SUPPLIER'S DOCUMENT COVER PAGE


(FOR A4/A3 DOCUMENTS ONLY)

SUPPLIER'S NAME : ABB

PURCHASE ORDER No : 3830-100 510 -50

DOCUMENT TITLE : Electrical Schem. & Wiring diagram

TOTAL No OF PAGES : 58

SUPLLIER'S ORDER No : 12000261

SUPPLIER'S SUPPLIER APPROVAL


SUPPLIER'S OWN DOCUMENT No DATE
REVISION SIGNATURE

3 10.10.2016 Ehab Samy

N/A

ERC Project - New Crude De-salter


SUPPLIER DOCUMENT REVIEW PROJECT TITLE :
packages

ENPPI PROJECT
: 3830-100
PERMISSION TO PROCEED DOES NOT CONSTITUTE NUMBER
ACCEPTANCE OR APPROVAL OF DESIGN DETAILS,
CALCULATIONS, ANALYSIS, TEST METHODS OR
MATERIALS DEVELOPED OR SELECTED BY SUPPLIER
FROM FULL COMPLIANCE WITH CONTRACTUAL PACKAGE Electrical Schem. & Wiring
:
OBLIGATIONS. DESCRIPTION Diagram

EQUIPMENT
1. WORK MAY PROCEED. : ( 5 LV SWG - 01 )
TAG
REVISE AND RESUBMIT IN ACCORDANCE WITH
10000-Z-000-PM1-FRM-0033 (11/14)

CODE
2. COMMENTS, WORK MAY PROCEED SUBJECT TO : E99
INCORPORATION OF CHANGES INDICATED. IDENTIFIER
REVISE AND RESUBMIT, (MAJOR COMMENTS)
3.
WORK MAY NOT PROCEED.
DOCUMENT NUMBER REV
REJECTED, (REASON TO BE SPECIFIED ON THE
4.
DOCUMENT).
HOLD FOR A SPECIFIC REASON ( TO BE
5.
SPECIFIED ON THE DOCUMENT).

NAME: 30-Oct.-2016 E99 3

SIGNATURE: DATE : 10.10.2016


1 2 3 4 5 6 7 8

Rev. Date Name Remarks


3 10/9/2016 egemkha
2 8/27/2016 egemkha

REVISIONS
FOR APPROVAL
A A
1 7/3/2016 EGEMKHA
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.

B B

LOW VOLTAGE DEPARTMENT


C C

Main Cover For All Items


Project Name:

Power and productivity New Crude Desalter


Package And Their Ancillaries
D

for a better world Consultant:


Contractor :

Enppi
D

Client:

ERC / CORC
Order Number:
E E

12000261
Date: 30/03/2016 Title :-
Prepared: Emad Khaled
Ahmed
Checked: Abdel-Rahman Control Wiring
Electrical Schematic

F
Approved: Mohamed Abdou F

TOTAL
SHEETS
57
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

SER.No SYMBOL LAB. DESCRIPTION REMARK


We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

A1

A2
COIL FOR AUX./ POWER CONTACTOR

NORMALLY CLOSED CONTACT

B NORMALLY OPEN CONTACT B

1
A
2 AMMETER
1
V
2 VOLTMETER

-P1 2
1
V VOLTAMETER WITH SELECTOR SWITCH
L3-L1
L2-L3
L1-L2

L1-N
L2-N
L3-N
0

S? SELECTOR VOLT

L1 L2 L3 N

C C

SIGNALLING CONTACTS FOR BREAKER POSITION

(RACKED IN , RACKED OUT,TEST)

NORMALLY CLOSE PUSH BUTTON

1
NORMALLY OPEN PUSH BUTTON
D 2 D

CURRENT TRANSFORMER
L

L1 L1/1
L2 L2/1
L3 L3/1 VOLTAGE TRANSFORMER
N N/1

E 1 INDICATION LAMP / LIGHTING LAMP E

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

SER.No SYMBOL LAB. DESCRIPTION REMARK


We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

15
TRIP CONTACT OF C.B.
14

1
SINGLE POLE M.C.B.
2

B B
1 3 5 7
MAIN CONTACT OF 4 POLE CB D/O
WITH THERMOMAGNETIC RELEASE OR
2 4 6 8 WITH MICROPROCESSOR BASED RELEASE

U1

-Q1 C.B. SPRING CHARGING MOTOR


M
U2

C 1
C

YC SHUNT CLOSING COIL OF C.B.


2

YO SHUNT OPENING COIL OF C.B.


10
REMOTE

LOCAL/OFF/REMOTE SELECTOR SWITCH OR


LOCAL
OFF

1 3 7
AUTO./OFF/MANUAL SELECTOR SWITCH
D D
2

YU UNDER VOLTAGE COIL


8

TERMINAL BLOCK
1

-D2
E SURGE E

ARRESTOR

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

SER.No SYMBOL LAB. DESCRIPTION REMARK

S A1
COIL FOR ON DELAY TIMER RELAY
A2

B B

1 3 5 7 MAIN CONTACT OF 4 POLE CB D/O


WITHOUT RELEASE

2 4 6 8

A1

A2 COIL FOR OFF DELAY TIMER RELAY

C C

ON DELAY NORMALY OPEN AUX. CONTACT

OFF DELAY NORMALY CLOSE AUX. CONTACT

1
SINGLE POLE MCB WITHOUT RELEASE
2 (TO BE USED AS A REMOVABLE LINK)

D 1 D
-F1? FUSE SWITCH

1 3 5

MAIN CONTACT OF 3 POLE CB


WITH MAGNETIC ONLY RELEASE
2 4 6
TRANSFER

E E
OFF

2 3
SPRING RETURN SELECTOR SWITCH

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 3
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

SER.No SYMBOL LAB. DESCRIPTION REMARK

ELR
N- 6
1 1 EARTH LEAKAGE RELAY - RCQ
L1- 7
2 2
L2- 8
3 3
L3- 9
4 4
B -R? 10 B
11
12

18 19

1 3 5

MAIN CONTACT OF 3 POLE CB


WITH THERMOMAGNETIC RELEASE OR
C C
WITH MICROPROCESSOR BASED RELEASE
2 4 6

TH THERMOSTATE

D D

SPACE HEATER

INTERNAL LIGHTING

E E
L2 L3 A K L

AUTO. REGULATOR
AUTO. REGULATOR -R1
1 2 3 4 5 6 7 8 9 10 11 12

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 4
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

SER.No SYMBOL LAB. DESCRIPTION REMARK

13 21 33 41

14 22 34 42
3-pole Switch Fuse OESA Complete
with Aux. Contact

B B

TEST SWITCH FOR DRAWOUT MODULE


TO ALL CONTACT

R RESISTOR
SUPRESSOR

R-C SUPPRESSOR
R-C

C C

L1

L2
L3
N
16 U/O Voltage Relay
15
18
26
-R2
25
28

D D
1
2

2
1 3

SELECTOR SWITCH
1

2 4 5 8 10

1 2 3

E E
0V 0V 0V
LED BLOCK
RED GREEN YELLOW
ON READY FAULT

LED BLOCK

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 5
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

SER.No SYMBOL LAB. DESCRIPTION REMARK

13 14

4-20mA
0-1A
1
15 CURRENT TRANSDUCER
3 16
B B

- +
13 14

4-20mA
0-140V

15
1
16
3 VOLTAGE TRANSDUCER

C C

+110VDC +24VDC
CONVERTER
-110VDC -24VDC
110VDC/24VDC
Converter

ph.c. PHOTO CELL

D D

1 2 3 4
L1 L2 L3 N

6 3I

5 3K

8 2I

-D1 Universal Measuring Device


7 2K

10 1I
E E

9 1K DPM
UMG96

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 6
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

SER.No SYMBOL LAB. DESCRIPTION REMARK

-K1

Y/D Timer Contact

B B

0 1 C1 2 3

-D1
XO 08 R1
PLC AC31
EXTENSION
8 RELAY OUTPUTS

4 5 C2 6 7

C C

Capacitor bank
-C1

-P1 h Run Hour Meter


D D

A2 27 37 47

Contactor For Capacitor Switching


NO NO NO
-K1 28 38 48
A1

2T1 4T2 6T3

E E

-H1 horn

F 3 10/9/2016 A egemkha
09-07-2009
Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 IndexegemkhaDate Prepared: Name Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 7
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A * EXTERNAL SUPPLY 110VDC A


We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

126 / +OUTGOING-2/2.1:A
124 / +OUTGOING-1/2.2:A
122 / +COUPLER/9.2:A

B 120 / +COUPLER/7.2:A B
118 / +COUPLER/5.6:A
116 / +COUPLER/3.1:A

112 / +TR 2/7.2:A

110 / +TR 2/6.6:A

108 / +TR 2/3.1:A

106 / +TR 1/7.2:A

-F110A 104 / +TR 1/6.6:A


-X110 -X110
1 3
900 1 2 902
C 110VDC FROM +
-X110 -X110
100 / +TR 1/3.1:A C
THE CLIENT 2
901 3 4 4
903
- 101 / +TR 1/3.1:A
S282UC
K25A
105 / +TR 1/6.6:A
Location : 8M1
107 / +TR 1/7.2:A

109 / +TR 2/3.1:A

111 / +TR 2/6.6:A

113 / +TR 2/7.2:A

117 / +COUPLER/3.1:A
D 119 / +COUPLER/5.6:A D

121 / +COUPLER/7.2:B

123 / +COUPLER/9.2:A

125 / +OUTGOING-1/2.2:B

127 / +OUTGOING-2/2.1:B

CONVERTER
110/24 VDC
-F110B 20 VA -F24
-X24
1
1 2 904 906 1 2 908
01 / +SUPPLY 24VDC/1.3:C
E -X24 E
3 4 3 4 2
905 907 909
02 / +SUPPLY 24VDC/1.3:D
S202UC S202UC
C6 C25

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + SUPPLY 110VDC
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 1
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A SUPPLY 24VDC A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

B B

C C

-X24 110 / +OUTGOING-2/1.3:B


1
908
+SUPPLY 110VDC-01 / +SUPPLY 110VDC/1.5:E 108 / +OUTGOING-1/1.3:B
-X24
2
909
+SUPPLY 110VDC-02 / +SUPPLY 110VDC/1.5:E 109 / +OUTGOING-1/1.3:B

111 / +OUTGOING-2/1.3:B

D D

E E

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + SUPPLY 24VDC
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 1
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

2.1:F

2.1:F

2.1:F

2.2:F

2.2:F
PE.

L1.

L2.

L3.
N.
-PE CURRENT
A 1 TEST BLOCK A
150 -X3 1 0150
-T1 1 01 LC / 8.2:E
L
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

5000/5
Cl. 0.5
15VA
K 151 -X3 2 0151
2 02 K1 / 8.2:D
150 -X3 1
-T2 L
5000/5
Cl. 0.5 -X3 3
15VA
K 152 0152
3 03 K2 / 8.2:D
150 -X3 1
-T3 L
5000/5
Cl. 0.5
15VA
K 153 -X3 4 0153
B 4 04 K3 / 8.2:E B

150 -X3 1 0150


-T4 5 05 01 / 7.2:B
L
5000/5
5P20
10VA
K 154 -X3 5 0154
6 06 02 / 7.2:B
150 -X3 1
-T5 L
5000/5
5P20 -X3 6
10VA
K 155 0155
7 07 03 / 7.2:B
150 -X3 1
-T6 L
C 5000/5 C
5P20
10VA
K 156 -X3 7 0156
8 08 04 / 7.2:C

-T7 150 -X3 1


L
5000/5
5P20
10VA K 156 -X3 8 0156
9 09 05 / 7.2:C

D D
N1/1
PE/1

L1/1

L2/1

L3/1

UPSTREAM MV SWG
51G TRIP

-PE

-T8
5000/5 BUSDUCT(S-LV-80-A)
5P20
E 10VA E

TO REF 615 F
TRAFO. TO ANNOUNCE ON DISPLAY
CP UNIT THE TRANSFORMER
MECHANICAL

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

/3.4:C

/3.5:C

/3.6:C

/3.7:C

/3.8:C
/5.3:D

/5.5:E

/5.5:E

/5.3:E

/5.1:E
/5.2:E
Q1
X

K1

K2
1 3 5

96 -96

98 -98

12

14

22

24

32

34

42

44

102 102

104 104

112 112

114 114

122 122

124 124

132 132

134 134

142 142

144 144

U1 -U1

36

38

C1

C11 C11

D1 -D1

46

48
B B
XV 1 3 5

36

38

C1

46

48
12

14

22

24

32

34

42

44
K1

K2

The protection functions and the accesories is as per the SLD


S33M/1

-K51
T11
T12 />

T21 / >>
T22 -F1
/ >>

A1 T31
/ >>>

This is general sympol of the release


T32
/ >>
YC YO YU
EKIP SY -Q/1 -Q/2 -Q/3 -Q/4 S75I/1 S75I/2 S75T/1 S75E/1 S75E/2 S33M/2 -RTC
T13
T14
-M
M
T23
T24
1~
--
T33

C T34
C
Ne+ Ne+

C12 C12
XV

101 101

131 131

141 141
Ne- Ne-

111 111

121 121
W3 W3

W4 W4

D2 D2
2 4 6

45 45
C2 C2
U2 U2

35 35
95 95

11 11

21 21

31 31

41 41
X 2 4 6

MOTOR SHUNT SHUNT UNDER AUX.CONTACT


C.B TRIP C.B STATUS ON/OFF C.B STATUS POSITION CLOSE OPEN VOLTAGE READY TO
SPRING COIL CLOSE
CHARGE

D D

T1
400/110V -F4
L1' / +COUPLER/8.2:B 20VA S273
-XQ1 -F1 -XQ1 -XQ1 K2A -XQ1
L1 / 8.2:C 2A L1'' / 8.2:A
100
1 1 2 5
104 L1 L1/1 107
8 2 1 12
111
010 / 7.1:D
-XQ1 -F2 -XQ1 -XQ1 -XQ1
2 L2 / 8.2:C 2A 6 L2'' / 8.2:A L2 L2/1 9 13
101 1 2 105 108 4 3 112
011 / 7.1:D
-XQ1 L2' / +COUPLER/8.2:B -F3 -XQ1 -XQ1 -XQ1
3
2A
7 L3'' / 8.2:B L3 L3/1 10 14
102 1 2 106 109 6 5 113
012 / 7.1:E
-XQ1 L3 / 8.2:C -XQ1
4 11
103 110
N'' / 8.2:B 013 / 7.1:E
E N / 8.2:D E
x1 x1 x1
-H8 -H9 -H10
L1 x2 L2 x2 L3 x2
RED RED RED
1.2:A

1.3:A

1.3:A

1.3:A

1.3:A
PE.

L1.

L2.

L3.
N.

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+SUPPLY 110VDC/1.6:C
+SUPPLY 110VDC-101 +SUPPLY 110VDC/1.6:C
+SUPPLY 110VDC-100
-X110 4 -X110 3
A A
903 902
3 1 96 98
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-F5
S282UC 4 2 95
B6

/6.8:B
-XQ1 15 -XQ1 16

115 115
1 / 4.2:A

B 114 B

A U
7.4:F 7.4:F
13
7
-KTQ
/3.4:E -LOC X 95 X 31 X 101 X 121 X 141
14
/3.2:D
B 8 6 Y
7.4:F 7.5:F SY Q/3 S75I/1 S75T/1 S75E/2
/2.3:C /2.4:C /2.5:C
/2.4:C /2.5:C
X 98 96 X 34 32 X 104 102 X 124 122 X 144 142

C C

116 117 118 119 120 121 122 123

-XQ1 17 -XQ1 18 -XQ1 19 -XQ1 20 -XQ1 21 -XQ1 22 -XQ1 23 -XQ1 24

D D

1
-LOC
/3.3:B

5
2 3
4 A1 A1 A1 A1 A1 A1 A1 A1 A1

8 -KLOR -KUVQ -KTQ -KQ -KQ' -KR -KR' -KT -KO


7 A2 A2 A2 A2 A2 A2 A2 A2 A2

E 6 E

2 / 4.2:E
LOCK OUT
ANSI (86) 13 14 /5.3:B 13 14 /5.4:B 13 14 /3.2:B 13 14 /6.4:B 13 14 +COUPLER/7.4:B 13 14 /5.7:C 13 14 /9.2:B 13 14 /5.8:A 13 14 /9.5:D
21 22 /5.7:C 21 22 /5.7:C 21 22 21 22 /6.4:B 21 22 21 22 21 22 21 22 21 22
31 32 +COUPLER/3.6:A 31 32 +COUPLER/3.5:A 31 32 31 32 31 32 +COUPLER/3.7:B 31 32 31 32 31 32 31 32
43 44 /6.4:B 43 44 /6.5:B 43 44 /9.3:D 43 44 /9.2:B 43 44 /9.3:B 43 44 /9.5:D 43 44 /9.3:B 43 44 /6.5:B 43 44
53 54 /9.2:D 53 54 /9.6:D 53 54 /9.4:D 51 52 /7.4:A 51 52 +TR 2/5.7:A 53 54 +COUPLER/7.4:B 53 54 /9.4:B 43 44 +TR 2/5.6:A
63 64 /9.2:D 63 64 /7.4:A 53 54 /9.4:B 63 64 /9.5:B 53 54 +COUPLER/3.8:B
73 74 +COUPLER/3.2:B 73 74 /8.6:C 61 62 /9.5:B 73 74 /9.5:B 63 64 /9.7:B
84 83 71
+COUPLER/3.6:A 72 /9.5:B 83 84 /9.6:B 83 84 /5.7:C
81 82 /9.6:B
STATUS LCKOUT
TRIP STATUS REF VOLTAGE STATUS CB TRIP STATUS CB ON/OFF STATUS CB RACKED IN STATUS CB TEST STATUS CB RACKED OUT

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 3
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

3.8:B / 1 1 / 5.1:A

B B

-X6 1 -X6 3 -X6 5 -X6 7

Winding Temp. Pressure reflief


Buchloz Trip Oil Temp. Trip Trip valve Trip

-X6 2 -X6 4 -X6 6 -X6 8


C C

124 126 126 127


D D

A1 A1 A1 A1
-KB-1 -KO-1 -KW-1 -KP-1
Buchloz Trip A2 Oil Temp. Trip A2 Winding Temp. A2 Pressure Trip A2
Trip

E 3.8:E / 2 2 / 5.1:F E
14 11 /7.4:A 14 11 /7.5:A 14 11 /7.5:A 14 11 /7.6:A
12 12 12 12
24 21 /5.7:D 24 21 /5.7:D 24 21 /5.7:D 24 21 /5.7:E
22 22 22 22
34 34 34 34
32 31 32 31 32 31 32 31

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 4
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

4.7:A / 1 1 / 6.1:B
A A
-X2 14 -XQ2 56 -XQ3 46 -XQ2 56 -XQ3 46

+COUPLER-KS
+COUPLER/8.6:E

+COUPLER/4.6:E
+COUPLER-KT

+COUPLER/4.4:E
+COUPLER-KQ'
13 63 13
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

63 21 21
-KT
+TR 2-KT +TR 2-KQ' /3.7:E
14 64 14
+TR 2/3.7:E 64 22 +TR 2/3.5:E 22

-X2 16 -XQ2 57 -XQ3 47 -XQ2 57 -XQ3 47

131

XQ1 55
13
-S2
CLOSE 14
GREEN
XQ1 28
141
B B
21
+COUPLER-KTQ
+COUPLER/4.3:E 22

-X2 14 -X4Q1 1 -XQ2 58


132
13 13 13 13 MV
13 -XQ1 27
+COUPLER-K1 -S1 -KLOR -KUVQ TRIP
-S11 +COUPLER/7.4:E OPEN /3.3:E /3.4:E
21
14 14 14 14
DOOR
14 RED -KLOR
LIMIT SWITCH -X4Q1 2
/3.3:E 22
-X2 15 133

21
-KUVQ
C -X4Q1 -X4Q1 /3.4:E 22 C
140 4 PERMISSION 3
134
TO CLOSE
13 83
-KR -KT
/3.6:E 14 /3.7:E 84
-XQ1 25 -XQ1 26

135

21
128 129
-KB-1
/4.4:E 24 22

136
21
-KO-1
D /4.4:E D
24 22

137

X 11 21

Q/1 X 21
-KW-1
/2.3:C /4.5:E 24 22
Q/2
X 14 12 /2.3:C
138
X 24 22
21

130 -KP-1
/4.6:E
142 24 22
X U1
139
E E
M
X D1 -M X C11 X C1
/2.6:C 1~
--
-YU -YO -YC
/2.6:C /2.6:C /2.6:C
X U2
X D2 X C12 X C2

114
4.7:E / 2 2 / 6.1:E

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 5
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-X110
A 3 A
902
+SUPPLY 110VDC/1.6:C / +SUPPLY 110VDC-104
-X110
4
903
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

+SUPPLY 110VDC/1.6:C / +SUPPLY 110VDC-105

-F6 -XQ1
2A 29
1 2 160
5.8:A / 1

B B

13 13 21 43 43 43 21 11 95
-S3 -KQ -KQ -KLOR -KUVQ -KT -KH -KMCB -F5
LAMP TEST 14 /3.5:E 14 /3.5:E 22 /3.3:E 44 /3.4:E 44 /3.7:E 44 /10.3:D 24 22 /6.8:E 14 12 /3.1:A 98 96

C C

13 43 53 63 73 83 13
-KTEST -KTEST -KTEST -KTEST -KTEST -KTEST -KTEST'
/6.2:E 14 /6.2:E 44 /6.2:E 54 /6.2:E 64 /6.2:E 74 /6.2:E 84 /6.3:E 14

161 162 163 164 165 166 167 168 190

D D

-XQ1 30 -XQ1 31 -XQ1 32 -XQ1 33 -XQ1 34 -XQ1 35 -XQ1 36 -XQ1 37

A1 A1 x1 x1 x1 x1 x1 x1 x1 A1
-KTEST -KTEST' -H1 -H2 -H3 -H4 -H5 -H6 -H7 -KMCB
A2 A2 ON x2 OFF x2 TRIP x2 TEST x2 VOLTAGE OK x2 CUBICLE x2 CONTROL CIRCUIT x2 MCB TRIP A2
RED GREEN YELLOW BLUE GREEN SPACE FAULT
HEATER WHITE
WHITE
E E
5.8:F / 2
13 14 /6.3:C 13 14 /6.7:C 14 11 /6.7:B
21 22 21 22 12
24 21 /9.8:D
31 32 31 32
22
43 44 /6.4:C 43 44
34
53 54 /6.5:C
32 31
63 64 /6.5:C
73 74 /6.5:C
83 84 /6.6:C

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 6
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-F7
-X110 -XQ1
3 38
902 2 1 169
+SUPPLY 110VDC/1.6:C / +SUPPLY 110VDC-106
-X110 -XQ1
4 39
903 4 3 170
+SUPPLY 110VDC/1.6:C / +SUPPLY 110VDC-107
A S282UC A
B6
11 11 11 11
51 63
-KB-1 -KO-1 -KW-1 -KP-1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-KQ -KQ /4.4:E /4.4:E /4.5:E /4.6:E


14 12 14 12 14 12 14 12
/3.5:E 52 /3.5:E 64

-XQ1 39 -XQ1 40 -XQ1 41 -XQ1 42 -XQ1 43 -XQ1 44

171 172 173 174 175 176

-R3
X120 X100 1 2 X110
1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 15 17 19 18 20 22 21 23 24

+ -

0154 1/5 A
1.7:B / 02
B 7 B
lL1 BI 1 BI 2 BI 3 BI 4 BI 5 BI 6 BI 7 BI 8 SO1 SO2 SO3 SO4
0150 N
1.7:B / 01
8
0155 1/5 A
1.7:C / 03
9
lL2
N
10
0156 1/5 A
1.7:C / 04
11
lL3
N
12
0157 1/5 A
1.7:D / 05
13
lO
N
14
C C

X130

9
60
210V

not in use
REF 615F
VOLTAGE N
10
TEST BLOCK
111 0111 60
2.7:D / 010 1 01
11 210V
D U1 D

N
12

112 0112 60
2.7:E / 011 2 02 Overload&Short Circuit&
13 210V Earth Fault Protection

Voltage Protection
U2
50,51,50N,51N SPARE OUTPUTS
N
14

27,47,59
113 0113 60 TCS1 TCS1
2.7:E / 012 3 03
15 210V

U3
IRF PO1 PO2 SO1 SO2 PO3 PO3
E 110 0110 N E
2.7:E / 013 4 04 X1/LAN
16

60
17 210V

U0
N
18 X100 3 5 4 6 7 8 9 10 12 11 13 14 15 17 16 19 18 15 22 21 19 18

A B U Y S1 S2
3.2:B 3.2:C 3.4:B 3.4:C 9.7:C 9.7:D

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 7
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

104
2.4:D / L1'' 9
183
10
105
2.4:E / L2'' 5 x1

106 V
2.4:E / L3'' 1
-V1
x2
12
184
103
2.4:E / N'' 11

B B
L1-N

SELECTOR VOLT
L2-N
L3-N
0
L1-L2
L2-L3
L3-L1

S10

-XQ1 -F8 -X3


1 2A 9
C 100 1 2 185 C
2.3:D / L1
-XQ1 -F9 -X3
2 2A 10 73
101 1 2 186
2.3:E / L2 -KQ
-XQ1 -F10 -X3
3 2A 11 /3.5:E 74
102 1 2 187
2.3:E / L3

-XQ1
4
103 190
2.3:E / N

A1
Mech.Door Lock
A2

D -P1 D
0151 x1 x2
1.7:A / K1 A

-P2
0152 x1 x2
1.7:B / K2 A

-P3
0153 x1 x2
1.7:B / K3 A

0150
1.7:A / LC
E E

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 8
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-X4Q1 5 -X4Q1 7 -X4Q1 9 -X4Q1 11 -X4Q1 13 -X4Q1 15 -X4Q1 17

50 53 56 59 62 65
13 43 53 63 73 83
68
-KR' -KR' -KR' -KR' -KR' -KR'
/3.7:E 14 /3.7:E 44 /3.7:E 54 /3.7:E 64 /3.7:E 74 /3.7:E 84
63
52 55 58 61 64 67
-KT
/3.7:E 64
43 43 53 61 71 81

B -KQ -KQ' -KQ' -KQ' -KQ' -KQ' B


/3.5:E /3.5:E /3.5:E /3.5:E 62 /3.5:E 72 /3.5:E 82
44 44 54 69
51 54 57 60 63 66

-X4Q1 6 -X4Q1 8 -X4Q1 10 -X4Q1 12 -X4Q1 14 -X4Q1 16 -X4Q1 18

STATUS CB ON STATUS CB ON STATUS CB ON STATUS CB OFF STATUS CB OFF STATUS CB OFF STATUS CB TEST
POSITION

C C

7.5:F
-X4Q1 19 -X4Q1 21 -X4Q1 23 -X4Q1 25 -X4Q1 27 -X4Q1 29 -X4Q1 31
S1 -X4Q1 35

70 72 74 76 78 80 82 84 86

63 53 43 53 43 13 53 -X4Q1 33 21
-KLOR -KLOR -KTQ -KTQ -KR -KO -KUVQ -KMCB
/3.3:E 64 /3.3:E 54 /3.4:E 44 /3.4:E 54 /3.6:E 44 /3.8:E 14 /3.4:E 54 /6.8:E 24 22
-X4Q1 34
D 83 D
71 73 75 77 79 81 87
85

-X4Q1 20 -X4Q1 22 -X4Q1 24 -X4Q1 26 -X4Q1 28 -X4Q1 30 -X4Q1 32 -X4Q1 36


S2
7.6:F

STATUS LOCKOUT TRIP STATUS LOCKOUT TRIP STATUS CB TRIP STATUS CB TRIP STATUS CB RACKED IN STATUS CB RACKED OUT STATUS REF VOLTAGE STATUS REF GENERAL TRIP STATUS CONTROL CIRCUIT
CONNECTED FAULT MCB TRIP

E E

FOR CUSTOMER USE


FROM INCOMING CIRCUIT
(LV01-INC-A)

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 9
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

0 1

-X5 2 -X5 1

B B

1 1

-FH -FL
2A 2A
2 2

2 4

2
TH1 -S1
HYGROSTATE 3 N LIMIT SWITCH

C C

3 5

-X5 3 -X5 4

12 x1
-H1
-KH -E1 LIGHTING
D 11 HEATER D
x2

14
12 11
24
22 21 /6.6:B
34
32 31

E E

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 10
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TERMINALS FOR EXTERNAL CONNECTIONS

A A
CUSTOMER SIDE ABB SIDE CUSTOMER SIDE ABB SIDE CUSTOMER SIDE ABB SIDE
-X4Q1 -X6 -XCOM

1
MV TRIP Buchloz Trip
MODBUS COMMENECTION
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.

2
3

3
PERMISSION TO CLOSE Oil Temp. Trip

4
PE

5
STATUS CB ON Winding Temp. Trip

6
7

7
B STATUS CB ON Pressure reflief valve Trip B

8
9

STATUS CB ON
10
11

STATUS CB OFF
12
13

STATUS CB OFF
14
15

STATUS CB OFF
C C
16
17

STATUS CB TEST POSITION


18
19

STATUS LOCKOUT TRIP


20
21

STATUS LOCKOUT TRIP


22
23

STATUS CB TRIP
24

D D
25

STATUS CB TRIP
26
27

STATUS CB RACKED IN(CONNECTED)


28
29

STATUS CB RACKED OUT


30
31

STATUS REF VOLTAGE FAULT


32
33

E STATUS REF GENERAL TRIP E


34
35

STATUS CONTROL CIRCUIT (MCB TRIP)


36

F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = Item(1)
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Schematic multi-line /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 11
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1
L1

A L1 A
N
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

PE

B B

L1 L2 L3
2.2:E 2.2:E 2.2:E

/4.2:B

/4.4:B

/4.5:B

/4.6:B

/4.6:B
/3.4:D

/3.6:D

/3.6:E

/3.4:E

/3.2:E
/3.1:E
Q2
X K1

K2
1 3 5

96 -96

98 -98

12

14

22

24

32

34

42

44

102 102

104 104

112 112

114 114

122 122

124 124

132 132

134 134

142 142

144 144

U1 -U1

36

38

C1

C11 C11

D1 -D1

46

48
C C
XV 1 3 5

36

38

C1

46

48
12

14

22

24

32

34

42

44
K1

K2

The protection functions and the accesories is as per the SLD


S33M/1

-K51
T11
T12 />

T21 / >>
T22 -F1
/ >>

A1 T31
/ >>>

This is general sympol of the release


T32
/ >>
YC YO YU
EKIP SY -Q/1 -Q/2 -Q/3 -Q/4 S75I/1 S75I/2 S75T/1 S75E/1 S75E/2 S33M/2 -RTC
T13
T14 -M
M
T23
T24
1~
--
T33
T34

D D
Ne+ Ne+

XV

101 101

141 141

C12 C12
Ne- Ne-

111 111

121 121

131 131

D2 D2
W3 W3

W4 W4

2 4 6

45 45
C2 C2
U2 U2

35 35
95 95

11 11

21 21

31 31

41 41
X 2 4 6

SHUNT SHUNT UNDER AUX.CONTACT


C.B TRIP C.B STATUS ON/OFF C.B STATUS POSITION MOTOR
CLOSE OPEN VOLTAGE READY TO
SPRING COIL CLOSE
CHARGE

T1
400/110V -F4
20VA S273
E -XQ2 018 / 6.1:A -F1 -XQ2 -XQ2 K2A -XQ2 E
2A
200
1 1 2 5
204 L1 L1/1 207
8 2 1 12
211
010 / 9.1:D
-XQ2 019 / 6.1:B -F2 -XQ2 -XQ2 -XQ2
2A
201 2 1 2 6
205 L2 L2/1 208 9 4 3 13
212
011 / 9.1:D
-XQ2 020 / 6.1:B -F3 -XQ2 -XQ2 -XQ2
2A
202 3 1 2 7
206 L3 L3/1 209 10 6 5 14
213
012 / 9.1:E
-XQ2
11
210
013 / 9.1:E

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
N
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-XQ2
-XQ2 18
15 217
214 025 / 6.1:D
022 / 6.1:C
-XQ2
16
215
023 / 6.1:C
-XQ2
17
216
024 / 6.1:D
-PE CURRENT
1 TEST BLOCK
250 -X3 1 0250
-T1 5 05 LC / 6.1:E
L
B 5000/5 B
Cl. 0.5
15VA
K 251 -X3 2 0251
6 06 K1 / 6.1:D
250 -X3 1
-T2 L
5000/5
Cl. 0.5 -X3 3
15VA
K 252 0252
7 07 K2 / 6.1:E
250 -X3 1
-T3
L
5000/5
Cl. 0.5
15VA
K 253 -X3 4 0253
8 08 K3 / 6.1:E

C 250 -X3 1 0250 C


-T4 5 05 01 / 9.2:B
L
5000/5
5P20
10VA
K 254 -X3 5 0254
6 06 02 / 9.2:B
250 -X3 1
-T5 L
5000/5
5P20 -X3 6
K 255 0255
10VA 7 07 03 / 9.2:B
250 -X3 1
-T6 L
5000/5
5P20
10VA
K 256 -X3 7 0256
8 08 04 / 9.2:C

D -T7 250 -X3 1 D


L
5000/5
5P20
10VA K 257 -X3 8 0257
9 09 05 / 9.2:C

L1 L2 L3
1.2:B 1.2:B 1.2:B
E E

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+SUPPLY 110VDC/1.6:D
+SUPPLY 110VDC/1.6:B
+SUPPLY 110VDC-117
+SUPPLY 110VDC-116

-X110 4 -X110 3

A +TR 1 +TR 1 A
903 902
-XQ1 -KUVQ -KQ
96 98 45
3 1 31 32 0224 83 84
-F5
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

+TR 1/3.4:E +TR 1/3.5:E


S282UC 4 2 95 C / 4.2:A
B6 224 +TR 2 +TR 2 225

/5.8:C
-KR -KTQ -XQ2 -XQ3 -KUVQ -KQ -XQ3 -XQ1 +TR 1-KLOR -XQ1 -XQ3 +TR 2-KLOR -XQ3
-XQ2 20 -XQ2 19
23 48 49 46 47 50 51
218 14 13 223 51 52 31 32 0225 83 84 32 31 226 32 31 239
/4.5:E /4.3:E +TR 2/3.4:E +TR 2/3.5:E +TR 1/3.3:E +TR 2/3.3:E

-X2 19 XQ1 48 XQ3 51 XQ1 48 XQ3 51


43 31 31
13 53 53
B 3.6:C -KS +TR 1-KQ' +TR 2-KQ' +TR 1-KT +TR 2-KT B
SO -KT /8.6:E 44 +TR 1/3.5:E 32 +TR 2/3.5:E 32 +TR 1/3.7:E +TR 2/3.7:E
/4.6:E 14 54 54
-X2 20 -XQ1 50 -XQ3 52 -XQ1 50 -XQ3 52

219 -X2 17
228
13 73 73 73 13 13 13
-S11 +TR 1-KLOR +TR 2-KLOR -KTQ -KUVQ -S2 -K2 -XQ2 24
DOOR +TR 1/3.3:E 74 +TR 2/3.3:E 74 /4.3:E 74 /4.7:E 14 OPEN 14 /7.5:E 14 2
14
LIMIT SWITCH RED
1 2

-S20
-X2 18
/7.6:C

AUTO
MAN
1 3
-XQ2
26
230

C C
-XQ2 25

229
3.4:B / SO 67
-KA
/3.7:E 68
220 221 13
-S3
CLOSE 14
GREEN 231

-XQ2 21 -XQ2 22
-XQ2 27

21
D D
-KUVQ
/4.7:E 22
X 11
623
Q/1
/1.4:D
X 21
X 14 12
Q/2
/1.4:D

X 24 22
222
232
X U1

M X D1 X C11 X C1
-M A1
E /1.6:D 1~
-- -YC -KA E
-YU -YO
/1.7:D /1.7:D /1.6:D A2
X U2 X D2 X X
C12 C2

D / 4.2:E

13 14
21 22
31 32
43 44
55 56
67 68 /3.7:C

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 3
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

218
3.4:A / C 1 / 5.1:B

A U
9.4:F 9.4:F
X 95 7 X 31 X 101 X 121 X 141
B B
-LOC Q/3 S75E/2
SY /4.2:D S75I/1 S75T/1
/1.6:D
B /1.3:D
8 6 /1.4:D /1.5:D /1.5:D Y
9.4:F 9.5:F
X 98 96 X 34 32 X 104 102 X 124 122 X 144 142

C C

233 234 235 236 237 238 622

-XQ2 28 -XQ2 29 -XQ2 30 -XQ2 31 -XQ2 32 -XQ2 33

D D

1
-LOC
/4.3:B

5
2 3
4 A1 A1 A1 A1 A1 A1 A1 A1

8 -KTQ -KQ -KQ' -KR -KR' -KT -KO -KUVQ


7 A2 A2 A2 A2 A2 A2 A2 A2

E 3.8:E / D 2 / 5.1:E E
LOCK OUT 13 14 /5.4:B
ANSI (86) 21 22 +TR 1/5.7:B 13 14 /5.3:B 13 14 /7.4:C 13 14 /3.4:A 13 14 /10.2:B 13 14 /3.4:B 13 14 /10.5:D 13 14 /3.3:B
31 32 +TR 2/5.7:B 21 22 /5.4:B 21 22 +TR 1/5.7:A 21 22 21 22 21 22 21 22 21 22 /3.6:D
43 44 /10.2:D 31 32 31 32 +TR 2/5.7:A 31 32 31 32 31 32 31 32 31 32
51 52 /3.5:A 43 44 43 44 /10.3:B 43 44 /7.4:C 43 44 /10.3:B 43 44 /5.5:B 43 44 43 44
63 64 /10.3:D 51 52 /9.4:A 53 54 /10.4:B 53 54 /10.4:D 53 54 /10.4:B 43 44 +TR 2/5.6:A
73 74 /3.3:B 53 54 /10.2:B 61 62 /10.5:B 63 64 /10.5:B 63 64 +TR 1/5.6:A
63 64 /9.4:A 71 72 /10.6:B 73 74 /10.6:B 73 74 /10.7:B
83 84 /6.4:D 81 82 /10.7:B 83 84 /10.7:B
STATUS LCKOUT
STATUS CB TRIP
TRIP STATUS CB ON/OFF STATUS CB RACKED IN STATUS CB TEST STATUS CB RACKED OUT

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 4
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-X110
3
+SUPPLY 110VDC/1.6:B / +SUPPLY
902
110VDC-118
-X110
4
+SUPPLY 110VDC/1.6:D / +SUPPLY
903
110VDC-119

-F6 -XQ2
2A 34
1 2 260
4.8:A / 1

B B

21 43
13 13 21 13 43 -KH -KS
/11.3:D
-S4 -KQ -KQ -KTQ -KT 24 22 /8.6:E 44 11 95
LAMP TEST 14 /4.4:E 14 /4.4:E 22 /4.3:E 14 /4.6:E 44
-KMCB -F5
/5.8:E 14 12 /3.1:A 98 96

C C

13 43 53 63 73 83 13 43
-KTEST -KTEST -KTEST -KTEST -KTEST -KTEST -KTEST' -KTEST'
/5.2:E 14 /5.2:E 44 /5.2:E 54 /5.2:E 64 /5.2:E 74 /5.2:E 84 /5.3:E 14 /5.3:E 44

D D
261 262 263 264 265 266 267 268 269 294

-XQ2 35 -XQ2 36 -XQ2 37 -XQ2 38 -XQ2 39 -XQ2 40 -XQ2 41 -XQ2 42 -XQ2 43

A1 A1 x1 x1 x1 x1 x1 x1 x1 x1 A1
E E
-KTEST -KTEST' -H1 -H2 -H3 -H4 -H5 -H6 -H7 -H8 -KMCB
A2 A2 ON x2 OFF x2 TRIP x2 TEST x2 VOLTAGE OK x2 CUBICLE x2 SYNC.ON x2 CONTROL CIRCUIT x2 MCB TRIP A2
RED GREEN YELLOW BLUE GREEN SPACE GREEN FAULT
HEATER WHITE
WHITE
4.8:E / 2

13 14 /5.3:D 13 14 /5.6:D 14 11 /5.7:C


21 22 21 22 12
24 21 /10.6:D
31 32 31 32
43 44 /5.4:D 43 44 /5.7:D 22
34
53 54 /5.4:D
32 31
63 64 /5.4:D
73 74 /5.5:D
83 84 /5.5:D

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 5
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-F7 -XQ2
2A 44
200 1 2 270
1.3:E / 018 9
280
-F8 -XQ2 10
2A 45
201 1 2 271
1.3:E / 019 5 x1
-F9 -XQ2
2A
202 1 2 46
272 V
1.3:E / 020 1
-V1
x2
12
281
217 11
B B

L1-N

SELECTOR VOLT
L2-N
L3-N
0
L1-L2
L2-L3 217
L3-L1

S10

C C

-F11 -XQ2
2A 47
214 1 2 282
2.3:A / 022 9
292
-F12 -XQ2 10
2A 48
215 1 2 283
2.3:B / 023 5 x1
-F13 -XQ2
2A
216 1 2 49
284 V
2.3:B / 024 1
-V2
x2
12
293
217 11

217
D 025 N / 6.6:D L1-N D

SELECTOR VOLT
2.5:A /
L2-N
L3-N
0
-P1
L1-L2
0251 x1 x2 83
2.5:B / K1 A -KQ
L2-L3
6.5:D
/4.4:E 84
L3-L1 N

-P2 S11
0252 x1 x2
2.5:B / K2 A
290

-P3
0253 x1 x2 A1
E 2.5:C / K3 A Mech.Door Lock E
A2
0250
2.5:B / LC

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 6
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
-FC
S282UC
-X110 -X2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

B6
3 1
902 2 1 600
+SUPPLY 110VDC/1.6:B / +SUPPLY 110VDC-120 020 / 8.6:A

-X110
4
903 4 3
+SUPPLY 110VDC/1.6:D / +SUPPLY 110VDC-121 -XQ1 51
15
13
-KT1
+TR 1-KQ' /7.4:E 18 16
+TR 1/3.5:E 14 13 11

602 -S6 -KSS


SYNC.ON 14 /7.6:E 14 12
53 BLUE
B -X2 4
B
+TR 1-KR
+TR 1/3.6:E 54 608
-X2 2
-XQ1 52

603
1 2 3

-S5
-X2 8
-XQ2 50

INC-A

INC-B
BC
13
-KQ' 612
/4.4:E 14

604
31
C 43 -KS C
601 /8.6:E
-KR 32
/4.5:E -X2 5 -X2 6 -X2 7
44
0613

-XQ2 51
609 610 611 9
605 1 2

-S20
/3.7:C

OPEN INC.A

OPEN INC.B

AUTO
-XQ3 53

MAN
10 11

OPEN B.C
13
+TR 2-KQ'
+TR 2/3.5:E 14

606
53
D 613 D
+TR 2-KR
+TR 2/3.6:E 54

-XQ3 54

-X2 3

607

A1 A1 A1 A1 A1 A1
-KT1 -K1 -K2 -K3 -KSS -KSS'
E TIME ????
A2 A2 A2 A2 A2 A2 E

021 / 8.5:E
18 13 14 +TR 1/5.2:B 13 14 /3.4:B 13 14 +TR 2/5.2:C 14 14
15 /7.5:B
16 21 22 21 22 21 22 12 11 /7.6:B 12 11
31 32 31 32 31 32 24 24
43 44 43 44 43 44 22 21 /8.1:C 22 21 /8.3:C
34 34
32 31 /8.2:C 32 31 /8.3:C

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Incoming 0.4-CB-03 (Control)
Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 7
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

7.7:A / 020

V TR-1 V TR-2
+TR 1/2.3:D +TR 1/2.3:E +TR 2/2.3:D +TR 2/2.3:E Manual Synchronizing Relay
+TR 1-L1' +TR 1-L2' +TR 2-L1' +TR 2-L2'

SQ 02*4 IsKra
-XQ1 1 -XQ1 2 -XQ3 1 -XQ3 2

B SYNC B
100 101 300 301
/8.6:C /8.6:C
BUS BAR 1
1 1 1 1

-F12 -F13 -F12 -F13


2A 2A 2A 2A
2 2 2 2 BUS BAR 2

-XQ1 53 -XQ1 54 -XQ3 55 -XQ3 56

U + - UGEN
614 615 616 617
UBB
21 31 21 31
C -KSS -KSS -KSS' -KSS' C
/7.6:E /7.6:E /7.6:E /7.6:E
STATUS BUS BAR 2 BUS BAR 1 SYNC.
24 22 34 32 24 22 34 32
L2 L1 L2 L1
7 8 4 3 2 1 6 5
+ -
24Vmax

X2
11
620
X2
12
621
-X2
9
618
-X2
10
D 619 -X2 13
D

622
A1

E -KS E
A2

7.7:E / 021
13 14 +TR 1/5.5:A
31 32 /7.6:C
43 44 /3.6:B
43 44 /5.6:B
53 54 +TR 2/5.5:A

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 8
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-F15
-X110 -XQ2
3 52
902 2 1 294
+SUPPLY 110VDC/1.6:B / +SUPPLY 110VDC-122
-X110 -XQ2
4 53
903 4 3 295
+SUPPLY 110VDC/1.6:D / +SUPPLY 110VDC-123
A S282UC A
B6

51 63
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-KQ -KQ
/4.4:E 52 /4.4:E 64

-XQ2 54 -XQ2 55

296 297

-R3
X120 X100 1 2 X110
1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 15 17 19 18 20 22 21 23 24

+ -

0254 1/5 A
2.5:C / 02
B 7 B
lL1 BI 1 BI 2 BI 3 BI 4 BI 5 BI 6 BI 7 BI 8 SO1 SO2 SO3 SO4
0250 N
2.5:C / 01
8
0255 1/5 A
2.5:D / 03
9
lL2
N
10
0256 1/5 A
2.5:D / 04
11
lL3
N
12
0257 1/5 A
2.5:D / 05
13
lO
N
14
C C

X130

9
60
210V

not in use
REF 615F
VOLTAGE N
10
TEST BLOCK
211 0211 60
1.6:E / 010 1 01
11 210V
D U1 D

N
12

212 0212 60
1.6:E / 011 2 02 Overload&Short Circuit&
13 210V Earth Fault Protection

Voltage Protection
U2
50,51,50N,51N

N
14

27,47,59
213 0213 60 TCS1 TCS1
1.6:E / 012 3 03
15 210V

U3
IRF PO1 PO2 SO1 SO2 PO3 PO3
E 210 0210 N E
1.6:F / 013 4 04 X1/LAN
16

60
17 210V

U0
N
18 X100 3 5 4 6 7 8 9 10 12 11 13 14 15 17 16 19 18 15 22 21 19 18

A B U Y S1 S2
4.2:B 4.2:B 4.7:B 4.7:B 10.6:D 10.6:D

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 9
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-X4Q2 1 -X4Q2 3 -X4Q2 5 -X4Q2 7 -X4Q2 9 -X4Q2 11 -X4Q2 13

50 53 56 59 62 65
13 43 53 63 73 83 68
-KR' -KR' -KR' -KR' -KR' -KR'
/4.5:E 14 /4.5:E 44 /4.5:E 54 /4.5:E 64 /4.5:E 74 /4.5:E 84 73

52 55 58 61 64 67 -KT
/4.6:E 74
53 43 53 61 71 81
B -KQ' -KQ' -KQ' B
-KQ -KQ' -KQ'
/4.4:E 54 /4.4:E 44 /4.4:E 54
/4.4:E 62 /4.4:E 72 /4.4:E 82 69
51 54 57 60 63 66

-X4Q2 2 -X4Q2 4 -X4Q2 6 -X4Q2 8 -X4Q2 10 -X4Q2 12 -X4Q2 14

STATUS CB ON STATUS CB ON STATUS CB ON STATUS CB OFF STATUS CB OFF STATUS CB OFF STATUS CB TEST
POSITION

C C

-X4Q2 15 -X4Q2 17 -X4Q2 19 -X4Q2 21 9.5:F -X4Q2 25


S1

70 72 74 76 80
78
43 63 53 13 21
-X4Q2 23
-KTQ -KTQ -KR -KO -KMCB
/4.3:E 44 /4.3:E 64 /4.5:E 54 /4.6:E 14 /5.8:E 24 22
-X4Q2 24
D D
71 73 75 77 79 81

-X4Q2 16 -X4Q2 18 -X4Q2 20 -X4Q2 22 S2 -X4Q2 26


9.6:F

STATUS LOCKOUT TRIP STATUS LOCKOUT TRIP STATUS CB RACKED IN STATUS CB RACKED OUT STATUS REF GENERAL TRIP STATUS MCB TRIP

E E

FOR CUSTOMER USE


FROM BUS COUPLER (LV01-BC)

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 10
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

0 1

-X5 2 -X5 1

B B

1 1

-FH -FL
2A 2A
2 2

2 4

2
TH1 -S1
HYGROSTATE 3 N LIMIT SWITCH

C C

3 5

-X5 3 -X5 4

12 x1
-H1
-KH -E1 LIGHTING
D 11 HEATER D
x2

14
12 11
24
22 21 /5.6:B
34
32 31

E E

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 11
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TERMINALS FOR EXTERNAL CONNECTIONS

A A
CUSTOMER SIDE ABB SIDE CUSTOMER SIDE ABB SIDE CUSTOMER SIDE ABB SIDE
-X4Q2 -XCOM -X110
+

1
STATUS CB ON EXTERNAL SUPPLY 110VDC
MODBUS COMMENECTION -
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.

2
3

3
STATUS CB ON

4
PE

5
STATUS CB ON

6
7
B STATUS CB OFF B

8
9

STATUS CB OFF
10
11

STATUS CB OFF
12
13

STATUS CB TEST POSITION


14
15

STATUS LOCKOUT TRIP


C C
16
17

STATUS LOCKOUT TRIP


18
19

STATUS CB RACKED IN
20
21

STATUS CB RACKED OUT


22
23

STATUS REF GENERAL TRIP


24

D D
25

STATUS MCB TRIP


26

E E

F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = Item(1)
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Schematic multi-line /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 12
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

2.1:F

2.1:F

2.1:F

2.2:F

2.2:F
PE.

L1.

L2.

L3.
N.
A A
-PE CURRENT
1 TEST BLOCK
-X3 1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

350 0350
-T1 1 01 LC / 8.2:E
L
5000/5
Cl. 0.5
15VA
K 351 -X3 2
0351
2 02 K1 / 8.2:D
350 -X3 1
-T2 L
5000/5
Cl. 0.5 -X3 3
15VA
K 352 0352
3 03 K2 / 8.2:D
350 -X3 1
-T3 L
5000/5
B Cl. 0.5 B
15VA
K 353 -X3 4 0353
4 04 K3 / 8.2:E

350 -X3 1 0350


-T4 5 05 01 / 7.2:B
L
5000/5
5P20
10VA
K 354 -X3 5 0354
6 06 02 / 7.2:B
350 -X3 1
-T5 L
5000/5
5P20 -X3 6
10VA
K 355 0355
7 07 03 / 7.2:B
C 350 -X3 1 C
-T6 L
5000/5
5P20
10VA
K 356 -X3 7 0356
8 08 04 / 7.2:C

-T7 350 -X3 1


L
5000/5
5P20
10VA K 357 -X3 8 0357
9 09 05 / 7.2:C

D D
N1/1
PE/1

L1/1

L2/1

L3/1

UPSTREAM MV SWG
51G TRIP

-PE

-T8
5000/5
BUSDUCT(S-LV-80-A)
5P20
E 10VA E

TO REF 615 F
TRAFO. TO ANNOUNCE ON DISPLAY
CP UNIT THE TRANSFORMER
MECHANICAL

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

/3.4:C

/3.5:C

/3.7:C

/3.8:C
/5.3:D

/5.5:E

/5.5:E

/5.3:E

/5.1:E
/3.6:C

/5.2:E
B Q3 B

K1

K2
1 3 5

96 -96

98 -98

12

14

22

24

32

34

42

44

102 102

104 104

112 112

114 114

122 122

124 124

132 132

134 134

142 142

144 144

U1 -U1

36

38

C1

C11 C11

D1 -D1

46

48
XV 1 3 5

36

38

C1

46

48
12

14

22

24

32

34

42

44
K1

K2

The protection functions and the accesories is as per the SLD


S33M/1

-K51
T11
T12 />

T21 / >>
T22 -F1
/ >>

A1 T31
/ >>>

This is general sympol of the release


T32
/ >>
YC YO YU
EKIP SY -Q/1 -Q/2 -Q/3 -Q/4 S75I/1 S75I/2 S75T/1 S75E/1 S75E/2 S33M/2 -RTC
T13
T14
-M
M
C 1~ C
T23
T24
--
T33
T34
Ne+ Ne+

XV

101 101

141 141

C12 C12
Ne- Ne-

111 111

121 121

131 131

D2 D2
W3 W3

W4 W4

2 4 6

45 45
C2 C2
U2 U2

35 35
95 95

11 11

21 21

31 31

41 41
X 2 4 6

MOTOR SHUNT SHUNT UNDER AUX.CONTACT


C.B TRIP C.B STATUS ON/OFF C.B STATUS POSITION CLOSE OPEN VOLTAGE READY TO
SPRING COIL CLOSE
CHARGE

D D

T1
400/110V -F4
L1' / +COUPLER/8.3:B 20VA S273
-XQ3 -F1 -XQ3 -XQ3 K2A -XQ3
1 L1 / 8.2:C 2A
5 L1'' / 8.2:A L1 L1/1 8 12
300 1 2 304 307 2 1 311
010 / 7.1:D
-XQ3 -F2 -XQ3 -XQ3 -XQ3
2 L2 / 8.2:C 2A
6 L2'' / 8.2:A L2 L2/1 9 13
301 1 2 305 308 4 3 312
011 / 7.1:D
-XQ3 L2' / +COUPLER/8.3:B -F3 -XQ3 -XQ3 -XQ3
3 2A 7 L3'' / 8.2:B L3 L3/1 10 14
302 1 2 306 309 6 5 313
012 / 7.1:E
-XQ3 L3 / 8.2:C -XQ3
4 11
303 310
N'' / 8.2:B 013 / 7.1:E
E N / 8.2:D E
x1 x1 x1
-H8 -H9 -H10
L1 x2 L2 x2 L3 x2
RED RED RED
1.2:A

1.3:A

1.3:A

1.3:A

1.3:A
PE.

L1.

L2.

L3.
N.

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

+SUPPLY 110VDC/1.6:D
+SUPPLY 110VDC-109 +SUPPLY 110VDC/1.6:C
+SUPPLY 110VDC-108
-X110 4 -X110 3

A A
903 902
3 1 96 98
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-F5
S282UC 4 2 95
B6

/6.8:B
-XQ3 15 -XQ3 16

315
1 / 4.2:A

B 314 B

A U
7.4:F 7.4:F
13
7
-KTQ
/3.4:E -LOC X 95 X 31 X 101 X 121 X 141
14
/3.2:D
B 8 6 Y
7.4:F 7.5:F SY Q/3 S75I/1 S75T/1 S75E/2
/2.3:C /2.4:C /2.5:C
/2.4:C /2.5:C
X 98 96 X 34 32 X 104 102 X 124 122 X 144 142

C C

316 317 318 319 320 321 322 323

-XQ3 17 -XQ3 18 -XQ3 19 -XQ3 20 -XQ3 21 -XQ3 22 -XQ3 23 -XQ3 24

D D

1
-LOC
/3.3:B

5
2 3
4 A1 A1 A1 A1 A1 A1 A1 A1 A1

8 -KLOR -KUVQ -KTQ -KQ -KQ' -KR -KR' -KT -KO


7 A2 A2 A2 A2 A2 A2 A2 A2 A2

E 6 E

2 / 4.2:E
LOCK OUT
ANSI (86) 13 14 /5.3:C 13 14 /5.4:C 13 14 /3.2:B 13 14 /6.4:B 13 14 +COUPLER/7.4:D 13 14 /5.7:C 13 14 /9.2:B 13 14 /5.8:A 13 14 /9.5:D
21 22 /5.7:C 21 22 /5.7:C 21 22 21 22 /6.4:B 21 22 +TR 1/5.7:A 21 22 21 22 21 22 21 22
31 32 +COUPLER/3.7:A 31 32 +COUPLER/3.5:A 31 32 31 32 31 32 +COUPLER/3.7:B 31 32 31 32 31 32 31 32
43 44 /6.4:B 43 44 /6.5:B 43 44 /9.3:D 43 44 /9.2:B 43 44 /9.3:B 43 44 /9.5:D 43 44 /9.3:B 43 44 /5.7:C 43 44
53 54 /9.2:D 53 54 /9.6:D 53 54 /9.4:D 51 52 /7.4:A 53 54 /9.4:B 53 54 +COUPLER/7.4:D 53 54 /9.4:B 53 54 +COUPLER/3.8:B
63 64 /9.1:D 63 64 /7.4:A 61 62 /9.5:B 63 64 /9.5:B 63 64 +TR 1/5.6:A
73 74 +COUPLER/3.3:B 73 74 /8.6:C 71 72 /9.5:B 73 74 /9.5:B 63 64 /9.7:B
84 83 81
+COUPLER/3.6:A 82 /9.6:B 83 84 /9.6:B 73 74 /6.5:B
STATUS LCKOUT
TRIP STATUS REF VOLTAGE STATUS CB TRIP STATUS CB ON/OFF STATUS CB RACKED IN STATUS CB TEST STATUS CB RACKED OUT

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 3
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

3.8:B / 1 1 / 5.1:A

B B

-X6 1 -X6 3 -X6 5 -X6 7

Winding Temp. Pressure reflief


Buchloz Trip Oil Temp. Trip Trip valve Trip

-X6 2 -X6 4 -X6 6 -X6 8


C C

324 325 326 327


D D

A1 A1 A1 A1
-KB-1 -KO-1 -KW-1 -KP-1
Buchloz Trip A2 Oil Temp. Trip A2 Winding Temp. A2 Pressure Trip A2
Trip

E 3.8:E / 2 2 / 5.1:F E
14 11 /7.4:A 14 11 /7.5:A 14 11 /7.5:A 14 11 /7.6:A
12 12 12 12
24 21 /5.7:D 24 21 /5.7:D 24 21 /5.7:E 24 21 /5.7:E
22 22 22 22
34 34 34 34
32 31 32 31 32 31 32 31

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 4
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

4.7:A / 1 1 / 6.1:B
A A
-X2 21 -XQ2 59 -XQ1 55 -XQ2 59 -XQ1 55

+COUPLER-KS
+COUPLER/8.6:E

+COUPLER/4.6:E
+COUPLER-KT

+COUPLER/4.4:E
+COUPLER-KQ'
53 43 13
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

43 31 51
-KT
+TR 1-KT +TR 1-KQ' /3.7:E
54 44 14
+TR 1/3.7:E 44 32 +TR 1/3.5:E 52

-X2 23 -XQ2 60 -XQ1 56 -XQ2 60 -XQ1 56

331

XQ3 55

13
-S2
CLOSE 14
GREEN
B XQ3 28 B
340
-X4Q3 1 31

MV +COUPLER-KTQ
-X2 21 +COUPLER/4.3:E 32
TRIP
13
-XQ2 61
13 13 13 13
-X4Q3 2 332
-S11 +COUPLER-K3 -S1 -KLOR -KUVQ
DOOR
14
+COUPLER/7.5:E 14 OPEN 14 /3.3:E 14 /3.4:E 14 -XQ3 27
LIMIT SWITCH RED 21

-X2 22 -KLOR
/3.3:E 22

333

C -X4Q3 -X4Q3 21 C
4 PERMISSION 3
-KUVQ
TO CLOSE /3.4:E 22
334

13 43
-KR -KT
/3.6:E 14 /3.7:E 44

335
328 329
21

342 -KB-1
/4.4:E 24 22
-XQ3 25 -XQ3 26
336
D 21 D
-KO-1
/4.4:E 24 22

X 11
337
Q/1 X 21
/2.3:C 339 21
Q/2 -KW-1
X 14 12 /2.3:C /4.5:E 24 22
X 24 22
338

330
21
341
X U1 -KP-1
/4.6:E 24 22
E E
M
X D1 -M X C11 X C1
/2.6:C 1~
--
-YU -YO -YC
/2.6:C /2.6:C /2.6:C
X U2
X D2 X C12 X C2

114
4.7:E / 2 2 / 6.1:E

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 5
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-X110
A 3 A
902
+SUPPLY 110VDC/1.6:B / +SUPPLY 110VDC-110
-X110
4
903
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

+SUPPLY 110VDC/1.6:D / +SUPPLY 110VDC-111

-F6 -XQ3
2A 29
1 2 360
5.8:A / 1

B B

13 13 21 43 43 73 21 11 95
-S3 -KQ -KQ -KLOR -KUVQ -KT -KH -KMCB -F5
LAMP TEST 14 /3.5:E 14 /3.5:E 22 /3.3:E 44 /3.4:E 44 /3.7:E 74 /10.3:D 24 22 /6.8:E 14 12 /3.1:A 98 96

C C

13 43 53 63 73 83 13
-KTEST -KTEST -KTEST -KTEST -KTEST -KTEST -KTEST'
/6.2:E 14 /6.2:E 44 /6.2:E 54 /6.2:E 64 /6.2:E 74 /6.2:E 84 /6.3:E 14

361 362 363 364 365 366 367 368 377

D D

-XQ3 30 -XQ3 31 -XQ3 32 -XQ3 33 -XQ3 34 -XQ3 35 -XQ3 36 -XQ3 37

A1 A1 x1 x1 x1 x1 x1 x1 x1 A1
-KTEST -KTEST' -H1 -H2 -H3 -H4 -H5 -H6 -H7 -KMCB
A2 A2 ON x2 OFF x2 TRIP x2 TEST x2 VOLTAGE OK x2 CUBICLE x2 CONTROL CIRCUIT x2 MCB TRIP A2
RED GREEN YELLOW BLUE GREEN SPACE FAULT
HEATER WHITE
WHITE
E E
5.8:F / 2
13 14 /6.3:C 13 14 /6.7:C 14 11 /6.7:B
21 22 21 22 12
24 21 /9.8:D
31 32 31 32
22
43 44 /6.4:C 43 44
34
53 54 /6.5:C
32 31
63 64 /6.5:C
73 74 /6.5:C
83 84 /6.6:C

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 6
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-F7
-X110 -XQ3
3 38
902 2 1 369
+SUPPLY 110VDC/1.6:B / +SUPPLY 110VDC-112
-X110 -XQ3
4 39
903 4 3 370
+SUPPLY 110VDC/1.6:D / +SUPPLY 110VDC-113
A S282UC A
B6
11 11 11 11
51 63
-KB-1 -KO-1 -KW-1 -KP-1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-KQ -KQ /4.4:E /4.4:E /4.5:E /4.6:E


14 12 14 12 14 12 14 12
/3.5:E 52 /3.5:E 64

-XQ3 40 -XQ3 41 -XQ3 42 -XQ3 43 -XQ3 44 -XQ3 45

371 372 373 374 375 376

-R3
X120 X100 1 2 X110
1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 15 17 19 18 20 22 21 23 24

+ -

0354 1/5 A
1.7:C / 02
B 7 B
lL1 BI 1 BI 2 BI 3 BI 4 BI 5 BI 6 BI 7 BI 8 SO1 SO2 SO3 SO4
0350 N
1.7:B / 01
8
0355 1/5 A
1.7:C / 03
9
lL2
N
10
0356 1/5 A
1.7:C / 04
11
lL3
N
12
0357 1/5 A
1.7:D / 05
13
lO
N
14
C C

X130

9
60
210V

not in use
REF 615F
VOLTAGE N
10
TEST BLOCK
311 0311 60
2.7:E / 010 1 01
11 210V
D U1 D

N
12

312 0312 60
2.7:E / 011 2 02 Overload&Short Circuit&
13 210V Earth Fault Protection

Voltage Protection
U2
50,51,50N,51N

N
14

27,47,59
313 0313 60 TCS1 TCS1
2.7:E / 012 3 03
15 210V

U3
IRF PO1 PO2 SO1 SO2 PO3 PO3 X1/LAN
E 310 0310 N E
2.7:E / 013 4 04
16

60
17 210V

U0
N
18 X100 3 5 4 6 7 8 9 10 12 11 13 14 15 17 16 19 18 15 22 21 19 18

A B U Y S1 S2
3.2:B 3.2:C 3.4:B 3.4:C 9.7:D 9.7:D

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 7
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

304
2.4:D / L1'' 9
383
10
305
2.4:E / L2'' 5 x1

306 V
2.4:E / L3'' 1
-V1
x2
12
384
303
2.4:E / N'' 11

B B
L1-N

SELECTOR VOLT
L2-N
L3-N
0
L1-L2
L2-L3
L3-L1

S10

-XQ3 -F8 -X3


1 2A 9
C 300 1 2 385 C
2.3:D / L1
-XQ3 -F9 -X3
2 2A 10 73
301 1 2 386
2.3:E / L2 -KQ
-XQ3 -F10 -X3
3 2A 11 /3.5:E 74
302 1 2 387
2.3:E / L3

-XQ3
4
303 390
2.3:E / N

A1
Mech.Door Lock
A2

D -P1 D
0351 x1 x2
1.7:A / K1 A

-P2
0352 x1 x2
1.7:B / K2 A

-P3
0353 x1 x2
1.7:B / K3 A

0350
1.7:A / LC
E E

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 8
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-X4Q3 5 -X4Q3 7 -X4Q3 9 -X4Q3 11 -X4Q3 13 -X4Q3 15 -X4Q3 17

50 53 56 59 62 65
13 43 53 63 73 83
68
-KR' -KR' -KR' -KR' -KR' -KR'
/3.7:E 14 /3.7:E 44 /3.7:E 54 /3.7:E 64 /3.7:E 74 /3.7:E 84
63
52 55 58 61 64 67
-KT
/3.7:E 64
43 43 53 61 71 81

B -KQ -KQ' -KQ' -KQ' -KQ' -KQ' B


/3.5:E /3.5:E /3.5:E /3.5:E 62 /3.5:E 72 /3.5:E 82
44 44 54 69
51 54 57 60 63 66

-X4Q3 6 -X4Q3 8 -X4Q3 10 -X4Q3 12 -X4Q3 14 -X4Q3 16 -X4Q3 18

STATUS CB ON STATUS CB ON STATUS CB ON STATUS CB OFF STATUS CB OFF STATUS CB OFF STATUS CB TEST
POSITION

C C

-X4Q3 19 -X4Q3 21 -X4Q3 23 -X4Q3 25 -X4Q3 27 -X4Q3 29 -X4Q3 31


7.5:F
-X4Q3 35

S1
70 72 74 76 78 80 82 86
84
63 53 43 53 43 13 53 21
-KLOR -KLOR -KTQ -KTQ -KR -KO -KUVQ -X4Q3 33
-KMCB
/3.3:E 64 /3.3:E 54 /3.4:E 44 /3.4:E 54 /3.6:E 44 /3.8:E 14 /3.4:E 54 /6.8:E 24 22
-X4Q3 34
D D
71 73 75 77 79 81 83 85 87

S2
-X4Q3 20 -X4Q3 22 -X4Q3 24 -X4Q3 26 -X4Q3 28 -X4Q3 30 -X4Q3 32
7.6:F -X4Q3 36

STATUS LOCKOUT TRIP STATUS LOCKOUT TRIP STATUS CB TRIP STATUS CB TRIP STATUS CB RACKED IN STATUS CB RACKED OUT STATUS REF VOLTAGE STATUS REF GENERAL TRIP STATUS CONTROL CIRCUIT
CONNECTED FAULT MCB TRIP

E E

FOR CUSTOMER USE


FROM INCOMING CIRCUIT
(LV01-INC-B)

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 9
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

0 1

-X5 2 -X5 1

1
B B
-FH
2A
2

-X5 3

2 4

2
TH1 -S1
HYGROSTATE 3 N LIMIT SWITCH

C C

3 5

-X5 3 -X5 4

12 x1
-H1
-KH -E1 LIGHTING
D 11 HEATER D
x2

14
12 11
24
22 21 /6.6:B
34
32 31

E E

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 10
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TERMINALS FOR EXTERNAL CONNECTIONS

A A
CUSTOMER SIDE ABB SIDE CUSTOMER SIDE ABB SIDE CUSTOMER SIDE ABB SIDE
-X4Q3 -X6 -XCOM

1
MV TRIP Buchloz Trip
MODBUS COMMENECTION
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.

2
3

3
PERMISSION TO CLOSE Oil Temp. Trip

4
PE

5
STATUS CB ON Winding Temp. Trip

6
7

7
B STATUS CB ON Pressure reflief valve Trip B

8
9

STATUS CB ON
10
11

STATUS CB OFF
12
13

STATUS CB OFF
14
15

STATUS CB OFF
C C
16
17

STATUS CB TEST POSITION


18
19

STATUS LOCKOUT TRIP


20
21

STATUS LOCKOUT TRIP


22
23

STATUS CB TRIP
24

D D
25

STATUS CB TRIP
26
27

STATUS CB RACKED IN(CONNECTED)


28
29

STATUS CB RACKED OUT


30
31

STATUS REF VOLTAGE FAULT


32
33

E STATUS REF GENERAL TRIP E


34
35

STATUS CONTROL CIRCUIT (MCB TRIP)


36

F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = Item(1)
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Schematic multi-line /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 11
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-X1
1
1
L1Q1 / 4.3:A
-X1
2
2
L2Q1 / 4.3:A
-X1
3
3
L3Q1 / 4.3:B
-X1
4
0
NQ1 / 4.3:B

B B
-X24
1
908
+SUPPLY 24VDC-108 / +SUPPLY 24VDC/1.4:C
-X24
2
909
+SUPPLY 24VDC-109 / +SUPPLY 24VDC/1.4:D

/2.6:B

/2.4:B

/2.5:B

/2.5:B
/3.4:D

/3.3:D

/3.4:E

/3.3:E

/3.2:E
/2.4:B

/3.2:E
Q1
X
K1

K2
1 3 5

96 -96

98 -98

12

14

22

24

32

34

42

44

102 102

104 104

112 112

114 114

122 122

124 124

132 132

134 134

142 142

144 144

U1 -U1

36

38

C1

C11 C11

D1 -D1

46

48
XV 1 3 5 APPLICABLE FOR :

36

38

C1

46

48
12

14

22

24

32

34

42

44
K1

K2

C 2M1 C

The protection functions and the accesories is as per the SLD


S33M/1
3M1
-K51
T11
/>
4M1
5M1
T12

T21 / >>
-F1
13M1
T22
/ >>

A1 T31
/ >>>

This is general sympol of the release


14M1
T32
/ >>
YC YO YU
EKIP SY -Q/1 -Q/2 -Q/3 -Q/4 S75I/1 S75I/2 S75T/1 S75E/1 S75E/2 S33M/2 -RTC
T13
T14
-M
M 15M1
1~
-- 16M1
T23
T24

T33
T34
Ne+ Ne+

XV

101 101

141 141

C12 C12
Ne- Ne-

111 111

121 121

131 131

D2 D2
W3 W3

W4 W4

2 4 6

45 45
C2 C2
U2 U2

35 35
95 95

11 11

21 21

31 31

41 41
D X 2 4 6 D

NCT
1000 1001
-XCOM 1 2 3

-T1 30 -X3 1
LCQ1 / 4.3:C
1600/5 L
Cl. 0.5
15VA K 31 -X3 2
K1Q1 / 4.3:B
-T2 30 -X3 1
1600/5 L
E Cl. 0.5 E
15VA K 32 -X3 3
K2Q1 / 4.3:C
-T3 30 -X3 1
1600/5 L
Cl. 0.5
15VA K 33 -X3 4
K3Q1 / 4.3:C
1
-PE
PE

L1

L2

L3
N

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

-F1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-X110 -X1
3 5
+SUPPLY 110VDC/1.6:B / +SUPPLY
902 2 1 4
110VDC-124 01 / 3.1:A

-X110 -X1
4 6
+SUPPLY 110VDC/1.6:D / +SUPPLY
903 4 3
110VDC-125

S282UC
B6
B X 11 X 101 X 141 X 121 X 95 B
7
Q/1 S75I/1 S75E/2 S75T/1 SY -LOC
/1.3:C /1.5:C /1.3:C /2.6:D
/1.4:C /1.5:C 8 6
X 14 12 X 104 102 X 144 142 X 124 122 X 98 96

5 6 7 8 9 10 11

C C

-X1 7 -X1 8 -X1 9 -X1 10 -X1 11 -X1 12

D D

1
-LOC
/2.7:B

5
2 3
A1 A1 A1 A1 4 A1
-KQ -KR -KO -KT 8 -KLOR
A2 A2 A2 A2 7 A2

02 / 3.1:E
LOCK OUT
E 13 14 /3.6:C 13 14 /4.7:E 13 14 /3.7:C 13 14 /4.4:E ANSI (86) 13 14 /3.7:C E
21 22 /3.6:C 21 22 21 22 21 22 21 22 /3.3:B
31 32 /4.4:E 31 32 31 32 31 32 31 32
43 44 /4.2:E 43 44 /4.2:D 43 44 /4.8:E 43 44 /4.5:E 43 44 /4.6:E
53 54 /4.3:E 53 54 /4.3:D 63 64 /4.5:E
61 62 /4.5:E
73 74 /4.7:A

STATUS CB STATUS CB STATUS CB STATUS LCKOUT


ON/OFF RACKED IN RACKED OUT STATUS CB TEST STATUS CB TRIP TRIP

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

2.7:A / 01

21
-KLOR
/2.7:E 22

-X1 14
B B
13
13
-S11
2
DOOR
14
LIMIT SWITCH 1 2

-S10

REMOTE
/4.1:E

LOCAL
1 3

15
13 13 21 13 13 21
-S3 -KQ -KQ -KLOR -KO -KH
14 LAMP TEST 14 /2.4:E 14 /2.4:E 22 /2.7:E 14 /2.5:E 14 /5.3:D 24 22
-X4 1 -X4 3

REMOTE SIGNAL
13 13
CLOSE / OPEN
-S1 -S2 -X4 2 -X4 4
C C
OPEN 14 CLOSE 14

13 43 53 63 83
-KA -KA -KA -KA -KA
-X1 13 -X1 15 -X1 16 /3.5:E 14 /3.5:E 44 /3.5:E 54 /3.5:E 64 /3.5:E 84

12 16 18

X 31 X 21

Q/3 Q/2
/1.4:C /1.4:C -X1 17 -X1 18 -X1 19 -X1 20 -X1 21 -X1 22

D X 34 32 X 23 22 D

20 21 22 23 24 25
17 19
X U1

X D1 X C11 X C1
A1
M x1 x1 x1 x1 x1
-M -YU -YO -YC -KA
/1.6:D 1~
-- /1.6:C /1.6:C /1.6:C
-H1 -H2 -H3 -H4 -H5
A2 ON x2 OFF x2 TRIP x2 C.B RACKED OUT x2 CUBICLE x2
RED GREEN YELLOW WHITE SPACE
X D2 X C12 X C2 HEATER
X U2 WHITE

2.7:E / 02
E 13 14 /3.6:C E
21 22
31 32
43 44 /3.6:C
53 54 /3.6:C
63 64 /3.7:C
83 84 /3.7:C

LAMP TEST
STATUS

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 3
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

-F2 2A -X3
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

9
1 1 2 40
1.3:A / L1Q1
-F3 2A -X3 73
10
2 1 2 41 -KQ
1.3:B / L2Q1
/2.4:E 74
-F4 2A -X3
11
3 1 2 42
1.3:B / L3Q1
-XQ1
0 4 26
1.3:B / NQ1

A1
B B
-P1 Mech.Door Lock
31 x1 x2 A2
1.5:E / K1Q1 A

-P2
32 x1 x2
1.5:E / K2Q1 A

-P3
33 x1 x2
1.5:E / K3Q1 A
C C

30
1.5:E / LCQ1

D D

-X4 5 -X4 7 -X4 9 -X4 11 -X4 13 -X4 15 -X4 17 -X4 19 -X4 21

52 55
50 43 53 58 60 62 64 66 68
-KR -KR
/2.4:E 44 /2.4:E 54
6 31 61
13 43 63 43 13 43
54 57
1 2

-S10 -KQ -KT -KQ -KT -KLOR -KLOR -KR -KO


/2.4:E /2.4:E
REMOTE

/3.3:B 43 53 32 /2.5:E 14 62 /2.5:E 44 /2.7:E 64 /2.7:E 44 /2.4:E 14 /2.5:E 44


LOCAL

5 7
-KQ -KQ
/2.4:E 44 /2.4:E 54 59 61 63 65 67 69
51
53 56
E E
-X4 6 -X4 8 -X4 10 -X4 12 -X4 14 -X4 16 -X4 18 -X4 20 -X4 22

STATUS SELECTOR
STATUS CB ON STATUS CB ON STATUS CB OFF/TEST STATUS CB OFF/TEST STATUS LOCKOUT TRIP STATUS LOCKOUT TRIP STATUS CB RACKED IN STATUS CB RACKED OUT
REMOTE POSITION

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 4
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

0 1

-X5 2 -X5 1

B B

1 1

-FH -FL
2A 2A
2 2

2 4

2
TH1 -S1
HYGROSTATE 3 N LIMIT SWITCH

C C

3 5

-X5 3 -X5 4

12 x1
-H1
-KH -E1 LIGHTING
D 11 HEATER D
x2

14
12 11
24
22 21 /3.7:C
34
32 31

E E

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 5
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TERMINALS FOR EXTERNAL CONNECTIONS

A A
CUSTOMER SIDE ABB SIDE
-X4

1
REMOTE SIGNAL CLOSE
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.

2
3
REMOTE SIGNAL OPEN

4
5
STATUS SELECTOR
REMOTE POSITION

6
7
B STATUS CB ON B

8
9
STATUS CB ON

10
11
STATUS CB OFF/TEST

12
13
STATUS CB OFF/TEST

14
15
STATUS LOCKOUT TRIP
C C

16
17
STATUS LOCKOUT TRIP

18
19
STATUS CB RACKED IN

20
21
STATUS CB RACKED OUT

22
D D

E E

F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = Item(1)
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-1
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Schematic multi-line /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 6
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-X1
1
1
L1Q1 / 3.3:B
-X1
2
2
L2Q1 / 3.3:B
-X1
3
3
L3Q1 / 3.3:B
-X1
4
0
NQ1 / 3.3:B

B B
-X24
1
908
+SUPPLY 24VDC-110 / +SUPPLY 24VDC/1.4:C
-X24
2
909
+SUPPLY 24VDC-111 / +SUPPLY 24VDC/1.4:D

/2.5:B

/2.3:B

/2.3:E
Q1
X 1 3 5 96 98 12 14 4 2 D1 54 U1 A1 C11
4

XV

D1
X3

X3

96

98

12

14
1 3 5

2
C C

U1

C11
54

A1
A17
YC

M
I>> I>> I>>
-M --
1~
APPLICABLE FOR :
A1

PR222
SY -Q/1 S75E
YU
1M1
1M2
12M1
S3
12M2

U2
D2

XV 2 4 6
X4

X4

X3

X3

95

11

1
1

D D
X 2 4 6 95 11 1 D2 U2
1

NCT
1000 1001
-XCOM 1 2 3

30 -X3 1
-T1 LCQ1 / 3.3:C
L
400/5
Cl. 0.5
5VA
K 31 -X3 2
K1Q1 / 3.3:B
30 -X3 1
E -T2 L E
400/5
Cl. 0.5 -X3 3
K 32
5VA K2Q1 / 3.3:C
30 -X3 1
-T3 L
400/5
Cl. 0.5
5VA
K 33 -X3 4
K3Q1 / 3.3:C
1
-PE
PE

L1

L2

L3
N

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

-F1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-X110 -X1
3 5
902 2 1 5
+SUPPLY 110VDC/1.6:B / +SUPPLY 110VDC-126
-X110 -X1
4 6
903 4 3

+SUPPLY 110VDC/1.6:E / +SUPPLY 110VDC-127

S282UC
B6
B X 11 X 1 X 95 B
13 7
13 11 21 11 11 21
-S11 Q/1 S75I/1 SY -LOC
DOOR /1.3:D /1.3:D /2.4:D 8 6 -S3 -KQ -KQ -KLOR -KO -KH
14 LAMP TEST /2.3:E
LIMIT SWITCH 14 12 /2.3:E
14 22 24 /2.5:E 12 14 /2.4:E 12 14 /4.3:D 24 22
X 14 12 X 4 2 X 98 96

-X1 7

6
21
C -KLOR C
/2.5:E 22

11 21 31 41 11
-KA -KA -KA -KA -KA'
/2.6:E 12 14 /2.6:E 22 24 /2.6:E 32 34 /2.6:E 42 44 /2.6:E 12 14

8 9 10 13 11 12 14

-X1 8 -X1 9 -X1 10 -X1 13 -X1 11 -X1 12 -X1 14 -X1 15 -X1 16 -X1 17 -X1 18 -X1 19

D D

1 15 16 17 18 19
-LOC
/2.5:B

X D1 5 x1 x1 x1 x1 x1
A1 A1 A1 A1 A1 A1 A1
2 3 -H1 -H2 -H3 -H4 -H5
-YU -KQ' -KQ -KR -KO -KLOR -KA -KA'
/1.4:D 4 ON x2 OFF x2 TRIP x2 C.B RACKED OUT x2 CUBICLE x2
A2 A2 A2 A2 A2 A2 A2 RED GREEN YELLOW WHITE SPACE
8 HEATER
X D2
7 WHITE

LOCK OUT
E 14 11 /3.3:E 14 11 /2.7:B 14 11 /3.2:E 14 11 /2.8:B ANSI (86) 14 11 /2.7:B 14 11 /2.6:C 14 11 /2.8:C E
12 12 12 12 12 12 12
24 21 /3.4:E 24 21 /2.7:B 24 21 /3.3:E 24 21 /3.7:E 21 22 /2.3:C 24 21 /2.7:C
22 22 22 22 34 31 /3.5:E 22
34 31 /3.2:E 34 31 /3.7:E 32 34 31 /2.7:C
32 32 44 41 /3.6:E 32
44 41 /3.3:E 42 44 41 /2.7:C
42 42

STATUS CB STATUS CB STATUS CB STATUS LCKOUT LAMP TEST


ON/OFF RACKED IN RACKED OUT STATUS CB TRIP TRIP STATUS

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

-F2 2A -X3
1 2 9
1 40
1.3:A / L1Q1
-F3 2A -X3
10
2 1 2 41
1.3:B / L2Q1
-F4 2A -X3
11
3 1 2 42
1.3:B / L3Q1
-XQ1
B 4 B
0
1.3:B / NQ1

-P1
31 x1 x2
1.5:E / K1Q1 A

-P2
32 x1 x2
1.5:E / K2Q1 A

C C
-P3
33 x1 x2
1.5:F / K3Q1 A

30
1.5:E / LCQ1

D D

-X4 1 -X4 3 -X4 5 -X4 7 -X4 9 -X4 10 -X4 13 -X4 15

50 53
11 21
56 58 60 62 64 66
-KR -KR
/2.4:E 14 12 /2.4:E 24 22
11 21 31 41 31 21
52 55 -KQ' -KQ' -KLOR -KLOR -KR -KO
/2.3:E 14 12 /2.3:E 24 22 /2.5:E 34 32 /2.5:E 44 42 /2.4:E 34 32 /2.4:E 24 22
31 41
-KQ -KQ
/2.3:E 34 32 /2.3:E 44 42 57 59 61 63 65 67
E E
51 54

-X4 2 -X4 4 -X4 6 -X4 8 -X4 10 -X4 11 -X4 14 -X4 15

STATUS CB ON STATUS CB ON STATUS CB OFF STATUS CB OFF STATUS LOCKOUT TRIP STATUS LOCKOUT TRIP STATUS CB RACKED IN STATUS CB RACKED OUT

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 3
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.

0 1

-X5 2 -X5 1

B B

1 1 1

-FH -FL -FL.


2A 2A 2A
2 2 2

2 4 6

2
TH1 -S1 -S1
HYGROSTATE 3 N LIMIT SWITCH LIMIT SWITCH

C C

3 5 7

-X5 3 -X5 4 -X5 4

12 x1
-H1 -H1
-KH -E1 LIGHTING LIGHTING
D 11 HEATER D
x2

14
12 11
24
22 21 /2.8:B
34
32 31

E E

1M1 1M1 1M2


1M2 12M1 12M2
12M1
12M2

F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 4
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TERMINALS FOR EXTERNAL CONNECTIONS

A A
CUSTOMER SIDE ABB SIDE
-X4

1
STATUS CB ON
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.

2
3
STATUS CB ON

4
5
STATUS CB OFF/TEST

6
7
B STATUS CB OFF/TEST B

8
9
STATUS LOCKOUT TRIP

10
11
STATUS LOCKOUT TRIP

12
13
STATUS CB RACKED IN

14
15
STATUS CB RACKED OUT
C C

16
D D

E E

F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = Item(1)
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-2
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Schematic multi-line /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 5
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Index Sheet A

Page Number Page Name Revision Page Number Page Name Revision
/1 Title page =Item(1)+COUPLER/7 Control wiring
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.

=Item(1)+LEGEND/1 Control wiring =Item(1)+COUPLER/8 Control wiring

=Item(1)+LEGEND/2 Control wiring =Item(1)+COUPLER/9 Control wiring

=Item(1)+LEGEND/3 Control wiring =Item(1)+COUPLER/10 Control wiring

=Item(1)+LEGEND/4 Control wiring =Item(1)+COUPLER/11 Control wiring


B B

=Item(1)+LEGEND/5 Control wiring =Item(1)+COUPLER/12 Control wiring

=Item(1)+LEGEND/6 Control wiring =Item(1)+TR 2/1 Control wiring

=Item(1)+LEGEND/7 Control wiring =Item(1)+TR 2/2 Control wiring

=Item(1)+SUPPLY 110VDC/1 Control wiring =Item(1)+TR 2/3 Control wiring

=Item(1)+SUPPLY 24VDC/1 Control wiring =Item(1)+TR 2/4 Control wiring

=Item(1)+TR 1/1 Control wiring =Item(1)+TR 2/5 Control wiring


C C
=Item(1)+TR 1/2 Control wiring =Item(1)+TR 2/6 Control wiring

=Item(1)+TR 1/3 Control wiring =Item(1)+TR 2/7 Control wiring

=Item(1)+TR 1/4 Control wiring =Item(1)+TR 2/8 Control wiring

=Item(1)+TR 1/5 Control wiring =Item(1)+TR 2/9 Control wiring

=Item(1)+TR 1/6 Control wiring =Item(1)+TR 2/10 Control wiring

=Item(1)+TR 1/7 Control wiring =Item(1)+TR 2/11 Control wiring

=Item(1)+TR 1/8 Control wiring =Item(1)+OUTGOING-1/1 Control wiring


D D
=Item(1)+TR 1/9 Control wiring =Item(1)+OUTGOING-1/2 Control wiring

=Item(1)+TR 1/10 Control wiring =Item(1)+OUTGOING-1/3 Control wiring

=Item(1)+TR 1/11 Control wiring =Item(1)+OUTGOING-1/4 Control wiring

=Item(1)+COUPLER/1 Control wiring =Item(1)+OUTGOING-1/5 Control wiring

=Item(1)+COUPLER/2 Control wiring =Item(1)+OUTGOING-1/6 Control wiring

=Item(1)+COUPLER/3 Control wiring =Item(1)+OUTGOING-2/1 Control wiring

E =Item(1)+COUPLER/4 Control wiring =Item(1)+OUTGOING-2/2 Control wiring E

=Item(1)+COUPLER/5 Control wiring =Item(1)+OUTGOING-2/3 Control wiring

=Item(1)+COUPLER/6 Control wiring =Item(1)+OUTGOING-2/4 Control wiring

F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = General
2 8/27/2016 egemkha Prepared: Title: + List Of Drawings
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Table of contents /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Index Sheet A

Page Number Page Name Revision


=Item(1)+OUTGOING-2/5 Control wiring
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.

=General+List Of Drawings/2 Index Sheet

=General+List Of Drawings/2.a Index Sheet

B B

C C

D D

E E

F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = General
2 8/27/2016 egemkha Prepared: Title: + List Of Drawings
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Table of contents /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2.a
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 2
1 2 3 4 5 6 7 8

Potrebbero piacerti anche