132KV SALBOUKH 9018 132KV SALBOUKH 9018
CT Secondary Injection Test Report CT Secondary Injection Test Report
CT Details:
Current Injected:
IN 1A
LOOP BURDEN:
PHASE CURRENT(A) VOLTAGE(V) BURDEN (VA)
IN-INE 1 0.723 0.723
Eqpt : Feja 300 Eqpt : Digital Clamp Meter Eqpt : Digital Multi Meter Fluke
Test Inst. Used ID# : 7601706 ID# : 43651 ID# : 30850258
Calibration Due Date :2-03-2017 Calibration Due Date : 18-08-2016 Calibration Due Date : 08-10-2016
Tested By Witnessed By
Company Name: Abdullah Sharif XER/001 Company Name: R.RIYAS
Xervon NG-CSD
Signature: Signature:
SITE TEST REPORT DATE : 1/6/2016
NCC
132KV SALBOUKH 9018 132KV SALBOUKH 9018
CT Secondary Injection Test Report CT Secondary Injection Test Report
Eqpt : Feja 300 Eqpt : Digital Clamp Meter Eqpt : Digital Multi Meter Fluke
Test Inst. Used ID# : 7601706 ID# : 43651 ID# : 30850258
Calibration Due Date :2-03-2017 Calibration Due Date : 18-08-2016 Calibration Due Date : 08-10-2016
Tested By Witnessed By
Company Name: Abdullah Sharif XER/001 Company Name: R.RIYAS
Xervon NG-CSD