Project Schedule

Date Action Details Comments and Date Criterion


Follow-up Completed
October 23th, Interview with Jon Interviewed Jon at his residence, Thanked Jon for 10/23/2016 Criterion A
2016 Colopy asking questions his time, recording
went well.

October 25th, Criterion A: Initial Transcript typed and video collected Will publish 10/25/2016 Criterion A
2016 Consultation criterion on
completed progress site
tomorrow
October 26th, Criterion A: Intitial Typed and saved as a PDF all of Will publish video 10/26/2016 Criterion A
2016 Investigation Criterion A uploaded to blog on blog also
completed
November 8th, Criterion B: Each section of criterion B completed, Will begin product 11/8/2016 Criterion B
2016 Analysis saved as PDF, and uploaded to blog
completed
November 28th, Criterion D: Began drawing designs for Criterion D Ready to publish, 11/27/2016 Criterion D
2016 Design must scan into
word document
December 24th, Criterion E: Created WordPress account, chose Next week will 12/24/2016 Criterion E
2016 Product color scheme and began rough page work on adding
Development layout, filled in Menus and navigation content to Home,
bars Painting and
December 30th, Criterion E: Began writing content for Home, Carpentry
Will Pages
fill in content 12/30/2016 Criterion E
2016 Product Painting, and Carpentry. Working on for the rest of the
Development image layout. site and meet with
Jon.
January 7th, Criterion E: Wrote content for Pressure Washing, Will meet with Jon 1/8/2017 Criterion E
2017 Product Contact page, and About page. soon to ensure
Development content is
accurate
January 15th, Meta tags for Began exploring options for meta data Will meet with Jon 1/15/2017 Criterion E
2017 Criterion E (used to put webpage on Google next weekend.
search results), looked at WordPresses
January 29th, Meeting with Jon Met with Jon toSEO
discuss website Didn't meet with 1/29/2017 Criterion E
2017 content. Current content was approved Jon last weekend
and finalized. due to busy
schedule.
February 1st, Criterion E: Wrote paper for advanced techniques Will post schedule 2/1/2017 Criterion E
2017 Product and updated schedule, will post on update and link to
Development website tomorrow. Paper was 995 product tomorrow.
words long.
February 26th, Criterion F: Met with Jon to ensure that all criteria Will type out 2/28/2017 Criterion F
2017 Feedback from that he outlined was met and to discuss interview in word
client future development of the website document and get
Jon's signature
March 1st, 2017 Criterion F: Completed Criterion F and converted Will ensure all 3/1/2017 Criterion F
Product both files to PDFs for posting on criterion are
Evaluation and website organized and
Future Product cover page is
Development completed