FACT SHEET

Enhanced
Oil Recovery

A large source of oil often remains within reach of existing oilfield


infrastructure after conventional production methods such as primary
depletion and water flooding reach their economical limits.
Enhanced oil recovery (EOR) techniques are With improvements in reservoir
used to produce the remaining oil and have characterisation and modeling, engineers may
become an important part of how Maersk Oil find that water flooding is required at the start
develops oil fields. of a development project to offset pressure
decline or even that an EOR method may be
EOR is typically classified as the tertiary considered from the beginning of development.
recovery process in field development.
It primarily occurs after both primary This is especially true when considering
production, when natural reservoir pressure offshore assets, such as those that make
drives production, and secondary recovery, up the bulk of our portfolio, where the
when energy is added to a reservoir via a lifecycle is limited and timely consideration
process that doesnt change the physical is therefore crucial in order to maximise
properties of the fluid. economic recovery.

Planning for EOR from the earliest stages


of field development saves money, boosts
Production life cycle of an oil
ultimate recovery and ensures maximum
return on investment.
Oil production rate

Primary
Depletion

Water Flood

EOR
What is EOR?

Tertiary recovery
Secondary recovery
Primary recovery
Pressure
Low salinity Miscible/
maintenance: Water flood Chemical Thermal Other
Natural Flow Artificial Lift water Immiscible
Water, displacement flooding methods methods
injection gas flooding
Gas,Injection

Polymer
HC gas CO2 Hot water
surfactant Microbial
nitrogen flue steam
alkaline APS foam gels
gas WAG combustion
micellar

Conventional recovery Enhanced oil recovery


Targets mobile oil Targets immobile oil

Enhanced Oil Recovery methods


EOR methods include low salinity water bore holes and the offshore environment.
flooding, hydro-carbon gas injection, thermal Though, our research is not limited to these
techniques, carbon dioxide flooding, polymer areas, they represent some of the unique
flooding, alkaline flooding, inert gas injection challenges Maersk Oil encounters in our
and surfactant flooding. projects.

Within these EOR methods, hundreds of EOR has become an important part of how
technologies are being researched and we develop oil fields. We currently have
developed across the industry. an actively operated EOR project in Qatar,
and an active non-operated EOR project in
Maersk Oil collaborates with industry and Algeria. We have implemented secondary
educational partners on various research recovery techniques in almost all our assets
projects, with a strong interest and expertise in in Denmark and UK by injecting water for
producing from tight carbonates, long horizontal pressure support and oil sweep.

Al-Shaheen vertical cross section with an extended


reach horizontal production well showing hydrocarbon
distribution throughout formation.
Blue represents water. Red represents hydrocarbons.
EOR methods at a glance

Low Salinity Gas Chemical Thermal


Water Injection flooding flooding techniques
reduces the tension is applied improves sweep reduce the viscosity
between oil and for pressure efficiency with of oil with heat, by
water, alters rock support, sweep a high viscosity swelling the oil and
wettability, which improvement, injection fluid changing the oil
is the interaction viscosity reduction, and/or change in composition. These
between fluid oil swelling and wettability of oil techniques achieve
and solid, and changing the oil bearing rock. It also high incremental
improves the oil composition. reduces interfacial recovery and
sweep. It also This method tension between include methods
aims to provide enables moderate oil and water by such as hot water
pressure support, to highest a factor of 1,000 or steam injection,
an effective oil incremental or more to form a high pressure air
displacement. recovery among all movable oil bank in injection or in-situ
EOR methods. a porous formation. combustion.

Water Alternating Gas at Al-Shaheen


Maersk Oil has had notable success with oil viscosity, the water is used to sweep the
Water Alternating immiscible Gas (WAG) EOR oil. When alternating the injections of the gas
at our Al-Shaheen field in Qatar. The success and water, our engineers have better control
of this mechanism, alternating injections over the movement of the hydrocarbons.
between water and gas, relies on the ability to While this mechanism is used throughout
predict incremental oil recoveries. This is done the industry, Al-Shaheen is considered unique
using robust fluid models that describe the as it is one of the largest offshore WAG
properties of different oil types and injection projects in the world, and uses ultra-long
gases. While the gas is the agent to reduce horizontal wells for injection and production.

A cross sectional representation of a Water


Alternating Gas (WAG) EOR scenario in Al-Shaheen
displaying 3D change in saturation.

Red represents hydrocarbons.


Injection wells
Production wells
Low salinity water injection
Low salinity water injection is a fairly new, yet the water within the formation changes the
potentially very significant mechanism as the wettability of the rock. It causes a shift in the
application and operations are very simple rock parameters from oil-wet, when oil sticks
and inexpensive as an increment to water to rock, to water-wet, when water sticks to
flooding. The success of this mechanism rock and forces the oil to move from the rock
relies on a positive exchange between the surface. Our researchers are currently testing
oil and rock surface when the salt content low salinity water injection in the lab and have
of the water is diluted. Diluting the salinity of experienced promising results.

EOR Development Lifecycle


Improving efficiency in every step of the EOR roadmap.

EOR projects are among the most complex and Maersk Oil continues to develop promising
difficult undertakings in the upstream industry. EOR mechanisms. Getting a particular
Success lies in improving efficiency in every mechanism ready for implementation on
step of the EOR roadmap by synchronising large scale production may take many years.
diverse measurements, applying advanced
technologies and integrating knowledge
across multiple domains.

FROM SCREENING TO FULL FIELD EXPANSION

Full field expansion


Pilot Execution Full field EOR
Laboratory testing
surveillance Development
& studies Pilot construction Reservoir monitoring
Screening and Planning
and facilities & control
design Evaluation
Pilot design & installation
Economical
risk evaluation Injection/ Production
Risk Mitigation Evaluation
optimisation

1-5 years +5 years

Project execution and risk reduction through established


processes, technology and expertise.