local Control Panel 1 pcs 1.2x1.0x0.3 100
- Cable terminations 20 pcs
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD

431.BU520 Start Oil Burner Station 2 units 0 0 N/A


432.BU520 type B-SO, equipped with:
MC - Terminal box on flow control unit, prewired to: 1 pcs
- . oil flow transmitter
- . oil temperature switch
- . oil pressure min.
- . solenoid valves
- . motorized oil valve
- . emergency stop
- - Terminal box on shut-off unit, prewired to: 1 pcs
- . oil pressure
- . oil valves
- . valve positions
- . pressure stat
- - Terminal box on burner inlet, prewired to: 1 pcs
- . ignition unit
- . oil valves
- . valve positions
- . UV sensor
- - Fan unit, 7,5 - 15 kW
- Local Control Panel 1 pcs 2.0x1.0x0.4
- Cable terminations 26 pcs
Paysandu_
PAYSANDU; Uruguay Print Date:
Cement Plant Work, Scope off, Basic Date:
Electrical Erection.
Dept. Dim. Weight Erection Equipment
Equip. Info Electrical Equipment incl. Preamble Qty. Unit HxWxD Net Unit Price Total Price Unit Price
No. m kg UYU / USD UYU / USD UYU / USD
431.BU530 Gas Burner Station for Kiln 2 units 0 0 N/A
432.BU530 type B-GK, equipped with:
MC - Terminal box on gas station unit, prewired to: 1 pcs
- . gas flow transmitter
- . gas temperature switch
- . gas pressure min.
- . solenoid valves
- . valve position
- - Terminal box on shut off unit, prewired to: 1 pcs
- . gas control valves
- . valve positions
- . gas pressure
- . air pressure
- - Terminal box on igniter unit, prewired to: 1 pcs
- . gas valve
- . air valve
- . igniter coil
- UV sensor 1 pcs
- Emergency stop 1 pcs
- Local Control Panel 1 pcs 2.0x1.2x0.4 150
- Cable terminations 32 pcs

Total Burner Stations 0


Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

Equipment
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
0

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD

0
Paysandu_
August 2011
October 2010
FEA
Equipment
Total Price
UYU / USD
0