Razo da Auditoria: Future Launch Current Partial Other Pea Relacionada a Segurana: Yes No N/A
Tipo da Auditoria Initial Follow Up Run at Rate (GP9 Attachement B)Validao Produto/Qualificao Completa: Yes No N/A
Condutor Auditoria APQP Confirmation Mgmt. Request Plant Request Run @ Rate CPIP/Warranty
Part / Assembly Line /Cell Operation / Machine Complete Mfg. System Quality System - Ongoing Documentation
Foco da Auditoria:
Revisado 18/05/2006
N/A
Revisado 18/05/2006
Revisado 18/05/2006
Revisado 18/05/2006
348127922.xls Summary Printed 03/14/2017
0 Total Potential 68 0%
0 38. Boundary Samples Available 0 39. Boundary Samples in Use 0 40. Master Parts/Samples Available
0 53. WIP for Final Product 0 54. Parts and Components Label
0 61. Implementation Responsibility 0 62. Communication 0 63. Support System for Operators
0 64. Information Across all Shifts 0 65. Check Requirements Performed 0 66. Results Documented
Assure Gauging/Inspection
Does the Process Flow Diagram include matches the Process Flow Garantir que as operaes de inspeo esto contempladas no
10 Process Flow Diagram R
gauging/inspection? Diagram and what is observed on Fluxograma de processo. O Fluxo corresponde realidade?
the shop floor.
Is there a Process Control Plan (PCP) Updated Process Control Verify current dates, etc. of PCP
16 R Existe o PCP, foi utilizado o PFMEA, quando foi a ultima atualizao?
available? Plan document.
8 of 16 Revised 01-21-05
348127922.xls Worksheet Printed 03/14/2017
Current Controls
Are all "Current Controls" listed on the Are Current Contols listed on the Garantir que todos os controles estabelecidos no PFMEA esto sendo
18 Call Out on R
PFMEA detailed on the Control Plan? PFMEA and PCP? utilizados no cho de fbrica.
Print/PCP/PFMEA
Are process controls in place in the PCP PFMEA Change Log, Appropriate Control and/or
Existem controles de processo para itens de alto RPN?
19 to address the high PFMEA Risk Priority PCP or RPN Reduction Redundant Inspection as R
Se no, aplicvel?
Numbers? Worksheet appropriate. (1927-21)
Is there a procedure/process for
PFMEA Procedure of Meeting minutes, worksheets,
20 Continuous Improvement for Risk R Deve existir processo formalizado de reduo de risco (QSB)
Continuous Improvement historic PFMEA's.
Reduction?
Are KPCs/PQCs/KCCs called out on the Control Plan Verify KPCs, PQCs, and KCCs
21 R Todos os KPCs/PQCs/KCCs esto no Plano de controle.
PCP? Blue Print are addressed on PCP.
Is there a history of failures
inspite of existing controls? Tamanho de Lote de acordo com um mtodo estatstico (p.ex. MIL Std,
Are sample sizes and check frequency for Does internal data (scrap, QN, JIT). Frequencia estabelecida de modo a que essa frequencia
22 Control Plan R
each operation reasonable? rework, FTQ, etc) suggest impea que entre a ultima inspeo e a identificao do problema, todas
sample sizes and frequency are as peas esto dentro de casa.
adequate?
Check to make sure tools and Buscar registros da aprovao dos dispositivos e ferramentais de
Gage and Tool gauges are certified. acordo com nvel vigente de engenharia. Para dispositivos deve ser
29 Are all tools and gauges certified? R
Certification Records Verify tools and gages are to the exigido a apresentao do Checklist GM1925 (mandatrio para peas
latest engineering change level. com PPAP depois de 1999).
9 of 16 Revised 01-21-05
348127922.xls Worksheet Printed 03/14/2017
10 of 16 Revised 01-21-05
348127922.xls Worksheet Printed 03/14/2017
Are instructions for handling Work In Check to make sure all operators
WIP Instructions
Process (WIP) and final product followed and material handling personnel Verificar se existem instrues padronizadas nas areas de expedio.
53 Final Shipping R
throughout the process to shipping area; are aware of and following WIP Elas esto sendo usadas?
Instructions
including repair/rework areas? instructions.
11 of 16 Revised 01-21-05
348127922.xls Worksheet Printed 03/14/2017
12 of 16 Revised 01-21-05
348127922.xls Worksheet Printed 03/14/2017
13 of 16 Revised 01-21-05
Process Performance SUPPLIER ACTION PLAN REPORT Rev. 7 1/7/02
"Color Codes"
G Green - Task Completed on Time
Y Yellow - Task May Be Late
R Red - Task is Late
W White - Task Re-Timed, No Status
B Blue - Task Status is Incorrect / Not Updated
On Track (Bold Box/No Color)
TOTAL TOTAL STATUS
0 0
STATUS HISTORY
TARGET ACTUAL
ACTION DATE LAST
ITEM ACTION ITEM CLOSE CLOSE Most COUNTER MEASURES
LEADER OPENED UPDATE
DATE DATE Oldest Recent
# 1 2 3 4 5 6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
"Color Codes"
G Green - Task Completed on Time
Y Yellow - Task May Be Late
R Red - Task is Late
W White - Task Re-Timed, No Status
B Blue - Task Status is Incorrect / Not Updated
On Track (Bold Box/No Color)
TOTAL TOTAL STATUS
0 0
STATUS HISTORY
TARGET ACTUAL
ACTION DATE LAST
ITEM ACTION ITEM CLOSE CLOSE Most COUNTER MEASURES
LEADER OPENED UPDATE
DATE DATE Oldest Recent
# 1 2 3 4 5 6
23
24
25
26
27
28
29
B5: Person at supplier that prepared the form for the GM SQE. (If applicable)
C16: ACTION ITEM: The item that requires action to improve the process or quality of the product being produced.
D16: ACTION LEADER: The person that leads the team to make the improvements. This should be the suppliers person but may be a GM Management person.
E15: Formula: DO NOT TYPE IN THIS CELL, UNLESS YOUR ARE MODIFYING THE FORMULA
E16: START DATE: The date the action item was identified and listed in the action item column
F16: TARGET CLOSE DATE: The date the supplier will complete the action item.
This date may change. If the date changes, you are required to entry the correct color code in the pass status and present status columns.
A comment on why the change to be entered in the comment field
G15: Formula: DO NOT TYPE IN THIS CELL, UNLESS YOUR ARE MODIFYING THE FORMULA
G16: ACTUALCLOSE DATE: The date the action item was closed TO INCLUDE VALIDATION.
The SQE should validate the action item as being closed and RESOLVED.
H16: LAST UPDATE: The date the SQE reviewed the action item.
I16: PAST STATUS: The cell is filled in when the status changes. Oldest status to the left
If status is WHITE put a "W" in the cell. Do not leave blank.
Copy the cell for the correct color.
COLOR CODE:
GREEN: Task Completed on Time
YELLOW: Action item is in trouble and may affect target date.
RED: Action item has missed target date.
WHITE: Task Re-Timed, No Status