Sei sulla pagina 1di 22

PREFACE

This manual is made as a guideline on joining the International Roof Truss Design
Competition 2017 Arch Truss Design with Free Horizontal Element for Hangar Building as
series of event at 6th Civil in Action of Student Body of Civil Engineering and Environmental
Department, Faculty of Enggineering, Universitas Gadjah Mada. International Roof Truss
Design Competition 2017 consist of proposal selection stage and final stage for 15 qualified
teams who passed the proposal selection.

This manual contain explanation and regulation about the International Roof Truss Design
Competition 2017 that must be obeyed by the participant and binding them nor the committee.
This manual is used by the board of jury and committee as judgement reference for determining
the winner of the competition.

This manual is subjected to change in condition by Majority of Jury in period of time


which is not adverse the participant and will be announced in Civil in Action website.

Regards

Comittee

1
LIST OF CONTENT
PREFACE ....................................................................................................................................... 1

LIST OF CONTENT ...................................................................................................................... 2

CHAPTER I. GENERAL REQUIREMENTS ............................................................................... 3

CHAPTER II. COMPETITION NAME ......................................................................................... 3

CHAPTER III. COMPETITION THEME ..................................................................................... 3

CHAPTER IV. BACKGROUND ................................................................................................... 4

CHAPTER V. TIME AND COMPETITION PLACE ................................................................... 4

CHAPTER VI. TIMELINE ............................................................................................................ 4

CHAPTER VII. COMPETITION SCHEDULE ............................................................................. 5

CHAPTER VIII. PARTICIPANT PROVISION ............................................................................ 6

CHAPTER IX. REGISTRATION .................................................................................................. 6

CHAPTER X. COMPETITION SYSTEM .................................................................................... 7

CHAPTER XI. PARTICIPANT FACILITIES ............................................................................... 9

CHAPTER XII. PROVISION AND CRITERIA ......................................................................... 10

CHAPTER XIII. TECHNICAL MEETING ................................................................................. 14

CHAPTER XIV. MATERIAL SELECTION ............................................................................... 14

CHAPTER XV. ROOF TRUSS CONSTRUCTING.................................................................... 14

CHAPTER XVI. OCCUPATIONAL SAFETY AND HEALTH (OSH) ..................................... 16

CHAPTER XVII. PRESENTATION ........................................................................................... 16

CHAPTER XVIII. TESTING ....................................................................................................... 17

CHAPTER XIX. ASSESSMENT................................................................................................. 18

2
CHAPTER I. GENERAL REQUIREMENTS
Article 1
By the regulation, it mean:
a) Arch Truss Design is a structural frame in curved / arch shape
b) Free Horizontal Element is something that do not use horizontal member to connect inter
pedestal
c) Hangar Building is an enclosed building to park the aircraft
d) The roof truss span is axis to axis placement length
e) Participants are active undergraduate students of national/private both local nor foreign
university which is legally registered to join the competition
f) Proposal selection stage is participant proposal checking and judging stage
g) Final Stage is constructing roof truss according to the design of qualify participant from
proposal stage consist of constructing, loading test, and presentation stage
h) Working space is work area of constructing roof truss restricted by boundaries line
according to the competition regulation
i) Board of jury consist of jury determined by the committee, the judgement made by the
board of jury is absolute and inviolable
j) Civil In Action website is civilinactionugm.id
k) Zone time used is Indonesia Western Time (GMT+7)
l) Comittee is event organizer of International Roof Truss Design Competition 2017.

CHAPTER II. COMPETITION NAME


Article 2
International Roof Truss Design Competition 2017

CHAPTER III. COMPETITION THEME


Article 3
Arch Truss Design with Free Horizontal Element for Hangar Building

3
CHAPTER IV. BACKGROUND
Article 4
Human needs of transportation in the world is increasing every year. One of the most
efficient and people favourite transportation is Aircraft. Aircraft requirements is currently
registered increased at the level of 3,8% per year (source : Persatuan Insinyur Indonesia)
The increasing number of passengers automatically take part of increasing the number of
Aircraft production in the world. With this increasing number of aircraft production, a structural
building that is capable to protect the aircraft while not operating is needed.
Hangar is the solution of the requirement of a building that is capable to keep, repair, and
treat the aircraft. Roof Truss of the hangar is one of the vital component on the hangar structure
itself.
On International Roof Truss Competition with Arch Truss Design with Free Horizontal
Element for Hangar Building theme, participants is expected to solve the requirement problem of
aircraft hangar roof truss. On this competition, participant is encouraged to create and design a
hangar roof truss on arch shape with free space component on the lower part of the truss
structure of the aircraft hangar. With the availability of a free space component, we can use the
space as a versatile storage so the structure of the truss will be much more efficient.
International Roof Truss Competition is the innovation form of National Roof Truss
Design which extended in to the international level. This competition will be joined by
Undergraduate Student of Civil Engineering University. Top 15 team will be chosen as finalist
and will be invited to construct, present, and test the truss directly.

CHAPTER V. TIME AND COMPETITION PLACE


Article 5
Day, Date : Sunday Wednesday, 7 10th May 2017
Place : Grha Sabha Pramana 1st floor Universitas Gadjah Mada

CHAPTER VI. TIMELINE


Article 6
23rd January 15th March 2017 Competition Participant Registration
16th March 2017 Proposal Submission Deadline

4
17th March 20th March 2017 Proposal Revision
21st March 2nd April 2017 Proposal Judgement by Board of Jury
3rd April 2017 Participant Announcement for the final stage

4th April 9th April 2017 Top 15 Finalist Re-Registration


10th April 14th April 2017 Replacement Team Re-Registration
7th May 2017 Technical Meeting, Welcoming Party
8th May 2017 Roof Truss Construction
9th May 2017 Presentation, Roof Truss Testing
10th May 2017 Short Trip, Announcement, Closing

CHAPTER VII. COMPETITION SCHEDULE


Article 7
Sunday, 7th May 2017
15.00 15.30 Participant Arrival
15.30 15.40 Opening
15.40 16.00 Speech
16.00 17.00 Competition Technical and Judgment System Presentation
17.00 17.30 Loading test demo along with the test equipment
17.30 18.30 Material selection by participant, testing and presentation order
drawing
18.30 completed Welcoming Party

Monday, 8th May 2017


07.00 08.00 Competition Material and Equipment Checking by comittee
08.00 08.30 Opening Ceremony
08.30 12.30 Roof Truss Construction
12.30 13.30 Break
13.30 14.00 Roof Truss Checking
14.00 14.30 Roof Truss Correction
14.30 15.00 Roof Truss Sealing

5
Tuesday, 9th May 2017
07.00 07.30 Roof Truss Picking Up
07.30 12.30 Presentation
12.30 13.00 Break
13.00 16.30 Roof Truss Loading
16.30 17.00 Closing

Wednesday, 10th May 2017


15.30 17.00 Announcing Competition Winners, Closing Ceremony

*Competition Schedule may change at time by the committee policy

CHAPTER VIII. PARTICIPANT PROVISION


Article 8
1. Participants are active undergraduate students of national/private both local and foreign
university.
2. Each team may consist of maximum 3 people from one national/private both local nor
foreign university along with 1 supervisor. Team members are allowed to come from
different Department with at least 1 person from Civil Engineering Department.
3. The teams are not allowed to use same / similar name to their university.
4. Each university are allowed to send more than 1 team.

CHAPTER IX. REGISTRATION


Article 9
1. Registration opened from 23th of January 2017 until 15th of March 2017, with registration
fee of 400.000 rupiah for Indonesian team and USD 40 for non-Indonesian team. For
participants who did not pass the final stage will be given cashback 50% of the
registration fee.
2. Payment can be done by transferring through Mandiri account with account number 133-
00-1404178-4 on behalf of Ni Made Nindya Desivyana.

6
3. At the time of registration, Participants enclose :
a. Registration Form
b. A copy of University Student Identification Card
c. Recommendation Letter from Each University
d. Registration Fee Bill / proof of payment
e. Proposal of the roof truss design
f. Design / Drawing of the roof truss in a single A4 paper
g. Detail of joint (each joint in a single A4 paper)
h. Photo with size of 3x4 cm
All files are handed in soft copy.
4. Participants must upload their proposal and registration files as a PDF at the latest on 16th
of March 2017 in Civil In Action website.
5. Participants who already submitted all the files required need to give confirmation to the
comittee contact person.
6. Every files sent must include the name, email, and active phone number of the team.

CHAPTER X. COMPETITION SYSTEM


Article 10
1. Participants design the roof truss with provided materials in accordance with the design load,
innovative and efficient design.
2. Participants are obligatory to make a proposal with maximum of 10 pages which consist of :
- Title
- Preface
- list of content
- list of Picture
- list of Table
- Chapter 1 Preliminary
- Background
- Aim
- Benefit / Advantage

7
- Chapter 2 Theory

- Chapter 3 Roof Truss Design


- Material Spesification
- Design Load Analysis
- Structural Failure Analysis

- Chapter 4 Drawing

- Reference
3. Background, watermark, header and footer on proposal can not contain team identity and
university identity.
4. Fifteen teams with the best proposal will qualify to join the final stage. The final stage will be
held at 7th until 10th May 2017.
5. The qualified finalist will be contacted through each contact person of the team and will be
announced through Civil in Action website on 3rd April 2017.
6. For the finalist who qualify the proposal selection, is obligatory to re-register at the latest by
9th April 2017 by 18.00. Finalist who do not register until the time determined will be
disqualified and the position will be replaced by another team.
7. The replacement team is the team with ranking of 16th, 17th, 18th,etc on proposal judgement.
8. The replacement team will be contacted by committee at 10th April 2017. The confirmation
due date is at 14th April 2017, by 18.00.
9. Roof truss constructed on the final stage must compatible with the design printed on the
proposal.

8
CHAPTER XI. PARTICIPANT FACILITIES
Article 11
For participants who qualify for the final stage (top 15) will receive various facilities
including:
1. Welcoming Party and Technical Meeting
2. Participants Certificate
3. Supervisor Certificate
4. Snack and Lunch for 2 days
5. Working space by 3x3 m size for each team for constructing the roof truss
6. 2 Power source (electric socket/plug in) for each team at constructing time
7. A table for each team at assembling time
8. Transportation from and to hotel, and all necessary place for welcoming party or technical
meeting and competition location
9. Winner Prize :
- Winner I 800 USD + trophy + certificate
- Winner II 500 USD + trophy + certificate
- Winner III 300 USD + trophy + certificate
- Most Innovative Category Winner 150 USD + trophy + certificate
- Most Complete OSH Winner 50 USD + trophy + certificate
11. Short trip into one of Yogyakarta Tourism Place at 10th May 2017
12. Roof Truss material according to article 14

9
CHAPTER XII. PROVISION AND CRITERIA
Article 12
DIMENSION

The Example of Outer Frame :


Figure 1 :

Figure 2:

10
Figure 3:

Figure 4:

11
L1 = Length of Roof Truss Span ** = 1500 mm ( 20 mm)
L2 = Length of Top Chord * = 150 mm 200 mm ( 2 mm)
L3 = Length of Bottom Chord ** = Max. 200 mm (2 mm tolerance)
H1 = Total Height of Roof Truss ** = 300 mm 500 mm ( 5 mm)
H2 = Height of Bottom Frame ** = 200 mm 400 mm ( 5 mm)
H3 = Height of Outer Vertical Member ** = 150 mm 200 mm ( 2 mm)
B = Largest Witdh of Composite Bar * = Max. 30 mm (2 mm tolerance)
b = Largest Width of Single Bar * = Max. 30 mm (2 mm tolerance)
h = Largest Height of Composite/Single Bar * = Max. 40 mm (2 mm tolerance)
d = Largest Width of Single Bar with Plate* = Max. 38 mm (2 mm tolerance)
D = Largest Width of Composite Bar with Plate* = Max. 38 mm (2 mm tolerance)
*) Dimension measured from outer frame (not from axis) and the distance of outer dimension to
the other
**) Dimension measured from axis to the other axis

Article 13
GENERAL
Roof truss must be formed into arch, meanwhile the under section can be another form
The joint of truss that is allowed only bolt with/without plate.
Outer frame of the truss must be appropriate as the criteria on Article 12
The truss must be constructed effectively as design load
Participant can define the design load by themself but can not be less than 200 kg and can
not be more than 300 kg
Design must be inovative and fulfilled the rules and regulations on Chapter XI
Participants only use wood that committee have prepared except plate and bolt.

Article 14
MATERIAL
The material which is used to construct the truss are wood, plate, and bolt. Wood is used
to construct all of the truss frame including tension bar, compression bar, or zero force
bar. The committee only provide the wood, in addition to it (for example: plate and bolt)
participants are required to provide their own.

12
The wood that is provided is only in the form of beams with 2 meters long and has
dimension of cross-section : 4/3, 3/2, 3/1

The types of wood and its specific gravity :


- Shorea bracteolata Deyr around 0,54 gr/cm3.
- Swietenia macrophylla King around 0,6 gr/cm3.
- Dipterocarpus kunstleri King around 0,80 gr/cm3.
The maximum length/the longest wood that can be used in truss design is 300 mm
(measured from end point to the other end point) so the segment of truss that has span
more than 300 mm must use the joint.
Materials of the joint between the member is bolt with/without plate.
Diameter of the bolt has to appropriate with participants design and can be measured
with structure analysis. Diameter of the bolt which is allowed is no more than 3/8 or
9,525 mm (measured from end point to the other end point).
Maximum length of the bolt is 6 cm (measured from end point to the other end point).
Minimum amount of the bolt which is allowed is 20 pcs.
Plate is made by wood or saw timber. Plate is allowed already in the form and size of
participants design but it has not allowed to make a hole yet.
Nail, glue, string, and wire are prohibited to use by participants.
All materials that participants have prepared will be checked by committe on technical
meeting.

13
CHAPTER XIII. TECHNICAL MEETING
Article 15
1. Day , date : Sunday, 7th May 2017
Time : 15.30 19.30
Location : Grha Sabha Pramana 1st Floor
2. Participants are obliged to attend the technical meeting.
3. Participants are obliged to dressed well, polite, courteous, wear shoes and use the attributes
of the respective universities.
4. Technical meeting is the review of rules and regulations during the competition, technical of
construction and loading test of roof truss, and the scoring system. Committe will give an
opportunity for participant to ask about anything that has mentioned above.

CHAPTER XIV. MATERIAL SELECTION


Article 16
1. Material are choosen according to participants design and will be used as the stuff of the
truss constuction.
2. The material selection is done by the participant.
3. Each team do the election of material based on the group order.
4. The order of the team based on the team that register first.
5. Material which is chosen will be noted and saved by committee.
6. The amount of the material which is chosen can be more than material that inserted in
proposal with maximum amount that can be chosen is more than a half from material
needs inserted in proposal.
7. The accuracy of the selected material is includes in the assessment.

CHAPTER XV. ROOF TRUSS CONSTRUCTING


Article 17
The configuration of truss which is made by participant must appropriate with the design in
proposal. If that configuration does not appropriate with the proposal, participant will get
penalty. The penalty is 50% score decrement from total score.
1. Participant is obliged to attend in location on time.

14
2. The material will be prepared by committee as the material that is chosen by participant
except the material which is brought by participant (plate and bolt).
3. All tools are brought by the participant in case it can not damage the facility that has
prepared by committee. Electric tools that can be used only Electric Drill. Committee
only prepare the electric socket. If participant bring electric tool except mentioned above,
that tool will be confiscated by committee.
4. The construction spot has prepared by committee as width as 3m x 3m
5. During the construction time, participant is prohibited to leave the construction spot.
Participants who want to leave their construction spot must ask the committee permission
and will accompanied by committee.
6. During contructing the truss, no one can be inside the construction spot except the
member of the team, even the lecturer.
7. During the execution time, participant only allowed to make an interaction with the other
team member and the committee.
8. When in the construction time, participant is prohibited to accept the tool, stuff, or
material from anyone.
9. The allocation time for constructing the truss is four hours. Participant is requested to
manage the time well so the truss can be done on time.
10. The construction time is includes in assessment. Participant who are finished the
construction have to notify to committe directly.
11. The construction procces that is done in construction spot is wood cutting, wood
connecting, installing the joint and assembling the truss.
12. If the truss has not done yet until the time limit that has decided, then:
If the outer frame as the figure on Article 12 has not constructed, participant is
considered fail to finish constructing truss
If the outer frame as the figure on Article 12 has constructed, that truss is validated.
13. If the truss does not fulfill the rules and regulations even the criterias that prevail when
the inspection by committee, then committee will give the time tolerance to fix the truss
in 30 minutes (maximum). The time revision is also one of the assessment point.
Participants who do not have to revise their truss will get 100 points, meanwhile
participants who have to revise the truss will get the point based on the revision rapidity.

15
CHAPTER XVI. OCCUPATIONAL SAFETY AND HEALTH (OSH)
Article 18
1. Participant is obliged to pay attention about OSH during assembly of truss and even bring the
equipment that can support safety. The minimum equipment of OSH that participant obliged to
bring:
Gloves
Safety glasses
Helmet
Mask
Vest
OSH Sign
2. The condition and completeness of OSH equipment is includes in assessment.
3. Committee prepare the first aid and Student Health Unit.
4. Participants are responsible for their safety
5. The winner of the most complete OSH category based on the assessment of the OSH that
participant has brought and used.

CHAPTER XVII. PRESENTATION


Article 19
1. Participant has to prepare the presentation in softfile form, the format can be .pptx, .pdf, or
.swf, and uploaded on the website of Civil In Action, deadline on 28th April 2017.
2. Each team has an opportunity to present their ideas and their model they have created within
time limited to 7 minutes then 8 minutes for Question and Answer session by judges. If the
time of presentation is over but the presentation have not done yet, the committee has the
right to stop the presentation and are not given tolerance.
3. Material of the presentation consist of :
- Truss design and joint details.
- The advantages of forms, materials, and uniqueness of the truss.
- Structure analysis.
- Planning of the dimension and the joint.
4. Presentation is present by each team closed in front of the judges.

16
CHAPTER XVIII. TESTING
Article 20

simply supported

Unit in millimeters

17
1. The order of testing based on illustration at the technical meeting.
2. Participant prepare the technical data and the truss that will be tested.
3. The weight of truss is weighed.
4. The truss placed on the testing instrument.
5. The measuring instruments of deflection placed at B point and arranged on the netral
condition.
6. The testing will be done on A point.
7. Testing will be started from 20 kg of load, then rise with interval 20 kg.
8. Deflection/deformation only measured when testing with load of 20 kg, 40 kg, 60 kg, 80 kg,
100 kg.
9. After load reach 100 kg, testing will be continued with interval 10 kg until the load reach the
design load.
10. When the load has reached design load and the truss has not damaged yet, testing will be
continued until 50 kg over design load or until the truss damaged.
11. When the truss damaged before reach the design load, it will gets zero on testing assesment.
12. Structure is considered a damaged if one of the segment of truss get cracking or has reached
the maximum of deflection. This decision is determined by the board of jury and inviolable.

CHAPTER XIX. ASSESSMENT


Article 21
Assessment criteria:
A. The proposal selection stage
1. Proposal Format (40%)
The rules of writing (20%)
Proposal is made with good and true language rules.
Systematical (20%)
Proposal has the good and true systematical.

18
2. Innovation and Creativity (60%)
Analysis (30%)
Truss Design (20%)
Excess of Truss (10%)
Assessment criteria : Innovation, Strength, Workability, Economic, Aestetics.
Assessment is done by the board of jury.

B. The Final Stage : Constructing, Testing, and Presentation


1. Constructing (35%)
Construction Time (10%)
Assessment of construction time depends on the speed of constructing the truss
Construction time (second)
Score = 120 144

Revision Time (5%)


Participant who do not go into the revision stage will get 100 point.
Participant who go into the revision stage will get point on revision time based on
how long the revision time.
1800 Revision time (second)
Score = 100
1800

Compatibility of dimension (10%)


Compatibility of dimension based on measurement of the length of truss, the
width of the truss, and the height of the truss that fulfill the requirements in
Article 12 (Maximum points 100)
- Length (max points 40), width (max points 30), height (max points 30).
- If the dimension of the truss is not fulfill the requirements, it will gets 0
point.

Compatibility of the material (5%)


Assessment based on compatibility of wood demand with actual wood needs.

19
Actual wood needs (meter) Wood demand (meter)
Score = 100 200
Wood demand (meter)

Completeness of OSH (5%)


Participant who bring all the equipment of OSH that is mentioned above at article
18 will get the maximum 100 points.
The consequences for participants who do not bring the equipment of OSH:
- Do not bring one of the OSH equipment that is mentioned above will get
maximum points 80
- Do not bring two of the OSH equipment that is mentioned above will get
maximum points 60
- Do not bring three of the OSH equipment that is mentioned above will get
maximum points 40
- Do not bring four of the OSH equipment that is mentioned above will get
maximum points 20
- Do not bring five of the OSH equipment that is mentioned above will get
maximum points 0
The condition of the OSH equipment also affect the assessment

2. Testing (40%)
Compatibility of design load and actual load (15%)
Assessment based on compatibility of design load which is inserted in proposal
and actual load.
Actual load (kg) Design load (kg)
Score = 100 x 100
50

If the actual load is less than design load, participant will get point.

Ratio of the actual load and the weight of truss (10%)


Assessment based on the ratio of actual load and the number of the truss weight.
Participant with the biggest ratio of actual load and truss weight will get 100
points.

20
Ratio of the load and deflection at the load 20-100 kg with truss weight (10%)
Assessment based on ratio of the load and deflection (max) with truss weight.
Participant with the biggest ratio will get 100 points

Compatibility of the planned failure and actual failure (damaged) (5%)


Assessment based on compatibility of the truss section that is planned will be
experiencing failure with the section of the truss that experiencing actual failure.
Participant will get 100 points if it compatible and will get 0 point if it does not
compatible.

3. Presentation (25%)
Compatibility of presentation with proposal (10%)
Mastery of the material (10%)
Delivery of the material (5%)
The assessment will be done by the board of jury.

21