TOTAL No OF PAGES : 58
N/A
ENPPI PROJECT
: 3830-100
PERMISSION TO PROCEED DOES NOT CONSTITUTE NUMBER
ACCEPTANCE OR APPROVAL OF DESIGN DETAILS,
CALCULATIONS, ANALYSIS, TEST METHODS OR
MATERIALS DEVELOPED OR SELECTED BY SUPPLIER
FROM FULL COMPLIANCE WITH CONTRACTUAL PACKAGE Electrical Schem. & Wiring
:
OBLIGATIONS. DESCRIPTION Diagram
EQUIPMENT
1. WORK MAY PROCEED. : ( 5 LV SWG - 01 )
TAG
REVISE AND RESUBMIT IN ACCORDANCE WITH
10000-Z-000-PM1-FRM-0033 (11/14)
CODE
2. COMMENTS, WORK MAY PROCEED SUBJECT TO : E99
INCORPORATION OF CHANGES INDICATED. IDENTIFIER
REVISE AND RESUBMIT, (MAJOR COMMENTS)
3.
WORK MAY NOT PROCEED.
DOCUMENT NUMBER REV
REJECTED, (REASON TO BE SPECIFIED ON THE
4.
DOCUMENT).
HOLD FOR A SPECIFIC REASON ( TO BE
5.
SPECIFIED ON THE DOCUMENT).
REVISIONS
FOR APPROVAL
A A
1 7/3/2016 EGEMKHA
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.
B B
Enppi
D
Client:
ERC / CORC
Order Number:
E E
12000261
Date: 30/03/2016 Title :-
Prepared: Emad Khaled
Ahmed
Checked: Abdel-Rahman Control Wiring
Electrical Schematic
F
Approved: Mohamed Abdou F
TOTAL
SHEETS
57
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
A1
A2
COIL FOR AUX./ POWER CONTACTOR
1
A
2 AMMETER
1
V
2 VOLTMETER
-P1 2
1
V VOLTAMETER WITH SELECTOR SWITCH
L3-L1
L2-L3
L1-L2
L1-N
L2-N
L3-N
0
S? SELECTOR VOLT
L1 L2 L3 N
C C
1
NORMALLY OPEN PUSH BUTTON
D 2 D
CURRENT TRANSFORMER
L
L1 L1/1
L2 L2/1
L3 L3/1 VOLTAGE TRANSFORMER
N N/1
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
15
TRIP CONTACT OF C.B.
14
1
SINGLE POLE M.C.B.
2
B B
1 3 5 7
MAIN CONTACT OF 4 POLE CB D/O
WITH THERMOMAGNETIC RELEASE OR
2 4 6 8 WITH MICROPROCESSOR BASED RELEASE
U1
C 1
C
1 3 7
AUTO./OFF/MANUAL SELECTOR SWITCH
D D
2
TERMINAL BLOCK
1
-D2
E SURGE E
ARRESTOR
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
S A1
COIL FOR ON DELAY TIMER RELAY
A2
B B
2 4 6 8
A1
C C
1
SINGLE POLE MCB WITHOUT RELEASE
2 (TO BE USED AS A REMOVABLE LINK)
D 1 D
-F1? FUSE SWITCH
1 3 5
E E
OFF
2 3
SPRING RETURN SELECTOR SWITCH
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 3
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
ELR
N- 6
1 1 EARTH LEAKAGE RELAY - RCQ
L1- 7
2 2
L2- 8
3 3
L3- 9
4 4
B -R? 10 B
11
12
18 19
1 3 5
TH THERMOSTATE
D D
SPACE HEATER
INTERNAL LIGHTING
E E
L2 L3 A K L
AUTO. REGULATOR
AUTO. REGULATOR -R1
1 2 3 4 5 6 7 8 9 10 11 12
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 4
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
13 21 33 41
14 22 34 42
3-pole Switch Fuse OESA Complete
with Aux. Contact
B B
R RESISTOR
SUPRESSOR
R-C SUPPRESSOR
R-C
C C
L1
L2
L3
N
16 U/O Voltage Relay
15
18
26
-R2
25
28
D D
1
2
2
1 3
SELECTOR SWITCH
1
2 4 5 8 10
1 2 3
E E
0V 0V 0V
LED BLOCK
RED GREEN YELLOW
ON READY FAULT
LED BLOCK
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 5
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
13 14
4-20mA
0-1A
1
15 CURRENT TRANSDUCER
3 16
B B
- +
13 14
4-20mA
0-140V
15
1
16
3 VOLTAGE TRANSDUCER
C C
+110VDC +24VDC
CONVERTER
-110VDC -24VDC
110VDC/24VDC
Converter
D D
1 2 3 4
L1 L2 L3 N
6 3I
5 3K
8 2I
10 1I
E E
9 1K DPM
UMG96
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 6
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-K1
B B
0 1 C1 2 3
-D1
XO 08 R1
PLC AC31
EXTENSION
8 RELAY OUTPUTS
4 5 C2 6 7
C C
Capacitor bank
-C1
A2 27 37 47
E E
-H1 horn
F 3 10/9/2016 A egemkha
09-07-2009
Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 IndexegemkhaDate Prepared: Name Title: + LEGEND
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 7
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 7
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
126 / +OUTGOING-2/2.1:A
124 / +OUTGOING-1/2.2:A
122 / +COUPLER/9.2:A
B 120 / +COUPLER/7.2:A B
118 / +COUPLER/5.6:A
116 / +COUPLER/3.1:A
117 / +COUPLER/3.1:A
D 119 / +COUPLER/5.6:A D
121 / +COUPLER/7.2:B
123 / +COUPLER/9.2:A
125 / +OUTGOING-1/2.2:B
127 / +OUTGOING-2/2.1:B
CONVERTER
110/24 VDC
-F110B 20 VA -F24
-X24
1
1 2 904 906 1 2 908
01 / +SUPPLY 24VDC/1.3:C
E -X24 E
3 4 3 4 2
905 907 909
02 / +SUPPLY 24VDC/1.3:D
S202UC S202UC
C6 C25
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + SUPPLY 110VDC
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 1
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A SUPPLY 24VDC A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
B B
C C
111 / +OUTGOING-2/1.3:B
D D
E E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + SUPPLY 24VDC
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 1
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
2.1:F
2.1:F
2.1:F
2.2:F
2.2:F
PE.
L1.
L2.
L3.
N.
-PE CURRENT
A 1 TEST BLOCK A
150 -X3 1 0150
-T1 1 01 LC / 8.2:E
L
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
5000/5
Cl. 0.5
15VA
K 151 -X3 2 0151
2 02 K1 / 8.2:D
150 -X3 1
-T2 L
5000/5
Cl. 0.5 -X3 3
15VA
K 152 0152
3 03 K2 / 8.2:D
150 -X3 1
-T3 L
5000/5
Cl. 0.5
15VA
K 153 -X3 4 0153
B 4 04 K3 / 8.2:E B
D D
N1/1
PE/1
L1/1
L2/1
L3/1
UPSTREAM MV SWG
51G TRIP
-PE
-T8
5000/5 BUSDUCT(S-LV-80-A)
5P20
E 10VA E
TO REF 615 F
TRAFO. TO ANNOUNCE ON DISPLAY
CP UNIT THE TRANSFORMER
MECHANICAL
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
/3.4:C
/3.5:C
/3.6:C
/3.7:C
/3.8:C
/5.3:D
/5.5:E
/5.5:E
/5.3:E
/5.1:E
/5.2:E
Q1
X
K1
K2
1 3 5
96 -96
98 -98
12
14
22
24
32
34
42
44
102 102
104 104
112 112
114 114
122 122
124 124
132 132
134 134
142 142
144 144
U1 -U1
36
38
C1
C11 C11
D1 -D1
46
48
B B
XV 1 3 5
36
38
C1
46
48
12
14
22
24
32
34
42
44
K1
K2
-K51
T11
T12 />
T21 / >>
T22 -F1
/ >>
A1 T31
/ >>>
C T34
C
Ne+ Ne+
C12 C12
XV
101 101
131 131
141 141
Ne- Ne-
111 111
121 121
W3 W3
W4 W4
D2 D2
2 4 6
45 45
C2 C2
U2 U2
35 35
95 95
11 11
21 21
31 31
41 41
X 2 4 6
D D
T1
400/110V -F4
L1' / +COUPLER/8.2:B 20VA S273
-XQ1 -F1 -XQ1 -XQ1 K2A -XQ1
L1 / 8.2:C 2A L1'' / 8.2:A
100
1 1 2 5
104 L1 L1/1 107
8 2 1 12
111
010 / 7.1:D
-XQ1 -F2 -XQ1 -XQ1 -XQ1
2 L2 / 8.2:C 2A 6 L2'' / 8.2:A L2 L2/1 9 13
101 1 2 105 108 4 3 112
011 / 7.1:D
-XQ1 L2' / +COUPLER/8.2:B -F3 -XQ1 -XQ1 -XQ1
3
2A
7 L3'' / 8.2:B L3 L3/1 10 14
102 1 2 106 109 6 5 113
012 / 7.1:E
-XQ1 L3 / 8.2:C -XQ1
4 11
103 110
N'' / 8.2:B 013 / 7.1:E
E N / 8.2:D E
x1 x1 x1
-H8 -H9 -H10
L1 x2 L2 x2 L3 x2
RED RED RED
1.2:A
1.3:A
1.3:A
1.3:A
1.3:A
PE.
L1.
L2.
L3.
N.
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+SUPPLY 110VDC/1.6:C
+SUPPLY 110VDC-101 +SUPPLY 110VDC/1.6:C
+SUPPLY 110VDC-100
-X110 4 -X110 3
A A
903 902
3 1 96 98
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-F5
S282UC 4 2 95
B6
/6.8:B
-XQ1 15 -XQ1 16
115 115
1 / 4.2:A
B 114 B
A U
7.4:F 7.4:F
13
7
-KTQ
/3.4:E -LOC X 95 X 31 X 101 X 121 X 141
14
/3.2:D
B 8 6 Y
7.4:F 7.5:F SY Q/3 S75I/1 S75T/1 S75E/2
/2.3:C /2.4:C /2.5:C
/2.4:C /2.5:C
X 98 96 X 34 32 X 104 102 X 124 122 X 144 142
C C
D D
1
-LOC
/3.3:B
5
2 3
4 A1 A1 A1 A1 A1 A1 A1 A1 A1
E 6 E
2 / 4.2:E
LOCK OUT
ANSI (86) 13 14 /5.3:B 13 14 /5.4:B 13 14 /3.2:B 13 14 /6.4:B 13 14 +COUPLER/7.4:B 13 14 /5.7:C 13 14 /9.2:B 13 14 /5.8:A 13 14 /9.5:D
21 22 /5.7:C 21 22 /5.7:C 21 22 21 22 /6.4:B 21 22 21 22 21 22 21 22 21 22
31 32 +COUPLER/3.6:A 31 32 +COUPLER/3.5:A 31 32 31 32 31 32 +COUPLER/3.7:B 31 32 31 32 31 32 31 32
43 44 /6.4:B 43 44 /6.5:B 43 44 /9.3:D 43 44 /9.2:B 43 44 /9.3:B 43 44 /9.5:D 43 44 /9.3:B 43 44 /6.5:B 43 44
53 54 /9.2:D 53 54 /9.6:D 53 54 /9.4:D 51 52 /7.4:A 51 52 +TR 2/5.7:A 53 54 +COUPLER/7.4:B 53 54 /9.4:B 43 44 +TR 2/5.6:A
63 64 /9.2:D 63 64 /7.4:A 53 54 /9.4:B 63 64 /9.5:B 53 54 +COUPLER/3.8:B
73 74 +COUPLER/3.2:B 73 74 /8.6:C 61 62 /9.5:B 73 74 /9.5:B 63 64 /9.7:B
84 83 71
+COUPLER/3.6:A 72 /9.5:B 83 84 /9.6:B 83 84 /5.7:C
81 82 /9.6:B
STATUS LCKOUT
TRIP STATUS REF VOLTAGE STATUS CB TRIP STATUS CB ON/OFF STATUS CB RACKED IN STATUS CB TEST STATUS CB RACKED OUT
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 3
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
3.8:B / 1 1 / 5.1:A
B B
A1 A1 A1 A1
-KB-1 -KO-1 -KW-1 -KP-1
Buchloz Trip A2 Oil Temp. Trip A2 Winding Temp. A2 Pressure Trip A2
Trip
E 3.8:E / 2 2 / 5.1:F E
14 11 /7.4:A 14 11 /7.5:A 14 11 /7.5:A 14 11 /7.6:A
12 12 12 12
24 21 /5.7:D 24 21 /5.7:D 24 21 /5.7:D 24 21 /5.7:E
22 22 22 22
34 34 34 34
32 31 32 31 32 31 32 31
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 4
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
4.7:A / 1 1 / 6.1:B
A A
-X2 14 -XQ2 56 -XQ3 46 -XQ2 56 -XQ3 46
+COUPLER-KS
+COUPLER/8.6:E
+COUPLER/4.6:E
+COUPLER-KT
+COUPLER/4.4:E
+COUPLER-KQ'
13 63 13
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
63 21 21
-KT
+TR 2-KT +TR 2-KQ' /3.7:E
14 64 14
+TR 2/3.7:E 64 22 +TR 2/3.5:E 22
131
XQ1 55
13
-S2
CLOSE 14
GREEN
XQ1 28
141
B B
21
+COUPLER-KTQ
+COUPLER/4.3:E 22
21
-KUVQ
C -X4Q1 -X4Q1 /3.4:E 22 C
140 4 PERMISSION 3
134
TO CLOSE
13 83
-KR -KT
/3.6:E 14 /3.7:E 84
-XQ1 25 -XQ1 26
135
21
128 129
-KB-1
/4.4:E 24 22
136
21
-KO-1
D /4.4:E D
24 22
137
X 11 21
Q/1 X 21
-KW-1
/2.3:C /4.5:E 24 22
Q/2
X 14 12 /2.3:C
138
X 24 22
21
130 -KP-1
/4.6:E
142 24 22
X U1
139
E E
M
X D1 -M X C11 X C1
/2.6:C 1~
--
-YU -YO -YC
/2.6:C /2.6:C /2.6:C
X U2
X D2 X C12 X C2
114
4.7:E / 2 2 / 6.1:E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 5
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-X110
A 3 A
902
+SUPPLY 110VDC/1.6:C / +SUPPLY 110VDC-104
-X110
4
903
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-F6 -XQ1
2A 29
1 2 160
5.8:A / 1
B B
13 13 21 43 43 43 21 11 95
-S3 -KQ -KQ -KLOR -KUVQ -KT -KH -KMCB -F5
LAMP TEST 14 /3.5:E 14 /3.5:E 22 /3.3:E 44 /3.4:E 44 /3.7:E 44 /10.3:D 24 22 /6.8:E 14 12 /3.1:A 98 96
C C
13 43 53 63 73 83 13
-KTEST -KTEST -KTEST -KTEST -KTEST -KTEST -KTEST'
/6.2:E 14 /6.2:E 44 /6.2:E 54 /6.2:E 64 /6.2:E 74 /6.2:E 84 /6.3:E 14
D D
A1 A1 x1 x1 x1 x1 x1 x1 x1 A1
-KTEST -KTEST' -H1 -H2 -H3 -H4 -H5 -H6 -H7 -KMCB
A2 A2 ON x2 OFF x2 TRIP x2 TEST x2 VOLTAGE OK x2 CUBICLE x2 CONTROL CIRCUIT x2 MCB TRIP A2
RED GREEN YELLOW BLUE GREEN SPACE FAULT
HEATER WHITE
WHITE
E E
5.8:F / 2
13 14 /6.3:C 13 14 /6.7:C 14 11 /6.7:B
21 22 21 22 12
24 21 /9.8:D
31 32 31 32
22
43 44 /6.4:C 43 44
34
53 54 /6.5:C
32 31
63 64 /6.5:C
73 74 /6.5:C
83 84 /6.6:C
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 6
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-F7
-X110 -XQ1
3 38
902 2 1 169
+SUPPLY 110VDC/1.6:C / +SUPPLY 110VDC-106
-X110 -XQ1
4 39
903 4 3 170
+SUPPLY 110VDC/1.6:C / +SUPPLY 110VDC-107
A S282UC A
B6
11 11 11 11
51 63
-KB-1 -KO-1 -KW-1 -KP-1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-R3
X120 X100 1 2 X110
1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 15 17 19 18 20 22 21 23 24
+ -
0154 1/5 A
1.7:B / 02
B 7 B
lL1 BI 1 BI 2 BI 3 BI 4 BI 5 BI 6 BI 7 BI 8 SO1 SO2 SO3 SO4
0150 N
1.7:B / 01
8
0155 1/5 A
1.7:C / 03
9
lL2
N
10
0156 1/5 A
1.7:C / 04
11
lL3
N
12
0157 1/5 A
1.7:D / 05
13
lO
N
14
C C
X130
9
60
210V
not in use
REF 615F
VOLTAGE N
10
TEST BLOCK
111 0111 60
2.7:D / 010 1 01
11 210V
D U1 D
N
12
112 0112 60
2.7:E / 011 2 02 Overload&Short Circuit&
13 210V Earth Fault Protection
Voltage Protection
U2
50,51,50N,51N SPARE OUTPUTS
N
14
27,47,59
113 0113 60 TCS1 TCS1
2.7:E / 012 3 03
15 210V
U3
IRF PO1 PO2 SO1 SO2 PO3 PO3
E 110 0110 N E
2.7:E / 013 4 04 X1/LAN
16
60
17 210V
U0
N
18 X100 3 5 4 6 7 8 9 10 12 11 13 14 15 17 16 19 18 15 22 21 19 18
A B U Y S1 S2
3.2:B 3.2:C 3.4:B 3.4:C 9.7:C 9.7:D
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 7
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
104
2.4:D / L1'' 9
183
10
105
2.4:E / L2'' 5 x1
106 V
2.4:E / L3'' 1
-V1
x2
12
184
103
2.4:E / N'' 11
B B
L1-N
SELECTOR VOLT
L2-N
L3-N
0
L1-L2
L2-L3
L3-L1
S10
-XQ1
4
103 190
2.3:E / N
A1
Mech.Door Lock
A2
D -P1 D
0151 x1 x2
1.7:A / K1 A
-P2
0152 x1 x2
1.7:B / K2 A
-P3
0153 x1 x2
1.7:B / K3 A
0150
1.7:A / LC
E E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 8
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
50 53 56 59 62 65
13 43 53 63 73 83
68
-KR' -KR' -KR' -KR' -KR' -KR'
/3.7:E 14 /3.7:E 44 /3.7:E 54 /3.7:E 64 /3.7:E 74 /3.7:E 84
63
52 55 58 61 64 67
-KT
/3.7:E 64
43 43 53 61 71 81
STATUS CB ON STATUS CB ON STATUS CB ON STATUS CB OFF STATUS CB OFF STATUS CB OFF STATUS CB TEST
POSITION
C C
7.5:F
-X4Q1 19 -X4Q1 21 -X4Q1 23 -X4Q1 25 -X4Q1 27 -X4Q1 29 -X4Q1 31
S1 -X4Q1 35
70 72 74 76 78 80 82 84 86
63 53 43 53 43 13 53 -X4Q1 33 21
-KLOR -KLOR -KTQ -KTQ -KR -KO -KUVQ -KMCB
/3.3:E 64 /3.3:E 54 /3.4:E 44 /3.4:E 54 /3.6:E 44 /3.8:E 14 /3.4:E 54 /6.8:E 24 22
-X4Q1 34
D 83 D
71 73 75 77 79 81 87
85
STATUS LOCKOUT TRIP STATUS LOCKOUT TRIP STATUS CB TRIP STATUS CB TRIP STATUS CB RACKED IN STATUS CB RACKED OUT STATUS REF VOLTAGE STATUS REF GENERAL TRIP STATUS CONTROL CIRCUIT
CONNECTED FAULT MCB TRIP
E E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 9
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
0 1
-X5 2 -X5 1
B B
1 1
-FH -FL
2A 2A
2 2
2 4
2
TH1 -S1
HYGROSTATE 3 N LIMIT SWITCH
C C
3 5
-X5 3 -X5 4
12 x1
-H1
-KH -E1 LIGHTING
D 11 HEATER D
x2
14
12 11
24
22 21 /6.6:B
34
32 31
E E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 10
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CUSTOMER SIDE ABB SIDE CUSTOMER SIDE ABB SIDE CUSTOMER SIDE ABB SIDE
-X4Q1 -X6 -XCOM
1
MV TRIP Buchloz Trip
MODBUS COMMENECTION
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.
2
3
3
PERMISSION TO CLOSE Oil Temp. Trip
4
PE
5
STATUS CB ON Winding Temp. Trip
6
7
7
B STATUS CB ON Pressure reflief valve Trip B
8
9
STATUS CB ON
10
11
STATUS CB OFF
12
13
STATUS CB OFF
14
15
STATUS CB OFF
C C
16
17
STATUS CB TRIP
24
D D
25
STATUS CB TRIP
26
27
F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = Item(1)
2 8/27/2016 egemkha Prepared: Title: + TR 1
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Schematic multi-line /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 11
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
L1
A L1 A
N
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
PE
B B
L1 L2 L3
2.2:E 2.2:E 2.2:E
/4.2:B
/4.4:B
/4.5:B
/4.6:B
/4.6:B
/3.4:D
/3.6:D
/3.6:E
/3.4:E
/3.2:E
/3.1:E
Q2
X K1
K2
1 3 5
96 -96
98 -98
12
14
22
24
32
34
42
44
102 102
104 104
112 112
114 114
122 122
124 124
132 132
134 134
142 142
144 144
U1 -U1
36
38
C1
C11 C11
D1 -D1
46
48
C C
XV 1 3 5
36
38
C1
46
48
12
14
22
24
32
34
42
44
K1
K2
-K51
T11
T12 />
T21 / >>
T22 -F1
/ >>
A1 T31
/ >>>
D D
Ne+ Ne+
XV
101 101
141 141
C12 C12
Ne- Ne-
111 111
121 121
131 131
D2 D2
W3 W3
W4 W4
2 4 6
45 45
C2 C2
U2 U2
35 35
95 95
11 11
21 21
31 31
41 41
X 2 4 6
T1
400/110V -F4
20VA S273
E -XQ2 018 / 6.1:A -F1 -XQ2 -XQ2 K2A -XQ2 E
2A
200
1 1 2 5
204 L1 L1/1 207
8 2 1 12
211
010 / 9.1:D
-XQ2 019 / 6.1:B -F2 -XQ2 -XQ2 -XQ2
2A
201 2 1 2 6
205 L2 L2/1 208 9 4 3 13
212
011 / 9.1:D
-XQ2 020 / 6.1:B -F3 -XQ2 -XQ2 -XQ2
2A
202 3 1 2 7
206 L3 L3/1 209 10 6 5 14
213
012 / 9.1:E
-XQ2
11
210
013 / 9.1:E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
N
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-XQ2
-XQ2 18
15 217
214 025 / 6.1:D
022 / 6.1:C
-XQ2
16
215
023 / 6.1:C
-XQ2
17
216
024 / 6.1:D
-PE CURRENT
1 TEST BLOCK
250 -X3 1 0250
-T1 5 05 LC / 6.1:E
L
B 5000/5 B
Cl. 0.5
15VA
K 251 -X3 2 0251
6 06 K1 / 6.1:D
250 -X3 1
-T2 L
5000/5
Cl. 0.5 -X3 3
15VA
K 252 0252
7 07 K2 / 6.1:E
250 -X3 1
-T3
L
5000/5
Cl. 0.5
15VA
K 253 -X3 4 0253
8 08 K3 / 6.1:E
L1 L2 L3
1.2:B 1.2:B 1.2:B
E E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+SUPPLY 110VDC/1.6:D
+SUPPLY 110VDC/1.6:B
+SUPPLY 110VDC-117
+SUPPLY 110VDC-116
-X110 4 -X110 3
A +TR 1 +TR 1 A
903 902
-XQ1 -KUVQ -KQ
96 98 45
3 1 31 32 0224 83 84
-F5
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
/5.8:C
-KR -KTQ -XQ2 -XQ3 -KUVQ -KQ -XQ3 -XQ1 +TR 1-KLOR -XQ1 -XQ3 +TR 2-KLOR -XQ3
-XQ2 20 -XQ2 19
23 48 49 46 47 50 51
218 14 13 223 51 52 31 32 0225 83 84 32 31 226 32 31 239
/4.5:E /4.3:E +TR 2/3.4:E +TR 2/3.5:E +TR 1/3.3:E +TR 2/3.3:E
219 -X2 17
228
13 73 73 73 13 13 13
-S11 +TR 1-KLOR +TR 2-KLOR -KTQ -KUVQ -S2 -K2 -XQ2 24
DOOR +TR 1/3.3:E 74 +TR 2/3.3:E 74 /4.3:E 74 /4.7:E 14 OPEN 14 /7.5:E 14 2
14
LIMIT SWITCH RED
1 2
-S20
-X2 18
/7.6:C
AUTO
MAN
1 3
-XQ2
26
230
C C
-XQ2 25
229
3.4:B / SO 67
-KA
/3.7:E 68
220 221 13
-S3
CLOSE 14
GREEN 231
-XQ2 21 -XQ2 22
-XQ2 27
21
D D
-KUVQ
/4.7:E 22
X 11
623
Q/1
/1.4:D
X 21
X 14 12
Q/2
/1.4:D
X 24 22
222
232
X U1
M X D1 X C11 X C1
-M A1
E /1.6:D 1~
-- -YC -KA E
-YU -YO
/1.7:D /1.7:D /1.6:D A2
X U2 X D2 X X
C12 C2
D / 4.2:E
13 14
21 22
31 32
43 44
55 56
67 68 /3.7:C
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 3
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
218
3.4:A / C 1 / 5.1:B
A U
9.4:F 9.4:F
X 95 7 X 31 X 101 X 121 X 141
B B
-LOC Q/3 S75E/2
SY /4.2:D S75I/1 S75T/1
/1.6:D
B /1.3:D
8 6 /1.4:D /1.5:D /1.5:D Y
9.4:F 9.5:F
X 98 96 X 34 32 X 104 102 X 124 122 X 144 142
C C
D D
1
-LOC
/4.3:B
5
2 3
4 A1 A1 A1 A1 A1 A1 A1 A1
E 3.8:E / D 2 / 5.1:E E
LOCK OUT 13 14 /5.4:B
ANSI (86) 21 22 +TR 1/5.7:B 13 14 /5.3:B 13 14 /7.4:C 13 14 /3.4:A 13 14 /10.2:B 13 14 /3.4:B 13 14 /10.5:D 13 14 /3.3:B
31 32 +TR 2/5.7:B 21 22 /5.4:B 21 22 +TR 1/5.7:A 21 22 21 22 21 22 21 22 21 22 /3.6:D
43 44 /10.2:D 31 32 31 32 +TR 2/5.7:A 31 32 31 32 31 32 31 32 31 32
51 52 /3.5:A 43 44 43 44 /10.3:B 43 44 /7.4:C 43 44 /10.3:B 43 44 /5.5:B 43 44 43 44
63 64 /10.3:D 51 52 /9.4:A 53 54 /10.4:B 53 54 /10.4:D 53 54 /10.4:B 43 44 +TR 2/5.6:A
73 74 /3.3:B 53 54 /10.2:B 61 62 /10.5:B 63 64 /10.5:B 63 64 +TR 1/5.6:A
63 64 /9.4:A 71 72 /10.6:B 73 74 /10.6:B 73 74 /10.7:B
83 84 /6.4:D 81 82 /10.7:B 83 84 /10.7:B
STATUS LCKOUT
STATUS CB TRIP
TRIP STATUS CB ON/OFF STATUS CB RACKED IN STATUS CB TEST STATUS CB RACKED OUT
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 4
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-X110
3
+SUPPLY 110VDC/1.6:B / +SUPPLY
902
110VDC-118
-X110
4
+SUPPLY 110VDC/1.6:D / +SUPPLY
903
110VDC-119
-F6 -XQ2
2A 34
1 2 260
4.8:A / 1
B B
21 43
13 13 21 13 43 -KH -KS
/11.3:D
-S4 -KQ -KQ -KTQ -KT 24 22 /8.6:E 44 11 95
LAMP TEST 14 /4.4:E 14 /4.4:E 22 /4.3:E 14 /4.6:E 44
-KMCB -F5
/5.8:E 14 12 /3.1:A 98 96
C C
13 43 53 63 73 83 13 43
-KTEST -KTEST -KTEST -KTEST -KTEST -KTEST -KTEST' -KTEST'
/5.2:E 14 /5.2:E 44 /5.2:E 54 /5.2:E 64 /5.2:E 74 /5.2:E 84 /5.3:E 14 /5.3:E 44
D D
261 262 263 264 265 266 267 268 269 294
A1 A1 x1 x1 x1 x1 x1 x1 x1 x1 A1
E E
-KTEST -KTEST' -H1 -H2 -H3 -H4 -H5 -H6 -H7 -H8 -KMCB
A2 A2 ON x2 OFF x2 TRIP x2 TEST x2 VOLTAGE OK x2 CUBICLE x2 SYNC.ON x2 CONTROL CIRCUIT x2 MCB TRIP A2
RED GREEN YELLOW BLUE GREEN SPACE GREEN FAULT
HEATER WHITE
WHITE
4.8:E / 2
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 5
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-F7 -XQ2
2A 44
200 1 2 270
1.3:E / 018 9
280
-F8 -XQ2 10
2A 45
201 1 2 271
1.3:E / 019 5 x1
-F9 -XQ2
2A
202 1 2 46
272 V
1.3:E / 020 1
-V1
x2
12
281
217 11
B B
L1-N
SELECTOR VOLT
L2-N
L3-N
0
L1-L2
L2-L3 217
L3-L1
S10
C C
-F11 -XQ2
2A 47
214 1 2 282
2.3:A / 022 9
292
-F12 -XQ2 10
2A 48
215 1 2 283
2.3:B / 023 5 x1
-F13 -XQ2
2A
216 1 2 49
284 V
2.3:B / 024 1
-V2
x2
12
293
217 11
217
D 025 N / 6.6:D L1-N D
SELECTOR VOLT
2.5:A /
L2-N
L3-N
0
-P1
L1-L2
0251 x1 x2 83
2.5:B / K1 A -KQ
L2-L3
6.5:D
/4.4:E 84
L3-L1 N
-P2 S11
0252 x1 x2
2.5:B / K2 A
290
-P3
0253 x1 x2 A1
E 2.5:C / K3 A Mech.Door Lock E
A2
0250
2.5:B / LC
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 6
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-FC
S282UC
-X110 -X2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
B6
3 1
902 2 1 600
+SUPPLY 110VDC/1.6:B / +SUPPLY 110VDC-120 020 / 8.6:A
-X110
4
903 4 3
+SUPPLY 110VDC/1.6:D / +SUPPLY 110VDC-121 -XQ1 51
15
13
-KT1
+TR 1-KQ' /7.4:E 18 16
+TR 1/3.5:E 14 13 11
603
1 2 3
-S5
-X2 8
-XQ2 50
INC-A
INC-B
BC
13
-KQ' 612
/4.4:E 14
604
31
C 43 -KS C
601 /8.6:E
-KR 32
/4.5:E -X2 5 -X2 6 -X2 7
44
0613
-XQ2 51
609 610 611 9
605 1 2
-S20
/3.7:C
OPEN INC.A
OPEN INC.B
AUTO
-XQ3 53
MAN
10 11
OPEN B.C
13
+TR 2-KQ'
+TR 2/3.5:E 14
606
53
D 613 D
+TR 2-KR
+TR 2/3.6:E 54
-XQ3 54
-X2 3
607
A1 A1 A1 A1 A1 A1
-KT1 -K1 -K2 -K3 -KSS -KSS'
E TIME ????
A2 A2 A2 A2 A2 A2 E
021 / 8.5:E
18 13 14 +TR 1/5.2:B 13 14 /3.4:B 13 14 +TR 2/5.2:C 14 14
15 /7.5:B
16 21 22 21 22 21 22 12 11 /7.6:B 12 11
31 32 31 32 31 32 24 24
43 44 43 44 43 44 22 21 /8.1:C 22 21 /8.3:C
34 34
32 31 /8.2:C 32 31 /8.3:C
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Incoming 0.4-CB-03 (Control)
Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 7
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
7.7:A / 020
V TR-1 V TR-2
+TR 1/2.3:D +TR 1/2.3:E +TR 2/2.3:D +TR 2/2.3:E Manual Synchronizing Relay
+TR 1-L1' +TR 1-L2' +TR 2-L1' +TR 2-L2'
SQ 02*4 IsKra
-XQ1 1 -XQ1 2 -XQ3 1 -XQ3 2
B SYNC B
100 101 300 301
/8.6:C /8.6:C
BUS BAR 1
1 1 1 1
U + - UGEN
614 615 616 617
UBB
21 31 21 31
C -KSS -KSS -KSS' -KSS' C
/7.6:E /7.6:E /7.6:E /7.6:E
STATUS BUS BAR 2 BUS BAR 1 SYNC.
24 22 34 32 24 22 34 32
L2 L1 L2 L1
7 8 4 3 2 1 6 5
+ -
24Vmax
X2
11
620
X2
12
621
-X2
9
618
-X2
10
D 619 -X2 13
D
622
A1
E -KS E
A2
7.7:E / 021
13 14 +TR 1/5.5:A
31 32 /7.6:C
43 44 /3.6:B
43 44 /5.6:B
53 54 +TR 2/5.5:A
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 8
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-F15
-X110 -XQ2
3 52
902 2 1 294
+SUPPLY 110VDC/1.6:B / +SUPPLY 110VDC-122
-X110 -XQ2
4 53
903 4 3 295
+SUPPLY 110VDC/1.6:D / +SUPPLY 110VDC-123
A S282UC A
B6
51 63
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-KQ -KQ
/4.4:E 52 /4.4:E 64
-XQ2 54 -XQ2 55
296 297
-R3
X120 X100 1 2 X110
1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 15 17 19 18 20 22 21 23 24
+ -
0254 1/5 A
2.5:C / 02
B 7 B
lL1 BI 1 BI 2 BI 3 BI 4 BI 5 BI 6 BI 7 BI 8 SO1 SO2 SO3 SO4
0250 N
2.5:C / 01
8
0255 1/5 A
2.5:D / 03
9
lL2
N
10
0256 1/5 A
2.5:D / 04
11
lL3
N
12
0257 1/5 A
2.5:D / 05
13
lO
N
14
C C
X130
9
60
210V
not in use
REF 615F
VOLTAGE N
10
TEST BLOCK
211 0211 60
1.6:E / 010 1 01
11 210V
D U1 D
N
12
212 0212 60
1.6:E / 011 2 02 Overload&Short Circuit&
13 210V Earth Fault Protection
Voltage Protection
U2
50,51,50N,51N
N
14
27,47,59
213 0213 60 TCS1 TCS1
1.6:E / 012 3 03
15 210V
U3
IRF PO1 PO2 SO1 SO2 PO3 PO3
E 210 0210 N E
1.6:F / 013 4 04 X1/LAN
16
60
17 210V
U0
N
18 X100 3 5 4 6 7 8 9 10 12 11 13 14 15 17 16 19 18 15 22 21 19 18
A B U Y S1 S2
4.2:B 4.2:B 4.7:B 4.7:B 10.6:D 10.6:D
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 9
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
50 53 56 59 62 65
13 43 53 63 73 83 68
-KR' -KR' -KR' -KR' -KR' -KR'
/4.5:E 14 /4.5:E 44 /4.5:E 54 /4.5:E 64 /4.5:E 74 /4.5:E 84 73
52 55 58 61 64 67 -KT
/4.6:E 74
53 43 53 61 71 81
B -KQ' -KQ' -KQ' B
-KQ -KQ' -KQ'
/4.4:E 54 /4.4:E 44 /4.4:E 54
/4.4:E 62 /4.4:E 72 /4.4:E 82 69
51 54 57 60 63 66
STATUS CB ON STATUS CB ON STATUS CB ON STATUS CB OFF STATUS CB OFF STATUS CB OFF STATUS CB TEST
POSITION
C C
70 72 74 76 80
78
43 63 53 13 21
-X4Q2 23
-KTQ -KTQ -KR -KO -KMCB
/4.3:E 44 /4.3:E 64 /4.5:E 54 /4.6:E 14 /5.8:E 24 22
-X4Q2 24
D D
71 73 75 77 79 81
STATUS LOCKOUT TRIP STATUS LOCKOUT TRIP STATUS CB RACKED IN STATUS CB RACKED OUT STATUS REF GENERAL TRIP STATUS MCB TRIP
E E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 10
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
0 1
-X5 2 -X5 1
B B
1 1
-FH -FL
2A 2A
2 2
2 4
2
TH1 -S1
HYGROSTATE 3 N LIMIT SWITCH
C C
3 5
-X5 3 -X5 4
12 x1
-H1
-KH -E1 LIGHTING
D 11 HEATER D
x2
14
12 11
24
22 21 /5.6:B
34
32 31
E E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 11
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CUSTOMER SIDE ABB SIDE CUSTOMER SIDE ABB SIDE CUSTOMER SIDE ABB SIDE
-X4Q2 -XCOM -X110
+
1
STATUS CB ON EXTERNAL SUPPLY 110VDC
MODBUS COMMENECTION -
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.
2
3
3
STATUS CB ON
4
PE
5
STATUS CB ON
6
7
B STATUS CB OFF B
8
9
STATUS CB OFF
10
11
STATUS CB OFF
12
13
STATUS CB RACKED IN
20
21
D D
25
E E
F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = Item(1)
2 8/27/2016 egemkha Prepared: Title: + COUPLER
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Schematic multi-line /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 12
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 12
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
2.1:F
2.1:F
2.1:F
2.2:F
2.2:F
PE.
L1.
L2.
L3.
N.
A A
-PE CURRENT
1 TEST BLOCK
-X3 1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
350 0350
-T1 1 01 LC / 8.2:E
L
5000/5
Cl. 0.5
15VA
K 351 -X3 2
0351
2 02 K1 / 8.2:D
350 -X3 1
-T2 L
5000/5
Cl. 0.5 -X3 3
15VA
K 352 0352
3 03 K2 / 8.2:D
350 -X3 1
-T3 L
5000/5
B Cl. 0.5 B
15VA
K 353 -X3 4 0353
4 04 K3 / 8.2:E
D D
N1/1
PE/1
L1/1
L2/1
L3/1
UPSTREAM MV SWG
51G TRIP
-PE
-T8
5000/5
BUSDUCT(S-LV-80-A)
5P20
E 10VA E
TO REF 615 F
TRAFO. TO ANNOUNCE ON DISPLAY
CP UNIT THE TRANSFORMER
MECHANICAL
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
/3.4:C
/3.5:C
/3.7:C
/3.8:C
/5.3:D
/5.5:E
/5.5:E
/5.3:E
/5.1:E
/3.6:C
/5.2:E
B Q3 B
K1
K2
1 3 5
96 -96
98 -98
12
14
22
24
32
34
42
44
102 102
104 104
112 112
114 114
122 122
124 124
132 132
134 134
142 142
144 144
U1 -U1
36
38
C1
C11 C11
D1 -D1
46
48
XV 1 3 5
36
38
C1
46
48
12
14
22
24
32
34
42
44
K1
K2
-K51
T11
T12 />
T21 / >>
T22 -F1
/ >>
A1 T31
/ >>>
XV
101 101
141 141
C12 C12
Ne- Ne-
111 111
121 121
131 131
D2 D2
W3 W3
W4 W4
2 4 6
45 45
C2 C2
U2 U2
35 35
95 95
11 11
21 21
31 31
41 41
X 2 4 6
D D
T1
400/110V -F4
L1' / +COUPLER/8.3:B 20VA S273
-XQ3 -F1 -XQ3 -XQ3 K2A -XQ3
1 L1 / 8.2:C 2A
5 L1'' / 8.2:A L1 L1/1 8 12
300 1 2 304 307 2 1 311
010 / 7.1:D
-XQ3 -F2 -XQ3 -XQ3 -XQ3
2 L2 / 8.2:C 2A
6 L2'' / 8.2:A L2 L2/1 9 13
301 1 2 305 308 4 3 312
011 / 7.1:D
-XQ3 L2' / +COUPLER/8.3:B -F3 -XQ3 -XQ3 -XQ3
3 2A 7 L3'' / 8.2:B L3 L3/1 10 14
302 1 2 306 309 6 5 313
012 / 7.1:E
-XQ3 L3 / 8.2:C -XQ3
4 11
303 310
N'' / 8.2:B 013 / 7.1:E
E N / 8.2:D E
x1 x1 x1
-H8 -H9 -H10
L1 x2 L2 x2 L3 x2
RED RED RED
1.2:A
1.3:A
1.3:A
1.3:A
1.3:A
PE.
L1.
L2.
L3.
N.
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+SUPPLY 110VDC/1.6:D
+SUPPLY 110VDC-109 +SUPPLY 110VDC/1.6:C
+SUPPLY 110VDC-108
-X110 4 -X110 3
A A
903 902
3 1 96 98
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-F5
S282UC 4 2 95
B6
/6.8:B
-XQ3 15 -XQ3 16
315
1 / 4.2:A
B 314 B
A U
7.4:F 7.4:F
13
7
-KTQ
/3.4:E -LOC X 95 X 31 X 101 X 121 X 141
14
/3.2:D
B 8 6 Y
7.4:F 7.5:F SY Q/3 S75I/1 S75T/1 S75E/2
/2.3:C /2.4:C /2.5:C
/2.4:C /2.5:C
X 98 96 X 34 32 X 104 102 X 124 122 X 144 142
C C
D D
1
-LOC
/3.3:B
5
2 3
4 A1 A1 A1 A1 A1 A1 A1 A1 A1
E 6 E
2 / 4.2:E
LOCK OUT
ANSI (86) 13 14 /5.3:C 13 14 /5.4:C 13 14 /3.2:B 13 14 /6.4:B 13 14 +COUPLER/7.4:D 13 14 /5.7:C 13 14 /9.2:B 13 14 /5.8:A 13 14 /9.5:D
21 22 /5.7:C 21 22 /5.7:C 21 22 21 22 /6.4:B 21 22 +TR 1/5.7:A 21 22 21 22 21 22 21 22
31 32 +COUPLER/3.7:A 31 32 +COUPLER/3.5:A 31 32 31 32 31 32 +COUPLER/3.7:B 31 32 31 32 31 32 31 32
43 44 /6.4:B 43 44 /6.5:B 43 44 /9.3:D 43 44 /9.2:B 43 44 /9.3:B 43 44 /9.5:D 43 44 /9.3:B 43 44 /5.7:C 43 44
53 54 /9.2:D 53 54 /9.6:D 53 54 /9.4:D 51 52 /7.4:A 53 54 /9.4:B 53 54 +COUPLER/7.4:D 53 54 /9.4:B 53 54 +COUPLER/3.8:B
63 64 /9.1:D 63 64 /7.4:A 61 62 /9.5:B 63 64 /9.5:B 63 64 +TR 1/5.6:A
73 74 +COUPLER/3.3:B 73 74 /8.6:C 71 72 /9.5:B 73 74 /9.5:B 63 64 /9.7:B
84 83 81
+COUPLER/3.6:A 82 /9.6:B 83 84 /9.6:B 73 74 /6.5:B
STATUS LCKOUT
TRIP STATUS REF VOLTAGE STATUS CB TRIP STATUS CB ON/OFF STATUS CB RACKED IN STATUS CB TEST STATUS CB RACKED OUT
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 3
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
3.8:B / 1 1 / 5.1:A
B B
A1 A1 A1 A1
-KB-1 -KO-1 -KW-1 -KP-1
Buchloz Trip A2 Oil Temp. Trip A2 Winding Temp. A2 Pressure Trip A2
Trip
E 3.8:E / 2 2 / 5.1:F E
14 11 /7.4:A 14 11 /7.5:A 14 11 /7.5:A 14 11 /7.6:A
12 12 12 12
24 21 /5.7:D 24 21 /5.7:D 24 21 /5.7:E 24 21 /5.7:E
22 22 22 22
34 34 34 34
32 31 32 31 32 31 32 31
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 4
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
4.7:A / 1 1 / 6.1:B
A A
-X2 21 -XQ2 59 -XQ1 55 -XQ2 59 -XQ1 55
+COUPLER-KS
+COUPLER/8.6:E
+COUPLER/4.6:E
+COUPLER-KT
+COUPLER/4.4:E
+COUPLER-KQ'
53 43 13
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
43 31 51
-KT
+TR 1-KT +TR 1-KQ' /3.7:E
54 44 14
+TR 1/3.7:E 44 32 +TR 1/3.5:E 52
331
XQ3 55
13
-S2
CLOSE 14
GREEN
B XQ3 28 B
340
-X4Q3 1 31
MV +COUPLER-KTQ
-X2 21 +COUPLER/4.3:E 32
TRIP
13
-XQ2 61
13 13 13 13
-X4Q3 2 332
-S11 +COUPLER-K3 -S1 -KLOR -KUVQ
DOOR
14
+COUPLER/7.5:E 14 OPEN 14 /3.3:E 14 /3.4:E 14 -XQ3 27
LIMIT SWITCH RED 21
-X2 22 -KLOR
/3.3:E 22
333
C -X4Q3 -X4Q3 21 C
4 PERMISSION 3
-KUVQ
TO CLOSE /3.4:E 22
334
13 43
-KR -KT
/3.6:E 14 /3.7:E 44
335
328 329
21
342 -KB-1
/4.4:E 24 22
-XQ3 25 -XQ3 26
336
D 21 D
-KO-1
/4.4:E 24 22
X 11
337
Q/1 X 21
/2.3:C 339 21
Q/2 -KW-1
X 14 12 /2.3:C /4.5:E 24 22
X 24 22
338
330
21
341
X U1 -KP-1
/4.6:E 24 22
E E
M
X D1 -M X C11 X C1
/2.6:C 1~
--
-YU -YO -YC
/2.6:C /2.6:C /2.6:C
X U2
X D2 X C12 X C2
114
4.7:E / 2 2 / 6.1:E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 5
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-X110
A 3 A
902
+SUPPLY 110VDC/1.6:B / +SUPPLY 110VDC-110
-X110
4
903
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-F6 -XQ3
2A 29
1 2 360
5.8:A / 1
B B
13 13 21 43 43 73 21 11 95
-S3 -KQ -KQ -KLOR -KUVQ -KT -KH -KMCB -F5
LAMP TEST 14 /3.5:E 14 /3.5:E 22 /3.3:E 44 /3.4:E 44 /3.7:E 74 /10.3:D 24 22 /6.8:E 14 12 /3.1:A 98 96
C C
13 43 53 63 73 83 13
-KTEST -KTEST -KTEST -KTEST -KTEST -KTEST -KTEST'
/6.2:E 14 /6.2:E 44 /6.2:E 54 /6.2:E 64 /6.2:E 74 /6.2:E 84 /6.3:E 14
D D
A1 A1 x1 x1 x1 x1 x1 x1 x1 A1
-KTEST -KTEST' -H1 -H2 -H3 -H4 -H5 -H6 -H7 -KMCB
A2 A2 ON x2 OFF x2 TRIP x2 TEST x2 VOLTAGE OK x2 CUBICLE x2 CONTROL CIRCUIT x2 MCB TRIP A2
RED GREEN YELLOW BLUE GREEN SPACE FAULT
HEATER WHITE
WHITE
E E
5.8:F / 2
13 14 /6.3:C 13 14 /6.7:C 14 11 /6.7:B
21 22 21 22 12
24 21 /9.8:D
31 32 31 32
22
43 44 /6.4:C 43 44
34
53 54 /6.5:C
32 31
63 64 /6.5:C
73 74 /6.5:C
83 84 /6.6:C
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 6
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-F7
-X110 -XQ3
3 38
902 2 1 369
+SUPPLY 110VDC/1.6:B / +SUPPLY 110VDC-112
-X110 -XQ3
4 39
903 4 3 370
+SUPPLY 110VDC/1.6:D / +SUPPLY 110VDC-113
A S282UC A
B6
11 11 11 11
51 63
-KB-1 -KO-1 -KW-1 -KP-1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-R3
X120 X100 1 2 X110
1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 15 17 19 18 20 22 21 23 24
+ -
0354 1/5 A
1.7:C / 02
B 7 B
lL1 BI 1 BI 2 BI 3 BI 4 BI 5 BI 6 BI 7 BI 8 SO1 SO2 SO3 SO4
0350 N
1.7:B / 01
8
0355 1/5 A
1.7:C / 03
9
lL2
N
10
0356 1/5 A
1.7:C / 04
11
lL3
N
12
0357 1/5 A
1.7:D / 05
13
lO
N
14
C C
X130
9
60
210V
not in use
REF 615F
VOLTAGE N
10
TEST BLOCK
311 0311 60
2.7:E / 010 1 01
11 210V
D U1 D
N
12
312 0312 60
2.7:E / 011 2 02 Overload&Short Circuit&
13 210V Earth Fault Protection
Voltage Protection
U2
50,51,50N,51N
N
14
27,47,59
313 0313 60 TCS1 TCS1
2.7:E / 012 3 03
15 210V
U3
IRF PO1 PO2 SO1 SO2 PO3 PO3 X1/LAN
E 310 0310 N E
2.7:E / 013 4 04
16
60
17 210V
U0
N
18 X100 3 5 4 6 7 8 9 10 12 11 13 14 15 17 16 19 18 15 22 21 19 18
A B U Y S1 S2
3.2:B 3.2:C 3.4:B 3.4:C 9.7:D 9.7:D
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 7
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
304
2.4:D / L1'' 9
383
10
305
2.4:E / L2'' 5 x1
306 V
2.4:E / L3'' 1
-V1
x2
12
384
303
2.4:E / N'' 11
B B
L1-N
SELECTOR VOLT
L2-N
L3-N
0
L1-L2
L2-L3
L3-L1
S10
-XQ3
4
303 390
2.3:E / N
A1
Mech.Door Lock
A2
D -P1 D
0351 x1 x2
1.7:A / K1 A
-P2
0352 x1 x2
1.7:B / K2 A
-P3
0353 x1 x2
1.7:B / K3 A
0350
1.7:A / LC
E E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 8
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
50 53 56 59 62 65
13 43 53 63 73 83
68
-KR' -KR' -KR' -KR' -KR' -KR'
/3.7:E 14 /3.7:E 44 /3.7:E 54 /3.7:E 64 /3.7:E 74 /3.7:E 84
63
52 55 58 61 64 67
-KT
/3.7:E 64
43 43 53 61 71 81
STATUS CB ON STATUS CB ON STATUS CB ON STATUS CB OFF STATUS CB OFF STATUS CB OFF STATUS CB TEST
POSITION
C C
S1
70 72 74 76 78 80 82 86
84
63 53 43 53 43 13 53 21
-KLOR -KLOR -KTQ -KTQ -KR -KO -KUVQ -X4Q3 33
-KMCB
/3.3:E 64 /3.3:E 54 /3.4:E 44 /3.4:E 54 /3.6:E 44 /3.8:E 14 /3.4:E 54 /6.8:E 24 22
-X4Q3 34
D D
71 73 75 77 79 81 83 85 87
S2
-X4Q3 20 -X4Q3 22 -X4Q3 24 -X4Q3 26 -X4Q3 28 -X4Q3 30 -X4Q3 32
7.6:F -X4Q3 36
STATUS LOCKOUT TRIP STATUS LOCKOUT TRIP STATUS CB TRIP STATUS CB TRIP STATUS CB RACKED IN STATUS CB RACKED OUT STATUS REF VOLTAGE STATUS REF GENERAL TRIP STATUS CONTROL CIRCUIT
CONNECTED FAULT MCB TRIP
E E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 9
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
0 1
-X5 2 -X5 1
1
B B
-FH
2A
2
-X5 3
2 4
2
TH1 -S1
HYGROSTATE 3 N LIMIT SWITCH
C C
3 5
-X5 3 -X5 4
12 x1
-H1
-KH -E1 LIGHTING
D 11 HEATER D
x2
14
12 11
24
22 21 /6.6:B
34
32 31
E E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 10
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CUSTOMER SIDE ABB SIDE CUSTOMER SIDE ABB SIDE CUSTOMER SIDE ABB SIDE
-X4Q3 -X6 -XCOM
1
MV TRIP Buchloz Trip
MODBUS COMMENECTION
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.
2
3
3
PERMISSION TO CLOSE Oil Temp. Trip
4
PE
5
STATUS CB ON Winding Temp. Trip
6
7
7
B STATUS CB ON Pressure reflief valve Trip B
8
9
STATUS CB ON
10
11
STATUS CB OFF
12
13
STATUS CB OFF
14
15
STATUS CB OFF
C C
16
17
STATUS CB TRIP
24
D D
25
STATUS CB TRIP
26
27
F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = Item(1)
2 8/27/2016 egemkha Prepared: Title: + TR 2
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Schematic multi-line /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 11
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 11
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-X1
1
1
L1Q1 / 4.3:A
-X1
2
2
L2Q1 / 4.3:A
-X1
3
3
L3Q1 / 4.3:B
-X1
4
0
NQ1 / 4.3:B
B B
-X24
1
908
+SUPPLY 24VDC-108 / +SUPPLY 24VDC/1.4:C
-X24
2
909
+SUPPLY 24VDC-109 / +SUPPLY 24VDC/1.4:D
/2.6:B
/2.4:B
/2.5:B
/2.5:B
/3.4:D
/3.3:D
/3.4:E
/3.3:E
/3.2:E
/2.4:B
/3.2:E
Q1
X
K1
K2
1 3 5
96 -96
98 -98
12
14
22
24
32
34
42
44
102 102
104 104
112 112
114 114
122 122
124 124
132 132
134 134
142 142
144 144
U1 -U1
36
38
C1
C11 C11
D1 -D1
46
48
XV 1 3 5 APPLICABLE FOR :
36
38
C1
46
48
12
14
22
24
32
34
42
44
K1
K2
C 2M1 C
T21 / >>
-F1
13M1
T22
/ >>
A1 T31
/ >>>
T33
T34
Ne+ Ne+
XV
101 101
141 141
C12 C12
Ne- Ne-
111 111
121 121
131 131
D2 D2
W3 W3
W4 W4
2 4 6
45 45
C2 C2
U2 U2
35 35
95 95
11 11
21 21
31 31
41 41
D X 2 4 6 D
NCT
1000 1001
-XCOM 1 2 3
-T1 30 -X3 1
LCQ1 / 4.3:C
1600/5 L
Cl. 0.5
15VA K 31 -X3 2
K1Q1 / 4.3:B
-T2 30 -X3 1
1600/5 L
E Cl. 0.5 E
15VA K 32 -X3 3
K2Q1 / 4.3:C
-T3 30 -X3 1
1600/5 L
Cl. 0.5
15VA K 33 -X3 4
K3Q1 / 4.3:C
1
-PE
PE
L1
L2
L3
N
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-F1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-X110 -X1
3 5
+SUPPLY 110VDC/1.6:B / +SUPPLY
902 2 1 4
110VDC-124 01 / 3.1:A
-X110 -X1
4 6
+SUPPLY 110VDC/1.6:D / +SUPPLY
903 4 3
110VDC-125
S282UC
B6
B X 11 X 101 X 141 X 121 X 95 B
7
Q/1 S75I/1 S75E/2 S75T/1 SY -LOC
/1.3:C /1.5:C /1.3:C /2.6:D
/1.4:C /1.5:C 8 6
X 14 12 X 104 102 X 144 142 X 124 122 X 98 96
5 6 7 8 9 10 11
C C
D D
1
-LOC
/2.7:B
5
2 3
A1 A1 A1 A1 4 A1
-KQ -KR -KO -KT 8 -KLOR
A2 A2 A2 A2 7 A2
02 / 3.1:E
LOCK OUT
E 13 14 /3.6:C 13 14 /4.7:E 13 14 /3.7:C 13 14 /4.4:E ANSI (86) 13 14 /3.7:C E
21 22 /3.6:C 21 22 21 22 21 22 21 22 /3.3:B
31 32 /4.4:E 31 32 31 32 31 32 31 32
43 44 /4.2:E 43 44 /4.2:D 43 44 /4.8:E 43 44 /4.5:E 43 44 /4.6:E
53 54 /4.3:E 53 54 /4.3:D 63 64 /4.5:E
61 62 /4.5:E
73 74 /4.7:A
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
2.7:A / 01
21
-KLOR
/2.7:E 22
-X1 14
B B
13
13
-S11
2
DOOR
14
LIMIT SWITCH 1 2
-S10
REMOTE
/4.1:E
LOCAL
1 3
15
13 13 21 13 13 21
-S3 -KQ -KQ -KLOR -KO -KH
14 LAMP TEST 14 /2.4:E 14 /2.4:E 22 /2.7:E 14 /2.5:E 14 /5.3:D 24 22
-X4 1 -X4 3
REMOTE SIGNAL
13 13
CLOSE / OPEN
-S1 -S2 -X4 2 -X4 4
C C
OPEN 14 CLOSE 14
13 43 53 63 83
-KA -KA -KA -KA -KA
-X1 13 -X1 15 -X1 16 /3.5:E 14 /3.5:E 44 /3.5:E 54 /3.5:E 64 /3.5:E 84
12 16 18
X 31 X 21
Q/3 Q/2
/1.4:C /1.4:C -X1 17 -X1 18 -X1 19 -X1 20 -X1 21 -X1 22
D X 34 32 X 23 22 D
20 21 22 23 24 25
17 19
X U1
X D1 X C11 X C1
A1
M x1 x1 x1 x1 x1
-M -YU -YO -YC -KA
/1.6:D 1~
-- /1.6:C /1.6:C /1.6:C
-H1 -H2 -H3 -H4 -H5
A2 ON x2 OFF x2 TRIP x2 C.B RACKED OUT x2 CUBICLE x2
RED GREEN YELLOW WHITE SPACE
X D2 X C12 X C2 HEATER
X U2 WHITE
2.7:E / 02
E 13 14 /3.6:C E
21 22
31 32
43 44 /3.6:C
53 54 /3.6:C
63 64 /3.7:C
83 84 /3.7:C
LAMP TEST
STATUS
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 3
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-F2 2A -X3
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
9
1 1 2 40
1.3:A / L1Q1
-F3 2A -X3 73
10
2 1 2 41 -KQ
1.3:B / L2Q1
/2.4:E 74
-F4 2A -X3
11
3 1 2 42
1.3:B / L3Q1
-XQ1
0 4 26
1.3:B / NQ1
A1
B B
-P1 Mech.Door Lock
31 x1 x2 A2
1.5:E / K1Q1 A
-P2
32 x1 x2
1.5:E / K2Q1 A
-P3
33 x1 x2
1.5:E / K3Q1 A
C C
30
1.5:E / LCQ1
D D
52 55
50 43 53 58 60 62 64 66 68
-KR -KR
/2.4:E 44 /2.4:E 54
6 31 61
13 43 63 43 13 43
54 57
1 2
5 7
-KQ -KQ
/2.4:E 44 /2.4:E 54 59 61 63 65 67 69
51
53 56
E E
-X4 6 -X4 8 -X4 10 -X4 12 -X4 14 -X4 16 -X4 18 -X4 20 -X4 22
STATUS SELECTOR
STATUS CB ON STATUS CB ON STATUS CB OFF/TEST STATUS CB OFF/TEST STATUS LOCKOUT TRIP STATUS LOCKOUT TRIP STATUS CB RACKED IN STATUS CB RACKED OUT
REMOTE POSITION
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 4
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
0 1
-X5 2 -X5 1
B B
1 1
-FH -FL
2A 2A
2 2
2 4
2
TH1 -S1
HYGROSTATE 3 N LIMIT SWITCH
C C
3 5
-X5 3 -X5 4
12 x1
-H1
-KH -E1 LIGHTING
D 11 HEATER D
x2
14
12 11
24
22 21 /3.7:C
34
32 31
E E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-1
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 5
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CUSTOMER SIDE ABB SIDE
-X4
1
REMOTE SIGNAL CLOSE
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.
2
3
REMOTE SIGNAL OPEN
4
5
STATUS SELECTOR
REMOTE POSITION
6
7
B STATUS CB ON B
8
9
STATUS CB ON
10
11
STATUS CB OFF/TEST
12
13
STATUS CB OFF/TEST
14
15
STATUS LOCKOUT TRIP
C C
16
17
STATUS LOCKOUT TRIP
18
19
STATUS CB RACKED IN
20
21
STATUS CB RACKED OUT
22
D D
E E
F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = Item(1)
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-1
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Schematic multi-line /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 6
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 6
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-X1
1
1
L1Q1 / 3.3:B
-X1
2
2
L2Q1 / 3.3:B
-X1
3
3
L3Q1 / 3.3:B
-X1
4
0
NQ1 / 3.3:B
B B
-X24
1
908
+SUPPLY 24VDC-110 / +SUPPLY 24VDC/1.4:C
-X24
2
909
+SUPPLY 24VDC-111 / +SUPPLY 24VDC/1.4:D
/2.5:B
/2.3:B
/2.3:E
Q1
X 1 3 5 96 98 12 14 4 2 D1 54 U1 A1 C11
4
XV
D1
X3
X3
96
98
12
14
1 3 5
2
C C
U1
C11
54
A1
A17
YC
M
I>> I>> I>>
-M --
1~
APPLICABLE FOR :
A1
PR222
SY -Q/1 S75E
YU
1M1
1M2
12M1
S3
12M2
U2
D2
XV 2 4 6
X4
X4
X3
X3
95
11
1
1
D D
X 2 4 6 95 11 1 D2 U2
1
NCT
1000 1001
-XCOM 1 2 3
30 -X3 1
-T1 LCQ1 / 3.3:C
L
400/5
Cl. 0.5
5VA
K 31 -X3 2
K1Q1 / 3.3:B
30 -X3 1
E -T2 L E
400/5
Cl. 0.5 -X3 3
K 32
5VA K2Q1 / 3.3:C
30 -X3 1
-T3 L
400/5
Cl. 0.5
5VA
K 33 -X3 4
K3Q1 / 3.3:C
1
-PE
PE
L1
L2
L3
N
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 1
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-F1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-X110 -X1
3 5
902 2 1 5
+SUPPLY 110VDC/1.6:B / +SUPPLY 110VDC-126
-X110 -X1
4 6
903 4 3
S282UC
B6
B X 11 X 1 X 95 B
13 7
13 11 21 11 11 21
-S11 Q/1 S75I/1 SY -LOC
DOOR /1.3:D /1.3:D /2.4:D 8 6 -S3 -KQ -KQ -KLOR -KO -KH
14 LAMP TEST /2.3:E
LIMIT SWITCH 14 12 /2.3:E
14 22 24 /2.5:E 12 14 /2.4:E 12 14 /4.3:D 24 22
X 14 12 X 4 2 X 98 96
-X1 7
6
21
C -KLOR C
/2.5:E 22
11 21 31 41 11
-KA -KA -KA -KA -KA'
/2.6:E 12 14 /2.6:E 22 24 /2.6:E 32 34 /2.6:E 42 44 /2.6:E 12 14
8 9 10 13 11 12 14
-X1 8 -X1 9 -X1 10 -X1 13 -X1 11 -X1 12 -X1 14 -X1 15 -X1 16 -X1 17 -X1 18 -X1 19
D D
1 15 16 17 18 19
-LOC
/2.5:B
X D1 5 x1 x1 x1 x1 x1
A1 A1 A1 A1 A1 A1 A1
2 3 -H1 -H2 -H3 -H4 -H5
-YU -KQ' -KQ -KR -KO -KLOR -KA -KA'
/1.4:D 4 ON x2 OFF x2 TRIP x2 C.B RACKED OUT x2 CUBICLE x2
A2 A2 A2 A2 A2 A2 A2 RED GREEN YELLOW WHITE SPACE
8 HEATER
X D2
7 WHITE
LOCK OUT
E 14 11 /3.3:E 14 11 /2.7:B 14 11 /3.2:E 14 11 /2.8:B ANSI (86) 14 11 /2.7:B 14 11 /2.6:C 14 11 /2.8:C E
12 12 12 12 12 12 12
24 21 /3.4:E 24 21 /2.7:B 24 21 /3.3:E 24 21 /3.7:E 21 22 /2.3:C 24 21 /2.7:C
22 22 22 22 34 31 /3.5:E 22
34 31 /3.2:E 34 31 /3.7:E 32 34 31 /2.7:C
32 32 44 41 /3.6:E 32
44 41 /3.3:E 42 44 41 /2.7:C
42 42
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
-F2 2A -X3
1 2 9
1 40
1.3:A / L1Q1
-F3 2A -X3
10
2 1 2 41
1.3:B / L2Q1
-F4 2A -X3
11
3 1 2 42
1.3:B / L3Q1
-XQ1
B 4 B
0
1.3:B / NQ1
-P1
31 x1 x2
1.5:E / K1Q1 A
-P2
32 x1 x2
1.5:E / K2Q1 A
C C
-P3
33 x1 x2
1.5:F / K3Q1 A
30
1.5:E / LCQ1
D D
50 53
11 21
56 58 60 62 64 66
-KR -KR
/2.4:E 14 12 /2.4:E 24 22
11 21 31 41 31 21
52 55 -KQ' -KQ' -KLOR -KLOR -KR -KO
/2.3:E 14 12 /2.3:E 24 22 /2.5:E 34 32 /2.5:E 44 42 /2.4:E 34 32 /2.4:E 24 22
31 41
-KQ -KQ
/2.3:E 34 32 /2.3:E 44 42 57 59 61 63 65 67
E E
51 54
STATUS CB ON STATUS CB ON STATUS CB OFF STATUS CB OFF STATUS LOCKOUT TRIP STATUS LOCKOUT TRIP STATUS CB RACKED IN STATUS CB RACKED OUT
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 3
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
L2
L3
A N A
PE
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2012 ABB.
0 1
-X5 2 -X5 1
B B
1 1 1
2 4 6
2
TH1 -S1 -S1
HYGROSTATE 3 N LIMIT SWITCH LIMIT SWITCH
C C
3 5 7
12 x1
-H1 -H1
-KH -E1 LIGHTING LIGHTING
D 11 HEATER D
x2
14
12 11
24
22 21 /2.8:B
34
32 31
E E
F 3 10/9/2016 egemkha Date: 30/03/2016 Project name: New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number Item Number = Item(1) F
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-2
1 7/3/2016 EGEMKHA Emad Khaled Package And
ERC /Their
CORCAncillaries Schematic Multi Line Diagram 12000261 1
DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 4
REV. Date Name Ahmed Abdel-Rahman Mohamed Abdou ABB Arab LVS Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
CUSTOMER SIDE ABB SIDE
-X4
1
STATUS CB ON
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.
2
3
STATUS CB ON
4
5
STATUS CB OFF/TEST
6
7
B STATUS CB OFF/TEST B
8
9
STATUS LOCKOUT TRIP
10
11
STATUS LOCKOUT TRIP
12
13
STATUS CB RACKED IN
14
15
STATUS CB RACKED OUT
C C
16
D D
E E
F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = Item(1)
2 8/27/2016 egemkha Prepared: Title: + OUTGOING-2
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Schematic multi-line /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 5
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A Index Sheet A
Page Number Page Name Revision Page Number Page Name Revision
/1 Title page =Item(1)+COUPLER/7 Control wiring
W e reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Industry Pte Ltd. Copyright 2010 ABB.
F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = General
2 8/27/2016 egemkha Prepared: Title: + List Of Drawings
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Table of contents /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 2
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A Index Sheet A
B B
C C
D D
E E
F F
3 10/9/2016 egemkha Date: 30/03/2016 Project name:
New Crude Desalter Based on:EPLAN Electric P8 Professional - 1.9 international SP1 Order Number/Year = General
2 8/27/2016 egemkha Prepared: Title: + List Of Drawings
1 7/3/2016 EGEMKHA Package And
ERC /Their
CORCAncillaries Table of contents /
12000261 DEPT./B.U. IPS/ Lang. EN
Checked: Approved: Drawing No.: Page 2.a
REV. Date Name Mohamed Abdou ABB Arab LVS Pages 2
1 2 3 4 5 6 7 8