Project: RELOCATION OF SECONDARY POWER LINE

Location: Gate 2, SMU College Campus


Scope of Work:
1. Transfer the Sub-Feeder Line to its new location as per drawing.

SAN VIDAL ST. Residential Area


Gate 2
EXISTING
LAYOUT
STALLS
(outside)

Proposed 4-storey Building Lambrecht


Approx Height @ Eaves Line = 13m (43 ft) Building

Hantson Building

SAN VIDAL ST.


Gate 2

PROPOSED
LAYOUT Property Line

Property Line

Lambrecht
Building

Hantson Building

Additional Specifications:
1. The Sub-Feeder line must be insulated and placed in PVC pipe.
2. The existing line should be modified so as to pass along the perimeter fence.