SUMINISTRO E INSTALACION DE POSTE 735 daN x 12m UN 14 1,215,200 29,285 171,390 1,415,875.36 19,822,255.08
1.002
ML TENDIDO LNEA AREA (3F) A 13.2/34.5 KV ACSR 1/0 ML 2,500 9,185 9,589 3,428 3,646 25,847.99 64,619,967.87
1.008
RETENIDA DE 3/8" A TIERRA EN POSTE MT UN 10 286,783 18,352 2,572 982 308,689.14 3,086,891.41
1.009
HERRAJES Y ACCESORIOS ELCTRICOS PARA FIJACION (3F) UN 1 495,051 18,352 1,433 1,089 515,924.00 515,924.00
1.011
MONTAJE RETENIDA MT 3/8" EN POSTE NN C/ POSTE AUX(1) - STUNT UN 1 161,390 18,352 2,572 982 183,295.62 183,295.62
1.012
SUMINISTRO E INSTALACION DE POSTE 500 daN x 9 M UN 1 1,060,800 18,352 171,390 1,250,541.92 1,250,541.92
1.013
TRABAJOS EN CALIENTE PARA ADECUAR RED TRIFASICA A 13.200VOLTS HORA 3.0 114,000 170,000 1,800,000 2,084,000.00 6,252,000.00
1.014
KIT SISTEMA DE PUESTA A TIERRA MT EN ACERO AUSTENICO HASTA 14 MTRS UN 4 175,000 100,000 15,000 10,000 300,000.00 1,200,000.00
1.015
-
COSTO TOTAL MANTENIMIENTO DE REDES AREAS DE MEDIA TENSIN DE LA VEREDA LAS MERCEDES DEL MUNICIPIO DE SANTO TOMS - DEPARTAMENTO DEL ATLNTICO $ 150,644,278.31
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - MUNICIPIO DE SANTO TOMS - ATLNTICO
F.I.Material Elctrico 1.36
1.24
LP - MATERIAL ELCTRICO - MT
Precio
Codigo Material
Real
Columna1 Columna2 Columna5
Inicio Inicio -
930954 AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv 68,716
707868 ANCLA DE HORMIGON 16,800
707561 AISLADOR DE PORCELANA TIPO TENSOR ANSI 54-2 5,280
441249 AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN 28,536
441264 ARANDELA CURVA CUADRADA 2-1/4X2-1/4X3/16" 925
440944 ARANDELA PLANA REDONDA 5/8" 348
440945 ARANDELA PRESIN REDONDA 5/8" 307
458528 BASE SECCIONADOR FUSIBLE 15kV 100AMP 130,000
BASE SECCIONADOR FUSIBLE 27kV 100AMP 145,680
434435 CABLE ACERO GALVANIZADO P/RETENIDA 2,295
434470 CONDUCTOR COBRE DESNUDO N 2 AWG CLASE A 9,000
437596 CONECTOR CUA ACSR O AAAC 16,704
436978 CONDUCTOR AL-ACERO ACSR 1/0 AWG(RAVEN) 2,200
454857 CONECTOR AMOVIBLE (P:ACSR 2-2/0 D:Cu 6-2/0) 25,600
437603 CONECTOR CUA C/ ESTRIBO 14,400
551265 CRUCETA ANGULAR METALICA 1400 mm 116,000
551267 CRUCETA ANGULAR METALICA 2400 mm 139,200
690290 CRUCETA ANGULAR METALICA 3000 mm 130,283
450949 GRAPA DE RETENCION RECTA 1/0 AWG 24,104
450950 GRAPA 3 PERNOS 12,000
551418 GRILLETE LARGO RECTO 5/8" 11300 Kg 8,888
530875 GRILLETE NORMAL RECTO 7/8" 13,000
458467 GUARDACABOS PARA RETENCION ACERO GAL. 1,320
RETENCION PREF."Z" ACSR 1/0 AWG (AAAC 123.3 MCM) AISL.
808064 13,642
HIBRIDO
437655 PERNO CORTO AC.GALVANIZ.3/4"-3/4"X3" 5,150
PERNO ROSCA CORRIDA ACERO GALVANIZADO
551282 6,264
C 5/8" x 14"
458662 PLETINA SUJECION PARA RETENIDAS 38,400
P12X510B POSTE EN HORMIGN 12m x 510Kgf 610,160
P12X750B POSTE EN HORMIGN 12m x 750Kgf 980,000
P12X1050B POSTE EN HORMIGN 12m x 1050Kgf 1,480,000
P9X510B POSTE EN HORMIGN 9m x 510Kgf 780,000
P9X510M POSTE EN HORMIGN 9m x 510Kgf 552,485
P12X510M POSTE EN HORMIGN 12m x 510Kgf
P12X750M POSTE EN HORMIGN 12m x 750Kgf 701,568
P12X1050M POSTE EN HORMIGN 12m x 1050Kgf 932,866
Precio*F.I. Proveedor
Columna6 Octubre 2016
- Inicio
93,454 JV - B/Quilla
22,848 JV - B/Quilla
7,181
38,809 JV - B/Quilla
1,257 Felix Torres - B/Quilla
473 JV - B/Quilla
418 JV - B/Quilla
176,800
198,125
3,121 JV - B/Quilla
12,240 JV - B/Quilla
22,717 JV - B/Quilla
2,992 JV - B/Quilla
34,816 JV - B/Quilla
19,584 JV - B/Quilla
157,760 JV - B/Quilla
189,312 JV - B/Quilla
177,185 Felix Torres - B/Quilla
32,781 JV - B/Quilla
16,320
12,088 JV - B/Quilla
17,680 Electrowilson - B/Quilla
1,795
18,553
JV - B/Quilla
7,005 JV - B/Quilla
8,519
JV - B/Quilla
52,224 JV - B/Quilla
829,818 Titn - B/Quilla
1,215,200 Titn - B/Quilla
1,835,200 Titn - B/Quilla
1,060,800
751,380 Camel - Montera
- Camel - Montera
954,132 Camel - Montera
1,268,698 Camel - Montera
ANALISIS DE P
UNIDAD
CONSTRUCTIVA
1.001
MAT
REFERENCIA
P12X1050B
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE P
UNIDAD
CONSTRUCTIVA
1.002
MAT
REFERENCIA
P12X750B
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE P
UNIDAD
CONSTRUCTIVA
1.003
MAT
REFERENCIA
551267
551282
440944
551418
441249
450949
437651
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
HERR
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE P
UNIDAD
CONSTRUCTIVA
1.004
MAT
REFERENCIA
551267
440944
441264
437655
930954
808064
437651
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
HERR
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE P
UNIDAD
CONSTRUCTIVA
1.005
MAT
REFERENCIA
551267
440944
437655
551282
930954
808072
437651
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
HERR
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE P
UNIDAD
CONSTRUCTIVA
1.006
MAT
REFERENCIA
551267
551282
437655
440944
551418
441249
450949
930954
808064
437596
437651
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
HERR
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE PR
UNIDAD
CONSTRUCTIVA
1.007
MAT
REFERENCIA
551267
551282
437655
440944
551418
441249
450949
930954
808064
436978
437596
437651
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
HERR
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE P
UNIDAD CONSTRUCTIVA
1.008
MAT
REFERENCIA
436978
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
HERRAMIE
REFERENCIA
E0804
SUBTOTAL HERRAMIENTAS
TOTAL UNIDAD
ANALISIS DE P
UNIDAD
CONSTRUCTIVA
1.009
MAT
REFERENCIA
458479
434435
458467
707561
450950
707868
458662
440944
441264
530875
437651
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
HERR
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE P
UNIDAD
CONSTRUCTIVA
1.010
MAT
REFERENCIA
458528
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
HERR
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE P
UNIDAD
CONSTRUCTIVA
1.011
MAT
REFERENCIA
441249
551267
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
HERR
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE P
UNIDAD
CONSTRUCTIVA
1.012
MAT
REFERENCIA
434435
458467
441264
707561
450950
437661
437658
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
HERR
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE PR
UNIDAD CONSTRUCTIVA
1.013
MAT
REFERENCIA
P9X510B
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE P
UNIDAD CONSTRUCTIVA
1.014
MAT
REFERENCIA
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0118
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
HERRAMIEN
REFERENCIA
E0804
SUBTOTAL HERRAMIENTAS
TOTAL UNIDAD
ANALISIS DE P
UNIDAD CONSTRUCTIVA
1.015
MAT
REFERENCIA
23299475944
SUBTOTAL MATERIA
MANO
REFERENCIA
P0100
P0109
P0117
P0127
SUBTOTAL MANO DE O
TRAN
REFERENCIA
M0612
SUBTOTAL TRANSPOR
HERR
REFERENCIA
M0612
SUBTOTAL TRANSPOR
TOTAL UNIDAD
ANALISIS DE PRECIOS UNITARIOS
MATERIALES
DESCRIPCION
POSTE EN HORMIGN 12m x 1050Kgf
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS
MATERIALES
DESCRIPCION
POSTE EN HORMIGN 12m x 750Kgf
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS
MATERIALES
DESCRIPCION
CRUCETA ANGULAR METALICA 2400 mm
PERNO ROSCA CORRIDA ACERO GALVANIZADO
C 5/8" x 14"
ARANDELA PLANA REDONDA 5/8"
GRILLETE LARGO RECTO 5/8" 11300 Kg
AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN
GRAPA DE RETENCION RECTA 1/0 AWG
TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12"
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
HERRAMIENTAS
DESCRIPCION
Herramientas Menores
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS
MATERIALES
DESCRIPCION
CRUCETA ANGULAR METALICA 2400 mm
ARANDELA PLANA REDONDA 5/8"
ARANDELA CURVA CUADRADA 2-1/4X2-1/4X3/16"
PERNO CORTO AC.GALVANIZ.3/4"-3/4"X3"
AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv
RETENCION PREF."Z" ACSR 1/0 AWG (AAAC 123.3 MCM) AISL. HIBRIDO
TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12"
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
DESCRIPCION
Herramientas Menores
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS
MATERIALES
DESCRIPCION
CRUCETA ANGULAR METALICA 2400 mm
ARANDELA PLANA REDONDA 5/8"
PERNO
PERNO CORTO
ROSCA AC.GALVANIZ.3/4"-3/4"X3"
CORRIDA ACERO GALVANIZADO
C 5/8" x 14"
AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv
RETENCION PREF."OMEGA DOB" ACSR 1/0 AWG (AAAC 123,3MCM) AISL. HIBRIDO
TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12"
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
HERRAMIENTAS
DESCRIPCION
Herramientas Menores
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS
DESCRIPCION
CRUCETA
PERNO ROSCAANGULAR METALICA
CORRIDA ACERO 2400 mm
GALVANIZADO
C 5/8" x 14"
PERNO CORTO AC.GALVANIZ.3/4"-3/4"X3"
ARANDELA PLANA REDONDA 5/8"
GRILLETE LARGO RECTO 5/8" 11300 Kg
AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN
GRAPA DE RETENCION RECTA 1/0 AWG
AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv
RETENCION PREF."Z" ACSR 1/0 AWG (AAAC 123.3 MCM) AISL. HIBRIDO
CONECTOR CUA ACSR O AAAC
TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12"
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
HERRAMIENTAS
DESCRIPCION
Herramientas Menores
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS-OK
MATERIALES
DESCRIPCION
CRUCETA
PERNO ANGULAR
ROSCA METALICA
CORRIDA ACERO 2400 mm
GALVANIZADO
C 5/8" x 14"
PERNO CORTO AC.GALVANIZ.3/4"-3/4"X3"
ARANDELA PLANA REDONDA 5/8"
GRILLETE LARGO RECTO 5/8" 11300 Kg
AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN
GRAPA DE RETENCION RECTA 1/0 AWG
AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv
RETENCION PREF."Z" ACSR 1/0 AWG (AAAC 123.3 MCM) AISL. HIBRIDO
CONDUCTOR AL-ACERO ACSR 1/0 AWG(RAVEN)
CONECTOR CUA ACSR O AAAC
TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12"
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
HERRAMIENTAS
DESCRIPCION
Herramientas Menores
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS
UNIDAD CONSTRUCTIVA
ML TENDIDO LNEA AREA (3F) A 13.2/34.5
MATERIALES
DESCRIPCION
CONDUCTOR AL-ACERO ACSR 1/0 AWG(RAVEN)
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
HERRAMIENTAS Y EQUIPOS
DESCRIPCION
Grua Mecanica c/mariposa p/tendido de lineas(01)
SUBTOTAL HERRAMIENTAS Y EQUIPOS
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS
RETENIDA DE 3/8" A TIERRA EN POS
MATERIALES
DESCRIPCION
VARILLA ANCLAJE DE OJO C.T. 3/4"X8' (3/4 - 2,4m)
CABLE ACERO GALVANIZADO P/RETENIDA
GUARDACABOS PARA RETENCION ACERO GAL.
AISLADOR DE PORCELANA TIPO TENSOR ANSI 54-2
GRAPA 3 PERNOS
ANCLA DE HORMIGON
PLETINA SUJECION PARA RETENIDAS
ARANDELA PLANA REDONDA 5/8"
ARANDELA CURVA CUADRADA 2-1/4X2-1/4X3/16"
GRILLETE NORMAL RECTO 7/8"
TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12"
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
Camioneta
SUBTOTAL TRANSPORTES
HERRAMIENTAS
DESCRIPCION
Herramienas Menores
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS
MATERIALES
DESCRIPCION
BASE SECCIONADOR FUSIBLE 15kV 100AMP
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
HERRAMIENTAS
DESCRIPCION
Herramientas Menores
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS
MATERIALES
DESCRIPCION
AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN
CRUCETA ANGULAR METALICA 2400 mm
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
HERRAMIENTAS
DESCRIPCION
Herramientas Menores
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS
MATERIALES
DESCRIPCION
CABLE ACERO GALVANIZADO P/RETENIDA
GUARDACABOS PARA RETENCION ACERO GAL.
ARANDELA CURVA CUADRADA 2-1/4X2-1/4X3/16"
AISLADOR DE PORCELANA TIPO TENSOR ANSI 54-2
GRAPA 3 PERNOS
TUERCA DE OJO AC. GALVANIZADO 5/8"
TORNILLO AC.GALVANIZ.CON OJO.C.T.5/8"X12"
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
Camioneta
SUBTOTAL TRANSPORTES
HERRAMIENTAS
DESCRIPCION
Herramienas Menores
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS-OK
UNIDAD CONSTRUCTIVA
SUMINISTRO E INSTALACION DE POSTE 5
MATERIALES
DESCRIPCION
POSTE EN HORMIGN 9m x 510Kgf
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS
UNIDAD CONSTRUCTIVA
TRABAJOS EN CALIENTE PARA ADECUAR RED TRIF
MATERIALES
DESCRIPCION
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
Camioneta doble cabina para 2 cuadrillas
SUBTOTAL TRANSPORTES
HERRAMIENTAS Y EQUIPOS
DESCRIPCION
Grua Mecanica c/mariposa p/tendido de lineas(01)
SUBTOTAL HERRAMIENTAS Y EQUIPOS
TOTAL UNIDAD
WILSON BORJA
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL D
ANALISIS DE PRECIOS UNITARIOS
UNIDAD CONSTRUCTIVA
KIT SISTEMA DE PUESTA A TIERRA MT EN ACERO AUS
MATERIALES
DESCRIPCION
KIT SPT DE EN ACERO AUSTENITICO HASTA 14m
SUBTOTAL MATERIALES
MANO DE OBRA
DESCRIPCION
Ayudante de Dllo/Mto TEFs
Capataz de Dllo/Mtto TEF
Liniero de Dllo/Mtto TEF
Ingeniero Electricista
SUBTOTAL MANO DE OBRA
TRANSPORTES
DESCRIPCION
Camioneta
SUBTOTAL TRANSPORTES
HERRAMIENTAS
DESCRIPCION
Herramienas Menores
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
RIOS
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
1 0.029 $ 95,215.68 $ 2,761.25
1 0.025 $ 102,323.76 $ 2,558.09
1 0.19 $ 118,370.80 $ 22,490.45
1 0.01 $ 147,556.20 $ 1,475.56
$ 29,285.36
$ 2,035,875.36
JA
IA MUNICIPAL DE SANTO TMAS
RIOS
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
1 0.029 $ 95,215.68 $ 2,761.25
1 0.025 $ 102,323.76 $ 2,558.09
1 0.19 $ 118,370.80 $ 22,490.45
1 0.01 $ 147,556.20 $ 1,475.56
$ 29,285.36
CANTIDAD HORAS VEHICULO VR UNITARIO SUBTOTAL
$ 1,415,875.36
JA
IA MUNICIPAL DE SANTO TMAS
RIOS
ZONTAL
1
VR
CANTIDAD UNIDAD SUBTOTAL
UNITARIO
2 UN 189,312 $ 378,624.00
2 UN $ 17,038.08
8,519
12 UN 473 $ 5,679.36
3 UN 12,088 $ 36,262.71
3 UN 38,809 $ 116,426.88
3 UN 32,781 $ 98,342.85
2 UN 6,572 $ 13,144.56
$ 665,518.45
HORAS VR
CANTIDAD SUBTOTAL
TRABAJADOR UNITARIO
1 0.019 $ 95,215.68 $ 1,809.10
1 0.02 $ 102,323.76 $ 2,046.48
1 0.11 $ 118,370.80 $ 13,020.79
1 0.01 $ 147,556.20 $ 1,475.56
$ 18,351.92
HORAS VR
CANTIDAD SUBTOTAL
VEHICULO UNITARIO
1 0.22 $ 9,573.00 $ 2,106.06
$ 2,106.06
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
1 0.22 $ 3,573.00 $ 786.06
$ 786.06
$ 686,762.49
JA
IA MUNICIPAL DE SANTO TMAS
RIOS
ZONTAL
MT 332
VR
CANTIDAD UNIDAD SUBTOTAL
UNITARIO
1 UN $ 189,312.00 $ 189,312.00
2 UN $ 473.28 $ 946.56
2 UN $ 1,257.35 $ 2,514.69
3 UN $ 7,004.54 $ 21,013.63
3 UN $ 93,453.87 $ 280,361.61
3 UN $ 18,552.58 $ 55,657.73
2 UN $ 6,572.28 $ 13,144.56
$ 562,950.78
HORAS VR
CANTIDAD SUBTOTAL
TRABAJADOR UNITARIO
1 0.019 $ 95,215.68 $ 1,809.10
1 0.02 $ 102,323.76 $ 2,046.48
1 0.11 $ 118,370.80 $ 13,020.79
1 0.01 $ 147,556.20 $ 1,475.56
$ 18,351.92
HORAS VR
CANTIDAD SUBTOTAL
VEHICULO UNITARIO
1 0.22 $ 9,573.00 $ 2,106.06
$ 2,106.06
HORAS VR
CANTIDAD SUBTOTAL
VEHICULO UNITARIO
1 0.22 $ 3,573.00 $ 786.06
$ 786.06
$ 584,194.83
JA
IA MUNICIPAL DE SANTO TMAS
RIOS
ZONTAL
VR
CANTIDAD UNIDAD SUBTOTAL
UNITARIO
2 UN $ 189,312.00 $ 378,624.00
12 UN $ 473.28 $ 5,679.36
6 UN $ 7,004.54 $ 42,027.26
2 UN $ 8,519.04 $ 17,038.08
6 UN $ 93,453.87 $ 560,723.21
3 UN $ 36,239.05 $ 108,717.15
2 UN $ 6,572.28 $ 13,144.56
$ 1,125,953.63
HORAS VR
CANTIDAD SUBTOTAL
TRABAJADOR UNITARIO
1 0.019 $ 95,215.68 $ 1,809.10
1 0.02 $ 102,323.76 $ 2,046.48
1 0.11 $ 118,370.80 $ 13,020.79
1 0.01 $ 147,556.20 $ 1,475.56
$ 18,351.92
HORAS VR
CANTIDAD SUBTOTAL
VEHICULO UNITARIO
1 0.22 $ 9,573.00 $ 2,106.06
$ 2,106.06
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
1 0.22 $ 3,573.00 $ 786.06
$ 786.06
$ 1,147,197.67
JA
IA MUNICIPAL DE SANTO TMAS
RIOS
ZONTAL
VR
CANTIDAD UNIDAD SUBTOTAL
UNITARIO
2 UN $ 189,312.00 $ 378,624.00
2 UN $ 8,519.04 $ 17,038.08
1 UN $ 7,004.54 $ 7,004.54
12 UN $ 473.28 $ 5,679.36
6 UN $ 12,087.57 $ 72,525.43
6 UN $ 38,808.96 $ 232,853.76
6 UN $ 32,780.95 $ 196,685.70
1 UN $ 93,453.87 $ 93,453.87
1 UN $ 18,552.58 $ 18,552.58
6 UN $ 22,717.44 $ 136,304.64
2 UN $ 6,572.28 $ 13,144.56
$ 1,171,866.52
HORAS VR
CANTIDAD SUBTOTAL
TRABAJADOR UNITARIO
1 0.019 $ 95,215.68 $ 1,809.10
1 0.02 $ 102,323.76 $ 2,046.48
1 0.11 $ 118,370.80 $ 13,020.79
1 0.01 $ 147,556.20 $ 1,475.56
$ 18,351.92
HORAS VR
CANTIDAD SUBTOTAL
VEHICULO UNITARIO
1 0.22 $ 9,573.00 $ 2,106.06
$ 2,106.06
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
1 0.22 $ 3,573.00 $ 786.06
$ 786.06
$ 1,193,110.56
JA
IA MUNICIPAL DE SANTO TMAS
OS-OK
ZONTAL
VR
CANTIDAD UNIDAD SUBTOTAL
UNITARIO
4 UN $ 189,312.00 $ 757,248.00
4 UN $ 8,519.04 $ 34,076.16
2 UN $ 7,004.54 $ 14,009.09
24 UN $ 473.28 $ 11,358.72
6 UN $ 12,087.57 $ 72,525.43
6 UN $ 38,808.96 $ 232,853.76
6 UN $ 32,780.95 $ 196,685.70
2 UN $ 93,453.87 $ 186,907.74
2 UN $ 18,552.58 $ 37,105.15
6 m $ 2,992.00 $ 17,952.00
3 UN $ 22,717.44 $ 68,152.32
4 UN $ 6,572.28 $ 26,289.13
$ 1,655,163.19
HORAS VR
CANTIDAD SUBTOTAL
TRABAJADOR UNITARIO
1 0.019 $ 95,215.68 $ 1,809.10
1 0.02 $ 102,323.76 $ 2,046.48
1 0.11 $ 118,370.80 $ 13,020.79
1 0.01 $ 147,556.20 $ 1,475.56
$ 18,351.92
HORAS VR
CANTIDAD SUBTOTAL
VEHICULO UNITARIO
1 0.22 $ 9,573.00 $ 2,106.06
$ 2,106.06
VR
CANTIDAD HORAS VEHICULO SUBTOTAL
UNITARIO
1 0.22 $ 3,573.00 $ 786.06
$ 786.06
$ 1,676,407.24
JA
IA MUNICIPAL DE SANTO TMAS
RIOS
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
1 0.0209 $ 95,215.68 $ 1,990.01
1 0.002 $ 102,323.76 $ 204.65
1 0.05 $ 118,370.80 $ 5,918.54
1 0.01 $ 147,556.20 $ 1,475.56
$ 9,588.76
S
CANTIDAD HORAS EQUIPO VR UNITARIO SUBTOTAL
1 0.1 $ 36,458.33 $ 3,645.83
$ 3,645.83
$ 25,847.99
JA
IA MUNICIPAL DE SANTO TMAS
RIOS
" A TIERRA EN POSTE MT
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
1 0.019 $ 95,215.68 $ 1,809.10
1 0.02 $ 102,323.76 $ 2,046.48
1 0.11 $ 118,370.80 $ 13,020.79
1 0.01 $ 147,556.20 $ 1,475.56
$ 18,351.92
JA
IA MUNICIPAL DE SANTO TMAS
RIOS
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
1 0.019 $ 95,215.68 $ 1,809.10
1 0.02 $ 102,323.76 $ 2,046.48
1 0.11 $ 118,370.80 $ 13,020.79
1 0.01 $ 147,556.20 $ 1,475.56
$ 18,351.92
$ 551,273.12
JA
IA MUNICIPAL DE SANTO TMAS
RIOS
$ 515,924.00
JA
IA MUNICIPAL DE SANTO TMAS
RIOS
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
1 0.019 $ 95,215.68 $ 1,809.10
1 0.02 $ 102,323.76 $ 2,046.48
1 0.11 $ 118,370.80 $ 13,020.79
1 0.01 $ 147,556.20 $ 1,475.56
$ 18,351.92
JA
IA MUNICIPAL DE SANTO TMAS
OS-OK
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
1 0.019 $ 95,215.68 $ 1,809.10
1 0.02 $ 102,323.76 $ 2,046.48
1 0.11 $ 118,370.80 $ 13,020.79
1 0.01 $ 147,556.20 $ 1,475.56
$ 18,351.92
$ 1,250,541.92
JA
IA MUNICIPAL DE SANTO TMAS
RIOS
$ -
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
3 1 $ 15,000.00 $ 15,000.00
1 1 $ 36,000.00 $ 36,000.00
1 1 $ 33,000.00 $ 33,000.00
1 1 $ 30,000.00 $ 30,000.00
$ 114,000.00
OS
CANTIDAD HORAS EQUIPO VR UNITARIO SUBTOTAL
1 1 $ 1,800,000.00 $ 1,800,000.00
$ 1,800,000.00
$ 2,084,000.00
JA
IA MUNICIPAL DE SANTO TMAS
RIOS
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
1 0.019 $ 95,215.68 $ 1,809.10
1 0.02 $ 102,323.76 $ 2,046.48
1 0.11 $ 118,370.80 $ 13,020.79
1 0.01 $ 147,556.20 $ 1,475.56
$ 18,351.92
40000
14,000
16,000
2,300
17,000
7,000
1,200
10,000
2,000
40,000
75,000
80,000
130,000
130,000
8,000
8,500
70,000
XXX
1,000
13,000
20,000
8,000
8,500
2000
13,000
ANALISIS DE PRECIOS UNITARIOS
UNIDAD
CONSTRUCTIVA
1.001 SUMINISTRO E INSTALACION DE POSTE 500 daN x 12m
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.11
P0109 Capataz de Dllo/Mtto TEF 1 0.02
P0117 Liniero de Dllo/Mtto TEF 1 0.11
P0127 Ingeniero Electricista 1 0.01
SUBTOTAL MANO DE OBRA
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.22
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
XXXXXXX
SECRETARIO DE OBRAS PBLICAS - ALCALDIA MUNICIPAL DE SANTO TMAS
ANALISIS DE PRECIOS UNITARIOS-OK
UNIDAD
CONSTRUCTIVA
1.002 SUMINISTRO E INSTALACION DE POSTE 735 daN x 12m
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD
P12X750B POSTE EN HORMIGN 12m x 750Kgf 1 UN
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.11
P0109 Capataz de Dllo/Mtto TEF 1 0.02
P0117 Liniero de Dllo/Mtto TEF 1 0.11
P0127 Ingeniero Electricista 1 0.01
SUBTOTAL MANO DE OBRA
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.22
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
UNIDAD
CONSTRUCTIVA
1.003 SUMINISTRO E INSTALACION DE POSTE 735 daN x 14m
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD
023299475900 Poste en Hormign de 735 daN x 14m 1 UN
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.11
P0109 Capataz de Dllo/Mtto TEF 1 0.02
P0117 Liniero de Dllo/Mtto TEF 1 0.11
P0127 Ingeniero Electricista 1 0.01
SUBTOTAL MANO DE OBRA
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.22
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
UNIDAD
CONSTRUCTIVA
1.004 SUMINISTRO E INSTALACION DE POSTE EN HORMIGON 1030d
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD
P12X1050B POSTE EN HORMIGN 12m x 1050Kgf 1 UN
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.11
P0109 Capataz de Dllo/Mtto TEF 1 0.55
P0117 Liniero de Dllo/Mtto TEF 1 0.5
P0127 Ingeniero Electricista 1 0.02
SUBTOTAL MANO DE OBRA
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.23
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
ROGER CASTILLO BERMEJO
R.L INGECAST LTDA
OSTE 500 daN x 12m
VR UNITARIO SUBTOTAL
$ 829,817.60 $ 829,817.60
$ 829,817.60
VR UNITARIO SUBTOTAL
$ 198,025.20 $ 21,782.77
$ 229,632.60 $ 4,592.65
$ 138,370.80 $ 15,220.79
$ 207,556.20 $ 2,075.56
$ 43,671.77
VR UNITARIO SUBTOTAL
$ 257,190.00 $ 56,581.80
$ 56,581.80
$ 930,071.17
L DE SANTO TMAS
K
VR UNITARIO SUBTOTAL
$ 1,215,200.00 $ 1,215,200.00
$ 1,215,200.00
VR UNITARIO SUBTOTAL
$ 198,025.20 $ 21,782.77
$ 229,632.60 $ 4,592.65
$ 138,370.80 $ 15,220.79
$ 207,556.20 $ 2,075.56
$ 43,671.77
VR UNITARIO SUBTOTAL
$ 257,190.00 $ 56,581.80
$ 56,581.80
$ 1,315,453.57
VR UNITARIO SUBTOTAL
$ 198,025.20 $ 21,782.77
$ 229,632.60 $ 4,592.65
$ 138,370.80 $ 15,220.79
$ 207,556.20 $ 2,075.56
$ 43,671.77
VR UNITARIO SUBTOTAL
$ 257,190.00 $ 56,581.80
$ 56,581.80
$ 100,253.57
K
VR UNITARIO SUBTOTAL
$ 1,835,200.00 $ 1,835,200.00
$ 1,835,200.00
VR UNITARIO SUBTOTAL
$ 198,025.20 $ 21,782.77
$ 229,632.60 $ 126,297.93
$ 138,370.80 $ 69,185.40
$ 207,556.20 $ 4,151.12
$ 221,417.23
VR UNITARIO SUBTOTAL
$ 257,190.00 $ 59,153.70
$ 59,153.70
$ 2,115,770.93
ANALISIS DE PRECIOS UNITARIOS-OK
UNIDAD CONSTRUCTIVA
2.001 SUMINISTRO E INSTALACION DE POSTE 500 daN x 9 M
MATERIALES
CANTIDA
REFERENCIA DESCRIPCION UNIDAD
D
023299475900 Poste en Hormign de 500 daN x 9m 1 UN
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
CANTIDA
REFERENCIA DESCRIPCION TRABAJAD
D
OR
P0100 Ayudante de Dllo/Mto TEFs 1 0.11
P0109 Capataz de Dllo/Mtto TEF 1 0.02
P0117 Liniero de Dllo/Mtto TEF 1 0.11
P0127 Ingeniero Electricista 1 0.01
SUBTOTAL MANO DE OBRA
TRANSPORTES
CANTIDA HORAS
REFERENCIA DESCRIPCION
D VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.22
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
UNIDAD CONSTRUCTIVA
2.002 SUMINISTRO E INSTALACION DE POSTE HPC 735 daN 9 M(1)
MATERIALES
CANTIDA
REFERENCIA DESCRIPCION UNIDAD
D
023299475900 Poste en Hormign de 500 daN x 9m 1 UN
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
CANTIDA
REFERENCIA DESCRIPCION TRABAJAD
D
OR
P0100 Ayudante de Dllo/Mto TEFs 1 0.11
P0109 Capataz de Dllo/Mtto TEF 1 0.02
P0117 Liniero de Dllo/Mtto TEF 1 0.11
P0127 Ingeniero Electricista 1 0.01
SUBTOTAL MANO DE OBRA
TRANSPORTES
CANTIDA HORAS
REFERENCIA DESCRIPCION
D VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.22
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
OS-OK
VR UNITARIO SUBTOTAL
$ 1,551,890.34 $ 1,551,890.34
$ 1,551,890.34
VR UNITARIO SUBTOTAL
$ 198,025.20 $ 21,782.77
$ 229,632.60 $ 4,592.65
$ 138,370.80 $ 15,220.79
$ 207,556.20 $ 2,075.56
$ 43,671.77
VR UNITARIO SUBTOTAL
$ 257,190.00 $ 56,581.80
$ 56,581.80
$ 1,652,143.91
O
RIOS
VR UNITARIO SUBTOTAL
$ 1,289,000.00 $ 1,289,000.00
$ 1,289,000.00
VR UNITARIO SUBTOTAL
$ 198,025.20 $ 21,782.77
$ 229,632.60 $ 4,592.65
$ 138,370.80 $ 15,220.79
$ 207,556.20 $ 2,075.56
$ 43,671.77
VR UNITARIO SUBTOTAL
$ 257,190.00 $ 56,581.80
$ 56,581.80
$ 1,389,253.57
ANALISIS DE PRECIOS UNITARIOS
UNIDAD CONSTRUCTIVA
3.001 POSTE EN ACERO GALVANIZADO DE 510KG X 12MTRS
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.22 $ 257,190.00 $ 56,581.80
SUBTOTAL TRANSPORTES $ 56,581.80
UNIDAD CONSTRUCTIVA
3.002 POSTE EN ACERO GALVANIZADO DE 750KG X 12MTRS
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.22 $ 257,190.00 $ 56,581.80
SUBTOTAL TRANSPORTES $ 56,581.80
UNIDAD CONSTRUCTIVA
4.001 POSTE EN ACERO GALVANIZADO DE 510KG X 12MTRS
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.22 $ 257,190.00 $ 56,581.80
SUBTOTAL TRANSPORTES $ 56,581.80
UNIDAD CONSTRUCTIVA
5.001 HORMIGONADO PARA APOYO POSTE DE 510 KG X 9 M
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camion Bodega 1 0.1 $ 1,000.00 $ 100.00
SUBTOTAL TRANSPORTES $ 100.00
HERRAMIENTAS MENORES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramientas Menores 1 0.1 $ 2,000.00 $ 200.00
SUBTOTAL TRANSPORTES $ 200.00
UNIDAD CONSTRUCTIVA
5.002 HORMIGONADO PARA APOYO POSTE DE 750 KG x 12 M
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camion Bodega 1 0.2 $ 29,845.80 $ 5,969.16
SUBTOTAL TRANSPORTES $ 5,969.16
HERRAMIENTAS MENORES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramientas Menores 1 0.22 $ 1,000.00 $ 220.00
SUBTOTAL TRANSPORTES $ 220.00
UNIDAD CONSTRUCTIVA
5.003 HORMIGONADO PARA APOYO POSTE DE 1050KG X 12 M.
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camion Bodega 1 0.2 $ 29,845.80 $ 5,969.16
SUBTOTAL TRANSPORTES $ 5,969.16
HERRAMIENTAS MENORES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramientas Menores 1 0.22 $ 1,000.00 $ 220.00
SUBTOTAL TRANSPORTES $ 220.00
UNIDAD CONSTRUCTIVA
6.001 INSTALACION DE LAMPARA DE 70WATT
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.09 $ 39,605.04 $ 3,564.45
P0109 Capataz de Dllo/Mtto TEF 1 0.09 $ 68,889.78 $ 6,200.08
P0117 Liniero de Dllo/Mtto TEF 1 0.09 $ 62,266.86 $ 5,604.02
P0127 Ingeniero Electricista 1 0.09 $ 121,925.16 $ 10,973.26
SUBTOTAL MANO DE OBRA $ 26,341.82
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.12 $ 85,730.00 $ 10,287.60
SUBTOTAL TRANSPORTES $ 10,287.60
HERRAMIENTAS Y EQUIPOS
UNIDAD CONSTRUCTIVA
7.001 TRAFO MONOFASICO CONVENCIONAL EN POSTE A 13,2 kV/120-240 V - 10 KVA
MATERIALES
REFERENCI VR
DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
A UNITARIO
23299475900 TRAFO MONOF CONVENCIONAL EN POSTE NN 13, 1 UN ### $ 12,631,196.58
1207311110 FUSIBLE EXPULSISN 3 A TIPO D 2 UN $ 10,500.00 $ 21,000.00
20884853680 CRUCETA GALC DE 2,40MTRS 2 UN $ 315,000.00 $ 630,000.00
42977018470 PERNO DE 5/8X12" 2 UN $ 15,000.00 $ 30,000.00
1304390210 ABRAZADERA DE 180 mm CON PERNO CARRUA 2 UN $ 30,000.00 $ 60,000.00
SUBTOTAL MATERIALES $ 13,372,196.58
MANO DE OBRA
HORAS
REFERENCI VR
DESCRIPCION CANTIDAD TRABAJADO SUBTOTAL
A UNITARIO
R
P0100 Ayudante de Dllo/Mto TEFs 1 0.5 $ 39,605.04 $ 19,802.52
P0109 Capataz de Dllo/Mtto TEF 1 0.5 $ 68,889.78 $ 34,444.89
P0117 Liniero de Dllo/Mtto TEF 1 0.5 $ 62,266.86 $ 31,133.43
P0127 Ingeniero Electricista 1 0.5 $ 121,925.16 $ 60,962.58
SUBTOTAL MANO DE OBRA $ 146,343.42
TRANSPORTES
REFERENCI HORAS VR
DESCRIPCION CANTIDAD SUBTOTAL
A VEHICULO UNITARIO
UNIDAD CONSTRUCTIVA
MATERIALES
REFERENCI VR
DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
A UNITARIO
MANO DE OBRA
HORAS
REFERENCI VR
DESCRIPCION CANTIDAD TRABAJADO SUBTOTAL
A UNITARIO
R
P0100 Ayudante de Dllo/Mto TEFs 1 0.7 $ 39,605.04 $ 27,723.53
P0109 Capataz de Dllo/Mtto TEF 1 0.7 $ 68,889.78 $ 48,222.85
P0117 Liniero de Dllo/Mtto TEF 1 0.7 $ 62,266.86 $ 43,586.80
P0127 Ingeniero Electricista 1 0.7 $ 121,925.16 $ 85,347.61
SUBTOTAL MANO DE OBRA $ 204,880.79
TRANSPORTES
REFERENCI HORAS VR
DESCRIPCION CANTIDAD SUBTOTAL
A VEHICULO UNITARIO
UNIDAD CONSTRUCTIVA
SUMINISTRO E INSTALACION TRAFO MONOFASICO CONVENCIONAL
7.003 EN POSTE A 13,2 kV/120-240 V - 25 Kva
MATERIALES
REFERENCI VR
DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
A UNITARIO
MANO DE OBRA
HORAS
REFERENCI VR
DESCRIPCION CANTIDAD TRABAJADO SUBTOTAL
A UNITARIO
R
P0100 Ayudante de Dllo/Mto TEFs 1 0.5 $ 39,605.04 $ 19,802.52
P0109 Capataz de Dllo/Mtto TEF 1 0.5 $ 68,889.78 $ 34,444.89
P0117 Liniero de Dllo/Mtto TEF 1 0.5 $ 62,266.86 $ 31,133.43
P0127 Ingeniero Electricista 1 0.5 $ 121,925.16 $ 60,962.58
SUBTOTAL MANO DE OBRA $ 146,343.42
TRANSPORTES
REFERENCI HORAS VR
DESCRIPCION CANTIDAD SUBTOTAL
A VEHICULO UNITARIO
UNIDAD CONSTRUCTIVA
'7.004 TRAFO MONOFASICO CONVENCIONAL EN POSTE A 13,2 kV/120-240 V - 37.5 Kva
MATERIALES
REFERENCI VR
DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
A UNITARIO
MANO DE OBRA
HORAS
REFERENCI VR
DESCRIPCION CANTIDAD TRABAJADO SUBTOTAL
A UNITARIO
R
P0100 Ayudante de Dllo/Mto TEFs 1 0.7 $ 39,605.04 $ 27,723.53
P0109 Capataz de Dllo/Mtto TEF 1 0.7 $ 68,889.78 $ 48,222.85
P0117 Liniero de Dllo/Mtto TEF 1 0.7 $ 62,266.86 $ 43,586.80
P0127 Ingeniero Electricista 1 0.7 $ 121,925.16 $ 85,347.61
SUBTOTAL MANO DE OBRA $ 204,880.79
TRANSPORTES
REFERENCI HORAS VR
DESCRIPCION CANTIDAD SUBTOTAL
A VEHICULO UNITARIO
UNIDAD CONSTRUCTIVA
'7.005 TRAFO MONOFASICO CONVENCIONAL EN POSTE A 13,2 kV/120-240 V - 50 Kva
MATERIALES
REFERENCI VR
DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
A UNITARIO
TRAFO MONOF CONVENCIONAL
EN POSTE NN 13,2 kV/120-240 V
23299475900 - 50 kVA(1) 1 UN ### $ 25,831,196.58
FUSIBLE EXPULSISN 3 A
1207311110 TIPO D 2 UN $ 8,500.00 $ 17,000.00
20884853680 CRUCETA GALC DE 2,40MTRS 2 UN $ 315,000.00 $ 630,000.00
42977018470 PERNO DE 5/8X12" 2 UN $ 15,000.00 $ 30,000.00
1304390210 ABRAZADERA DE 180 mm CON PERNO CARRUA 2 UN $ 30,000.00 $ 60,000.00
SUBTOTAL MATERIALES $ 26,568,196.58
MANO DE OBRA
HORAS
REFERENCI VR
DESCRIPCION CANTIDAD TRABAJADO SUBTOTAL
A UNITARIO
R
P0100 Ayudante de Dllo/Mto TEFs 1 0.5 $ 39,605.04 $ 19,802.52
P0109 Capataz de Dllo/Mtto TEF 1 0.5 $ 68,889.78 $ 34,444.89
P0117 Liniero de Dllo/Mtto TEF 1 0.5 $ 62,266.86 $ 31,133.43
P0127 Ingeniero Electricista 1 0.5 $ 121,925.16 $ 60,962.58
SUBTOTAL MANO DE OBRA $ 146,343.42
TRANSPORTES
REFERENCI HORAS VR
DESCRIPCION CANTIDAD SUBTOTAL
A VEHICULO UNITARIO
UNIDAD CONSTRUCTIVA
7.006 TRAFO MONOFASICO CONVENCIONAL EN POSTE A 13,2 kV/120-240 V - 75 Kva
MATERIALES
REFERENCI VR
DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
A UNITARIO
MANO DE OBRA
HORAS
REFERENCI VR
DESCRIPCION CANTIDAD TRABAJADO SUBTOTAL
A UNITARIO
R
P0100 Ayudante de Dllo/Mto TEFs 1 0.5 $ 39,605.04 $ 19,802.52
P0109 Capataz de Dllo/Mtto TEF 1 0.5 $ 68,889.78 $ 34,444.89
P0117 Liniero de Dllo/Mtto TEF 1 0.5 $ 62,266.86 $ 31,133.43
P0127 Ingeniero Electricista 1 0.5 $ 121,925.16 $ 60,962.58
SUBTOTAL MANO DE OBRA $ 146,343.42
TRANSPORTES
REFERENCI HORAS VR
DESCRIPCION CANTIDAD SUBTOTAL
A VEHICULO UNITARIO
UNIDAD
CONSTRUCTIVA
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
551265 CRUCETA ANGULAR METALICA 1400 mm 2 UN 157,760 $ 315,520.00
551282 PERNO ROSCA CORRIDA ACERO GALVANIZADO 2 UN $ 17,038.08
C 5/8" x 14" 8,519
440944 ARANDELA PLANA REDONDA 5/8" 12 UN 473 $ 5,679.36
551418 GRILLETE LARGO RECTO 5/8" 11300 Kg 2 UN 12,088 $ 24,175.14
441249 AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN 2 UN 38,809 $ 77,617.92
450949 GRAPA DE RETENCION RECTA 1/0 AWG 2 UN 32,781 $ 65,561.90
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12" 2 UN 6,572 $ 13,144.56
SUBTOTAL MATERIALES $ 518,736.97
MANO DE OBRA
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
TRABAJADOR UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.22 $ 39,605.04 $ 8,713.11
P0109 Capataz de Dllo/Mtto TEF 1 0.22 $ 76,544.20 $ 16,839.72
P0117 Liniero de Dllo/Mtto TEF 1 0.22 $ 69,185.40 $ 15,220.79
P0127 Ingeniero Electricista 1 0.5 $ 121,925.16 $ 60,962.58
SUBTOTAL MANO DE OBRA $ 101,736.20
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina 1 0.22 $ 9,573.00 $ 2,106.06
SUBTOTAL TRANSPORTES $ 2,106.06
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD
CONSTRUCTIVA
SUMINISTRO E INSTALACION DE ESTRUCTURA TIPO HORIZONTAL
8.002
BIFASICO ALINEACION Y ANGULO MENOR A 5 13,2 kV - MT 322
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
551265 CRUCETA ANGULAR METALICA 1400 mm 1 UN $ 157,760.00 $ 157,760.00
440944 ARANDELA PLANA REDONDA 5/8" 2 UN $ 473.28 $ 946.56
441264 ARANDELA CURVA CUADRADA 2-1/4X2-1/4X3/16" 2 UN $ 1,257.35 $ 2,514.69
437655 PERNO CORTO AC.GALVANIZ.3/4"-3/4"X3" 2 UN $ 7,004.54 $ 14,009.09
930954 AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv 2 UN $ 93,453.87 $ 186,907.74
808064 RETENCION PREF."Z" ACSR 1/0 AWG (AAAC 123.3 MCM) AISL. HIBRIDO 2 UN $ 18,552.58 $ 37,105.15
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12" 2 UN $ 6,572.28 $ 13,144.56
SUBTOTAL MATERIALES $ 412,387.80
MANO DE OBRA
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS TRABAJADOR SUBTOTAL
UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.09 $ 84,605.04 $ 7,614.45
P0109 Capataz de Dllo/Mtto TEF 1 0.09 $ 96,544.20 $ 8,688.98
P0117 Liniero de Dllo/Mtto TEF 1 0.09 $ 99,185.40 $ 8,926.69
P0127 Ingeniero Electricista 1 0.03 $ 841,925.16 $ 25,257.75
SUBTOTAL MANO DE OBRA $ 50,487.87
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina 1 0.22 $ 9,573.00 $ 2,106.06
SUBTOTAL TRANSPORTES $ 2,106.06
HERRAMIENTAS
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD
CONSTRUCTIVA
SUMINISTRO E INSTALACION DE ESTRUCTURA TIPO HORIZONTAL
8.003
BIFASICO ANGULO 5 A 20-30 13,2 Kv - MT 323
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
551265 CRUCETA ANGULAR METALICA 1400 mm 2 UN $ 157,760.00 $ 315,520.00
440944 ARANDELA PLANA REDONDA 5/8" 12 UN $ 473.28 $ 5,679.36
437655 PERNO
PERNO CORTO
ROSCA AC.GALVANIZ.3/4"-3/4"X3"
CORRIDA ACERO GALVANIZADO 4 UN $ 7,004.54 $ 28,018.18
551282 C 5/8" x 14" 2 UN $ 8,519.04 $ 17,038.08
930954 AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv 4 UN $ 93,453.87 $ 373,815.48
808072 RETENCION PREF."OMEGA DOB" ACSR 1/0 AWG (AAAC 123,3MCM) AISL. HIBRIDO 2 UN $ 36,239.05 $ 72,478.10
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12" 2 UN $ 6,572.28 $ 13,144.56
SUBTOTAL MATERIALES $ 825,693.75
MANO DE OBRA
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS TRABAJADOR SUBTOTAL
UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.09 $ 84,605.04 $ 7,614.45
P0109 Capataz de Dllo/Mtto TEF 1 0.09 $ 96,544.20 $ 8,688.98
P0117 Liniero de Dllo/Mtto TEF 1 0.09 $ 99,185.40 $ 8,926.69
P0127 Ingeniero Electricista 1 0.03 $ 841,925.16 $ 25,257.75
SUBTOTAL MANO DE OBRA $ 50,487.87
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina 1 0.22 $ 9,573.00 $ 2,106.06
SUBTOTAL TRANSPORTES $ 2,106.06
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD
CONSTRUCTIVA
SUMINISTRO E INSTALACION DE ESTRUCTURA TIPO HORIZONTAL
8.004
BIFASICO ANGULO 20-30 A 60 13.2 kV - MT 324
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
551265 CRUCETA
PERNO ANGULAR
ROSCA METALICA
CORRIDA ACERO1400 mm
GALVANIZADO 2 UN $ 157,760.00 $ 315,520.00
551282 C 5/8" x 14" 2 UN $ 8,519.04 $ 17,038.08
440944 ARANDELA PLANA REDONDA 5/8" 12 UN $ 473.28 $ 5,679.36
551418 GRILLETE LARGO RECTO 5/8" 11300 Kg 4 UN $ 12,087.57 $ 48,350.28
441249 AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN 4 UN $ 38,808.96 $ 155,235.84
450949 GRAPA DE RETENCION RECTA 1/0 AWG 4 UN $ 32,780.95 $ 131,123.80
437596 CONECTOR CUA ACSR O AAAC 4 UN $ 22,717.44 $ 90,869.76
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12" 2 UN $ 6,572.28 $ 13,144.56
SUBTOTAL MATERIALES $ 776,961.69
MANO DE OBRA
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS TRABAJADOR SUBTOTAL
UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.22 $ 39,605.04 $ 8,713.11
P0109 Capataz de Dllo/Mtto TEF 1 0.22 $ 68,889.78 $ 15,155.75
P0117 Liniero de Dllo/Mtto TEF 1 0.22 $ 62,266.86 $ 13,698.71
P0127 Ingeniero Electricista 1 0.22 $ 121,925.16 $ 26,823.54
SUBTOTAL MANO DE OBRA $ 64,391.10
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina 1 0.22 $ 9,573.00 $ 2,106.06
SUBTOTAL TRANSPORTES $ 2,106.06
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD
CONSTRUCTIVA
SUMINISTRO E INSTALACION DE ESTRUCTURA TIPO HORIZONTAL
8.005
BIFASICO ANGULO 60 A 90 13,2 kV - MT 325
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
551265 CRUCETA
PERNO ANGULAR
ROSCA METALICA
CORRIDA ACERO1400 mm
GALVANIZADO 4 UN $ 157,760.00 $ 631,040.00
551282 C 5/8" x 14" 4 UN $ 8,519.04 $ 34,076.16
437655 PERNO CORTO AC.GALVANIZ.3/4"-3/4"X3" 1 UN $ 7,004.54 $ 7,004.54
440944 ARANDELA PLANA REDONDA 5/8" 24 UN $ 473.28 $ 11,358.72
551418 GRILLETE LARGO RECTO 5/8" 11300 Kg 4 UN $ 12,087.57 $ 48,350.28
441249 AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN 4 UN $ 38,808.96 $ 155,235.84
450949 GRAPA DE RETENCION RECTA 1/0 AWG 4 UN $ 32,780.95 $ 131,123.80
930954 AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv 1 UN $ 93,453.87 $ 93,453.87
808064 RETENCION PREF."Z" ACSR 1/0 AWG (AAAC 123.3 MCM) AISL. HIBRIDO 1 UN $ 18,552.58 $ 18,552.58
436978 CONDUCTOR AL-ACERO ACSR 1/0 AWG(RAVEN) 4 m $ 2,992.00 $ 11,968.00
437596 CONECTOR CUA ACSR O AAAC 2 UN $ 22,717.44 $ 45,434.88
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12" 4 UN $ 6,572.28 $ 26,289.13
SUBTOTAL MATERIALES $ 1,213,887.80
MANO DE OBRA
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS TRABAJADOR SUBTOTAL
UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.22 $ 39,605.04 $ 8,713.11
P0109 Capataz de Dllo/Mtto TEF 1 0.22 $ 68,889.78 $ 15,155.75
P0117 Liniero de Dllo/Mtto TEF 1 0.22 $ 62,266.86 $ 13,698.71
P0127 Ingeniero Electricista 1 0.22 $ 121,925.16 $ 26,823.54
SUBTOTAL MANO DE OBRA $ 64,391.10
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina 1 0.22 $ 9,573.00 $ 2,106.06
SUBTOTAL TRANSPORTES $ 2,106.06
HERRAMIENTAS
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS VEHICULO SUBTOTAL
UNITARIO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD
CONSTRUCTIVA
SUMINISTRO E INSTALACION DE ESTRUCTURA TIPO HORIZONTAL
8.006
BIFASICO ANCLAJE HASTA 60 - MT 326
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
551265 CRUCETA
PERNO ROSCAANGULAR METALICA
CORRIDA ACERO1400 mm
GALVANIZADO 2 UN $ 157,760.00 $ 315,520.00
551282 C 5/8" x 14" 2 UN $ 8,519.04 $ 17,038.08
440944 ARANDELA PLANA REDONDA 5/8" 12 UN $ 473.28 $ 5,679.36
551418 GRILLETE LARGO RECTO 5/8" 11300 Kg 4 UN $ 12,087.57 $ 48,350.28
441249 AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN 4 UN $ 38,808.96 $ 155,235.84
450949 GRAPA DE RETENCION RECTA 1/0 AWG 4 UN $ 32,780.95 $ 131,123.80
437596 CONECTOR CUA ACSR O AAAC 4 UN $ 22,717.44 $ 90,869.76
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12" 2 UN $ 6,572.28 $ 13,144.56
SUBTOTAL MATERIALES $ 776,961.69
MANO DE OBRA
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS TRABAJADOR SUBTOTAL
UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.22 $ 39,605.04 $ 8,713.11
P0109 Capataz de Dllo/Mtto TEF 1 0.22 $ 68,889.78 $ 15,155.75
P0117 Liniero de Dllo/Mtto TEF 1 0.22 $ 62,266.86 $ 13,698.71
P0127 Ingeniero Electricista 1 0.22 $ 121,925.16 $ 26,823.54
SUBTOTAL MANO DE OBRA $ 64,391.10
TRANSPORTES
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS VEHICULO SUBTOTAL
UNITARIO
M0612 Camioneta doble cabina 1 0.22 $ 9,573.00 $ 2,106.06
SUBTOTAL TRANSPORTES $ 2,106.06
HERRAMIENTAS
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS VEHICULO SUBTOTAL
UNITARIO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD
CONSTRUCTIVA
SUMINISTRO E INSTALACION DE CONEXION DE
8.005
1/0 AL-AWG 2 CU EN POSTE CON TRAFO (2F)
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD VR UNITARIO SUBTOTAL
454857 CONECTOR AMOVIBLE (P:ACSR 2-2/0 D:Cu 6-2/0) 2 UN $ 34,816.00 $ 69,632.00
434470 CONDUCTOR COBRE DESNUDO N 2 AWG CLASE A 16 M $ 12,240.00 $ 195,840.00
437603 CONECTOR CUA C/ ESTRIBO 2 UN $ 19,584.00 $ 39,168.00
SUBTOTAL MATERIALES $ 304,640.00
MANO DE OBRA
REFERENCIA DESCRIPCION CANTIDAD HORAS TRABAJADOR VR UNITARIO SUBTOTAL
P0100 Ayudante de Dllo/Mto TEFs 1 0.11 $ 13,201.68 $ 1,452.18
P0109 Capataz de Dllo/Mtto TEF 1 0.02 $ 22,963.26 $ 459.27
P0117 Liniero de Dllo/Mtto TEF 1 0.11 $ 20,755.62 $ 2,283.12
P0127 Ingeniero Electricista 1 0.01 $ 40,641.72 $ 406.42
SUBTOTAL MANO DE OBRA $ 4,600.99
TRANSPORTES
REFERENCIA DESCRIPCION CANTIDAD HORAS VEHICULO VR UNITARIO SUBTOTAL
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.11 $ 8,573.00 $ 943.03
SUBTOTAL TRANSPORTES $ 943.03
UNIDAD
CONSTRUCTIVA
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
551267 CRUCETA ANGULAR METALICA 2400 mm 2 UN 189,312 $ 378,624.00
551282 PERNO ROSCA CORRIDA ACERO GALVANIZADO 2 UN $ 17,038.08
C 5/8" x 14" 8,519
440944 ARANDELA PLANA REDONDA 5/8" 12 UN 473 $ 5,679.36
551418 GRILLETE LARGO RECTO 5/8" 11300 Kg 3 UN 12,088 $ 36,262.71
441249 AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN 3 UN 38,809 $ 116,426.88
450949 GRAPA DE RETENCION RECTA 1/0 AWG 3 UN 32,781 $ 98,342.85
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12" 2 UN 6,572 $ 13,144.56
SUBTOTAL MATERIALES $ 665,518.45
MANO DE OBRA
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
TRABAJADOR UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.22 $ 39,605.04 $ 8,713.11
P0109 Capataz de Dllo/Mtto TEF 1 0.22 $ 76,544.20 $ 16,839.72
P0117 Liniero de Dllo/Mtto TEF 1 0.22 $ 69,185.40 $ 15,220.79
P0127 Ingeniero Electricista 1 0.5 $ 121,925.16 $ 60,962.58
SUBTOTAL MANO DE OBRA $ 101,736.20
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina 1 0.22 $ 9,573.00 $ 2,106.06
SUBTOTAL TRANSPORTES $ 2,106.06
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD
CONSTRUCTIVA
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
551267 CRUCETA ANGULAR METALICA 2400 mm 1 UN $ 189,312.00 $ 189,312.00
440944 ARANDELA PLANA REDONDA 5/8" 2 UN $ 473.28 $ 946.56
441264 ARANDELA CURVA CUADRADA 2-1/4X2-1/4X3/16" 2 UN $ 1,257.35 $ 2,514.69
437655 PERNO CORTO AC.GALVANIZ.3/4"-3/4"X3" 3 UN $ 7,004.54 $ 21,013.63
930954 AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv 3 UN $ 93,453.87 $ 280,361.61
808064 RETENCION PREF."Z" ACSR 1/0 AWG (AAAC 123.3 MCM) AISL. HIBRIDO 3 UN $ 18,552.58 $ 55,657.73
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12" 2 UN $ 6,572.28 $ 13,144.56
SUBTOTAL MATERIALES $ 562,950.78
MANO DE OBRA
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS TRABAJADOR SUBTOTAL
UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.09 $ 84,605.04 $ 7,614.45
P0109 Capataz de Dllo/Mtto TEF 1 0.09 $ 96,544.20 $ 8,688.98
P0117 Liniero de Dllo/Mtto TEF 1 0.09 $ 99,185.40 $ 8,926.69
P0127 Ingeniero Electricista 1 0.03 $ 841,925.16 $ 25,257.75
SUBTOTAL MANO DE OBRA $ 50,487.87
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina 1 0.22 $ 9,573.00 $ 2,106.06
SUBTOTAL TRANSPORTES $ 2,106.06
HERRAMIENTAS
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD
CONSTRUCTIVA
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
551267 CRUCETA ANGULAR METALICA 2400 mm 2 UN $ 189,312.00 $ 378,624.00
440944 ARANDELA PLANA REDONDA 5/8" 12 UN $ 473.28 $ 5,679.36
437655 PERNO ROSCA
PERNO CORTO CORRIDA
AC.GALVANIZ.3/4"-3/4"X3"
ACERO GALVANIZADO 6 UN $ 7,004.54 $ 42,027.26
551282 C 5/8" x 14" 2 UN $ 8,519.04 $ 17,038.08
930954 AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv 6 UN $ 93,453.87 $ 560,723.21
808072 RETENCION PREF."OMEGA DOB" ACSR 1/0 AWG (AAAC 123,3MCM) AISL. HIBRIDO 3 UN $ 36,239.05 $ 108,717.15
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12" 2 UN $ 6,572.28 $ 13,144.56
SUBTOTAL MATERIALES $ 1,125,953.63
MANO DE OBRA
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS TRABAJADOR SUBTOTAL
UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.09 $ 84,605.04 $ 7,614.45
P0109 Capataz de Dllo/Mtto TEF 1 0.09 $ 96,544.20 $ 8,688.98
P0117 Liniero de Dllo/Mtto TEF 1 0.09 $ 99,185.40 $ 8,926.69
P0127 Ingeniero Electricista 1 0.03 $ 841,925.16 $ 25,257.75
SUBTOTAL MANO DE OBRA $ 50,487.87
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina 1 0.22 $ 9,573.00 $ 2,106.06
SUBTOTAL TRANSPORTES $ 2,106.06
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD
CONSTRUCTIVA
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
551267 CRUCETA
PERNO ANGULAR
ROSCA METALICA
CORRIDA ACERO 2400 mm
GALVANIZADO 2 UN $ 189,312.00 $ 378,624.00
551282 C 5/8" x 14" 2 UN $ 8,519.04 $ 17,038.08
437655 PERNO CORTO AC.GALVANIZ.3/4"-3/4"X3" 1 UN $ 7,004.54 $ 7,004.54
440944 ARANDELA PLANA REDONDA 5/8" 12 UN $ 473.28 $ 5,679.36
551418 GRILLETE LARGO RECTO 5/8" 11300 Kg 6 UN $ 12,087.57 $ 72,525.43
441249 AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN 6 UN $ 38,808.96 $ 232,853.76
450949 GRAPA DE RETENCION RECTA 1/0 AWG 6 UN $ 32,780.95 $ 196,685.70
930954 AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv 1 UN $ 93,453.87 $ 93,453.87
808064 RETENCION PREF."Z" ACSR 1/0 AWG (AAAC 123.3 MCM) AISL. HIBRIDO 1 UN $ 18,552.58 $ 18,552.58
437596 CONECTOR CUA ACSR O AAAC 6 UN $ 22,717.44 $ 136,304.64
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12" 2 UN $ 6,572.28 $ 13,144.56
SUBTOTAL MATERIALES $ 1,171,866.52
MANO DE OBRA
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS TRABAJADOR SUBTOTAL
UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.22 $ 39,605.04 $ 8,713.11
P0109 Capataz de Dllo/Mtto TEF 1 0.22 $ 68,889.78 $ 15,155.75
P0117 Liniero de Dllo/Mtto TEF 1 0.22 $ 62,266.86 $ 13,698.71
P0127 Ingeniero Electricista 1 0.22 $ 121,925.16 $ 26,823.54
SUBTOTAL MANO DE OBRA $ 64,391.10
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina 1 0.22 $ 9,573.00 $ 2,106.06
SUBTOTAL TRANSPORTES $ 2,106.06
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD
CONSTRUCTIVA
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
551267 CRUCETA
PERNO ROSCAANGULAR METALICA
CORRIDA ACERO 2400 mm
GALVANIZADO 4 UN $ 189,312.00 $ 757,248.00
551282 C 5/8" x 14" 4 UN $ 8,519.04 $ 34,076.16
437655 PERNO CORTO AC.GALVANIZ.3/4"-3/4"X3" 2 UN $ 7,004.54 $ 14,009.09
440944 ARANDELA PLANA REDONDA 5/8" 24 UN $ 473.28 $ 11,358.72
551418 GRILLETE LARGO RECTO 5/8" 11300 Kg 6 UN $ 12,087.57 $ 72,525.43
441249 AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN 6 UN $ 38,808.96 $ 232,853.76
450949 GRAPA DE RETENCION RECTA 1/0 AWG 6 UN $ 32,780.95 $ 196,685.70
930954 AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv 2 UN $ 93,453.87 $ 186,907.74
808064 RETENCION PREF."Z" ACSR 1/0 AWG (AAAC 123.3 MCM) AISL. HIBRIDO 2 UN $ 18,552.58 $ 37,105.15
436978 CONDUCTOR AL-ACERO ACSR 1/0 AWG(RAVEN) 6 m $ 2,992.00 $ 17,952.00
437596 CONECTOR CUA ACSR O AAAC 3 UN $ 22,717.44 $ 68,152.32
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12" 4 UN $ 6,572.28 $ 26,289.13
SUBTOTAL MATERIALES $ 1,655,163.19
MANO DE OBRA
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS TRABAJADOR SUBTOTAL
UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.22 $ 39,605.04 $ 8,713.11
P0109 Capataz de Dllo/Mtto TEF 1 0.22 $ 68,889.78 $ 15,155.75
P0117 Liniero de Dllo/Mtto TEF 1 0.22 $ 62,266.86 $ 13,698.71
P0127 Ingeniero Electricista 1 0.22 $ 121,925.16 $ 26,823.54
SUBTOTAL MANO DE OBRA $ 64,391.10
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina 1 0.22 $ 9,573.00 $ 2,106.06
SUBTOTAL TRANSPORTES $ 2,106.06
HERRAMIENTAS
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS VEHICULO SUBTOTAL
UNITARIO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD
CONSTRUCTIVA
SUMINISTRO E INSTALACION DE ESTRUCTURA TIPO HORIZONTAL
9.006
BIFASICO ANCLAJE HASTA 60 - MT 336
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
551267 CRUCETA
PERNO ANGULAR
ROSCA METALICA
CORRIDA ACERO 2400 mm
GALVANIZADO 2 UN $ 189,312.00 $ 378,624.00
551282 C 5/8" x 14" 2 UN $ 8,519.04 $ 17,038.08
437655 PERNO CORTO AC.GALVANIZ.3/4"-3/4"X3" 1 UN $ 7,004.54 $ 7,004.54
440944 ARANDELA PLANA REDONDA 5/8" 12 UN $ 473.28 $ 5,679.36
551418 GRILLETE LARGO RECTO 5/8" 11300 Kg 6 UN $ 12,087.57 $ 72,525.43
441249 AISLADOR COMPUESTO TIPO SUSPENSION ANSI DS 15 70 kN 6 UN $ 38,808.96 $ 232,853.76
450949 GRAPA DE RETENCION RECTA 1/0 AWG 6 UN $ 32,780.95 $ 196,685.70
930954 AISLADOR TIPO POSTE COMPUESTO HIBRIDO 13,2 Kv 1 UN $ 93,453.87 $ 93,453.87
808064 RETENCION PREF."Z" ACSR 1/0 AWG (AAAC 123.3 MCM) AISL. HIBRIDO 1 UN $ 18,552.58 $ 18,552.58
437596 CONECTOR CUA ACSR O AAAC 6 UN $ 22,717.44 $ 136,304.64
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12" 2 UN $ 6,572.28 $ 13,144.56
SUBTOTAL MATERIALES $ 1,171,866.52
MANO DE OBRA
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS TRABAJADOR SUBTOTAL
UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.22 $ 39,605.04 $ 8,713.11
P0109 Capataz de Dllo/Mtto TEF 1 0.22 $ 68,889.78 $ 15,155.75
P0117 Liniero de Dllo/Mtto TEF 1 0.22 $ 62,266.86 $ 13,698.71
P0127 Ingeniero Electricista 1 0.22 $ 121,925.16 $ 26,823.54
SUBTOTAL MANO DE OBRA $ 64,391.10
TRANSPORTES
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS VEHICULO SUBTOTAL
UNITARIO
M0612 Camioneta doble cabina 1 0.22 $ 9,573.00 $ 2,106.06
SUBTOTAL TRANSPORTES $ 2,106.06
HERRAMIENTAS
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS VEHICULO SUBTOTAL
UNITARIO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD
CONSTRUCTIVA
SUMINISTRO E INSTALACION DE CONEXION DE
8.005
1/0 AL-AWG 2 CU EN POSTE CON TRAFO (2F)
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD VR UNITARIO SUBTOTAL
454857 CONECTOR AMOVIBLE (P:ACSR 2-2/0 D:Cu 6-2/0) 2 UN $ 34,816.00 $ 69,632.00
434470 CONDUCTOR COBRE DESNUDO N 2 AWG CLASE A 16 M $ 12,240.00 $ 195,840.00
437603 CONECTOR CUA C/ ESTRIBO 2 UN $ 19,584.00 $ 39,168.00
SUBTOTAL MATERIALES $ 304,640.00
MANO DE OBRA
REFERENCIA DESCRIPCION CANTIDAD HORAS TRABAJADOR VR UNITARIO SUBTOTAL
P0100 Ayudante de Dllo/Mto TEFs 1 0.11 $ 13,201.68 $ 1,452.18
P0109 Capataz de Dllo/Mtto TEF 1 0.02 $ 22,963.26 $ 459.27
P0117 Liniero de Dllo/Mtto TEF 1 0.11 $ 20,755.62 $ 2,283.12
P0127 Ingeniero Electricista 1 0.01 $ 40,641.72 $ 406.42
SUBTOTAL MANO DE OBRA $ 4,600.99
TRANSPORTES
REFERENCIA DESCRIPCION CANTIDAD HORAS VEHICULO VR UNITARIO SUBTOTAL
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.11 $ 8,573.00 $ 943.03
SUBTOTAL TRANSPORTES $ 943.03
UNIDAD CONSTRUCTIVA
10.001 ARMADO EN BAJA TENSION (RT) ALINEACION - ANGULO HASTA DE 60 - FIN DE LINEA
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.15 $ 8,801.12 $ 1,320.17
P0109 Capataz de Dllo/Mtto TEF 1 0.5 $ 15,308.84 $ 7,654.42
P0117 Liniero de Dllo/Mtto TEF 1 0.4 $ 20,755.62 $ 8,302.25
P0127 Ingeniero Electricista 1 0.8 $ 20,755.62 $ 16,604.50
SUBTOTAL MANO DE OBRA $ 33,881.33
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta 1 0.1 $ 25,719.00 $ 2,571.90
SUBTOTAL TRANSPORTES $ 2,571.90
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramienas Menores 1 0.1 $ 9,819.00 $ 981.90
SUBTOTAL TRANSPORTES $ 981.90
UNIDAD CONSTRUCTIVA
10.002 ARMADO EN ANCLAJE PARA MENSAJERO
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.1 $ 8,801.12 $ 880.11
P0109 Capataz de Dllo/Mtto TEF 1 0.4 $ 15,308.84 $ 6,123.54
P0117 Liniero de Dllo/Mtto TEF 1 0.3 $ 20,755.62 $ 6,226.69
P0127 Ingeniero Electricista 1 0.7 $ 20,755.62 $ 14,528.93
SUBTOTAL MANO DE OBRA $ 27,759.27
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta 1 0.1 $ 25,719.00 $ 2,571.90
SUBTOTAL TRANSPORTES $ 2,571.90
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramienas Menores 1 0.1 $ 9,819.00 $ 981.90
SUBTOTAL TRANSPORTES $ 981.90
UNIDAD CONSTRUCTIVA
10.003 DERIVACION EN BAJA TENSION CON CONECTOR DE PERFORACION 1/0 - 1/0 -- 1/0-# 6
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.02 $ 4,400.56 $ 88.01
P0109 Capataz de Dllo/Mtto TEF 1 0.01 $ 7,654.42 $ 76.54
P0117 Liniero de Dllo/Mtto TEF 1 0.02 $ 6,918.54 $ 138.37
P0127 Ingeniero Electricista 1 0.01 $ 13,547.24 $ 135.47
SUBTOTAL MANO DE OBRA $ 438.40
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.01 $ 8,573.00 $ 85.73
SUBTOTAL TRANSPORTES $ 85.73
HERRAMIENTAS Y EQUIPOS
UNIDAD CONSTRUCTIVA
10.004 METRO LINEAL DE RED TRENZADA TRPLE X 1/0
MATERIALES
021101436978 2 CONDUCTOR ACSR 1/0 AWG + 1 CONDUCTOR NEUTRO 1.03 ML $ 26,794.73 $ 27,598.57
SUBTOTAL MATERIALES $ 27,598.57
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.04 $ 13,201.68 $ 528.07
P0109 Capataz de Dllo/Mtto TEF 1 0.04 $ 30,617.68 $ 1,224.71
P0117 Liniero de Dllo/Mtto TEF 1 0.06 $ 20,755.62 $ 1,245.34
P0127 Ingeniero Electricista 1 0.07 $ 13,547.24 $ 948.31
SUBTOTAL MANO DE OBRA $ 3,946.42
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.03 $ 8,573.00 $ 257.19
SUBTOTAL TRANSPORTES $ 257.19
HERRAMIENTAS Y EQUIPOS
UNIDAD CONSTRUCTIVA
11.001 CAJA DE ABONADOS O DE DISTRIBUCION DE 9 CIRTOS
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina 1 0.5 $ 5,730.00 $ 2,865.00
SUBTOTAL TRANSPORTES $ 2,865.00
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramientas Menores 1 0.5 $ 3,573.00 $ 1,786.50
SUBTOTAL TRANSPORTES $ 1,786.50
UNIDAD CONSTRUCTIVA
11.002 CAJA DE ABONADOS DE 4 CIRCUITOS
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina 1 0.22 $ 573.00 $ 126.06
SUBTOTAL TRANSPORTES $ 126.06
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramientas Menores 1 0.22 $ 3,573.00 $ 786.06
SUBTOTAL TRANSPORTES $ 786.06
UNIDAD CONSTRUCTIVA
11.003 ACOMETIDA SUBTERRANEA EN XLPE 90 EN CONDUCTOR N 2
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina 1 0.2 $ 9,573.00 $ 1,914.60
SUBTOTAL TRANSPORTES $ 1,914.60
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramientas Menores 1 0.2 $ 3,573.00 $ 714.60
SUBTOTAL TRANSPORTES $ 714.60
UNIDAD CONSTRUCTIVA
11.004 DERIVACION EN BAJA TENSION CON CONECTOR PERFORACION 4/0 - 1/0 / 4/0 - # 2
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.01 $ 8,573.00 $ 85.73
SUBTOTAL TRANSPORTES $ 85.73
HERRAMIENTAS Y EQUIPOS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
EQUIPO
E0804 Grua Mecanica c/mariposa p/tendido de lineas(01) 1 0.01 $ 36,458.33 $ 364.58
SUBTOTAL HERRAMIENTAS Y EQUIPOS $ 364.58
UNIDAD CONSTRUCTIVA
PUENTE SIMPLE CON CONEXIN EN BAJA TENSION PARA TRAFO MONOFASICO DE 2 BORNAS
12.001
TIPO POSTE 15, 25, 50 Y 75 KVA
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
TRABAJADO
R
P0100 Ayudante de Dllo/Mto TEFs 1 6 $ 13,201.68
P0109 Capataz de Dllo/Mtto TEF 1 0.03 $ 22,963.26
P0117 Liniero de Dllo/Mtto TEF 1 0.03 $ 20,755.62
P0127 Ingeniero Electricista 1 0.03 $ 40,641.72
SUBTOTAL MANO DE OBRA
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Camioneta doble cabina para 2 1 0.01 $ 8,573.00
SUBTOTAL TRANSPORTES
HERRAMIENTAS Y EQUIPOS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
EQUIPO
E0804 Grua Mecanica c/mariposa p/te 1 0.01 $ 36,458.33
SUBTOTAL HERRAMIENTAS Y EQUIPOS
TOTAL UNIDAD
UNIDAD CONSTRUCTIVA
MONTAJE Y SECCIONAMIENTO DE FUSIBLE O CORTACIRCUITO CON FIJACION
12.002
EN CRUCETA METALICA DE 15KV 200A (2F)
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD VR UNITARIO
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Camioneta doble cabina 1 0.25 $ 5,730.00
SUBTOTAL TRANSPORTES
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Herramientas Menores 1 0.19 $ 5,730.00
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
UNIDAD CONSTRUCTIVA
12.003 CONEX A PAT DOS SECCIONADOR FUSIBLE O CUCHILLAS EN CRUC MET
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD VR UNITARIO
434470 CONDUCTOR COBRE DESNUDO N 3.03 ME $ 12,240.00
TUERCA EXAGONAL ACERO GALVANIZ1 UN $ 1,160.00
ARANDELA PLANA REDONDA 5/8" 1 UN $ 900.00
ARANDELA DE PRESION 5/8" 1 UN $ 900.00
TERMINAL COMPRESIN PLETINA CO 3 UN $ 8,700.00
GRAPA CONEXION CABLE TIERRA S 1 PI $ 1,874.56
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Camioneta doble cabina para 2 cuadri 1 0.26 $ 8,573.00
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
UNIDAD CONSTRUCTIVA
MONTAJE DE DESCARGADOR O PARARRAYO AUTOVALV.
12.004
A13.2 CON KV FIJACION EN TANQUE (2F)
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD VR UNITARIO
23299475900 DESCARGADORES DE SOBRETEN 2 UN $ 344,000.00
1207311110 CABLE N2 DE CU DESNUDO 4.5 MTRS $ 11,500.00
20884853680 CONECTOR N2 3M 2 UN $ 9,000.00
42977018470 HERRAJES DEFIJACION 2 UN $ 13,000.00
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Camioneta doble cabina 1 0.395 $ 573.00
SUBTOTAL TRANSPORTES
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Herramientas Menores 1 0.22 $ 3,573.00
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
UNIDAD CONSTRUCTIVA
12.005 CONEXIN DESCARGADORES DE SOBRET CRUC MET/TANQ
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD VR UNITARIO
021103434470 CONDUCTOR COBRE DESNUDO 7 HI 4.03 ME $ 11,500.00
023202530559 TERMINAL COMPRESIN PLETINA CO 3 UN $ 8,700.00
023303699901 CONECTOR COMPRESION #2-#2 CU 1 PI $ 4,576.20
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Camioneta doble cabina para 2 cuadri 1 0.28 $ 8,573.00
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
UNIDAD CONSTRUCTIVA
12.006 KIT SISTEMA DE PUESTA A TIERRA BT EN ACERO AUSTENICO HASTA 12MTRS
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD VR UNITARIO
23299475944 KIT SPT DE EN ACERO AUSTENI 1 UN $ 250,000.00
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Camioneta 1 0.1 $ 77,157.00
SUBTOTAL TRANSPORTES
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Herramienas Menores 1 0.1 $ 2,730.00
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
UNIDAD CONSTRUCTIVA
12.007 KIT SISTEMA DE PUESTA A TIERRA MT EN ACERO AUSTENICO HASTA 14 MTRS
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD VR UNITARIO
23299475944 KIT SPT DE EN ACERO AUSTENI 1 UN $ 295,000.00
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Camioneta 1 0.1 $ 77,157.00
SUBTOTAL TRANSPORTES
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Herramienas Menores 1 0.1 $ 2,730.00
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
SUBTOTAL
$ 187,500.00
$ 187,500.00
SUBTOTAL
$ 79,210.08
$ 688.90
$ 622.67
$ 1,219.25
$ 81,740.90
SUBTOTAL
$ 85.73
$ 85.73
SUBTOTAL
$ 364.58
$ 364.58
$ 269,691.21
O CON FIJACION
SUBTOTAL
$ 530,400.00
$ 530,400.00
SUBTOTAL
$ 15,401.96
$ 26,790.47
$ 24,214.89
$ 47,415.34
$ 113,822.66
SUBTOTAL
$ 1,432.50
$ 1,432.50
SUBTOTAL
$ 1,088.70
$ 1,088.70
$ 646,743.86
N CRUC MET
SUBTOTAL
$ 37,087.20
$ 1,160.00
$ 900.00
$ 900.00
$ 26,100.00
$ 1,874.56
$ 68,021.76
SUBTOTAL
$ 1,320.17
$ 459.27
$ 2,213.93
$ 1,219.25
$ 5,212.62
SUBTOTAL
$ 2,228.98
$ 2,228.98
$ 75,463.36
VALV.
SUBTOTAL
$ 688,000.00
$ 51,750.00
$ 18,000.00
$ 26,000.00
$ 783,750.00
SUBTOTAL
$ 19,802.52
$ 34,444.89
$ 31,133.43
$ 60,962.58
$ 146,343.42
SUBTOTAL
$ 226.34
$ 226.34
SUBTOTAL
$ 786.06
$ 786.06
$ 931,105.82
/TANQ
SUBTOTAL
$ 46,345.00
$ 26,100.00
$ 4,576.20
$ 77,021.20
SUBTOTAL
$ 1,320.17
$ 459.27
$ 2,213.93
$ 474.15
$ 4,467.52
SUBTOTAL
$ 2,400.44
$ 2,400.44
$ 83,889.16
HASTA 12MTRS
SUBTOTAL
$ 250,000.00
$ 250,000.00
SUBTOTAL
$ 1,760.22
$ 15,308.84
$ 17,988.20
$ 24,906.74
$ 59,964.01
SUBTOTAL
$ 7,715.70
$ 7,715.70
SUBTOTAL
$ 273.00
$ 273.00
$ 317,952.71
HASTA 14 MTRS
SUBTOTAL
$ 295,000.00
$ 295,000.00
SUBTOTAL
$ 1,760.22
$ 15,308.84
$ 17,988.20
$ 24,906.74
$ 59,964.01
SUBTOTAL
$ 7,715.70
$ 7,715.70
SUBTOTAL
$ 273.00
$ 273.00
$ 362,952.71
ANALISIS DE PRECIOS UNITARIOS-OK
UNIDAD CONSTRUCTIVA
13.001 ML TENDIDO LNEA AREA (2F) A 13.2/34.5 KV ACSR 1/0
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
436978 CONDUCTOR AL-ACERO ACSR 1/0 AWG(RAVEN) 2.07 ML $ 2,992.00 $ 6,193.44
SUBTOTAL MATERIALES $ 6,193.44
MANO DE OBRA
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
TRABAJADOR UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.04 $ 4,400.56 $ 176.02
P0109 Capataz de Dllo/Mtto TEF 1 0.02 $ 7,654.42 $ 153.09
P0117 Liniero de Dllo/Mtto TEF 1 0.06 $ 6,918.54 $ 415.11
P0127 Ingeniero Electricista 1 0.02 $ 13,547.24 $ 270.94
SUBTOTAL MANO DE OBRA $ 1,015.17
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.199855 $ 8,573.00 $ 1,713.36
SUBTOTAL TRANSPORTES $ 1,713.36
HERRAMIENTAS Y EQUIPOS
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS EQUIPO SUBTOTAL
UNITARIO
E0804 Grua Mecanica c/mariposa p/tendido de lineas(01) 1 0.1 $ 36,458.33 $ 3,645.83
SUBTOTAL HERRAMIENTAS Y EQUIPOS $ 3,645.83
UNIDAD CONSTRUCTIVA
13.002 ML TENDIDO LNEA AREA (3F) A 13.2/34.5 KV ACSR 1/0
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
436978 CONDUCTOR AL-ACERO ACSR 1/0 AWG(RAVEN) 3.07 ML $ 2,992.00 $ 9,185.44
SUBTOTAL MATERIALES $ 9,185.44
MANO DE OBRA
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
TRABAJADOR UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.04 $ 4,400.56 $ 176.02
P0109 Capataz de Dllo/Mtto TEF 1 0.02 $ 7,654.42 $ 153.09
P0117 Liniero de Dllo/Mtto TEF 1 0.06 $ 6,918.54 $ 415.11
P0127 Ingeniero Electricista 1 0.02 $ 13,547.24 $ 270.94
SUBTOTAL MANO DE OBRA $ 1,015.17
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.199855 $ 8,573.00 $ 1,713.36
SUBTOTAL TRANSPORTES $ 1,713.36
HERRAMIENTAS Y EQUIPOS
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS EQUIPO SUBTOTAL
UNITARIO
E0804 Grua Mecanica c/mariposa p/tendido de lineas(01) 1 0.1 $ 36,458.33 $ 3,645.83
SUBTOTAL HERRAMIENTAS Y EQUIPOS $ 3,645.83
UNIDAD CONSTRUCTIVA
13.003 METRO LINEAL DE RED TRENZADA TRIPLEX 1/0
MATERIALES
VR
REFERENCIA DESCRIPCION CANTIDAD UNIDAD SUBTOTAL
UNITARIO
021101436978 2 CONDUCTOR ACSR 1/0 AWG + 1 CONDUCTOR NEUTR 1.03 ML $ 26,000.00 $ 26,780.00
SUBTOTAL MATERIALES $ 26,780.00
MANO DE OBRA
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
TRABAJADOR UNITARIO
P0100 Ayudante de Dllo/Mto TEFs 1 0.04 $ 13,201.68 $ 528.07
P0109 Capataz de Dllo/Mtto TEF 1 0.04 $ 30,617.68 $ 1,224.71
P0117 Liniero de Dllo/Mtto TEF 1 0.06 $ 20,755.62 $ 1,245.34
P0127 Ingeniero Electricista 1 0.04 $ 13,547.24 $ 541.89
SUBTOTAL MANO DE OBRA $ 3,540.00
TRANSPORTES
HORAS VR
REFERENCIA DESCRIPCION CANTIDAD SUBTOTAL
VEHICULO UNITARIO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.03 $ 8,573.00 $ 257.19
SUBTOTAL TRANSPORTES $ 257.19
HERRAMIENTAS Y EQUIPOS
VR
REFERENCIA DESCRIPCION CANTIDAD HORAS EQUIPO SUBTOTAL
UNITARIO
E0804 Grua Mecanica c/mariposa p/tendido de lineas(01) 1 0.07 $ 6,458.33 $ 452.08
SUBTOTAL HERRAMIENTAS Y EQUIPOS $ 452.08
UNIDAD CONSTRUCTIVA
13.004 METRO LNEAL DE RED TRENZADA 1 X # 6 + 6 CONCNTRICO
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.07 $ 10,000.00 $ 700.00
P0109 Capataz de Dllo/Mtto TEF 1 0.09 $ 10,000.00 $ 900.00
P0117 Liniero de Dllo/Mtto TEF 1 0.08 $ 12,000.00 $ 960.00
P0127 Ingeniero Electricista 1 0.05 $ 15,000.00 $ 750.00
SUBTOTAL MANO DE OBRA $ 3,310.00
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.09 $ 55,000.00 $ 4,950.00
SUBTOTAL TRANSPORTES $ 4,950.00
HERRAMIENTAS Y EQUIPOS
UNIDAD CONSTRUCTIVA
13.005 DERIVACION BIFASICA RIGIDA MEDIO DE VANO ACSR 1/0- 1/0
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.1 $ 13,201.68 $ 1,320.17
P0109 Capataz de Dllo/Mtto TEF 1 0.4 $ 30,617.68 $ 12,247.07
P0117 Liniero de Dllo/Mtto TEF 1 0.3 $ 27,674.16 $ 8,302.25
P0127 Ingeniero Electricista 1 0.9 $ 27,674.16 $ 24,906.74
SUBTOTAL MANO DE OBRA $ 46,776.23
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 CARRO CANASTA 1 0.5 $ 1,573.00 $ 786.50
SUBTOTAL TRANSPORTES $ 786.50
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Herramienas Menores 1 0.1 $ 9,819.00 $ 981.90
SUBTOTAL TRANSPORTES $ 981.90
UNIDAD CONSTRUCTIVA
13.006 MONTAJE DE KIDS PARA INSTALACIONES INTERNAS
MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.19 $ 39,605.04 $ 7,524.96
P0109 Capataz de Dllo/Mtto TEF 1 0.23 $ 68,889.78 $ 15,844.65
P0117 Liniero de Dllo/Mtto TEF 1 0.27 $ 62,266.86 $ 16,812.05
P0127 Ingeniero Electricista 1 0.15 $ 121,925.16 $ 18,288.77
SUBTOTAL MANO DE OBRA $ 58,470.43
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.19 $ 85,730.00 $ 16,288.70
SUBTOTAL TRANSPORTES $ 16,288.70
HERRAMIENTAS Y EQUIPOS
REFERENCIA DESCRIPCION CANTIDAD HORAS EQUIPO VR UNITARIO SUBTOTAL
UNIDAD
CONSTRUCTIVA
14.001 RETENIDA DE 3/8" A TIERRA EN
MATERIALES
REFERENCIA DESCRIPCION
458479 VARILLA ANCLAJE DE OJO C.T. 3/4"X8' (3/4 - 2,4m)
434435 CABLE ACERO GALVANIZADO P/RETENIDA
458467 GUARDACABOS PARA RETENCION ACERO GAL.
707561 AISLADOR DE PORCELANA TIPO TENSOR ANSI 54-2
458466 RETENCION PREFORMADA TERMINAL CABLE DE ACERO 3/8"
707868 ANCLA DE HORMIGON
458662 PLETINA SUJECION PARA RETENIDAS
440944 ARANDELA PLANA REDONDA 5/8"
441264 ARANDELA CURVA CUADRADA 2-1/4X2-1/4X3/16"
530875 GRILLETE NORMAL RECTO 7/8"
437651 TORNILLO ACERO GALVANIZADO CON TUERCA 5/8" x 12"
458482 TUBO ABIERTO SEALIZACION Y PROTECCION 2"X8'
SUBTOTAL MATERIALES
MANO DE OBRA
REFERENCIA DESCRIPCION
TRANSPORTES
REFERENCIA DESCRIPCION
M0612 Camioneta
SUBTOTAL TRANSPORTES
HERRAMIENTAS
REFERENCIA DESCRIPCION
TOTAL UNIDAD
UNIDAD CONSTRUCTIVA
14.002 RETENIDA DE 3/8" A TIERRA EN POST
MATERIALES
REFERENCIA DESCRIPCION
13445556787 CABLE EN ACERO GALV 3/8
13456663555 VARILA DE ANCLA DE 1/2
13422246788 GRAPA PRESORA DE 3 PERNOS
13387830021 GUARDACAVO
13353413254 AISLADOR TENSOR
13318996487 ARANDELA CUADRADA DE 4X4
13318996487 PLETINA DE SUJECCIN
SUBTOTAL MATERIALES
MANO DE OBRA
REFERENCIA DESCRIPCION
TRANSPORTES
REFERENCIA DESCRIPCION
M0612 Camioneta
SUBTOTAL TRANSPORTES
HERRAMIENTAS
REFERENCIA DESCRIPCION
TOTAL UNIDAD
UNIDAD CONSTRUCTIVA
MONTAJE RETENIDA MT 3/8" EN POSTE NN C
MATERIALES
REFERENCIA DESCRIPCION
MANO DE OBRA
REFERENCIA DESCRIPCION
TRANSPORTES
REFERENCIA DESCRIPCION
M0612 Camioneta
SUBTOTAL TRANSPORTES
HERRAMIENTAS
REFERENCIA DESCRIPCION
M0612 Herramienas Menores
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
IOS UNITARIOS-OK
IALES
VR
CANTIDAD UNIDAD SUBTOTAL
UNITARIO
1 UN $ 63,920.00 $ 63,920.00
12 M $ 3,121.20 $ 37,454.40
2 UN $ 1,795.20 $ 3,590.40
1 UN $ 7,180.80 $ 7,180.80
4 UN $ 95,200.00 $ 380,800.00
1 UN $ 22,848.00 $ 22,848.00
1 UN $ 52,224.00 $ 52,224.00
2 UN $ 473.28 $ 946.56
2 UN $ 1,257.35 $ 2,514.69
1 UN $ 17,680.00 $ 17,680.00
2 UN $ 6,572.28 $ 13,144.56
1 UN $ 74,800.00 $ 74,800.00
S $ 677,103.42
E OBRA
HORAS VR
CANTIDAD SUBTOTAL
TRABAJADOR UNITARIO
ORTES
HORAS VR
CANTIDAD SUBTOTAL
VEHICULO UNITARIO
1 0.1 $ 25,719.00 $ 2,571.90
ES $ 2,571.90
MIENTAS
HORAS VR
CANTIDAD SUBTOTAL
VEHICULO UNITARIO
1 0.1 $ 9,819.00 $ 981.90
ES $ 981.90
$ 724,626.85
OS UNITARIOS-OK
IALES
CANTIDAD UNIDAD VR UNITARIO SUBTOTAL
12 UN $ 8,000.00 $ 96,000.00
1 UN $ 40,000.00 $ 40,000.00
4 UN $ 15,000.00 $ 60,000.00
1 UN $ 8,000.00 $ 8,000.00
1 UN $ 25,000.00 $ 25,000.00
1 UN $ 7,000.00 $ 7,000.00
1 UN $ 80,000.00 $ 80,000.00
$ 316,000.00
E OBRA
HORAS
CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
1 0.1 $ 13,201.68 $ 1,320.17
1 0.45 $ 22,963.26 $ 10,333.47
1 0.55 $ 20,755.62 $ 11,415.59
1 0.9 $ 20,755.62 $ 18,680.06
$ 41,749.28
ORTES
IENTAS
$ 361,303.08
O BERMEJO
ST LTDA
CIOS UNITARIOS
IALES
VR
CANTIDAD UNIDAD SUBTOTAL
UNITARIO
20 UN $ 3,121.20 $ 62,424.00
2 UN $ 1,795.20 $ 3,590.40
2 UN $ 1,257.35 $ 2,514.69
1 UN $ 7,180.80 $ 7,180.80
4 UN $ 95,200.00 $ 380,800.00
1 UN $ 9,520.00 $ 9,520.00
1 UN $ 10,880.00 $ 10,880.00
S $ 476,909.89
E OBRA
HORAS VR
CANTIDAD SUBTOTAL
TRABAJADOR UNITARIO
ORTES
HORAS VR
CANTIDAD SUBTOTAL
VEHICULO UNITARIO
1 0.1 $ 25,719.00 $ 2,571.90
ES $ 2,571.90
MIENTAS
HORAS VR
CANTIDAD SUBTOTAL
VEHICULO UNITARIO
1 0.1 $ 9,819.00 $ 981.90
ES $ 981.90
$ 522,212.98
ANALISIS DE PRECIOS UNITARIOS
UNIDAD CONSTRUCTIVA
030 SUMINISTRO DE EQUIPO DE MEDIDA DIRECTA 1F MON BIF 120VOLT
MATERIALES
EQUIPO DE MEDIDA
1 UNIDAD $ 471,880.00 $ 471,880.00
MONOFSICO 120V
12133333567
021101436978 CALIBRACIN DE EQUIP 1 UNIDAD $ 178,975.00 $ 178,975.00
SUBTOTAL MATERIALES $ 650,855.00
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
TRABAJADOR
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
VEHICULO
M0612 Camioneta doble cabina para 1 0.9 $ 85,730.00 $ 77,157.00
SUBTOTAL TRANSPORTES $ 77,157.00
HERRAMIENTAS Y EQUIPOS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO SUBTOTAL
EQUIPO
E0804 Herramientas menores 1 0.12 $ 6,458.33 $ 775.00
SUBTOTAL HERRAMIENTAS Y EQUIPOS $ 775.00
UNIDAD CONSTRUCTIVA
021 ARMADO EN BAJA TENSION (RT) ALINEACION - ANGULO HASTA DE 60 - FIN DE LINEA
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD VR UNITARIO
13445556787 PERCHA DE UN PUESTO 1 UN $ 35,000.00
13456663555 AISLADOR TIPO CARRETO 1 UN $ 10,000.00
13422246788 CINTA BANDITH 1.03 MTRS $ 4,000.00
1344555678 CAPUCHON SELLADOR DE PUNTAS DE TRENZA 2-4/0 3 UN $ 3,000.00
13387830021 HEBILLAS PARA CINTA 2 UN $ 1,500.00
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.15 $ 8,801.12
P0109 Capataz de Dllo/Mtto TEF 1 0.5 $ 15,308.84
P0117 Liniero de Dllo/Mtto TEF 1 0.4 $ 20,755.62
P0127 Ingeniero Electricista 1 0.8 $ 20,755.62
SUBTOTAL MANO DE OBRA
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Camioneta 1 0.1 $ 25,719.00
SUBTOTAL TRANSPORTES
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
TOTAL UNIDAD
UNIDAD CONSTRUCTIVA
023 METRO LINEAL DE RED TRENZADA TRIPLEX 1/0
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD VR UNITARIO
021101436978 2 CONDUCTOR ACSR 1/0 AWG + 1 CONDUCTOR NEUTRO (TR1.03 ML $ 26,000.00
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.04 $ 13,201.68
P0109 Capataz de Dllo/Mtto TEF 1 0.04 $ 30,617.68
P0117 Liniero de Dllo/Mtto TEF 1 0.06 $ 20,755.62
P0127 Ingeniero Electricista 1 0.04 $ 13,547.24
SUBTOTAL MANO DE OBRA
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Camioneta doble cabina para 2 cuadrillas 1 0.03 $ 8,573.00
SUBTOTAL TRANSPORTES
HERRAMIENTAS Y EQUIPOS
TOTAL UNIDAD
UNIDAD CONSTRUCTIVA
024 CAJA DE ABONADOS O DE DISTRIBUCION DE 9 CIRTOS
MATERIALES
REFERENCIA DESCRIPCION CANTIDAD UNIDAD VR UNITARIO
23299475900 CAJA DE ABONADOS TIPO AMP DE 9 CIRT 1 UN $ 445,111.00
21207311110 CINTA BANDITH 1.05 MT $ 4,000.00
21334545676 HEBILLAS 3 UN $ 2,800.00
SUBTOTAL MATERIALES
MANO DE OBRA
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
TRABAJADOR
P0100 Ayudante de Dllo/Mto TEFs 1 0.01 $ 39,605.04
P0109 Capataz de Dllo/Mtto TEF 1 0.01 $ 76,544.20
P0117 Liniero de Dllo/Mtto TEF 1 0.01 $ 69,185.40
P0127 Ingeniero Electricista 1 0.2 $ 121,925.16
SUBTOTAL MANO DE OBRA
TRANSPORTES
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Camioneta doble cabina 1 0.5 $ 5,730.00
SUBTOTAL TRANSPORTES
HERRAMIENTAS
HORAS
REFERENCIA DESCRIPCION CANTIDAD VR UNITARIO
VEHICULO
M0612 Herramientas Menores 1 0.5 $ 3,573.00
SUBTOTAL TRANSPORTES
TOTAL UNIDAD
SUBTOTAL
$ 35,000.00
$ 10,000.00
$ 4,120.00
$ 9,000.00
$ 3,000.00
$ 61,120.00
SUBTOTAL
$ 1,320.17
$ 7,654.42
$ 8,302.25
$ 16,604.50
$ 33,881.33
SUBTOTAL
$ 2,571.90
$ 2,571.90
SUBTOTAL
$ 981.90
$ 981.90
$ 98,555.13
SUBTOTAL
$ 26,780.00
$ 26,780.00
SUBTOTAL
$ 528.07
$ 1,224.71
$ 1,245.34
$ 541.89
$ 3,540.00
SUBTOTAL
$ 257.19
$ 257.19
SUBTOTAL
$ 452.08
$ 452.08
$ 31,029.27
SUBTOTAL
$ 445,111.00
$ 4,200.00
$ 8,400.00
$ 457,711.00
SUBTOTAL
$ 396.05
$ 765.44
$ 691.85
$ 24,385.03
$ 26,238.38
SUBTOTAL
$ 2,865.00
$ 2,865.00
SUBTOTAL
$ 1,786.50
$ 1,786.50
$ 488,600.88