PART-11.

VERIFICATION FOR CONSTRUCTION PERIOD ( PRECAST GIRDER)

11-1. In case of putting the precast girder in abuttement:

We will use ultimate limit state to verify the resistance of precast girder during the construc
Load considered for the verification are:

Self-weight of precast girder: Wselt= kN/m


Mself= kN/m
Weight of CIP: WCIP= kN/m
MCIP= kN.m
site load during the construction:Msite= kN.m

Mu=DC(Mgirder+MCIP)+LLMsite = kNm

LOAD FACTOR (Strength I) (Table3.4.1-1)

Top cover:
Low cover:
DC= 1.25 Wearing surface and utilities
LL= 1.75 Live load factor

dpo As
dneg
s

b=

b=
h=
Assuming bar =
dpos=
we found As=
We use ..DB..@.. So Astotal= mm2

Because it is an apporximative expression, it will be necessary to verify the moment capacity to 0

The selected reinforcement


Maximum reinforcement [A5.7.3.3.1] is limited by the ductility requirement of
C<0.42de or a0.421d [A5.7.2.2]
We have C<0.42de [A5.7.3.3.1]
a=1C [A5.7.2.2]
See [A5.7.2.2], we get:
28MPa<f'c=30MPa<56MPa 1=

Thus: a0.35de where de=(..+..)/ [A5.7.3.3.1]


(.+.)

Aps=0 de=ds=d a0.35d


Where a=/0.85

a= < 0.35d=
Minimum reinforcement [A5.7.3.3.2] for component containing non-prestressing steel is sat

=/ 0.03
: ration tension steel to the gross area
/
For the given material properties, the minimum area of steel

Asmin= 0.03/ .b.d = <NO>!!!

Check strength of Moment

"" =""As.fy(d-/2) = < Mu=

11-2. When we bring up the girder to put on

In this case there is negative moment

b'

h
A's

b=

Top cover :
Low cover :
Mu=
b'=
h=
Assuming bar =
dpos=
Trial As
We use .DB..@... Astotal=

Because it is an approximative expression, it will be necessary to verify the moment capaci


The selected reinforcement
Maximum reinforcement [A5.7.3.3.1] is limited by the ductility requirement of
C<0.42de or a0.421d [A5.7.2.2]
We have C<0.42d e [A5.7.3.3.1]
a=1C [A5.7.2.2]
See [A5.7.2.2], we get:
28MPa<f'c=30MPa<56MPa 1=

Thus: a0.35de where de=(..+..)/ [A5.7.3.3.1]


(.+.)

Aps=0 de=ds=d a0.35d


Where a=/0.85

a= < 0.35d=
Minimum reinforcement [A5.7.3.3.2] for component containing non-prestressing steel is sat

=/ 0.03 : ration tension steel to the gross area


/
For the given material properties, the minimum area of steel

Asmin= 0.03/ .b.d = <NO>!!!


Check strength of Moment

"" =""As.fy(d-/2) = < Mu=


girder during the construction

(we use W=1kN/m)

As
h=

b=

moment capacity to 0

uirement of

a0.421de
<OK>!!!
n-prestressing steel is satified if

<NO>!!!
erify the moment capacity 0

uirement of

a0.421de

<OK>!!!
n-prestressing steel is satified if

<NO>!!!